Sulphide Intercepts Increase in Phase 3 Drilling at Carr Boyd
HIGHLIGHTS
Wedge hole CBDD0053A intersected a 47.9m(1) zone of matrix, disseminated to cloud Ni-Cu-Fe
sulphides 20m above CBDD053(2) within the T5 pyroxenite feeder-zone (Figure 1)
Second wedge twin hole CBDD053B intersected a 49.45m(1) zone of matrix, disseminated to cloud
Ni-Cu-Fe sulphides 7m above CBDD0053A (Figure 2)
Figure 1: CBDD053A breccia sulphides at 427.6m
Figure 2: CBDD053B matrix sulphides at 435m
(1): Downhole lengths are reported, true widths are approximately one quarter of downhole length. Nickel and copper tenor within
the feeder zone is variable. Aggregate intersections are reported above a 3% nickel-copper-iron sulphide cut-off.
(2): Refer to ASX Announcement “Phase 3 Drilling at Carr Boyd Enjoys Early Success” released 4th May 2021.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the latest
intercepts in the Phase 3 drill program at the T5 Prospect on its 100% owned Carr Boyd Tenements.
CBDD053A was wedged off CBDD053 at 260m and intersected a 47.9m broad zone of matrix,
disseminated and cloud nickel-copper-iron sulphides between 391.8m and 439.7m down hole (Table 2).
The intersection is approximately 20m above the CBDD053 sulphides reported on the 4 th May 2021.
CBDD053B wedge was set at 225m and intersected a 49.45m zone of matrix, disseminated and cloud
nickel-copper-iron sulphides between 388.55m and 438.0m down hole (Table 3).
These intersections are approximately 30m below CBDD033 which intersected massive and disseminated
nickel-copper-iron sulphides (20.1m @ 1.04%Ni, 0.67% Cu) as reported to the ASX on 19th November 2020
(Figure 3).
Figure 3: Longsection showing locations of the CBDD053A and CBDD053B intersections in relation to other significant
intersections and the T5 downhole electromagnetic (DHEM) Conductors.
The company currently has 2 diamond drill rigs testing the extents of the T5 mineralisation as a part of
Phase 3 exploration. Drilling has begun testing the upper portions of the fault-bound conductor beside and
above CBDD030 before further step-out drilling (Figure 4).
Geological Details
CBDD053 and wedges CBDD053A and CBDD053B were drilled to gain certainty in the continuity of
mineralisation down-dip of CBDD030 and CBDD033. Whilst the DHEM responses to date have been
coherent, it has been found that mineralisation exists outside the main DHEM conductor zone due to the
effects that faulting can have on DHEM response as sulphides become dislocated, and hence less
detectable through electromagnetic methods.
The wedge holes in Phase 3 have been designed to test an inverse scenario, where mineralisation within
the conductor could have been dislocated and yet the DHEM response overstated due to the close proximity
of separate sulphides zones.
The company is pleased to advise that the drilling thus far does not indicate that this is occurring. In fact,
the drilling shows a clear relationship and continuity of mineralisation within the conductor between drill
holes. Furthermore, the distribution of mineralisation within the drillholes and the T5 pyroxenite feeder zone
in general matches the expected geological models for such a zone, where a central core of heavily
disseminated, matrix or net-textured massive sulphides is surrounded by a halo of disseminated and cloud
sulphides. The sulphides lie on and close to the main pyroxenite basal contact (Figure 6).
The width of the whole pyroxenite flow has been mapped at surface exceeding 300m thickness and so far,
over 3,500m in length (Figure 5). The T5 feeder zone pyroxenite is one of several early ultramafic flows
that form the Carr Boyd Igneous Complex basal contact.
Figure 4: Locations that are to be targeted in Phase 3. The flat fault has a lateral throw of 80m to the East.
Figure 5: Outline of the Carr Boyd Igneous Complex, the T5 Pyroxenite in purple, and other similar basal pyroxenites,
many of which have not been tested
Estrella Managing Director Chris Daws commented:
“Our Phase 3 drilling at the T5 discovery area is going very well with all holes thus far hitting substantial
widths of sulphide mineralisation. Our understanding of the immediate geological setting is improving
rapidly allowing us to target postulated nickel and copper sulphide zones more accurately. With two rigs
onsite currently drilling 27/7 and a deep RC capability soon available we will not be breaking stride in our
hunt for the source of the metal sulphides. The Carr Boyd Project has intrigued explorers for decades and
I look forward to what we uncover next. I am grateful of the advice, support and encouragement from our
shareholders, thank you.”
Figure 6: Cross Section showing the current drill intercepts, and their relationship to the T5 conductor. The lower portion of
CBDD053 was fault-bound, intruded by granodiorite dykes and the sulphides remobilised away from the contact.
CBDD047 showed a similar scenario. The continuation of the Lower T5 Conductor lies 30m to the south.
Photographs of the core for holes CBDD053A and CBDD053B are included as Figures 7 and 8.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Table 1: Drill hole collar details for CBDD053, CBDD053A and CBDD053B
Hole ID
CBDD053
CBDD053A
CBDD053B
Final
Depth
514
484
460
Easting
Northing
RL
Dip
Azi
Status
367393.5
6673656
429.7
Wedge @ 260m
Wedge @ 225m
-70
-67.5
-67.4
270
281
280
Complete
Complete
Complete
Figure 7: CBDD053A Core
Table 2: CBDD053A Sulphide Percentages
Hole ID
From
To
Width Rocktype
391.80 396.00 4.20 Pyroxenite
396.00 403.00 7.00 Pyroxenite
Sulphide
Visual
Sulphide
Estimation
%
Visual
Pentlandite
Estimation
%
Visual
Chalcopyrite
Estimation
%
1
Cloud
3
Tr
Disseminated
8
3
403.00 411.60 8.60 Pyroxenite
411.60 417.30 5.70 Pyroxenite
Disseminated
6
2
1
Disseminated
6
2
1
417.30 420.00 2.70 Pyroxenite
420.00 424.50 4.50 Pyroxenite
Disseminated
8
4
0.5
Cloud
Heavily
Disseminated
1
CBDD053A
424.50 427.00 2.50 Pyroxenite
427.00 427.80 0.80 Pyroxenite Matrix Breccia
10
3
1
20
4
2
427.80 430.60 2.80 Pyroxenite
430.60 431.80 1.20 Dolerite
Disseminated
8
3
3
Cloud
2
1
431.80 439.70 7.90 Pyroxenite
Basalt
439.70 446.20
Disseminated
8
4
3
Tr = Trace
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide abundance should
never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine the
widths and grade of mineralisation. The Company will update the market when laboratory analytical results become
available.
Figure 8: CBDD053B Core
Table 3: CBDD053B Sulphides
Hole ID
From
To
Width
Rocktype
388.55 391.45
2.9
Pyroxenite
391.45 391.6
391.6
397.5
Sulphide
Visual
Sulphide
Estimation
%
Visual
Pentlandite
Estimation
%
1
Tr
0.15
Cloud
Heavily
Pyroxenite Disseminated
10
3
5.9
Pyroxenite
1
Tr
Cloud
397.5 399.15 1.65
Pyroxenite Disseminated
3
1
399.15 399.85
0.7
Pyroxenite
1
Tr
399.85 405.88 6.03
Pyroxenite
405.88 407.1
Pyroxenite Disseminated
5
2
Pyroxenite
Cloud
1
Tr
1.22
407.1 409.77 2.67
409.77 410.57
0.8 Granodiorite
Cloud
Visual
Chalcopyrite
Estimation
%
4
1
2
Cloud
1
Tr
Disseminated
7
2
411.02 411.25 0.23 Granodiorite
Cloud
1
Tr
411.25 411.32 0.07
Pyroxenite
Cloud
1
Tr
411.32 413.68 2.36
Pyroxenite
413.68 416.04 2.36
Pyroxenite Disseminated
8
3
3
416.04 417.5
Pyroxenite Disseminated
3
2
1
417.5 418.85 1.35
Pyroxenite
1
Tr
418.85 420.33 1.48
Pyroxenite
410.57 410.86 0.29
Quartz
410.86 411.02 0.16
Pyroxenite
420.33 421.8
1.46
1.47
CBDD053B 421.8 423.03 1.23
423.03 423.74 0.71
423.74 424.2
0.46
Cloud
1
Cloud
Heavily
Pyroxenite Disseminated
1
Tr
10
5
2
Pyroxenite Matrix Breccia
30
8
5
Pyroxenite Disseminated
Heavily
Pyroxenite Disseminated
8
3
3
20
4
5
424.2 424.79 0.59
Pyroxenite
424.79 426.28 1.49
Pyroxenite Disseminated
8
2
1
426.28 426.62 0.34
Pyroxenite Semi-Massive
60
5
5
426.62 428.06 1.44
3
1
428.06 428.13 0.07
Pyroxenite Disseminated
Heavily
Pyroxenite Disseminated
20
5
5
428.13 428.82 0.69
Pyroxenite
428.82 429.45 0.63
Heavily
Pyroxenite Disseminated
10
4
1
429.45 431.65
2.2
Pyroxenite
431.65 433.75
2.1
Pyroxenite Disseminated
3
1
433.75 433.91 0.16
Pyroxenite
1
Tr
433.91 434.21
Cloud
0.3
Pyroxenite Matrix Breccia
25
7
434.21 435.15 0.94
Pyroxenite Disseminated
3
1
435.15 435.38 0.23
Pyroxenite
435.38 435.6
0.22
Heavily
Pyroxenite Disseminated
10
2
3
435.6
436.8
1.2
Pyroxenite Disseminated
4
2
1
436.8
437.3
0.5
Pyroxenite
1
Tr
Cloud
10
437.3
437.7
0.4
437.7
438
0.3
Pyroxenite Disseminated
Basalt
Stringer
4
2
1
8
4
2
Tr = Trace
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide abundance
should never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to
determine the widths and grade of mineralisation. The Company will update the market when laboratory analytical
results become available.
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut DD core samples have been half cut with an automatic
techniques
channels, random chips, or specific
core saw.
specialised
industry
standard 0.25m-1.1m samples are collected from the core trays as
measurement tools appropriate to the
marked out by the supervising geologist.
minerals under investigation, such as A handheld XRF tool was used to verify the mineralisation
down hole gamma sondes or handheld
with samples reporting >0.3% Ni in disseminated zones
XRF
instruments,
etc.).
These
and >1% Ni in the matrix sulphide zones.
examples should not be taken as XRF results have not been reported and are used as a
limiting the broad meaning of sampling.
logging/sampling verification tool only.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
Core is cut and sampled to ensure the sample is
representative and no bias is introduced. Cutting of
specific, banded or stringer sulphide zoned core is done
orthogonal to the banding to ensure there is no bias.
Aspects of the determination of
mineralisation that are material to the
Public Report.
Determination of mineralisation has been based on
geological logging, visual sulphide estimates and
confirmation using a pXRF machine. Samples were
dispatched to an accredited laboratory for multi-element
analysis.
.
Diamond core drilling was used to obtain 3m length
samples from the core barrel which are then marked in
one meter intervals, based on core block measurements.
Samples are selected based on geological logging
boundaries or on nominal meter marks.
Collected samples weigh a nominal 2-3 kg (depending on
sample length).
Samples have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed using a 4-acid digest, MEICP for 33 elements and ore zone samples are also being
tested for Au & PGE elements using ICP analysis.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill sample
recovery
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Drilling was undertaken using NQ2 sized drill core.
Holes have been collared with mud rotary from surface,
HQ rough cored to top of fresh rock then NQ2 cored to
EOH.
Core recovery was recorded by the field crew and verified
by the geologist.
RQD measurements were digitally recorded to ensure
recovery details were captured.
Sample recovery in all mineralised zones is high with
negligible core loss observed.
Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very good
condition.
_________________________________________________________________________________
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines
was undertaken.
Core trays were photographed wet and dry prior to
sampling.
Drill hole logs are recorded in Excel spread sheets and
validated in Micromine Software as the drilling
progresses.
The entire length of all holes is logged.
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Results verified internally by Company personnel
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Core is half cut using an automatic core saw to achieve a
half-core sample for laboratory submission.
The sample preparation technique is considered industry
best standard practice.
No field duplicates have been collected in this program.
Field duplicates will be collected once initial results are
returned and resampling of the mineralised zones is
warranted.
Sample sizes are appropriate to the grain size of the
mineralisation.
No handheld XRF results are reported however the tool
was used to verify the mineralisation with reporting >0.3%
Ni in disseminated zones and >1% Ni in the matrix
sulphide zones.
DHTEM parameters are as follows;
Tx Loop size:
500 x 800 m
Transmitter:
GAP HPTX-70
Receiver:
EMIT SMARTem24
Sensor:
EMIT DigiAtlantis
Station spacing: 2m to 10m
Tx Freq:
0.5 Hz
Duty cycle:
50%
Current:
~130 Amp
Stacks:
32-64
Readings:
2-3 repeatable readings per
station
Hole CBDD0028 is twinning hole CBP042. No other
twinning is warranted at this stage.
The data was collected and logged using Excel
spreadsheets and validated using Micromine Software.
The data will be loaded into an externally hosted and
managed database.
No adjustments have been made to the assay data other
than length weighted averaging.
Criteria
Location of
data points
JORC Code explanation
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data
spacing
and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Commentary
The holes were pegged using a hand-held GPS + 3m
The rig was setup over the nominated hole position and
final GPS pickup occurred at the completion of the hole.
Holes are progressively surveyed by DGPS on a batch
basis.
MGA94_51
Topography is relatively flat and control is more than
adequate given the early stage of the project. A 3D drone
ortho-photographic survey had been used to create a
DTM of the project area.
Refer to Cross Sections and Plans included
Not applicable, no Mineral Resource is being stated.
No compositing has been applied. Intercepts are quoted
as length weighted intervals.
The drill hole orientation does not introduce a sample
bias.
Samples are in the possession of Estrella’s personnel
from field collection to laboratory submission.
No audits or reviews have been conducted for this release
given the early stage of the project.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
Type, reference name/number,
Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of
tenement and
location and ownership including
ESR) holds a 100% interest in the nickel and base metal
land tenure
agreements or material issues with
rights to the project.
status
third parties such as joint ventures,
There are no known impediments to operate in the area.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Exploration
Acknowledgment and appraisal of
The Carr Boyd Rocks deposit was discovered by Great
done by other
exploration by other parties.
Boulder Mines, in a joint venture with North Kalgurli Ltd
parties
in 1968. The deposit was mined between 1972 and
1975, during which time they explored for additional
breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni and 0.46%
Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground
over the CBLC outside of the immediate mine area.
Between 1968 and 1971 they conducted extensive
exploration programs searching for large basal contact
and/or stratabound Ni-Cu deposits. It was during this
time that most of the disseminated and cloud sulphide
occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from
Pacminex in 1987 and focused on exploration for PGE
deposits between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from WMC and
switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
From 1990 Defiance dewatered the mine to conduct
testwork and feasibility studies on the remnant
mineralisation. Metallurgical testwork, Mineral Resource
estimations, and scoping studies were completed.
Around 1996 the focus shifted again to regional
exploration for large tonnage basal contact deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project
and recommenced economic evaluations of the remnant
material at Carr Boyd Rocks before embarking on
another regional exploration program focusing on the
basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC
drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and
continued with some regional exploration, but focused
most attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd
(Consmin). Consmin conducted IP surveys and detailed
gravity surveys, but did not drill any targets before selling
the project to Salt Lake Mining (SLM) in 2013. SLM
completed limited drilling to meet expenditure
Criteria
JORC Code explanation
Commentary
commitments, before selling the project to Apollo
Phoenix Resources in 2016.
Apollo sold the project to ESR in 2018.
Geology
Deposit type, geological setting and
style of mineralisation.
The Carr Boyd project lies within the Achaean Yilgarn
Craton in a 700km belt of elongate deformed and folded
mafic, ultramafic rocks and volcanic sediments intruded
by granitoids which is referred to as the NorsemanWiluna Belt. The belt has been divided into several
geological distinct terranes, with the project area lying at
the northern end of the Gindalbie terrane (Swager, 1996).
The geology of the Carr Boyd area is dominated by the
Carr Boyd mafic-ultramafic intrusive complex (CBIC).
Several distinctive styles of Ni and Ni-Cu mineralisation
have been identified within the CBIC. At the Carr Boyd
Rocks Nickel Mine Ni-Cu mineralisation is hosted within
several 20 - 60m diameter brecciated pipe-like bodies
that appear to be discordant to the magmatic
stratigraphy. Mineralisation is hosted by a matrix of
sulphides
(pyrrhotite,
pentlandite,
pyrite
and
chalcopyrite) within brecciated Bronzite and altered
country rock clasts.
Stratiform Ni-Cu-PGE mineralisation has been identified
at several different locations within the layered magmatic
complex.
Estrella is in the process of re-mapping and reclassifying
the Carr Boyd Igneous Complex. Previous “Layered
Intrusive” models are misleading as the complex is made
up of many overprinted and juxtaposed, smaller layered
and non-layered intrusives that have progressed from
Ultramafic to Mafic over time. The complex is better
described as a magma feeder zone, where the earliest
melts passing through the Morelands Formation have
assimilated graphitic sulphidic shales, reached sulphur
saturation and deposited nickel sulphides along basal
contacts.
These basal contacts are not restricted to the base of the
complex, but can form within the complex, wherever
access was gained by these earlier flows.
The complex has then been intruded and inflated over
time by progressively more mafic, barren magmas to
produce what we see today.
Drill hole
Information
A summary of all information
material to the understanding of the
exploration results including a
tabulation
of
the
following
information for all Material drill
holes:
o
easting and northing of the
drill hole collar
o
elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and
interception depth
o
hole length.
All relevant drillhole information can be found in the
Tables and sections within the announcement.
Criteria
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
JORC Code explanation
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Where
aggregate
intercepts
incorporate short lengths of highgrade results and longer lengths of
low-grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be
reported.
If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (e.g. ‘down hole length, true
width not known’).
Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported. These should include, but
not be limited to a plan view of drill
hole collar locations and appropriate
sectional views.
Where comprehensive reporting of
all Exploration Results is not
practicable, representative reporting
of both low and high grades and/or
widths should be practiced to avoid
misleading reporting of Exploration
Results.
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological
observations;
geophysical
survey
results;
geochemical survey results; bulk
Commentary
No information is excluded.
Intersections are reported on a 0.5% Ni cut-off with SG
and length weighted intervals.
All intercepts are reported using SG and length weighted
intervals.
No metal equivalents have been stated
True widths have not been stated. The variable orientation
of mineralisation within magma feeders combined with a
structural overprint and steep drill angles make true width
calculations highly misleading.
Maps and sections with drill hole locations are included in
the announcement.
All new drillhole information within this announcement is
reported
Everything meaningful and material is disclosed in the
body of the report.
Geological observations are included in the report.
No bulk samples, metallurgical, bulk density, groundwater,
geotechnical and/or rock characteristics test were carried
out.
Criteria
Further work
JORC Code explanation
samples – size and method of
treatment; metallurgical test results;
bulk
density,
groundwater,
geotechnical
and
rock
characteristics; potential deleterious
or contaminating substances.
The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
Commentary
There are no known potential deleterious or contaminating
substances.
Diamond drilling and DHTEM geophysical testing is
continuing.