Half Year Accounts 31 December 2013
Released
Released
Announcement PDF
HALF YEAR FINANCIAL REPORT
31 DECEMBER 2013
ASX RELEASE 12 MARCH 2014
ABN: 39 151 155 207
Estrella Resources Limited
Half Year Financial Report 31 December 2013
CONTENTS
DIRECTORS’ REPORT .................................................................................................................... 3
AUDITOR’S INDEPENDENCE DECLARATION ................................................................................. 15
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME ........... 16
CONSOLIDATED STATEMENT OF FINANCIAL POSITION ............................................................... 17
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY ................................................................ 18
CONSOLIDATED STATEMENT OF CASH FLOWS ............................................................................ 19
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS ........................................................... 20
DIRECTORS’ DECLARATION ........................................................................................................ 26
INDEPENDENT AUDITOR’S REPORT............................................................................................. 27
CORPORATE DIRECTORY ............................................................................................................ 29
Half Year Financial Report 31 December 2013
2
Estrella Resources Limited
DIRECTORS’ REPORT
For half-year ended 31 December 2013
Your Directors present their report on the consolidated entity (Group) consisting of Estrella Resources
Limited (Company or Estrella) and the entity, Estrella Resources Chile SpA (Estrella Chile), which the
Group controlled at all times during and since the end of the half-year period to 31 December 2013.
Directors
The following persons were Directors of Estrella Resources Limited at all times during and since the end of
the reporting period and up to the date of this report:
Gavin Solomon
Non-Executive Chairman
Dr Jason Berton
Managing Director
Julian Bavin
Non-Executive Director
Simon Kidston
Non-Executive Director
Principal activities
The principal activities of the Group during the financial period were copper and gold exploration in Chile
and its longer term strategy to develop these assets into producing mines.
No significant change in the nature of these activities occurred during the reporting period.
Operating results
The loss of the Group for the reporting period after providing for income tax amounted to $684,922 (31
December 2012: $1,943,242).
Review of operations
The Company’s exploration activities for the second half of 2013 were focused on the Altair Project. The
Altair Project is located in Region II of northern Chile, 90 km north northeast of Antofagasta and covers an
area of 2,688 km2 over the Atacama Fault Zone on the Iron Oxide Copper Gold (IOCG) belt (See Figure
1). Estrella has made significant progress in the first 12 months of the two Altair Project Option Agreements
in determining the highest priority areas for exploration. The Company’s main focus has been on the
prospects to the south of the town of Maria Elena namely the Colupo, Dania, Ivannia and Antucoya West
Prospects (See Figure 2).
Estrella continues to review and assess all of its projects and prospects to ensure the most prospective
targets are identified and prioritised for follow up exploration accordingly. This process has resulted in 4
high priority prospects already being identified within the Altair Project.
Half Year Financial Report 31 December 2013
3
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
Figure 1: Location of Estrella’s projects in Chile
Half Year Financial Report 31 December 2013
4
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
The Altair Project
100% owned by Estrella of each discovery throughout Project Altair subject to SQM having
either 49% ‘back-in’ rights or a royalty arrangement
Figure 2: Estrella’s key Prospects within the Altair Project (also showing other operating mines
including Michilla and Mantos de la Luna and development projects Antucoya and Tovaku – all
not owned by Estrella).
Half Year Financial Report 31 December 2013
5
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
HIGH PRIORITY TARGET AREAS WITHIN THE ALTAIR PROJECT
Colupo Prospect (893 ha)
Exploration during the period:
After completion of Estrella’s RC drilling program in Q4 2013 which supplemented the historic SQM drilling
results and coupled the other geophysical and aeromagnetic data (refer below) Estrella commenced its
Diamond Drilling at Colupo on the 23rd December 2013 to determine:
Strike and dip of the structural contacts to assist validating the current geological model;
Geometrical nature of the multiple breccia system and subsequent mineralisation;
Deeper extensions of multiple mineralisation zones;
True width thicknesses of each mineralisation zone; and
Potential for the delineation an initial JORC resource at Colupo.
Estrella announced to the ASX on the 20th February 2014 that the initial round of diamond drilling at Colupo
had been completed with the diamond core assay results expected in March 2014.
Prior to the diamond drilling program, the Company undertook a 9 hole Reverse Circulation (RC) drilling
program which commenced late September 2013 and concluded in October 2013. The drilling results from
the RC program were announced to the ASX on the 11th November 2013 and 3rd December 2013. The RC
program allowed Estrella to extend the known depth of mineralisation to a vertical depth of at least 150
metres and which also remains open at depth. Historical drilling by SQM identified mineralised breccias from
the surface to a vertical depth of 70 metres. The Estrella Board and Management is encouraged that the RC
drilling program is yet to penetrate the oxide zone and into the hypogene sulphide zone. Results from the
Q4 2013 RC program are set out in Table 1 on page 7.
During the reporting period a 50 metre line spacing ground magnetics survey was also undertaken by
SouthernRock Geophysics (SRG) to provide high definition magnetics cover over the Colupo Prospect.
Geological observation of rock chips in the September/October 2013 RC program confirmed anomalous
magnetism in mineralised rocks when compared to adjacent un-mineralised volcanic rocks. The Ground
magnetics has potential extensions of mineralisation. Trenching in these areas has identified brecciated
rocks further afield from the current drilling areas that will be tested with mechanical drilling.
Half Year Financial Report 31 December 2013
6
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
Colupo Prospect (continued)
Hole_ID
RCC01
Coordinates (PSAD56)
East
North
402081
7514511
RL
EOH
Dip
Azimuth
1910
210
-60
180
Incl
Incl
RCC02
402089
7514579
1910
200
-70
180
RCC03
402096
7514638
1910
200
-60
130
RCC04
402033
7514550
1910
230
-60
180
Incl
Incl
Incl
Incl
Incl
RCC05
402008
7514595
1910
250
-60
180
RCC06
402067
7514616
1910
200
-60
146
Incl
Incl
RCC07
402140
7514653
1910
199
-60
130
RCC09
402050
7514600
1910
257
-60
180
From
(m)
10
12
34
43
47
53
7
118
144
150
41
52
87
12
23
56
102
115
116
131
131
141
91
197
102
104
125
127
50
194
83
101
184
195
To
(m)
16
15
37
56
51
55
10
122
158
153
44
54
94
31
26
62
108
122
119
147
137
147
96
199
108
107
133
130
55
196
89
103
186
199
Interval
(m)
6
3
3
13
4
2
3
4
20
3
3
2
7
20
6
6
6
7
3
16
6
6
5
2
6
3
8
3
5
2
6
2
2
5
Copper
%Cu
0.7
1.1
0.5
0.4
0.6
0.5
0.5
0.4
0.9
3.4
0.3
0.5
1
2.4
6.6
0.4
0.4
0.5
0.7
1.5
1.6
2.2
0.3
0.4
0.8
1.2
1.1
2.5
0.7
0.3
0.4
0.5
0.3
0.5
Gold
g/t Au
Silver
g/t Ag
0.5
27.1
0.2
0.2
7.5
11.8
0.15
20.3
0.2
Table 1: Holes RCC01 to RCC09 Assay Results at Colupo (Using a cut off of 0.3% Copper)
Prior to the RC drilling at Colupo, Estrella undertook ground Induced Polarisation (IP), electrical resistivity
and magnetotelluric (MT) surveys in August 2013. The results of these geophysical surveys, coupled with
the existing drill data from the SQM drilling program in 2010, proved useful in identifying areas with high
chargeability correlating to sulphide copper mineralisation.
Colupo Norte
Copper mineralisation was observed outcropping at surface approximately 3.1 km north-northwest of
Colupo. This occurrence is referred to as Colupo Norte and is currently under appraisal by Estrella’s
exploration team for is mineralisation potential.
Half Year Financial Report 31 December 2013
7
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
Colupo Prospect (continued)
Future Exploration: Estrella will continue to test targets with further drilling plus ground geophysics
programs where required.
Estrella is currently performing diamond drilling across the Colupo and Dania prospects. Estrella will
continue to drill test the Colupo and Dania prospects in the foreseeable future.
All diamond drill holes from the Colupo program have now been logged, photographed, cut, sampled and
dispatched for assay testing. The assay results are expected in March 2014 and follow up exploration
activities is pending analysis of these assay results.
Half Year Financial Report 31 December 2013
8
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
Antucoya West Prospect (5,864 ha)
Exploration during the period:
During the reporting period SRG performed a Vector Induced Polarisation (VIP) survey over the Antucoya
West Prospect area (Figure 3) totalling 80 observation stations. The objective of the survey was to
characterize the distribution of the chargeability and resistivity parameters to define potential response
characteristic of disseminated porphyry style sulphide mineralisation.
Figure 3: The VIP survey results show high chargeability responses in the southeast of
Antucoya West Prospect being less than 2 km to the west of the Antucoya Deposit owned by
Antofagasta Minerals PLC.
Half Year Financial Report 31 December 2013
9
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
Antucoya West Prospect (continued)
In SRG’s opinion, general responses over 25 msec are characteristic of sulphide mineralisation in volcanic
and intrusive geological environments similar to elsewhere in the district.
There are high chargeability responses over 25 msec evident in the southeast of the survey area of the
Antucoya West Prospect (Figure 3) trending towards the north and open beyond the boundaries of the
survey coverage.
In Figure 4 the VIP responses have been overlaid on the airborne magnetics for the Antucoya West
Prospect to qualitatively assess correlations between the two datasets. The most noteworthy characteristic
about the now identified anomaly shown in Figure 4 is that it trends toward the west along the known
magnetic anomaly that trends west-northwest to northwest and extends over Antofagasta Mineral’s
Antucoya porphyry Deposit (Antucoya Deposit), which is located less than 2 km to the east.
In summary, the surveys have identified a 7 km2 high chargeability zone less than 2 km east of Antofagasta
Minerals’ Antucoya Deposit.
Future Exploration:
Estrella is currently incorporating hyperspectral data image processing and ground reconnaissance of
identified geological alteration areas of interest to constrain the 7 km 2 of prospective surface area. Infill
geophysics is also in planning to assist in further identifying fault structures and zones of high strain which
are more likely to host mineralisation. Once these activities have been completed, Estrella expects to test
the area for mineralisation with mechanical drilling.
Half Year Financial Report 31 December 2013
10
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
Antucoya West Prospect (continued)
Figure 4: The VIP survey results for Antucoya West superimposed on the Analytic Signal of the
first Vertical derivative (ASVI) total magnetic image for Altair Project. The high chargeability
zone in the southwest of the VIP image displays a near 1:1 relationship with the westnorthwest trending ASVI magnetic anomaly
Half Year Financial Report 31 December 2013
11
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
Dania Prospect (1,476 ha) and Ivannia Prospect (1,000 ha):
Exploration subsequent to the 31st December 2013
As announced on the 20th February 2014 a diamond coring drill rig was deployed on site at the Dania
Prospect. The results of this initial diamond drilling program are expected in March/April 2014.
The Colupo, Dania and Ivannia Prospects (all within Project Altair and all within close proximity to each
other) are located along fault splays of the Atacama Fault System that also extends over Antofagasta
Minerals’ Antucoya Deposit (not owned by Estrella).
The Dania Prospect lies 9km north-west of the Antucoya Deposit (owned by Antofagasta Minerals) and is
7km south of the Colupo Prospect.
Having recently examined the chip samples from the historical SQM drilling at the Dania Prospect, Estrella
discovered that some of the shallow SQM historic holes which had encountered significant porphyritic
copper grades had also ended prematurely within mineralisation. The current Estrella diamond drilling will
be aimed at testing the extent of this known mineralisation.
Drilling will be ongoing at the Dania Prospect whilst the assay results from Colupo Prospect are anticipated
to be received in March 2014.
Future Exploration:
Estrella is currently performing diamond drilling at the Dania prospect. Additional to this, Estrella is mapping
at Dania and reviewing historical drilling archives to redefine the surface and subsurface extents of likely
mineralisation and identify drill hole targets for the extension of the current drilling program.
Estrella has recently completed the first drill hole at Dania (DHD-01) which has a total depth of 312
metres. The core for DHD-01 has been relocated to ALS laboratories in Antofagasta and is currently being
logged, photographed, cut, sampled and prepared for assay testing. The assay results are expected in
March/April 2014.
Half Year Financial Report 31 December 2013
12
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
The Venus Project (100% ESR owned)
The Venus project is located in Region IV of northern Chile, 75 km NNW of La Serena and covers an area of
85 km2 at the end of the December 2013 half-year.
Jupiter Project (100% ESR owned)
The Jupiter project is located in Region III of northern Chile, 50 km east of Copiapo and covers an area of
17.5 km2 at the end of the December 2013 half-year.
The Luna Project (100% ESR owned incorporating Luna 91.5% ESR owned)
The Luna project is located in Region IV of northern Chile, 320 km north of Santiago and covers an area of
262 km2 at the end of the December 2013 half-year.
There was no exploration activity on the Venus, Jupiter or Luna/Inca projects during the reporting period.
Other
There were no projects or tenements acquired or disposed of during the half-year or any change to the
beneficial or other interest held in each.
Dividends
No dividends were paid or declared during the period by the Group and no recommendation is made as to
dividends.
Events subsequent to reporting date
All events subsequent to the 31 December 2013 have been outlined in the review of operations and no
other matters or circumstances since the end of the half-year have occurred that have significantly affected
or may significantly affect the operations, the results of the operations or the state of affairs of the Group in
subsequent financial years.
Half Year Financial Report 31 December 2013
13
Estrella Resources Limited
Directors’ Report
For the half-year ended 31 December 2013
Review of operations (continued)
Likely future developments
Likely developments in the operations of the Group and the expected results of those operations in future
financial periods will be reliant upon the activities of the Group and securing positive exploration results.
Environmental issues
The Group’s operations are subject to the laws and regulations pertaining to mining exploration operations
in Chile, South America and future production activities. As at the date of this report the Group has not
been notified of any breach.
Auditor’s Independence Declaration
A copy of the auditor’s independence declaration as required under s307C of the Corporations Act 2001 is
included on page 15 of this financial report and forms part of this Directors’ report.
Signed in accordance with a resolution of the Board of Directors:
____________________________________________
Gavin Solomon
Non-executive Chairman
Dated this 12 day of March 2014
Half Year Financial Report 31 December 2013
14
Grant Thornton Audit Pty Ltd
ACN 130 913 594
Level 17, 383 Kent Street
Sydney NSW 2000
Correspondence to:
Locked Bag Q800
QVB Post Office
Sydney NSW 1230
T +61 2 8297 2400
F +61 2 9299 4445
E info.nsw@au.gt.com
W www.grantthornton.com.au
Auditor’s Independence Declaration
To The Directors of Estrella Resources Limited
In accordance with the requirements of section 307C of the Corporations Act 2001, as lead
auditor for the review of Estrella Resources Limited for the half-year ended 31 December
2013, I declare that, to the best of my knowledge and belief, there have been:
a
no contraventions of the auditor independence requirements of the Corporations
Act 2001 in relation to the review; and
b
no contraventions of any applicable code of professional conduct in relation to the
review.
GRANT THORNTON AUDIT PTY LTD
Chartered Accountants
G S Layland
Director – Audit & Assurance
Sydney, 12 March 2014
Grant Thornton Audit Pty Ltd ACN 130 913 594
a subsidiary or related entity of Grant Thornton Australia Ltd ABN 41 127 556 389
‘Grant Thornton’ refers to the brand under which the Grant Thornton member firms provide assurance, tax and advisory services to their clients and/or refers to one or more member firms, as the context requires. Grant
Thornton Australia Ltd is a member firm of Grant Thornton International Ltd (GTIL). GTIL and the member firms are not a worldwide partnership. GTIL and each member firm is a separate legal entity. Services are delivered
by the member firms. GTIL does not provide services to clients. GTIL and its member firms are not agents of, and do not obligate one another and are not liable for one another’s acts or omissions. In the Australian context
only, the use of the term ‘Grant Thornton’ may refer to Grant Thornton Australia Limited ABN 41 127 556 389 and its Australian subsidiaries and related entities. GTIL is not an Australian related entity to Grant Thornton
Australia Limited.
Liability limited by a scheme approved under Professional Standards Legislation. Liability is limited in those States where a current scheme applies.
Estrella Resources Limited
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE
INCOME
For the half-year ended 31 December 2013
Note
31 December
2013
$
31 December
2012
$
Revenue from continuing operations
4
30,344
91,289
Expenses from continuing operations
5
(715,266)
(2,034,531)
(684,922)
(1,943,242)
Income tax expense
-
-
Loss for the period
(684,922)
(1,943,242)
(21,393)
22,731
(706,315)
(1,920,511)
Basic loss per share (cents per share)
(0.7)
(2.4)
Diluted loss per share (cents per share)
(0.7)
(2.4)
Loss before income tax
Other comprehensive income
Items that will be reclassified subsequently to profit or
loss:
Exchange differences on translating foreign operations
Total comprehensive loss for the period attributable to
members of Estrella Resources Limited
Loss per share:
These financial statements should be read in conjunction with the accompanying notes.
Half Year Financial Report 31 December 2013
16
Estrella Resources Limited
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
As at 31 December 2013
Note
31 December 2013
$
30 June 2013
$
Cash and cash equivalents
1,967,996
2,487,476
Trade and other receivables
20,045
15,314
Other current assets
41,532
31,789
2,029,573
2,534,579
135,458
35,412
2,360,855
1,505,638
67,576
46,816
Total non-current assets
2,563,889
1,587,866
Total assets
4,593,462
4,122,445
Trade and other payables
186,175
139,162
Provisions
25,479
50,171
211,654
189,333
Provisions
1,514
1,329
Total non-current liabilities
1,514
1,329
213,168
190,662
4,380,294
3,931,783
7,563,614
6,697,675
681,121
413,627
Accumulated losses
(3,864,441)
(3,179,519)
Total equity
4,380,294
3,931,783
Current assets
Total current assets
Non-current assets
Receivables
Exploration and evaluation assets
Property, plant and equipment
6
Current liabilities
Total current liabilities
Non-current liabilities
Total liabilities
Net assets
Equity
Share capital
Reserves
These financial statements should be read in conjunction with the accompanying notes.
Half Year Financial Report 31 December 2013
17
Estrella Resources Limited
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the half-year ended 31 December 2013
Issued
capital
Accumulated
losses
Option
reserve
Foreign
exchange
reserve
Total
$
$
$
$
$
6,697,675
(3,179,519)
308,755
104,872
3,931,783
Total comprehensive loss for the
period
-
(684,922)
-
-
(684,922)
Foreign exchange translation
reserve
-
-
-
(21,393)
(21,393)
865,939
-
-
-
865,939
-
-
288,887
-
288,887
Balance at 31 December 2013
7,563,614
(3,864,441)
597,642
83,479
4,380,294
Balance at 1 July 2012
6,697,675
(823,115)
281,354
(32,261)
6,123,653
Total comprehensive loss for the
period
-
(1,943,242)
-
-
(1,943,242)
Foreign exchange translation
reserve
-
-
-
22,731
22,731
Balance at 1 July 2013
Transactions with owners in their capacity as owners:
Contributions of equity, net of costs
Options issued during the period
Transactions with owners in their capacity as owners:
Options issued during the period
-
-
14,041
-
14,041
Balance at 31 December 2012
6,697,675
(2,766,357)
295,395
(9,530)
4,217,183
These financial statements should be read in conjunction with the accompanying notes.
Half Year Financial Report 31 December 2013
18
Estrella Resources Limited
CONSOLIDATED STATEMENT OF CASH FLOWS
For the half year ended 31 December 2013
31 December
2013
$
31 December
2012
$
(552,978)
(632,548)
30,344
91,289
(522,634)
(541,259)
Exploration and evaluation costs
(875,438)
(724,866)
Payment for property, plant and equipment
(33,192)
(9,574)
Net cash used in investing activities
(908,630)
(734,440)
Proceeds from issue of shares
950,000
-
Payments for share issue costs
(63,541)
-
Net cash provided by financing activities
886,459
-
Net change in cash and cash equivalents held
(544,805)
(1,275,699)
Cash and cash equivalents at beginning of financial period
2,487,476
5,106,367
Effects of exchange rate changes on cash and cash
equivalents
25,325
21,478
Cash and cash equivalents at end of half year
1,967,996
3,852,146
Cash flows from operating activities
Cash payments in the course of operations
Interest received
Net cash used in operating activities
Cash flows from investing activities
Cash flows from financing activities
These financial statements should be read in conjunction with the accompanying notes.
Half Year Financial Report 31 December 2013
19
Estrella Resources Limited
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half-year ended 31 December 2013
1. Nature of Operations
The consolidated entity (Group) consists of Estrella Resources Limited (Company or Estrella) and the
wholly owned entity Estrella Resources Chile SpA (Estrella Chile) that it controlled at the end of, or
during, the half-year ended 31 December 2013. The Group’s principal activities include gold and copper
exploration in Chile.
2. General Information
Estrella Resources Limited is a listed public company limited by shares, incorporated and domiciled in
Australia. The financial report also incorporates the Company’s fully owned subsidiary Estrella Chile.
The Company is a for-profit entity.
The registered and principal place of business is Level 7, 15 Castlereagh Street, Sydney NSW 2000.
Estrella Resources’ shares are listed on the Australian Stock Exchange (ASX.ESR).
3. Statement of significant accounting policies
a) Basis of preparation
Statement of compliance
The interim consolidated financial statements of the Group are for the six months ended 31 December 2013
and are presented in Australian dollars ($), which is the functional currency of the parent Company. These
general purpose interim financial statements which are unaudited have been prepared in accordance with
the requirements of the Corporations Act 2001 and AASB 134 Interim Financial Reporting. They do not
include all of the information required in annual financial statements in accordance with Australian
Accounting Standards, and should be read in conjunction with the consolidated financial statements of the
Group for the year ended 30 June 2013 and any public announcements made by the Group during the halfyear in accordance with continuous disclosure requirements arising under the Australian Stock Exchange
Listing Rules and the Corporations Act 2001.
The interim financial statements have been approved and authorised for issue by the Board of Directors on
7th March 2014.
Half Year Financial Report 31 December 2013
20
Estrella Resources Limited
Notes to the Consolidated Financial Statements
For the half-year ended 31 December 2013
3. Statement of significant accounting policies (continued)
b) Significant Accounting Policies
Historical Cost Convention
The half year financial report has been prepared on an accrual basis and is based on the historical costs
modified, where applicable by the measurement at fair value of selected non-current assets, financial assets
and financial liabilities. The accounting policies and methods of computation adopted in the preparation of
the half-year financial report are consistent with those adopted and disclosed in the Company’s 2013 annual
financial report for the year ended 30 June 2013, except for the application of the following standards as of
1 January 2013:
AASB 10 Consolidated Financial Statements;
AASB 11 Joint Arrangements;
AASB 13 Fair Value Measurement; and
AASB 119 Employee Benefits (September 2011)
The effects of applying these standards are described below.
AASB 10 Consolidated Financial Statements
AASB 10 supersedes AASB 127 Consolidated and Separate Financial Statements and Interpretation 112
Consolidation – Special Purpose Entities. AASB 10 revises the definition of control and provides extensive
new guidance on its application. These new requirements have the potential to affect which of the
Company’s investees are considered to be subsidiaries and therefore change the scope of consolidation.
The requirements on consolidation procedures, accounting for changes in non-controlling interests and
accounting for loss of control of a subsidiary are unchanged.
Management has reviewed its control assessments in accordance with AASB 10 and has concluded that
there is no effect on the classification (as subsidiaries or otherwise) of any of the Company’s investees held
during the period or comparative periods covered by these financial statements.
Half Year Financial Report 31 December 2013
21
Estrella Resources Limited
Notes to the Consolidated Financial Statements
For the half-year ended 31 December 2013
3. Statement of significant accounting policies (continued)
b) Significant Accounting Policies (continued)
AASB 11 Joint Arrangements
AASB 11 supersedes AASB 131 Interests in Joint Ventures and Interpretation 113 Jointly Controlled Entities
– Non-Monetary-Contributions by Venturers. It aligns more closely the accounting by the investors with
their rights and obligations relating to the joint arrangement. In addition, AASB 131’s option of using
proportionate consolidation for joint ventures has been eliminated. AASB 11 now requires the use of the
equity accounting method, which is currently used for investments in associates.
There is no impact on transactions and balances recognised in the financial statements because the
Company has not entered into any joint arrangements.
AASB 13 Fair Value Measurement
AASB 13 clarifies the definition of fair value and provides related guidance and enhanced disclosures about
fair value measurements. It does not affect which items are required to be fair-valued. AASB 13 applies
prospectively for annual periods beginning on or after 1 January 2013. AASB 134 requires particular AASB
13 disclosures in the interim financial statements. The application of AASB 13 did not have a material effect
on the financial statements of the Company.
AASB 119 Employee Benefits (September 2013)
AASB 119 makes a number of changes to the accounting for employee benefits, the most significant
relating to defined benefit plans. AASB 119:
Eliminates the ‘corridor method’ and requires the recognition of remeasurements (including actuarial
gains and losses) arising in the reporting period in other comprehensive income
Changes the measurement and presentation of certain components of the defined benefit cost. The net
amount in profit or loss is affected by the removal of the expected return on plan assets and interest
cost components and their
Share your feedback
Discover