Carr Boyd Nickel Sulphides Continue at Depth
Released
Released
Announcement PDF
1 February 2021
ASX ANNOUNCEMENT
Carr Boyd Nickel Sulphides Continue at Depth and Assays Received
HIGHLIGHTS
CBDD0042A intersects 19m1 zone of disseminated, net-textured and semi-massive nickel
sulphides in pyroxenite cumulate from 595m (Table 1, Picture 1)
o Sulphides located on the T5 basal contact 300m below new CBDD0041 intersection
o CBDD0042A is the deepest intersection to date, 575m vertically below surface
o Mineralisation now confirmed by broad spaced drilling over a 500m strike length and open
to the North, South and at depth, with later structural off-sets being understood
CBDD0041 intersected an 8.25m1 zone of disseminated and stringer sulphides on the same
section as CBDD0042A just prior to the Christmas break (Table 1, Figure 1)
Assays from CBDD0035 returned 8.05m1 @ 0.81% Ni & 0.48% Cu from 516.8m (Table 2)
o Including 3.7m1 @ 1.14% Ni, 0.74% Cu, 0.96g/t 2PGE2 and 5.17g/t Ag
Assays from CBDD0036 returned 5.4m1 @ 0.85% Ni & 0.72% Cu from 505.6m (Table 2)
o Including 1.95m1 @ 1.35% Ni, 1.37% Cu, 0.94g/t 2PGE2 & 5.96 g/t Ag
Detailed geological mapping of the Carr Boyd Intrusive Complex (CBIC) initiated
o Surface expression of T5 mineralisation mapped over 1.2km strike length remains open
o Mapping of additional targets around the CBIC to continue over coming weeks ahead of
more regional exploration drilling
1: Downhole lengths are reported, true widths are not known
2: 2PGE refers to Pt + Pd in g/t
Picture 1. Lower portion of CBDD0042A intersection showing nickel rich sulphides in basal accumulation zone
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to inform the market of the
success of the first diamond drill hole of the new year. CBDD0042A intersected a broad zone of nickel,
copper and PGE mineralisation on the basal contact of the T5 target area, 300m below hole CBDD0041
which also intersected nickel sulphides just prior to the Christmas shut-down. Both CBDD0041 and
CBD0042A are located approximately 150 metres south of the discovery hole CBDD0030 at T5. Visual
estimates for both holes are detailed in Table 1 and an interpretive cross-section in Figure 1.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Table 1: Visual sulphide mineralisation estimates from CBDD0041 and CBDD0042A
Hole ID
CBDD0041
CBDD0042A
From
(m)
To
(m)
Width
Texture Type
Sulphides
Visual
Sulphide
Estimation
298
302.4
304
595.25
597.93
598.55
602.46
603.7
608.6
302.4
304
306.25
597.93
598.55
602.46
603.7
608.6
612.82
4.4
1.6
2.25
2.68
0.62
3.91
1.24
4.9
4.22
Po, cpy, pe
Po, cpy, pe
Po, cpy, pe
Po, cpy, pe
Po, cpy, pe
Po
Po, cpy, pe
Po, cpy, pe
Po
1%
7%
5%
3%
12%
4%
15%
50%
Tr%
612.82
614.51
1.69
Disseminated
Matrix to Blebby
Disseminated to Matrix
Disseminated
Highly Disseminated
Disseminated
Highly Disseminated
Net Textured
Cloud
Disseminated to Highly
Disseminated
Po, cpy, pe
10%
po=pyrrhotite, py=pyrite, cpy=chalcopyrite, pe=pentlandite
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide abundance
should never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine
the widths and grade of mineralisation. The Company will update the market when laboratory analytical results become
available.
Estrella Managing Director Chris Daws said:
“We have started the year with a fantastic result in the very first hole of 2021, significantly
expanding the vertical extent of nickel and copper sulphide mineralisation at T5 to over 500m. Our
understanding of the immediate geological environment is becoming clearer as we continue our
hunt in earnest for the source of the massive nickel and copper sulphides at Carr Boyd.”
Figure 1: Step-faulted basal contact to the Carr Boyd Intrusive Complex on section 6,673,500 North. All lengths stated are
downhole, true widths are not known
As can be seen in Figure 1, the basal contact is interpreted to have been offset by a set of flat-lying normal
faults. On this section a barren pyroxenite intrusive was logged in the core and is interpreted to also have
off-set mineralisation. Characterisation and timing of the faulting and the later pyroxenite intrusive will follow
in due course however no significant remobilisation of the sulphides is apparent. Down-hole transient
electromagnetic (DHTEM) surveying of CBDD0039, CBDD0041 and CBDD0042A is underway.
The next hole, CBDD0043, has been collared 450m to the north on section 6,673,950 to look for the eastfaulted mineralised contact that was not seen in CBDD0032 or CBDD0034, due to what is interpreted to be
a fault blank (see Figure 2). Both these holes intersected a significant fault zone before heading into the
footwall basalt horizon. The mineralised footwall was observed above in both CBDD0028 and ESR RC hole
CBP0042. The interpretation is that flat faulting has shifted the mineralised contact to the east. Once the
contact has been located it may be possible to extend or wedge off CBDD0029 (Figure 2) and CBDD0031
(a further 300m north of this section) that were drilled from the west, and failed to locate the contact due to
the now interpreted fault off-set. This understanding has completely reopened the opportunity for
discovery of nickel and copper mineralisation over an extensive distance at T5.
Figure 2: Section 6,673,950 North showing the placement of CBDD0043 to locate the Footwall Contact that was not seen in
the fault-blank area intersected by CBDD0032 and CBDD0034
Assay results for CBDD0035 and CBDD0036 have now been returned (Table 2, Figure 3). To date, nine
holes have intersected the basal T5 Target and the Company is getting a much better handle on the
orientation and potential off-sets in the target zone. Five of the six holes to date have returned significant
intercepts with assays outstanding for the three remaining holes.
Table 2: Significant Intersections Table for Carr Boyd
Hole
CBDD0028
including
CBDD0029
CBDD0030
including
CBDD0031
CBDD0032
CBDD0033
including
From
To
(m)
(m)
Interval
Ni%
165.2
167
1.8
0.72
165.2 165.6
0.4
1.12
NSA - Hole did not test T5 contact
431.6 445.5
13.9
1.06
436.3 439.5
3.2
3.14
NSA - Hole did not test T5 contact
NSA - Faulted T5 contact
368.5 388.6
20.1
1.02
372.52 378.4
5.88
1.38
Cu%
0.33
1.07
Co%
0.04
0.06
2PGE *
0.65
0.91
Ag g/t
1.73
6.80
0.38
0.67
0.05
0.14
0.44
0.71
1.56
2.62
0.66
0.65
0.05
0.07
0.79
0.90
2.41
2.30
and
and
CBDD0034
CBDD0035
including
CBDD0036
including
CBDD0037
CBDD0038
CBDD0039
CBDD0040
CBDD0041
CBDD0042A
380.7 382.8
2.1
1.43
386.15 388.6
2.45
1.64
NSA - Hole did not test T5 contact
516.8 524.85
8.05
0.81
516.8 520.5
3.7
1.14
505.6
511
5.4
0.85
506.15 508.1
1.95
1.35
Awaiting Assays
Regional stratigraphic hole
NSA - Tested T5 contact
Regional stratigraphic hole
Awaiting Assays
Awaiting Assays
0.62
1.97
0.07
0.08
2.17
0.83
3.03
7.18
0.48
0.74
0.72
1.37
0.03
0.04
0.04
0.06
0.61
0.96
0.59
0.94
2.76
5.17
3.06
5.96
Note: Intervals quoted are downhole lengths, true widths are not known
* 2PGE refers to Pt + Pd in g/t
Figure 3 below depicts how the intersections received to date fit in with the interpreted faulting of the basal
contact position and help explain the location of the T5 Conductor response received to date. The T5
Conductor and DHTEM results clearly show truncation and the logged fault zones correlate well with the
truncated geophysical response.
The basal contact is interpreted to be tilted since it was emplaced, however the geological evidence
gathered to date still suggests that gravity accumulation of sulphides and nickel tenor is increasing with
depth. Thus exploration potential also continues to increase with depth. This is common amongst intrusive
nickel discoveries.
The Carr Boyd Mine itself is not situated on the basal contact, however, it is interpreted to be closely related
to remobilisation the T5 Mineralisation during intrusion emplacement and is shown in Figure 3 for a sence
of location and scale. The basal contact lies around 170m behind the Carr Boyd Mine and has received no
testing at depth to-date. The Company believes there is a gelogical relationship between the T5
mineralisation and the Carr Boyd Ore and will continue to explore that relationship in due course.
The Company also believes there is a relationship between the faulting that has off-set the T5 Conductor
(as proved by the recent drilling) and the faulting that truncated mineralisation below the Carr Boyd Mine.
As exploration steps out to the south along T5, this relationship should become apparent.
Figure 3: T5 Long Section showing location of Significant Intercepts and interpreted faulting. The T5 basal contact
mineralisation is open in all directions. Intervals stated are downhole lengths, true widths are not known. The Carr Boyd
Mine is not on the basal contact, however it is interpreted to be closely related to remobilisation of the T5 Mineralisation
during intrusion emplacement, and is shown here for scale.
Next Steps
The DHTEM crew is on site and conducting downhole EM surveys on CBDD0039, CBDD0041 and
CBDD0042A. Results will be announced once they have been interpreted together with 2020 DHTEM
results. CBDD0043 has been collared and is aimed at finding the eastern off-set of the T5 Contact well
below CBDD0028. If this contact is located then another hole will be collared to follow up either above or
below this position to better define the extent, followed by further DHTEM.
Mapping of the Carr Boyd Intrusive Complex will continue. Mapping to date has located several sulphur
sources in close proximity to the basal contact position of the intrusion and a regional round of drilling will
be considered based upon the results.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Table 3: Drill hole collar details for T5 Drilling
Hole ID
CBDD0028
CBDD0029
CBDD0030
CBDD0031
CBDD0032
CBDD0033
CBDD0034
CBDD0035
CBDD0036
CBDD0037
CBDD0038
CBDD0039
CBDD0040
CBDD0041
CBDD0042A
Final
Depth
251
603.8
495.7
591.8
335.6
450
412
581.7
576.8
420.8
155.7
609.7
439.8
480.7
654.7
Easting
Northing
RL
Dip
Azimuth
Status
367048.96
367004.61
367030.37
366943.09
367279.38
367397.53
367361.34
367441.86
367420
367425
365503
367450
365700
367400
367403
6673939.6
6673939.07
6673642.32
6674243.14
6673941.27
6673657.83
6673941.15
6673659.47
6673620
6673625
6673068
6673710
6673200
6673500
6673500
421.8
421.6
418.3
424.5
423.3
422.2
423.5
423
422.4
422.4
430
423.6
430
421.86
421.86
-60
-70
-65
-65
-65
-65
-65
-65
-65
-60
-60
-65
-65
-60
-70
90
90
90
90
270
270
270
270
270
270
270
270
270
270
270
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Table 4: Assay Results for CBDD035 and CBDD036
Hole_ID
SampleID
From
To
Int
Ni%
Cu%
Co
ppm
Au
g/t
Ag
g/t
Pt g/t
Pd
g/t
As
ppm
S%
CBDD0035
ECB10484
501
502
1
0.22
0.06
159
0.01
<0.5
0.03
0.05
<5
1.01
CBDD0035
ECB10485
502
503
1
0.12
0.01
76
0.00
<0.5
0.02
0.02
<5
0.22
CBDD0035
ECB10486
503
504
1
0.08
0.00
73
0.01
<0.5
0.02
0.01
<5
0.03
CBDD0035
ECB10487
504
505
1
0.05
0.00
75
0.00
<0.5
0.02
0.01
<5
<0.01
CBDD0035
ECB10488
505
506
1
0.09
0.00
76
0.00
<0.5
0.01
0.01
<5
0.01
CBDD0035
ECB10489
506
507
1
0.07
0.00
65
0.01
<0.5
0.01
0.01
<5
0.02
CBDD0035
ECB10490
507
508
1
0.05
0.02
46
0.03
<0.5
0.01
0.01
<5
0.16
CBDD0035
ECB10491
508
509
1
0.08
0.01
71
0.01
<0.5
0.01
0.01
<5
0.03
CBDD0035
ECB10492
509
510.1
1.1
0.07
0.00
70
0.01
<0.5
0.01
0.01
<5
0.01
CBDD0035
ECB10493
510.1
510.6
0.5
0.01
0.01
13
0.01
<0.5
<0.005
0.00
<5
0.14
CBDD0035
ECB10494
510.6
511.03
0.43
0.08
0.02
61
0.01
<0.5
0.01
0.01
<5
0.16
CBDD0035
ECB10495
511.03
511.8
0.77
0.26
0.12
116
0.02
<0.5
0.09
0.08
<5
1.33
CBDD0035
ECB10496
511.8
512.6
0.8
0.06
0.02
57
0.01
<0.5
0.01
0.01
<5
0.21
CBDD0035
ECB10497
512.6
513.4
0.8
0.08
0.03
69
0.01
<0.5
0.02
0.03
<5
0.29
CBDD0035
ECB10498
513.4
514.4
1
0.25
0.11
128
0.02
<0.5
0.04
0.12
<5
1.39
CBDD0035
ECB10499
514.4
515.4
1
0.34
0.13
158
0.02
<0.5
0.13
0.16
<5
1.88
CBDD0035
ECB10500
515.4
516.1
0.7
0.47
0.17
210
0.01
<0.5
0.09
0.20
<5
2.61
CBDD0035
ECB10501
516.1
516.8
0.7
0.40
0.12
182
0.01
<0.5
0.10
0.14
<5
2.20
CBDD0035
ECB10502
516.8
517.8
1
0.93
0.37
405
0.02
1.40
0.37
0.31
<5
5.26
mFrom
mTo
Interval
Ni%
Cu%
Co
ppm
Au
g/t
Ag
g/t
Pt g/t
Pd
g/t
As
ppm
S%
ECB10503
517.8
518.76
0.96
2.57
1.77
772
0.43
11.30
0.48
0.93
<5
>10.0
ECB10504
518.76
519
0.24
0.75
0.20
328
0.05
0.60
0.06
0.35
<5
4.51
CBDD0035
ECB10505
519
519.7
0.7
0.15
0.09
93
0.11
0.00
0.11
0.04
<5
0.71
CBDD0035
ECB10506
519.7
520.5
0.8
0.68
0.69
316
0.09
8.40
1.31
0.32
<5
4.97
CBDD0035
ECB10507
520.5
521.1
0.6
0.16
0.12
93
0.01
<0.5
0.04
0.06
<5
0.78
CBDD0035
ECB10508
521.1
521.7
0.6
0.37
0.10
177
0.01
<0.5
0.04
0.16
<5
1.90
CBDD0035
ECB10509
521.7
522.35
0.65
0.59
0.38
263
0.05
1.30
0.06
0.22
<5
3.35
CBDD0035
ECB10510
522.35
523.1
0.75
0.54
0.21
244
0.02
<0.5
0.18
0.24
<5
2.96
CBDD0035
ECB10511
523.1
523.85
0.75
0.48
0.22
225
0.03
0.50
0.11
0.22
<5
2.64
CBDD0035
ECB10512
523.85
524.85
1
0.84
0.43
398
0.17
1.90
0.08
0.36
<5
4.47
CBDD0035
ECB10513
524.85
525.45
0.6
0.38
0.22
181
0.02
0.70
0.05
0.13
<5
2.03
CBDD0035
ECB10514
525.45
526.05
0.6
0.37
0.24
180
0.02
0.50
0.05
0.13
<5
2.03
CBDD0035
ECB10515
526.05
526.6
0.55
0.23
0.19
128
0.15
0.70
0.03
0.08
<5
1.24
CBDD0035
ECB10516
526.6
527.4
0.8
0.38
0.24
193
0.22
0.90
0.05
0.15
<5
1.90
CBDD0035
ECB10517
527.4
528
0.6
0.32
0.25
172
0.06
0.90
0.04
0.11
<5
1.77
CBDD0035
ECB10518
528
529
1
0.34
0.20
179
0.03
<0.5
0.14
0.14
<5
1.91
CBDD0035
ECB10519
529
530
1
0.24
0.12
144
0.02
<0.5
0.06
0.08
<5
1.41
CBDD0035
ECB10520
530
531
1
0.25
0.13
154
0.01
<0.5
0.19
0.08
<5
1.64
CBDD0035
ECB10521
531
532
1
0.33
0.20
174
0.02
0.70
0.10
0.12
<5
2.18
CBDD0035
ECB10522
532
533
1
0.34
0.19
181
0.03
0.60
0.15
0.13
<5
2.00
CBDD0035
ECB10523
533
534
1
0.34
0.17
186
0.03
0.60
0.09
0.15
<5
1.94
CBDD0035
ECB10524
534
535
1
0.23
0.18
143
0.08
1.10
0.02
0.06
<5
1.14
CBDD0035
ECB10525
535
535.7
0.7
0.53
0.51
253
0.10
2.70
0.01
0.23
<5
3.71
CBDD0035
ECB10526
535.7
536.7
1
0.07
0.04
66
0.01
<0.5
0.02
0.02
<5
0.28
CBDD0035
ECB10527
536.7
537.7
1
0.02
0.01
58
0.01
<0.5
0.02
0.02
<5
0.07
CBDD0035
ECB10528
537.7
538.7
1
0.01
0.02
56
0.01
<0.5
0.01
0.02
<5
0.08
CBDD0035
ECB10529
538.7
539.7
1
0.02
0.02
60
0.01
<0.5
0.01
0.02
<5
0.12
CBDD0035
ECB10530
539.7
540.7
1
0.01
0.01
47
0.01
<0.5
0.01
0.02
<5
0.07
CBDD0035
ECB10531
540.7
541.7
1
0.01
0.01
56
0.01
<0.5
0.02
0.02
<5
0.05
CBDD0035
ECB10532
541.7
542.7
1
0.01
0.01
60
0.01
<0.5
0.01
0.02
<5
0.11
CBDD0035
ECB10533
542.7
543.7
1
0.01
0.01
55
0.01
<0.5
0.02
0.02
<5
0.09
CBDD0035
ECB10534
543.7
544.7
1
0.01
0.05
52
0.03
<0.5
0.01
0.02
<5
0.09
CBDD0035
ECB10535
544.7
545.7
1
0.01
0.02
58
0.01
<0.5
0.01
0.02
<5
0.14
CBDD0036
ECB10424
500
501
1
0.08
0.00
76
0.00
<0.5
0.02
0.01
<5
<0.01
CBDD0036
ECB10425
501
502
1
0.08
0.00
74
0.00
<0.5
0.02
0.01
<5
<0.01
CBDD0036
ECB10426
502
503
1
0.08
0.00
79
0.00
<0.5
0.01
0.02
<5
<0.01
CBDD0036
ECB10427
503
504
1
0.09
0.00
81
0.01
<0.5
0.02
0.02
<5
<0.01
CBDD0036
ECB10428
504
504.95
0.95
0.07
0.03
84
0.00
<0.5
0.02
0.02
<5
0.04
CBDD0036
ECB10429
504.95
505.6
0.65
0.22
0.28
117
0.05
1.80
0.18
0.09
<5
1.11
CBDD0036
ECB10430
505.6
506.15
0.55
0.44
0.69
190
0.18
3.80
0.17
0.15
<5
2.67
CBDD0036
ECB10431
506.15
506.9
0.75
1.22
3.17
504
0.05
13.50
0.39
0.27
<5
8.52
CBDD0036
ECB10432
506.9
507.5
0.6
1.38
0.31
554
0.01
1.20
0.14
0.46
5.00
8.76
CBDD0036
ECB10433
507.5
508.1
0.6
1.47
0.17
605
0.04
1.30
1.15
0.48
<5
8.14
CBDD0036
ECB10434
508.1
509
0.9
0.44
0.29
192
0.04
1.00
0.12
0.23
<5
2.13
CBDD0036
ECB10435
509
510
1
0.44
0.23
190
0.04
1.00
0.09
0.23
<5
2.43
Hole_ID
SampleID
CBDD0035
CBDD0035
mFrom
mTo
Interval
Ni%
Cu%
Co
ppm
Au
g/t
Ag
g/t
Pt g/t
Pd
g/t
As
ppm
S%
ECB10436
510
510.65
0.65
0.68
0.30
290
0.05
1.40
0.10
0.32
<5
4.44
ECB10437
510.65
511
0.35
0.66
0.31
279
0.04
1.20
0.10
0.29
<5
4.46
CBDD0036
ECB10438
511
512
1
0.46
0.27
199
0.10
1.00
0.24
0.19
<5
2.44
CBDD0036
ECB10439
512
512.95
0.95
0.41
0.68
186
0.46
4.80
0.11
0.20
<5
2.86
CBDD0036
ECB10440
512.95
514.05
1.1
0.42
0.23
195
0.09
1.10
0.09
0.14
<5
2.61
CBDD0036
ECB10441
514.05
514.3
0.25
0.23
0.48
127
0.44
4.50
0.06
0.09
<5
1.82
CBD0D036
ECB10442
514.3
515
0.7
0.42
0.30
191
0.04
1.50
0.24
0.15
<5
2.58
CBDD0036
ECB10443
515
516
1
0.26
0.13
136
0.04
<0.5
0.27
0.09
5.00
1.44
CBDD0036
ECB10444
516
517
1
0.31
0.26
153
0.13
2.00
0.19
0.11
<5
2.03
CBDD0036
ECB10445
517
518
1
0.43
0.51
197
0.12
3.50
0.31
0.22
<5
2.80
CBDD0036
ECB10446
518
519
1
0.47
0.39
219
0.27
3.80
0.60
0.17
<5
2.53
CBDD0036
ECB10447
519
520
1
0.39
0.54
193
0.48
7.40
0.29
0.19
<5
2.38
CBDD0036
ECB10448
520
521
1
0.21
0.18
128
0.13
2.30
0.12
0.07
<5
1.06
CBDD0036
ECB10449
521
522.1
1.1
0.22
0.34
134
0.24
5.20
0.27
0.11
<5
1.17
CBDD0036
ECB10450
522.1
523
0.9
0.21
0.15
121
0.14
2.00
0.08
0.09
<5
0.57
CBDD0036
ECB10451
523
524
1
0.07
0.01
85
0.01
<0.5
0.01
0.00
<5
0.07
CBDD0036
ECB10452
524
525
1
0.08
0.02
81
0.02
<0.5
0.01
0.00
<5
0.16
CBDD0036
ECB10453
525
525.8
0.8
0.26
0.08
143
0.02
<0.5
0.03
0.05
<5
1.22
CBDD0036
ECB10454
525.8
526.5
0.7
0.10
0.19
91
0.01
0.70
0.02
0.07
<5
0.76
CBDD0036
ECB10455
526.5
527
0.5
0.06
0.03
73
0.01
<0.5
0.02
0.03
<5
0.46
CBDD0036
ECB10456
527
528
1
0.01
0.01
58
0.01
<0.5
0.02
0.02
<5
0.10
CBDD0036
ECB10457
528
529
1
0.02
0.02
60
0.01
<0.5
0.02
0.02
<5
0.12
CBDD0036
ECB10458
529
530
1
0.01
0.02
55
0.01
<0.5
0.02
0.02
<5
0.09
CBDD0036
ECB10459
530
531
1
0.01
0.03
56
0.01
<0.5
0.02
0.02
<5
0.10
Hole_ID
SampleID
CBDD0036
CBDD0036
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut DD core samples have been half cut with an automatic
techniques
channels, random chips, or specific
core saw.
specialised
industry
standard 0.25m-1.1m samples are collected from the core trays as
measurement tools appropriate to the
marked out by the supervising geologist.
minerals under investigation, such as A handheld XRF tool was used to verify the mineralisation
down hole gamma sondes or handheld
with samples reporting >0.3% Ni in disseminated zones
XRF
instruments,
etc.).
These
and >1% Ni in the matrix sulphide zones.
examples should not be taken as XRF results have not been reported and are used as a
limiting the broad meaning of sampling.
logging/sampling verification tool only.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
Core is cut and sampled to ensure the sample is
representative and no bias is introduced. Cutting of
specific, banded or stringer sulphide zoned core is done
orthogonal to the banding to ensure there is no bias.
Aspects of the determination of
mineralisation that are material to the
Public Report.
Determination of mineralisation has been based on
geological logging, visual sulphide estimates and
confirmation using a pXRF machine. Samples were
dispatched to an accredited laboratory for multi-element
analysis.
.
Diamond core drilling was used to obtain 3m length
samples from the core barrel which are then marked in
one meter intervals, based on core block measurements.
Samples are selected based on geological logging
boundaries or on nominal meter marks.
Collected samples weigh a nominal 2-3 kg (depending on
sample length).
Samples have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed using a 4-acid digest, MEICP for 33 elements and ore zone samples are also being
tested for Au & PGE elements using ICP analysis.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill sample
recovery
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Drilling was undertaken using NQ2 sized drill core.
Holes have been collared with mud rotary from surface,
HQ rough cored to top of fresh rock then NQ2 cored to
EOH.
Core recovery was recorded by the field crew and verified
by the geologist.
RQD measurements were digitally recorded to ensure
recovery details were captured.
Sample recovery in all mineralised zones is high with
negligible core loss observed.
Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very good
condition.
_________________________________________________________________________________
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines
was undertaken.
Core trays were photographed wet and dry prior to
sampling.
Drill hole logs are recorded in Excel spread sheets and
validated in Micromine Software as the drilling
progresses.
The entire length of all holes is logged.
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Results verified internally by Company personnel
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Core is half cut using an automatic core saw to achieve a
half-core sample for laboratory submission.
The sample preparation technique is considered industry
best standard practice.
No field duplicates have been collected in this program.
Field duplicates will be collected once initial results are
returned and resampling of the mineralised zones is
warranted.
Sample sizes are appropriate to the grain size of the
mineralisation.
No handheld XRF results are reported however the tool
was used to verify the mineralisation with reporting >0.3%
Ni in disseminated zones and >1% Ni in the matrix
sulphide zones.
DHTEM parameters are as follows;
Tx Loop size:
500 x 800 m
Transmitter:
GAP HPTX-70
Receiver:
EMIT SMARTem24
Sensor:
EMIT DigiAtlantis
Station spacing: 2m to 10m
Tx Freq:
0.5 Hz
Duty cycle:
50%
Current:
~130 Amp
Stacks:
32-64
Readings:
2-3 repeatable readings per
station
Hole CBDD0028 is twinning hole CBP042. No other
twinning is warranted at this stage.
The data was collected and logged using Excel
spreadsheets and validated using Micromine Software.
The data will be loaded into an externally hosted and
managed database.
No adjustments have been made to the assay data other
than length weighted averaging.
Criteria
Location of
data points
JORC Code explanation
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data
spacing
and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Commentary
The holes were pegged using a hand-held GPS + 3m
The rig was setup over the nominated hole position and
final GPS pickup occurred at the completion of the hole.
Holes are progressively surveyed by DGPS on a batch
basis.
MGA94_51
Topography is relatively flat and control is more than
adequate given the early stage of the project. A 3D drone
ortho-photographic survey had been used to create a
DTM of the project area.
Refer to Cross Sections and Plans included
Not applicable, no Mineral Resource is being stated.
No compositing has been applied. Intercepts are quoted
as length weighted intervals.
The drill hole orientation does not introduce a sample
bias.
Samples are in the possession of Estrella’s personnel
from field collection to laboratory submission.
No audits or reviews have been conducted for this release
given the early stage of the project.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
Type, reference name/number,
Carr Boyd Nickel Pty Lt
Share your feedback
Discover