EM Confirms Two High Priority Targets at Carr Boyd
Released
Released
Announcement PDF
26 November 2018
ASX ANNOUNCEMENT
EM CONFIRMS TWO HIGH PRIORITY TARGETS AT CARR BOYD
HIGHLIGHTS
High Powered Electro-Magnetics (HPEM) has identified two conductors
These conductors are coincident with, or very close to existing high priority exploration targets
Exploration targets demonstrate strong geochemical and geological support for the EM conductors
Fosters Hill Prospect 8km East of the Carr Boyd mine also completed
Figure 1. HPEM imagery map, showing the locations of two new EM targets at Target A and Target 5. The location of
Carr Boyd mine, advanced prospects (red dots), and targets (yellow dots) are also shown. The interpreted
basal contact is in a black dashed line.
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to provide an exploration update
on the Carr Boyd Nickel Project (CBNP or the Project). The CBNP is comprised of the Carr Boyd Layered
Complex (CBLC or the Complex).
GROUND HPEM SURVEYING
The Phase II moving loop HPEM survey proposed to extend 3.3km further north from the Phase I survey is
now completed, screening the interpreted basal contact position and immediate footwall sequence to 1.4km
north of the Carr Boyd Rocks Mine.
There are several historic high priority exploration targets and prospects in this area based on surface
geochemistry, downhole geochemistry, aero-magnetics, ground gravity, and interpreted geology datasets.
HPEM has now defined two significant conductor’s indicative of the presence of well-developed
sulphides associated with two of the exploration targets, Target A and Target 5.
The Fosters Hill survey has also been completed as part of the Phase II program. Data for this area are still
being processed and assessed.
Figure 2. Geological map of the CBLC with outlines of Phase I and Phase II HPEM. The planned Phase III extension to the
north is shown in mustard outline. Also shown are all ranked exploration targets (yellow dots) and advanced prospect
locations (red dots).
TARGET 5
The first known report of this target appears in an internal company report written for Titan Resources in
2004. It is described again in an internal company report written for Yilgarn Mining in 2008.
The target is defined by a 450m long zone of highly anomalous nickel and copper mineralisation in drilling,
located approximately 100m south of the newly defined EM conductor. The mineralisation and EM
conductor appear to be located on or very close to the interpreted basal contact position of the CBLC.
Historic drilling does not appear to have tested the conductor defined by the recently completed Phase II
HPEM.
Figure 3. Geological map showing the location of the T5 EM conductor, The T5 geochemical halo and nickel sulphide
location, drillhole collar locations, and distance to the Carr Boyd Mine.
The EM conductor is discrete and moderately to highly conductive. The modelled conductance is 3000 –
5000S, making this a very high priority drill target.
Historic drilling returned many anomalous results over a 450m strike length of the interpreted basal contact
at Target 5. The best of which was 3.35m at 0.79% Ni and 0.35% Cu, including 0.61m at 2.12% Ni and
0.56% Cu from 100.89m in GD124. This occurs in a zone of disseminated and matrix sulphide on the
interpreted basal contact of the CBLC. This is very positive support for the EM conductor located
approximately 300m along strike to the north.
Figure 4. Key cross section through Target 5 showing the location of nickel sulphide intercepts.
Figure 5. Long section of Target 5 showing drillhole pierce points coloured by nickel grade, the EM model, and a bouger
gravity inversion model located at depth.
Table 1. Summary of drillholes and significant intercepts at Target 5. Intercepts have been generated on a trigger value
of 0.25% Ni, a minimum width of 0.5m, maximum total waste 15m, maximum consecutive length of waste 5m,
maximum gap 3m
Hole_ID
Hole_Type
Easting
Northing
RL
Dip
Azimuth
EOH Depth
mFrom
mTo
Interval
Ni ppm
Cu ppm
Co ppm
GD077
CORE
367214
6673376
430
-60
270
205.74
100.58
103.63
3.05
3140
1805
140
GD077
CORE
367160
6673376
333
-60
270
206
108.81
113.08
4.27
4014
2479
129
GD077
CORE
367150
6673376
314
-60
270
206
131.98
133.81
1.83
3167
3858
167
GD089
CORE
367247
6673378
430
-60
270
192
138.99
139.6
0.61
2600
1200
100
GD089
CORE
367175
6673378
305
-60
270
192
143.87
144.48
0.61
3200
1200
100
GD089
CORE
367158
6673378
275
-60
270
192
178
179.83
1.83
2633
2133
93
GD119
CORE
367218
6673501
425
-60
270
165
97.23
97.84
0.61
13700
700
800
GD120
CORE
367154
6673712
434
-60
270
67
39.62
45.72
6.1
2700
2275
176
GD121
CORE
367168
6673712
434
-60
270
93
79.86
81.08
1.22
2850
3100
150
GD122
CORE
367153
6673695
434
-60
270
51
41.76
44.2
2.44
6900
2231
625
GD124
CORE
367221
6673531
432
-60
270
116
99.67
103.02
3.35
7952
3530
546
GD124
CORE
367167
6673531
339
-60
270
116
106.38
108.2
1.82
6180
2491
435
GD128
CORE
367253
6673532
431
-60
270
191
128.63
129.24
0.61
6400
1225
100
GD134
CORE
367253
6673503
431
-60
270
210
170.08
176.17
6.09
2592
1430
141
GD137
CORE
367254
6673473
425
-60
270
188
168.55
173.43
4.88
5363
2916
200
GD139
CORE
367219
6673589
432
-60
270
114
73.53
74.75
1.22
2700
2625
100
GD139
CORE
367164
6673589
342
-60
270
114
104.7
105.77
1.07
5128
3004
357
GD140
CORE
367218
6673652
433
-60
270
123
115.06
117.35
2.29
11719
2390
GD162
CORE
367249
6673619
432
-60
270
182
147.52
148.13
0.61
4200
725
200
GD163
CORE
367293
6673476
430
-60
270
256
236.83
237.74
0.91
5500
6875
100
GD163
CORE
367160
6673476
228
-60
270
256
242.32
243.23
0.91
4500
4500
200
GD084
CORE
367223
6673315
430
-60
270
148
NSI
GD116
CORE
367226
6673438
431
-60
270
142
NSI
GD150
CORE
367294
6673430
430
-60
270
264
NSI
GD126
CORE
367217
6673470
431
-60
270
151
NSI
GD132
CORE
367254
6673564
431
-60
270
191
NSI
GD125
CORE
367199
6673713
434
-60
270
113
NSI
GD147
CORE
367196
6673778
434
-60
270
142
NSI
GD143
CORE
367225
6673837
434
-60
270
220
NSI
GD144
CORE
367222
6673899
435
-60
270
198
NSI
GD129
CORE
367223
6673562
432
-60
270
134
NSI
CBC022
RC
367613
6673407
421
-60
90
150
NSI
CBR193
RAB
367638
6673707
435
-60
90
16
NSI
CBR194
RAB
367588
6673707
435
-60
90
7
NSI
CBR195
RAB
367538
6673707
435
-60
90
18
NSI
CBR204
RAB
367638
6673402
433
-60
90
35
NSI
CBR205
RAB
367588
6673402
433
-60
90
23
NSI
CBR206
RAB
367538
6673402
433
-60
90
17
NSI
CBR207
RAB
367488
6673402
433
-60
90
21
NSI
CBR208
RAB
367438
6673402
434
-60
90
16
NSI
CBR209
RAB
367388
6673402
435
-60
90
32
NSI
CBR210
RAB
367338
6673402
435
-60
90
35
NSI
CBR218
RAB
367488
6673757
420
-60
90
27
NSI
CBR219
RAB
367438
6673757
420
-60
90
24
NSI
CBR220
RAB
367388
6673757
420
-60
90
36
NSI
CBR221
RAB
367338
6673757
420
-60
90
47
NSI
CBR222
RAB
367288
6673757
420
-60
90
46
NSI
CBR223
RAB
367238
6673757
420
-60
90
20
NSI
CBR224
RAB
367188
6673757
420
-60
90
35
NSI
CBR225
RAB
367138
6673757
420
-60
90
39
NSI
CBR226
RAB
367088
6673757
420
-60
90
32
NSI
CBR227
RAB
367038
6673757
420
-60
90
41
NSI
CBR228
RAB
366988
6673757
420
-60
90
25
NSI
CBR229
RAB
366938
6673757
420
-60
90
27
NSI
CBR230
RAB
366888
6673757
420
-60
90
37
NSI
Hole_ID
Hole_Type
Easting
Northing
RL
Dip
Azimuth
EOH Depth
CBR231
RAB
366838
6673757
420
-60
90
35
mFrom
mTo
Interval
NSI
Ni ppm
CBR232
RAB
366788
6673757
420
-60
90
53
NSI
GD078
DD
367443
6673327
426
-60
270
119
NSI
GD082
DD
367504
6673537
427
-60
90
166
NSI
GD141
DD
367387
6673936
431
-60
270
265
NSI
GD148
DD
366923
6673820
439
-60
270
152
NSI
Cu ppm
Co ppm
TARGET A
This is a conceptual satellite style target located on an interpreted fault outside of the CBLC, in the footwall
sequence. The target area also appears in the Titan and Yilgarn Mining reports, although the newly
defined EM conductor is located approximately 200m further west, on a different magnetic feature.
A diamond drillhole spudded by Defiance Mining in 1997, DD97CB043 appears to target the conductor
position, suggesting it was detected by a SiroTEM survey completed at that time. Interrogation of the
available datasets suggests the hole did not intersect the conductor, although more investigation is
required to confirm this.
The aim is to locate the hole collar in the field and have it picked up by a licensed surveyor. If the hole can
be re-entered and gyro surveyed that will also be completed. As geological logs are not available for the
hole, the core will be re logged and physical property tests carried out on it to determine the best course of
action for the EM target.
Table 2. Tenement Schedule of the CBNP.
Schedule of Mining and Exploration Tenements
Country State/Region Project Tenement ID Area Ha Grant Date Mineral Rights Interest %
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
WA
WA
WA
WA
WA
WA
WA
WA
WA
CBNP
CBNP
CBNP
CBNP
CBNP
CBNP
CBNP
CBNP
CBNP
E 31/1124
E 29/1012
E 29/982
E 31/726
E31/1162
M 31/12
M 31/159
M 31/109
L24/186
6229
1780
890
5419
9,196
266
79
98
279
1/05/2017
20/09/2017
2/01/2017
3/04/2008
26/03/2018
20/11/1984
21/01/1997
25/07/1991
13/04/2007
All
All
All
All
All
All
All
All
N/A
100
100
100
100
100
100
100
100
100
ABOUT THE PROJECT AND THE CBLC
The CBLC is a 75km2 layered mafic igneous complex, which hosts several occurrences of nickel and copper
sulphides. The most significant occurrence discovered to date is at the Carr Boyd Rocks mine, where
mineralisation is hosted by bronzitite breccias (pyroxenites) emplaced within the gabbroic sequence of the
Complex. The CBLC is in a Tier 1 jurisdiction approximately 80km north north-east of Kalgoorlie Western
Australia. An all-weather haul road accessible by Estrella under a granted miscellaneous license connects
the Project to the Goldfields Highway via Scotia.
A “Voisey Bay” style model has not been adequately explored within the CBLC. This represents a compelling
exploration target opportunity which the Company will continue to aggressively pursue.
Figure 6. Location of Carr Boyd in relation to commercial centres and other major nickel projects.
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Luke Marshall, who is a consultant to Estrella Resources, and a member of The Australasian
Institute of Geoscientists. Mr. Marshall has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Marshall
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
info@estrellaresources.com.au
APPENDIX 3 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
Nature and quality of sampling has not been determined for historic drilling results included in
random chips, or specific specialised industry
standard measurement tools appropriate to the
this announcement at this stage.
No other measurement tools other than directional survey tools have been used in the holes.
minerals under investigation, such as down hole
gamma sondes or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample
representivity
and
the
This has not been determined for historic drilling results included in this announcement.
appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are material to the Public Report.
Determination of mineralisation has been based solely on unvalidated laboratory assay results,
with samples above 2000ppm Ni and or 500ppm Cu considered mineralised.
Criteria
JORC Code explanation
Commentary
In cases where ‘industry standard’ work has been
This has not been determined for historic drilling results included in this announcement.
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
All holes reported with significant intercepts are diamond holes drilled by Great Boulder Mines
hammer, rotary air blast, auger, Bangka, sonic,
in the late 1960s and early 1970s, but the core is not preserved and none of this information
etc) and details (e.g. core diameter, triple or
has been captured for the holes being reported in this announcement.
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
RAB and RC holes were drilled by Titan Resources in 2003. Details of these drillholes is yet
to be captured in the database.
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing core and chip
No information is available on sample recoveries.
sample recoveries and results assessed.
Measures taken to maximise sample recoveries are unknown.
Measures taken to maximise sample recovery
and ensure representative nature of the samples.
No relationship has been established between sample recovery and reported grade as the
project is in its preliminary stages.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level
Core, RC and RAB samples have been logged in minimal detail and would not be suitable for
use in a Mineral Resource estimation, mining study, or metallurgical study.
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature.
Core
(or
costean,
channel,
etc)
photography.
The total length and percentage of the relevant
intersections logged.
Logging is of a qualitative nature.
All the relevant intersections have been geologically logged.
Criteria
JORC Code explanation
Commentary
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter,
It is unknown if the core was quartered or halved, and if split or sawn. No core has been
half or all core taken.
preserved. Sampling techniques for RC and RAB are also unknown.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
Standard reference material insertion rates are unknown for the Great Boulder diamond drilling.
For all sample types, the nature, quality and
appropriateness
of
the
sample
The sample preparation techniques are unknown at this stage.
preparation
technique.
Industry standard blank, standards, duplicates, and lab checks were completed on the Titan
Resources drilling. QAQC was not assessed for this announcement as no significant intercepts
are being reported for the Titan drilling.
Quality control procedures adopted for all sub-
Sample sizes and weights are unknown.
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
No results from geophysical tools are being reported.
Criteria
JORC Code explanation
Commentary
Nature of quality control procedures adopted
This is yet to be determined to the very small dataset and preliminary nature of the project and
(e.g. standards, blanks, duplicates, external
the fact that no potentially economic mineralisation is being reported.
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
Verification
of sampling
and
assaying
Location of
data points
The verification of significant intersections by
either independent or alternative company
personnel.
This has not been completed.
Umpire checks will be completed on higher-grade follow-up drill samples, is encountered, in due
course.
The use of twinned holes.
No twin holes have been drilled.
Documentation of primary data, data entry
The data is loaded into an externally hosted and managed database and loaded by an
procedures, data verification, data storage
independent consultant, before being validated and checked, then exported and send back to
(physical and electronic) protocols.
ESR for analysis.
Discuss any adjustment to assay data.
No adjustments have been made.
Accuracy and quality of surveys used to locate
Hole location accuracy is yet to be confirmed other than by preliminary inspection by handheld
drill holes (collar and down-hole surveys),
GPS.
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
GDA94_51
Criteria
Data spacing
and
distribution
JORC Code explanation
Commentary
Quality and adequacy of topographic control.
More than adequate given the early stage of the project. This is generated from a detailed gravity
survey and mine survey control.
Data spacing for reporting of Exploration
Drilling was completed on roughly 30m spacings along cross sections 60m apart.
Results.
Whether the data spacing and distribution is
Not applicable, no Mineral Resource is being stated.
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource
and
Ore
Reserve
estimation
procedure(s) and classifications applied.
Orientation
of data in
relation to
geological
structure
Whether sample compositing has been applied
No compositing has been applied. Intercepts are quoted as length weighted intervals.
Whether the orientation of sampling achieves
The drill line and drill hole orientations are oriented as close as possible to normal to the
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
interpreted target basal contact.
At this stage the relationship between drilling direction and direction of mineralised structures
cannot be determined.
If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling
bias, this should be assessed and reported if
material.
Sample
security
The measures taken to ensure sample security.
This is unknown for the historic drilling being reported.
Criteria
JORC Code explanation
Commentary
Audits or
reviews
The results of any audits or reviews of sampling
No audits or reviews have been conducted for this release given the very small size of the
techniques and data.
dataset.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
Estrella Resources holds a 100% interest in the nickel and base metal rights to the project.
There are no known impediments to operate in the area.
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native
title
wilderness
interests,
or
historical
national
park
Refer to Table 2 of this announcement for the tenement schedule.
sites,
and
environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration
by other parties.
The Carr Boyd Rocks deposit was discovered by Great Boulder Mines, in a joint venture with
North Kalgurli Ltd in 1968. The deposit was mined between 1972 and 1975, during which time
they explored for additional breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly reopening the mine in 1977 before
closing it permanently shortly thereafter due to a collapse in the nickel price. The mine had
Criteria
JORC Code explanation
Commentary
produced 210,000t at 1.44% Ni and 0.46% Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground over the CBLC outside of the immediate
mine area. Between 1968 and 1971 they conducted extensive exploration programs searching
for large basal contact and/or stratabound Ni-Cu deposits. It was during this time that most of
the disseminated and cloud sulphide occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from Pacminex in 1987 and focused on
exploration for PGE deposits between 1987 and 1990. In 1990 Defiance purchased the Carr
Boyd Rocks mine from WMC and switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
From 1990 Defiance dewatered the mine to conduct testwork and feasibility studies on the
remnant mineralisation. Metallurgical testwork, Mineral Resource estimations, and scoping
studies were completed. Around 1996 the focus shifted again to regional exploration for large
tonnage basal contact deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project and recommenced economic
evaluations of the remnant material at Carr Boyd Rocks before embarking on another regional
exploration program focusing on the basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and continued with some regional
exploration but focused most attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd (Consmin). Consmin conducted IP
surveys and detailed gravity surveys but did not drill any targets before selling the project to
Criteria
JORC Code explanation
Commentary
Salt Lake Mining (SLM) in 2013.
SLM completed limited drilling to meet expenditure
commitments, before selling the project to Apollo Phoenix Resources in 2016. Apollo Phoenix
Resources sold the project to Estrella Resources Limited in October 2017.
Geology
Deposit type, geological setting and style of
mineralisation.
The Carr Boyd project lies within the Achaean Yilgarn Craton in a 700km belt of elongate
deformed and folded mafic, ultramafic rocks and volcanic sediments intruded by granitoids which
is referred to as the Norseman-Wiluna Belt. The belt has been divided into several geological
distinct terranes, with the project area lying at the northern end of the Gindalbie terrane (Swager,
1996).
The geology of the Carr Boyd area is dominated by the Carr Boyd layered mafic-ultramafic
intrusive complex (CBLC). This layered intrusive covers an area of 17 km by 7 km and has
intruded into an Achaean Greenstone/Granite succession. The CBLC is comprised of a basal
sequence of dunites, which are overlain by peridotites / pyroxenites and above that by gabbros.
The intrusion has been interpreted to have been tilted to the east with the geometry of the
intrusive further complicated by regional deformation and folding. The sequence has been
metamorphosed to upper greenschist to lower amphibolite facies.
Several distinctive styles of Ni and Ni-Cu mineralisation have been identified within the CBLC.
At the Carr Boyd Rocks Nickel Mine Ni-Cu mineralisation is hosted within several 20 - 60m
diameter brecciated pipe-like bodies that appear to be discordant to the magmatic stratigraphy.
Mineralisation is hosted by a matrix of sulphides (pyrrhotite, pentlandite, pyrite and chalcopyrite)
within brecciated Bronzite and altered country rock clasts.
Stratiform Ni-Cu-PGE mineralisation has been identified at several different stratigraphic levels
within the layered magmatic complex. Low grade stratiform disseminated Ni-Cu-PGE sulphides
Criteria
JORC Code explanation
Commentary
have been identified at several locations within the basal parts of the complex and at shallower
stratigraphic levels of the complex. The presence of Ni-Cu-PGE mineralisation within multiple
stratigraphic positions and of several unique styles of mineralisation highlights the potential of
the CBLC for hosting a substantial Ni-Cu deposit.
The Company is not aware of any significant cobalt exploration being completed in the area.
Drill hole
Information
A summary of all information material to the
All relevant drillhole information can be found in Table 1.
understanding of the exploration results
including
a
tabulation
of
the
following
information for all Material drill holes:
o
easting and northing of the drill hole
collar
o
elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception
depth
o
hole length.
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
No information is excluded.
Criteria
JORC Code explanation
Commentary
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging
techniques,
maximum
and/or
minimum grade truncations (e.g. cutting of
Intersections are reported on a nominal 0.25% Ni cut-off with length weighted intervals.
Aggregation is achieved by calculation of length weighted intervals. SG weighting cannot be
applied as no SG data are available.
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and
some
typical
examples
of
such
aggregations should be shown in detail.
The assumptions used for any reporting of
No metal equivalents are used in this announcement.
metal equivalent values should be clearly
stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
The drill line and drill hole orientation in relation to mineralisation orientation cannot be
determined at this stage.
True width cannot be determined.
Criteria
JORC Code explanation
Commentary
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams
Appropriate maps and sections (with scales)
Appropriate maps and tables are included in the body of the Report.
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Balanced
reporting
Where
comprehensive
Exploration
Results
reporting
is
not
of
all
practicable,
All drillholes in the target area within a are reported in Table 1.
The results in this announcement are all from historic drilling drilled before 1997.
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited
to):
geophysical
geological
results;
of
survey results; geochemical
treatment;
bulk
metallurgical
density,
Geological observations are included in the report.
observations;
survey results; bulk samples – size and
method
Everything meaningful and material is disclosed in the body of the report.
test
groundwater,
No bulk samples, metallurgical, bulk density, groundwater, geotechnical and/or rock
characteristics test were carried out.
There are no known potential deleterious or contaminating substances.