Manganese Formation Extended & Further HighGrade Samples
HIGHLIGHTS
➔ Geological mapping continues to extend the strike of the manganese-forming Noni Formation
➢ 47km of strike defined to date (Figure 1)
➢ Lalena Mn Prospect 53.1% Mn*, 44.8% Mn* and 46.1% Mn* from pXRF rock chip samples
➢ Additional 28.1% Mn (pXRF) sample located 7 km northeast of Lalena (Figure 1) along strike
➔ In-country sample preparation and pXRF assay facility up and running with a clear pathway for sample
export through customs
➔ Preparations for a high-grade manganese metallurgical sample for market appraisal underway
➔ Applications to commence trenching and drilling have been submitted to allow testing of the highgrade manganese mineralisation defined within the three granted Exploration and Evaluation Licenses
Figure 1: Location of pXRF manganese samples within Estrella’s tenure and the mapped extension of the Noni Formation
*pXRF values have been averaged from 5 determinations per sample. PXRF results that are announced in this report are preliminary only. The
use of the PXRF is an indication only of the order of magnitude of expected final assay results. The samples that are the subject of
this report will be submitted for laboratory assay and some variation from the results presented herein should be expected.
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce an update to
exploration activities in Timor-Leste where mapping by the Company’s in-country team has defined an
additional ~20km of strike extension to the manganese-forming Noni Formation.
Commenting on the anticipated work program, Estrella Managing Director Chris Daws said:
“Our teams are working hard to define the limits of the extensive high grade manganese occurrences located
within our granted Timor-Leste concessions. We are awaiting confirmation assay results from numerous
pXRF results already released and have a large number of new samples being prepared for analysis.
We are working quickly to determine whether we may have an early opportunity to commence the first ever
manganese exports from Timor-Leste to take advantage of recent supply disruptions. Initially the plan is to
provide bulk 30 tonne samples to potential end users for metallurgical testing. This material is readily
available to the Company at numerous sites identified to date within our concessions and are located very
close to logistical infrastructure for ease of collection and transportation to port.
We are confident that we have priority drill targets after only a short period of field work and is testament of
the prospectivity of our concession areas and the work of our field teams.
I look forward in providing further exploration news in the coming weeks and updating our shareholders to
the progress being made in what is arguably the greatest new frontier for exploration.”
Lateritisation of the ~47km outcropping Noni mudstone is responsible for forming manganese banding and
nodule development near to the surface along the length of the Formation. Further concentration of these
high-grade occurrences occurs within the numerous streams and rivers throughout the area (see ASX
announcements 3-April 2024, 12-April 2024, 19-April 2024 and 31-May 2024).
With the arrival of laboratory equipment in Dili the Company has now set up basic sample preparation
facilities at its office in Dili, allowing samples to be crushed and pulverised for more accurate pXRF
determinations. There is currently approximately 70 samples to be prepared which the team is anticipated
to fully process in the next week.
Meanwhile, the Company has successfully prioritised a handful of samples and has brought pulverised
material back to Australia through both Timor-Leste and Australian customs authorities for analysis by ALS
in Perth post quarantine measures.
Recent rock-chip sample determinations are presented in Table 1 below:
Table 1: pXRF Results for additional rock samples brought back to Australia for analysis
PROSPECT
WGS84_Z52
E
WGS84_Z52
N
Sample ID
Status
pXRF
Mn%
pXRF
Fe%
Lalena
260745
9066403
LRG026
Crushed
53.1
n/a
Lalena
261259
9067376
CBR114502
Uncrushed
46.1
n/a
Lalena
261272
9067221
LRG032
Uncrushed
44.8
0.07
640
Dasidara
252863
9060560
LRG041
Uncrushed
36.3
0.48
76
ESR-RP-01
267161
9071145
CBR114506
Uncrushed
28.1
1.9
15
Sauro
269717
9056832
LRG071
Uncrushed
22
7.97
3
Mn:Fe
Figure 2 shows a manganese occurrence within Reconnaissance Permit ESR-RP-01 located 7km to the
northwest of the Lalena Manganese Prospect where manganese bedding just below the surface has been
exposed by recent erosion.
Sample CBR114506 was taken in this area which is directly along strike from the Lalena Prospect and the
exploration team will concentrate efforts to map the geology between these two areas.
Figure 2: Location of sample CBR114506 showing manganese formation just below the surface in Reconnaissance Permit
ESR-RP-01, 7km along strike from the Lalena Prospect; greater than 80% of the sample was logged as manganese
and iron oxides.
The exploration team is currently compiling the recent mapping within the Concession areas which will form
the basis of a technical report to be submitted to the Timor-Leste regulatory body, the Autoridade Nacional
dos Minerais (ANM).
The submission of this report will include a justification to begin ground-work in the form of trenching and
possibly drilling to assist the Company in quantifying sub-surface manganese mineralisation ahead of any
future resource work.
The Company will continue exploration mapping and sampling across the tenements whilst employing local
workers to trench priority locations that require further investigation at depth. Systematic trenching will add
greatly to the geological understanding of the formation and distribution below surface of this valuable
commodity.
Bulk Sample for Market Appraisal
Figure 3 shows a stockpile of around 30-40 tonnes of high-grade manganese at a known historical
Japanese WW2 port. Two grab samples from this location returned laboratory assays of 57.1% Mn and
58.1% Mn from ALS. The stockpile was a historical collection from several local sources, according to local
information, and is reasonably representative of the bulk of high-grade mineralisation within the area.
The stockpile is on the coast and the Company is in the process of acquiring permission from the ANM and
the Minister to utilise this stockpile as a representative sample for Market Appraisal to prospective
customers.
Figure 3: Manganese stockpile from Japanese WW2 port location where previously announced manganese and iron oxide
grab samples assayed 57.1% Mn and 58.1% Mn from ALS.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Cautionary Statement of pXRF
PXRF results that are announced in this report are preliminary only. The use of the PXRF is an indication only of the
order of magnitude of expected final assay results. The samples that are the subject of this report will be submitted for
laboratory assay and some variation from the results presented herein should be expected.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Beau Nicholls,
who is the Exploration Manager for Estrella Timor-Leste, and a fellow of The Australasian Institute of Geoscientists, and
Mr Steve Warriner, who is the Group Exploration Manager for Estrella Resources and a member of the Australian Institute
of Geoscientists. Mr. Nicholls and Mr. Warriner have sufficient experience relevant to the style of mineralisation and type
of deposit under consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr
Nicholls and Mr Warriner consent to the inclusion in the report of the matters based on their information in the form and
context in which it appears.
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological mapping, visual
mineral estimates and confirmation of
metallic concentration using a Bruker S1
Titan Portable XRF instrument.
•
pXRF determinations are an average of 5
readings per rock sample and three
readings per crushed sample. Samples
are crushed in Dili to 100% passing 1mm.
•
Manganese standards are introduced at a
rate of 1:5 for pXRF determinations to
ensure correct calibration of the
instrument.
•
Initial rock-chip samples were taken and
dispatched
through
customs
and
quarantine to ALS in Malaga for multielement analysis.
•
Assay results: Samples were analysed
using a 4-acid digest, ME-MS for 61
elements and ME-XRF for over-grade
manganese on a 50g sub-sample.
•
No drilling has been undertaken to date.
•
•
No drilling has been undertaken to date.
•
Rock-chip samples were geologically
logged for mineral content prior to sending
for assay or screening by pXRF.
Oxide mineral identification is qualitative
and best supported by pXRF or assay
analysis
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
•
•
•
Sample sizes are appropriate to the grain
size of the mineralisation.
The exploration program is in its very early
stages and initial sample sizes were kept
small due to freight and customs /
quarantine restrictions. They are not
considered representative of the bulk of
mineralisation.
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
sub-sampling
stages
to
maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
•
•
•
•
•
•
Verification
of sampling
and
assaying
Location of
data points
•
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
•
Sample
security
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
Samples are selected based on geological
logging. Samples are dispatched to an
accredited commercial laboratory in Perth
for analysis.
Preliminary samples are being analysed at
ALS in Malaga using a 4-acid digest, MEICP for 61 elements and all samples are
also being tested for Pt, Pd and Au by fire
assay and ICP-MS finish on a 50g subsample.
Standards and blanks have not been
included in this early phase of the program.
Current field samples are being analysed
by pXRF. The Cautionary statement is
included when assessing pXRF.
pXRF determinations are an average of 5
readings per rock sample and three
readings per crushed sample. Samples are
crushed in Dili to 100% passing 1mm.
Manganese standards are introduced at a
rate of 1:5 for pXRF determinations to
ensure correct calibration of the instrument.
•
No prior modern exploration has been
conducted in the area.
•
No adjustments to assay data were
undertaken.
•
GPS equipment using MGA94, Zone 52
coordinate system with an accuracy of +/5m.
Topographic control using 30m spaced
satellite point data.
•
•
•
•
No systematic sampling has been
conducted at this early stage.
Sample spacing is not yet sufficient to
establish continuity of grade or geology.
No composites have been taken.
•
No orientation-based sampling bias has
been identified.
•
Exported samples are in the possession of
ESR personnel from field collection to
Criteria
JORC Code explanation
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
Commentary
customs submission in Darwin. From there
a courier picks up and delivers them to the
laboratory in Perth.
•
Non-exported samples remain with ESR
personnel.
•
No independent audit or review has been
undertaken.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded to Estrella Murak Rai, forming
the joint-venture between Estrella
Resources Representante Permanente
(70%) and Murak Rai Timor (30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
ESR-RP-05, ESR-RP-06, ESR-RP-07
and ESR-RP-08 are awarded to Estrella
Resources
Limited
Representante
Permanente (100%)
•
Estrella
Resources
Limited
Representante Permanente is registered
in Timor-Leste and is a wholly-owned
subsidiary of Estrella Resources Limited
(Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Other local geologists and companies
have sporadically explored the area
however
there
has
been
no
documentation collected nor systematic
exploration
to
quantify
mineral
occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Permits host three main forms
of manganese mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
processes exist.
•
Additional primary mineralisation exists
as pisolithic concretions and direct
precipitates within deep-sea limestones.
•
Secondary mineralisation exists in the
form of small to extremely large clasts of
manganese mineralisation associated
with the Noni Formation, composed
mostly of cherts, banded irons and muds.
This unit represents an under-sea basin.
•
Tertiary mineralisation exists where high
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
Commentary
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
• No drilling has been undertaken in the
area.
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used.
Metal equivalent values have not been
used.
•
Any relationships have been discussed
within the body of the text.
•
Relevant diagrams have been included
within the main body of text.
•
No new information has been withheld.
Criteria
Other
substantive
exploration
data
Further work
JORC Code explanation
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
•
•
No other substantive data exists as the
program is in its early stages.
All observations are discussed within the
body of the text.
Further work by ESR will include
systematic mapping and sampling along
with
stratigraphic
and
structural
classification.
Share your feedback
Discover