Annual Report to shareholders
Released
Released
Announcement PDF
and its controlled entities
2020 ANNUAL REPORT
ABN: 39 151 155 207
Annual Report 2020
CONTENTS
DIRECTORS’ REPORT
3
REMUNERATION REPORT
20
AUDITORS’ INDEPENDENCE DECLARATION
26
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
27
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
28
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
29
CONSOLIDATED STATEMENT OF CASH FLOWS
30
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
31
DIRECTORS’ DECLARATION
55
INDEPENDENT AUDITORS’ REPORT
56
SHAREHOLDER INFORMATION
60
CORPORATE DIRECTORY
64
SCHEDULE OF EXPLORATION TENEMENTS
65
Annual Report 2020
2
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
DIRECTORS’ REPORT
Your directors present the following report on Estrella Resources Limited (“the Company”) and its wholly
owned subsidiaries (together referred to hereafter as “the Group”) for the financial year ended to 30
June 2020.
Directors
The names of directors in office at any time during or since the end of the period are:
Leslie Pereira
Non-Executive Director
John Kingswood
Non-Executive Director
Stephen Brockhurst
Non-Executive Director
Unless noted above, all directors have been in office since the start of the financial year to the date of
this report.
Principal activities
The principal activities of the Group during the reporting period were to explore nickel and gold projects
in Western Australia.
Review of Operations
Estrella Resources Limited (ASX: ESR) (Estrella or Company) is pleased to provide its Review of
Operations for the full year ended 30 June 2020.
Work Summary
The focus of fieldwork and studies during the full year were the Carr Boyd Layered Complex (CLBC),
Munda Gold and Spargoville Nickel Projects.
CARR BOYD LAYERED COMPEX (CLBC), WA 100%
The Company received laboratory assay results during the full year from the drilling success at the T5
EM target within the Carr Boyd Nickel Project (Table 1 and Figure 1). The T5 Target is located
approximately 1,000-1,200m north-north-west of the Carr Boyd Nickel Mine and is interpreted to be a
significant new zone of nickel-copper sulphides discovered away from the known historic mineralisation.
Modelling of the geological and geophysical data is supportive of mineralisation extending to the north,
south, and at depth.
The Company completed two RC drill holes in late May 2019 (Figures 2 & 3) testing the T5 EM target
which was previously identified by the Company in a ground Moving Loop Electro-Magnetic (MLEM)
program2. Historic drilling2 ~400m further to the south, intersected disseminated and matrix sulphides
on the interpreted basal contact of the western ultramafic unit, returning 3.35m at 0.79% Ni & 0.35%
Cu which included a higher-grade zone of 0.61m grading 2.12% Ni & 0.56% Cu from 100.89m in drill
hole GD124. The MLEM survey identified the T5 Target zone to the north of this historic drilling within
an area untested by deeper drilling.
Assay results returned from SGS Laboratories in Perth (Table 1) confirmed the presence and grade of
the Ni-Cu sulphides intersected in the drilling. Both holes intersected the same basal contact as the
historic drilling to the south, however the grades and width of the mineralisation in the Estrella holes
are better than the historic drilling which are the most significant results returned to date from outside
of the known Carr Boyd Mine area.
Annual Report 2020
3
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Table 1: Significant Intersection Results above 0.4% Ni cut-off grade.
Hole ID
From
To
Width
Ni%
Cu%
Co ppm
CBP042
129m
137m
8m
1.11%
0.36%
507ppm
Incl l 133m
137m
4m
1.60%
0.31%
689ppm
127m
1m
0.61%
0.57%
346ppm
CBP043
126m
Figure 1. Sulphide mineralised samples within CBP042 at Carr Boyd. Black samples are the higher grade, sulphide
rich matrix zone.
The host ultramafic sits against a primary basal contact (not sheared) and is underlain by a sequence
of mafic basalts and felsic sediments to the west. The base of the ultramafic sequence comprises lowmagnesium ultramafics which have a weakly to highly disseminated sulphide zone developing from the
base upwards. This is overlain by a geochemically different, second pulse of ultramafic comprising the
higher-grade matrix sulphides at the base of a thicker, magnesium-rich (20-25% MgO) host ultramafic
which develops eastwards.
Annual Report 2020
4
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
DHTEM clearly defines that the drilling intersected the T5 MLTEM conductor. Modelling of the
geochemical and geophysical data potentially indicates a strong target zone to the north as well as
below the current and historic drilling. The modelling of the data is supportive of mineralisation opening
up along the length of the basal contact to the north, as well as at depth below the drilling to the north
& south. Deep diamond core drilling has been revised to target a zone 300m to the north and south of
the current drilling and directly below T5 at a vertical target depth of 400-500m below surface. This
planned drilling will be testing the basal contact over a greater strike length of ~700-800m providing
critical geological and geochemical vectoring data. The drilling will also provide a platform for deep
DHTEM geophysical testing for strengthening Ni-Cu sulphide mineralisation.
The Company applied for Exploration Licence 31/1215 in May 2019 and the tenement was granted on
the 28th January 2020, extending the Company’s 100% owned total area at the CBNP to 25,902 Ha
(Figure 4). E31/1215 is located across the northern margin of the existing CBNP tenure, filling a gap
up to and abutting the southern boundary of the Goongarie National Park to the north (Figure 4).
Figure 2: Plan showing drill hole locations and interpreted geology from the logging.
Annual Report 2020
5
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Figure 3: Cross-section with intersection results and interpreted geology in drill hole CBP042.
Annual Report 2020
6
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Figure 4. Estrella's Carr Boyd Nickel Project tenure portfolio with the recently granted E 31/1215 located
across the northern boundary (blue shaded). The Goongarrie National Park abuts to the north.
Figure 5. Location of Carr Boyd relation to commercial centres and other major Ni projects.
Annual Report 2020
7
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
New Nickel and Gold geochemical targets were generated from an auger drilling program (Figure 6).
The targets were identified in the northwest portion of the Carr Boyd Nickel Project (CBNP or the
Project).
Figure 6. Auger sample sites (blue dots) across Estrella's Carr Boyd Nickel Projects NW tenure. The generated
pathfinder Nickel (red) and Gold (yellow) vector target zones are shown over aeromagnetic image (TMI-RTP)
along with previously identified prospects.
The Company enlisted Gyro Australia to drill 536 shallow auger holes (plus 28 QAQC samples) using a
low-impact Landcruiser mounted auger drill rig. Drilling comprised of shallow 0.5m-1.5m deep auger
soil sample drill holes across the northwest tenements (M31/12, M31/109, E31/726 & E31/1215) at the
CBNP (Figure 6). Drill spoil material was sieved to -2mm and a 150g-600g sample (ave. 270g) was
collected and submitted to SGS Laboratories in Perth for multi-element geochemical analysis.
Analysis comprised a 49 multi-element assay suite completed on the samples in order to evaluate the
geochemistry using pathfinding vectors, particularly looking for nickel and gold target zones. The
evaluation looked at the raw elemental assay results as well as combined key elemental associations in
order to produce vector target maps over the sampling area (Figures 7 and 8).
Two high priority Ni-Co-Cu targets were identified at the Central and POH Zones (Figure 6). These
target zones include previously identified smaller prospects; however, the soil sampling has extended
the target zones over a much larger area of approximately 2.5km x 1.2km (Figure 7), identifying
contacts which have had limited historical work completed on them. The geochemical maps clearly
demonstrate the fertility of the NNW trending Central Zone which includes the Scotia East Ni-Co zone
and the announced sulphide discovery at the Target 5 (T5) Prospect (ASX: Nickel Copper Discovery at
Carr Boyd Rocks- 28 May 2019; and Assay Results Confirm New Sulphide Nickel Discovery Zone at Carr
Boyd Rocks- 8 July 2019).
Annual Report 2020
8
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Ni-Co-Cu bearing sulphides were intersected in both drilled holes at T5 which comprised of disseminated
to matrix sulphide mineralisation:
o
o
8m @ 1.11% Ni & 0.36% Cu returned from drill hole CBP042
Includes 4m @ 1.60% Ni & 0.31% Cu from matrix sulphide zone
1m @ 0.61% Ni & 0.57% Cu returned from drill hole CBP043
It was interpreted from the drill data that the mineralisation was developing towards the north and the
results of the geochemical soil sampling supports this model, warranting further investigation along the
length of this fertile ultramafic unit and its basal contact. A strong Cu associated anomaly was generated
at the POH Zone (Figures 6 and 7) to the east of the Central Zone. Historic drilling has taken place at
this prospect, however remodelling and reinterpretation of the data is warranted given the strength of
the anomaly generated.
New secondary targets have been generated at what has been named the Eastern, Western and
Northern Zones (dashed rectangles), each showing Ni-Co and Cr association supporting fertile ultramafic
relationships (Figure 6 and 7). Of interest is the highly anomalous new Eastern Zone which is open to
the south of the auger sampling area. It is located directly over a magnetic high ultramafic unit (Figure
6) and does not have a historical prospect located in this area.
Reassying of pulps testing for PGE elements within these target zones is now warranted. Further
historical database and field investigation is also required to validate each of these target zones and
determine the next phase of exploration works required i.e. infill/extensional auger soil sampling and/or
deeper AC/RC drilling.
Annual Report 2020
9
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Figure 7: Key elemental and pathfinder vector plots identifying Nickel associated target zones (red rectangles).
Primary targets have solid outllines and secondary targets have dashed outlines.
In addition to the Ni-Co-Cu targets, the geochemical vector analysis defined two parallel Gold pathfinder
related trends over the Western greenstone sequence (Figure 8). The Au pathfinder targets are
coincident with structural breaks in the aeromagnetics (Figure 6: yellow dashed line) supporting the
potential for structurally controlled Au mineralisation to occur in the west of the project area.
Reassying of pulps testing for Gold & PGE elements within these structural target zones is warranted.
Further historical database and field investigations are required to validate each of these targets.
Figure 8: Pathfinder vector plots identifying Gold associated target zones (orange ovals).
Annual Report 2020
10
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
MUNDA GOLD PROJECT, WA 100%
The Company undertook diamond core drilling at the 100% owned Munda Gold Project at
Widgiemooltha, 34km south-west of Kambalda, WA during the full year 2019. Topdrive Drilling Australia
(TDA) was contracted to complete 350-400m of HQ3 diamond core drilling to the immediate north of
the historical Munda Gold Mine.
Drilling was designed to target postulated high-grade gold shoots that had been 3D modelled by the
Company using historical drilling completed by WMC, Titan Resources, Consolidated Minerals and
Eureka (Figure 9). Partial mining of the open pit in 1999 by Resolute Gold Mines Limited occurred before
mining ceased due to low gold prices. Evaluation of the historical RC drilling was inconclusive in
determining the dominant structural direction required to confidently resource model the deposit for
mining. However, 3D grade shell modelling of the gold data (Figure 10) provides a structurally controlled
ladder vein/shoot model that required drill coring to collect orientated drill core for detailed structural
and geological analysis. This has greatly assisted the Company in determining the orientation of the
gold hosting vein system.
Figure 9: Plan view showing the historical Munda Gold Pit (BLUE) with the planned drilling (RED) and targeted
gold shoots (GREEN).
Results exceeded the Company’s expectations, returning numerous very high-grade mineralised zones
which contained “Bonanza” grades as shown in Table 3 and Figure 11. The high grade plunging shoot
interpretation was a new concept, significantly different to interpretations undertaken by previous
explorers. The new drilling reported during the year confirmed the high grade plunging shoot
interpretation. This will have a significant impact on future drill targeting, allow an update to the JORC
2012 Mineral Resource, provide confidence in the 3D geological models, and allow robust economic
evaluations to occur for the first time on the Project.
Annual Report 2020
11
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Figure 10: Oblique section view showing the planned drill holes (RED) north of the Munda pit and target gold
shoots (GREEN).
Table 3: Significant Gold Intersections >1.0 g/t Au
Hole ID
EMD002
From
(m)
To
(m)
Width (m)
Grade
Au g/t
57.00
65.00
8.00
3.3
including
EMD002
57.00
102.00
58.00
118.00
1.00
16.00
Comments
19.6
21.6
including
102.00
103.00
1.00
9.5
& including
107.00
116.00
9.00
35.9
107.00
108.00
1.00
234.7
109.45
109.70
0.30
24.6
111.50
111.75
0.25
53.4
113.00
116.00
3.00*
12.8
which
includes
EMD002
124.00
130.00
6.00*
2.0
EMD002
134.00
138.00
4.00*
4.4
EMD001
EMD001
75.00
84.10
77.00
91.00
2.00
6.90
9.3
4.8**
EMD001
125.00
140.00
15.00
2.6
including
125.00
& including
135.00
126.00
136.00
1.00
15.7
3.00
3.8
EMD001
143.00
144.00
1.00
1.4
EMD001
149.00
150.10
1.10
1.7
Weathered and altered ultramafic above
broken quartz vein zone from 64.5-67.0m
Weathered & bleached ultramafic
Weakly altered & quartz veined basalt below
contact
Thin quartz veinlets & weak alteration in
basalt
Quartz vein stockworks in weak-moderately
altered basalt
Chlorite altered basalt with minor quartz
veinlets & quartz sweats
Qtz-sulphide vein with high grade
remobilised Ni sulphide blebs.
10cm wide quartz-chlorite vein in basalt
Altered basalt with numerous cross-cutting
quartz veinlets
Minor quartz veinlets with weak alteration in
coarse grained basalt-dolerite
Minor quartz veinlets with weak alteration in
coarse grained basalt-dolerite
Altered and veined ultramafic
Sheared & quartz veined zone in ultramafic.
Silicified & altered basalt below ultramafic
contact
Quartz veined contact zone between units
Narrow quartz veinlet in basalt with weak
alteration
Narrow quartz veinlets in basalt
10cm wide quartz-sulphide vein in basalt
near EOH.
* Two meter composite samples. Requires 1m resampling.
** Core loss occurred in the middle of the zone between 85.9m-88.9m through a shear zone (35% recovery). Recovered
sample from this interval grades 3.647g/t Au and has been used as the average grade of the entire 3m interval
Annual Report 2020
12
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Figure 11: Oblique cross-sections of EMD001 and EMD002 showing simplified geology and significant gold
intersections.
Annual Report 2020
13
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
SPARGOVILLE NICKEL RIGHTS PROJECT, 100% WA
The Company reported to shareholders during the full year its maiden 5A nickel sulphide Mineral
Resource at the Spargoville Nickel Rights Project, located approximately 30km south-west of Kambalda,
Western Australia. The maiden Mineral Resource stands at 127,000 tonnes at 1.9% Ni and 0.15% Cu
for a contained nickel metal inventory of 2,370 tonnes and is reported in compliance with the JORC
Code (2012) as shown at Table 4. The Mineral Resource is shallow with the majority of nickel within
100m of surface and amendable to open pit mining. The maiden Mineral Resource followed a detailed
assessment of historic drilling and the inclusion of significant high grade nickel sulphide drilling results
achieved by the Company (see ASX release 18 December 2018) which included;
15m at 10.45% Ni, 0.78% Cu, 0.20% Co, 0.87g/t Pb, and 1.15g/t Pt from 20m
5m at 11.32% Ni, 0.54% Cu, 0.21% Co, 0.42g/t Pd, and 0.22g/t Pt from 61m
3m at 12.90% Ni, 1.37% Cu, 0.29% Co, 1.86g/t Pd, and 0.67g/t Pt from 69m
Over 65% of the contained nickel tonnes in the 5A maiden Mineral Resource have been classified as
Indicated with there being sufficient drill density and understanding of the mineralisation to satisfy this
classification. The deposit is open at depth below the high grade nickel sulphide drill intercepts which
allows potential for an increase in the current resource with further drilling.
In light of the recent strength in the nickel market and the positive outlook, the Company has
undertaken steps towards commercialisation of the 5A nickel sulphide Mineral Resource with discussions
ongoing regarding the treatment of potential high grade nickel sulphide ore recovered from shallow
open pit mining.
The 5A nickel sulphide deposit is one of a number of significant nickel sulphide occurrences that make
up the Company’s 100% owned Spargoville Nickel Rights Project which was purchased at a time when
nickel projects were not in favour and nickel prices were much lower.
Annual Report 2020
14
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Table 4: Spargoville 5A Nickel Sulphide JORC Resource
5A Nickel Sulphide Deposit
October 2019 Mineral Resource Estimate - Min Type (0.5% Ni Cut-off)
Type
Disseminated
Matrix/Breccia
Semi-massive/Massive
Total
Type
Disseminated
Matrix/Breccia
Semi-massive/Massive
Total
Type
Disseminated
Matrix/Breccia
Semi-massive/Massive
Total
Tonnage
kt
37
20
12
69
Indicated Mineral Resource
Ni
Cu
Ni
%
%
t
0.7
0.05
250
2.1
0.17
430
8.1
0.63
950
2.4
0.19
1,630
Tonnage
kt
41
17
1
58
Inferred Mineral Resource
Ni
Cu
Ni
%
%
t
0.7
0.10
270
2.5
0.13
410
7.6
0.35
60
1.3
0.11
730
Tonnage
kt
78
37
13
127
Total Mineral Resource
Ni
Cu
Ni
%
%
t
0.7
0.08
520
2.3
0.16
840
8.0
0.61
1,000
1.9
0.15
2,370
Cu
t
20
30
70
130
Cu
t
40
20
70
Cu
t
60
60
80
190
Competent Person Statement
The information in this announcement relating to Exploration Results for the Carr Boyd Layered
Complex (CLBC) and the Munda Gold Project is based on information compiled by Mr. Neil Hutchison
of Geolithic Geological Services, who is a consultant to Estrella Resources, and a member of The
Australasian Institute of Geoscientists.
The information in this announcement relating to the Spargoville 5A Mineral Resources is based on
information compiled under supervision by Mr Shaun Searle of Ashmore Advisory Pty Ltd, who is a
consultant to Estrella Resources, and a member of The Australasian Institute of Geoscientists.
Mr Hutchison and Mr Searle both have sufficient experience relevant to the style of mineralisation and
type of deposit under consideration, and to the activity they are undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resource and Ore Reserves”.
Both Mr. Hutchison and Mr. Searle consent to the inclusion in the report of the matters based on the
information in the form and context in which it appears.
Annual Report 2020
15
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Significant changes in the state of affairs
In the opinion of the Directors, other than the matters as outlined in the operations report above, or as
set out in the accounts and notes thereto, there were no significant changes in the state of affairs of
the Group during the financial year.
Dividends
In respect to the current year, no dividends were paid or declared during the period by the Group and
no recommendation is made as to dividends.
Corporate Governance Statement
The Group has disclosed its corporate governance statement on the Company website at
www.estrellaresources.com.au/investor-centre.
Events subsequent to the reporting period
On 6 July 2020 the Group entered into a Binding Letter of Offer with Auric Gold Limited to dispose of
the Munda Gold Project for total consideration of $1,750,000 consisting of upfront and deferred cash
payments. Settlement of the disposal is subject to several conditions precedent and is expected to occur
during the September 2020 quarter.
On 3 August 2020 the Company announced a Placement to raise $1,400,000 (before costs) through the
issue of 200,000,000 ordinary shares at an issue price of $0.007 with one free attaching option for
every one share subscribed exercisable at $0.02 expiring 31 July 2023. In addition the Company will
complete an Option Placement through the issue of 200,000,000 options at an issue price of $0.0001
per option to raise $20,000, the options will be exercisable at $0.02 expiring 31 July 2023. On 7 August
2020, 75,000,000 ordinary shares were issued pursuant to the Placement, with the balance of the
securities to be issued following shareholder approval.
No other matters or circumstances since the end of the year have occurred that have significantly
affected or may significantly affect the operations, the results of the operations or the state of affairs
of the Entity in subsequent financial years.
Likely future developments and expected results
Further information, other than as disclosed this report, about likely developments in the operations of
the Group and the expected results of those operations in future years has not been included in this
report as disclosure of this information would be likely to result in unreasonable prejudice to the Group.
Environmental issues
The Group’s operations are subject to the laws and regulations pertaining to mining exploration
operations in Australia. As at the date of this Report the Group has not been notified of any breach of
any such laws or regulations.
Annual Report 2020
16
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Information on Directors
Mr Leslie Pereira– Non-Executive Director
Date of appointment: 1 February 2019
Mr Pereira is a WA based businessman and investor in the resources sector. Mr Pereira has previously
held senior management positions overseeing active mining operations in Indonesia. He has been
actively involved in capital raisings and promotions of a number of publicly listed companies.
Mr Pereira is not currently and has not been within the last three years a Director of any publicly listed
Companies. Mr Pereira currently holds 300,000 fully paid ordinary shares, 4,995,769 quoted options
and 3,000,000 unlisted options in Estrella Resources Limited.
Mr John Kingswood – Non-Executive Director
Date of appointment: 6 January 2017
Mr Kingswood has over 20 years’ mining experience with significant experience in mining and project
management.
Mr Kingswood has been involved with some of WA’s largest projects from BHP, RGP3, 5 and 6 Rio Tinto
Argyle Diamond underground operations. Mr Kingswood has a strong track record of identifying
potential projects and implementing effective strategies.
Mr Kingswood is not currently and has not been within the last three years a Director of any publicly
listed Companies.
Mr Kingswood currently holds 1,410,000 fully paid ordinary shares, 4,500,000 unlisted options and
470,000 quoted options in Estrella Resources Limited.
Mr Stephen Brockhurst – Non-Executive Director
Date of appointment as Non-Executive Director: 3 April 2017
Mr Brockhurst is the founding Director of Mining Corporate Pty Ltd and has over 15 years’ experience
in the finance and corporate advisory industry and has been responsible for the preparation of the due
diligence process and prospectuses on a number of initial public offers. His experience includes
corporate and capital structuring, corporate advisory and company secretarial services, capital raising,
ASX and ASIC compliance requirements.
Mr Brockhurst has served on the board and acted as Company Secretary for numerous ASX listed and
private companies. He is currently a Director of Kingwest Resources Limited and Nelson Resources
Limited and was previously a Director of Roto-Gro International Limited (resigned 5 February 2018) and
International Goldfields Limited (resigned 5 January 2018).
Mr Brockhurst currently holds 750,000 fully paid ordinary shares, 4,500,000 unlisted options and
250,001 quoted options in Estrella Resources Limited.
Annual Report 2020
17
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Other Management
Mr Christopher Daws: Chief Executive Officer
Date of appointment: 2 January 2017
Mr Daws has strong experience in running junior resource companies having previously been involved
with Niagara Mining (Poseidon), US Nickel and KMC Limited. Mr Daws is a Director and founder of Apollo
Resources Pty Ltd and a Director of Nimbus Mines Pty Ltd. Mr Daws is responsible for running the dayto-day operations of the Group.
Mr David McEntaggart: Company Secretary
Date of appointment: 21 May 2018
Mr McEntaggart is a Chartered Accountant and Chartered Secretary with over 15 years’ experience in
the resource industry and accounting profession in Australia and the UK. He provides services to a
number of ASX listed companies specialising in financial accounting and corporate compliance.
Meetings of the Board
The number of meetings of Directors held during the year and the number of meetings attended by
each Director were as follows:
BOARD MEETINGS
Director
Number
eligible to
attend
Number
attended
L Pereira
4
4
J Kingswood
4
4
S Brockhurst
4
4
The Company had the following options on issue as at the date of this report:
Number of shares
under option
Class
Exercise price
Expiry date of
options
5,500,000
Unquoted
$0.05
15 May 2021
14,000,000
Unquoted
$0.03
20 Nov 2022
250,980,328
Quoted
$0.05
27 June 2021
Total
270,480,328
Shares issued during or since the end of the year as a result of exercise
No shares have been issued during or since the end of the year as a result of exercise of an option.
Annual Report 2020
18
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Indemnifying officers or auditor
During the reporting period, the Group paid an insurance premium to insure the Directors and Officers
of the Group. The liabilities insured are legal costs that may be incurred in defending civil or criminal
proceedings that may be brought against the officers in their capacity as officers of the Group, and any
other payments arising from liabilities incurred by the officers in connection with such proceedings,
other than where such liabilities arise out of conduct involving a wilful breach of duty by the officers or
the improper use by the officers of their position or of information to gain advantage for themselves or
someone else to cause detriment to the Group. Details of the amount of the premium paid in respect
of the insurance policies are not disclosed as such disclosure is prohibited under the terms of the
contract.
The Group has entered into agreements with each of the Directors and Officers to indemnify them
against any claim and related expenses, which arise as a result of work completed in their respective
capabilities. The Group has not otherwise, during or since the end of the financial year, except to the
extent permitted by law, indemnified or agreed to indemnify any current or former officer or auditor of
the Group against a liability incurred as such by an officer or auditor.
Proceedings on behalf of Company
No person has applied to the Court under section 237 of the Corporations Act 2001 for leave to bring
proceedings on behalf of the Company or to intervene in any proceedings to which the Company is a
party, for the purpose of taking responsibility on behalf of the Company for all or any part of those
proceedings.
Non-audit services
Details of the amounts paid to the auditors of the Group, RSM Australia Partners for non-audit services
provided during the year are as follows:
2020
$
2019
$
3,155
-
Non-audit services:
Corporate Finance services - RSM
Officers of the Group who are former partners of RSM Australia Partners
There are no officers of the Group who are former partners of RSM Australia Partners.
Auditor independence declaration
A copy of the auditor’s independence declaration as required under s307C of the Corporations Act 2001
is included within this financial report and forms part of this Directors’ report.
Annual Report 2020
19
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
REMUNERATION REPORT (Audited)
The Directors of Estrella Resources Limited present the Remuneration Report prepared in accordance
with the Corporations Act 2001 and the Corporations Regulations 2001.
The Remuneration Report is set out under the following main headings:
1. Principles used to determine the nature and amount of remuneration
2. Details of remuneration
3. Service agreements
Principles used to determine the nature and amount of remuneration
The following Report outlines the principles used to determine the nature and amount of remuneration.
The Board assumes the role of the Remuneration Committee and is responsible for reviewing and
providing recommendations with respect to the remuneration packages of Directors and Key
Management
Share your feedback
Discover