5A Mineral Resource Estimate Upgrade
Released
Released
Announcement PDF
ASX:ESR
18 October 2022
Spargoville 5A Resource Estimate Upgrade
HIGHLIGHTS
The majority of the Spargoville 5A Resource now classified as Measured, grading 2.8% Ni
High confidence level in the geology, mineralogy and bulk densities
Deposit remains open at depth
Optimisation work to commence immediately to inform a Definitive Feasibility Study targeting 16,000t
of Massive Sulphide grading 7.8% Ni below the existing pit
Contract negotiations in final stages so the 2k-4k bulk sample can be mined, transported, processed
and the nickel sold
Testing has indicated that vast majority of nickel can be successfully extracted
5A Pre-mining site works have commenced Monday 17 October 2022
Figure 1: Location of Massive Sulphide averaging 7.8% Ni below the existing 5A Open Pit
_________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Managing Director Chris Daws commented:
“I am pleased to report this resource upgrade offers continued evidence of the quality of the
Spargoville 5A resource. Compared to the 2019 MRE, the upgrade highlights a shift of bulk tonnages
into the Measured Resource category in the area immediately below the open pit which we are
targeting for production and an increase in the amount of Transitional material which had previously
been classified as Fresh has been outlined.
Following the upgrade, we have now begun optimisation work to inform a Definitive Feasibility Study
targeting 16,000 tonnes of Massive Sulphide grading 7.8% nickel below the existing 5A open pit. We
remain firmly on target in bringing Spargoville into operation next year should the DFS be favourable.
As has been repeated to me by many a miner, grade is king! 5A delivers on this metric and at current
nickel prices is certainly worth pursuing development.”
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce an upgrade to
the 5A Mineral Resource Estimate (MRE) at the Company’s Spargoville Nickel Project, located
approximately 20km Southwest of Kambalda, Western Australia.
The update takes into account recent metallurgical drilling below the existing 5A open pit conducted from
May to July this year which assisted in defining mineralisation types and depths. The drilling also firmed up
massive and matrix sulphide widths, mineralogy and bulk densities which are required to be well understood
prior to mining.
The updated MRE is presented below in Table 1. The upgrade in comparison to the 2019 MRE saw the
bulk of tonnes shift into the Measured Resource in the area below the pit which Estrella is targeting for
production. There was also an increase in the amount of Transitional material.
Table 1: 5A October 2022 Mineral Resource Estimate (0.5% Ni Cut-off Grade)
Type
Oxide
Transition
Total
Type
Oxide
Transition
Total
Type
Oxide
Transition
Fresh
Total
Type
Oxide
Transition
Fresh
Total
Tonnage
kt
4
53
60
Ni
%
1.6
3.0
2.8
Measured Mineral Resource
Cu
Co
Ni
%
%
t
0.17
0.04
70
0.22
0.07
1,570
0.22
0.06
1,640
Tonnage
kt
20
17
36
Ni
%
0.8
1.3
1.0
Indicated Mineral Resource
Cu
Co
Ni
%
%
t
0.06
0.02
150
0.08
0.03
220
0.07
0.02
370
Cu
t
10
10
20
Co
t
4
5
10
Tonnage
kt
4
6
20
30
Ni
%
0.7
0.7
1.4
1.2
Inferred Mineral Resource
Cu
Co
Ni
%
%
t
0.12
0.02
30
0.25
0.02
40
0.11
0.03
280
0.14
0.02
350
Cu
t
10
10
20
40
Co
t
1
1
5
10
Ni
%
0.9
2.4
1.4
1.9
Total Mineral Resource
Cu
Co
Ni
%
%
t
0.09
0.02
250
0.19
0.05
1,840
0.11
0.03
280
0.15
0.04
2,370
Cu
t
20
150
20
190
Co
t
6
40
5
50
Tonnage
kt
28
76
20
124
Note: Refer to Competent Person Statement below.
Cu
t
10
120
130
Co
t
2
40
40
Estrella is particularly focussed on the 16kt of Massive grading 7.8% Ni which lies below the pit floor and is
accessible via a pit cut-back. The relative volumes of material are shown in Table 2 and Figure 1.
Table 2: October 2022 Mineral Resource Estimate - Mineralisation Type (0.5% Ni Cut-off)
Type
Disseminated
Matrix/Breccia
Massive
Total
Tonnage kt
76
32
16
124
Ni%
0.6
2.0
7.8
1.9
Total Mineral Resource
Cu%
Co%
Ni T
0.07
0.02
490
0.14
0.03
650
0.59
0.19
1,230
0.15
0.04
2,370
Cu T
50
40
90
190
Co T
10
10
30
50
Figure 2: Spargoville 5A Open Pit digital model with recent diamond drilling
Mineralogical analysis of the core showed the bulk of the nickel in the massive sulphide below the open pit
resides in violarite with additional nickel coming from sulphates, carbonates and then silicates. This
confirmed the Company’s view that traditional flotation would suffer unacceptable soluble nickel losses as
highlighted by flotation test work. Massive and matrix mineralogy is shown in Figure 3 below. Sulphides are
predominantly violarite with minor pyrite and marcasite. The sulphates are also nickel bearing.
Figure 3: XRD analysis of Massive and Matrix Sulphide arranged in order of increasing assayed nickel content
The alternative treatment method sought by Estrella has been shown through testing that the vast majority
of nickel can be successfully extracted, including the silicate and soluble fractions. The 2,000t to 4,000t
bulk sample will help the Company to quantify nickel, copper and cobalt recoveries for the DFS.
Inclement weather and a shortage of suitable machinery and contractors in the Goldfields has seen a slight
delay of the extraction of the bulk sample. The Company expects the sample to be mined in the current
quarter with pre-mining site works already commenced with ramp access, pit floor preparation and ore
mark-up underway. A short drill-blast program followed by extraction of the first ore bench will be
undertaken by local contractors under the supervision of Company representatives and consultant mining
specialist. High grade nickel ore will be placed onto the 5B ROM pad where it will be crushed/screened to
required size before being transported by road train to the desired treatment facility for processing and
recovery of the nickel metal.
5A Mineral Resource Estimate Details
Geology and Geological Interpretation
The Spargoville Project area lies within the Coolgardie Domain, the western most domain of the Kalgoorlie
Greenstone Terrain, which stretches northwards from Norseman to Menzies. The Project is situated within
a dominantly north-south striking belt of Archaean greenstone rocks that extend north from the
Widgiemooltha Dome. The 5A deposit is characterised as a Kambalda style (komatiite hosted) nickel
sulphide deposit.
Nickel mineralised bodies at Spargoville commonly form as lenses of massive sulphide up to several metres
thick within ultramafic rocks at or near the ultramafic / meta-basalt contact. A halo of disseminated, lowergrade, mineralisation often extends up to 20m width into the ultramafics and rare veins of sulphide may be
found in the underlying meta-basalt. The major ore bodies are all lensoidal with limited extent down dip and
along strike, suggesting structural control in the form of embayment structures or depressions in the metabasalt.
Sampling and Sub-Sampling Techniques
Most of the drilling, sampling and assaying was completed by Selcast Exploration and Amalg Resources.
Core was sampled at 1m intervals or to geological contacts and RC samples were collected at 1m intervals
from the rig mounted splitter.
For ESR drilling, RC drill holes were sampled by 1m cone split composites through mineralisation and 4m
spear samples in unmineralised material, producing a nominal 3kg to 5kg representative sample. RC drilling
was 5 ¼ inch in diameter. Diamond drill holes were carried out with HQ or NQ core diameter, using standard
tube. Diamond holes were sampled at 1m intervals or to geological contacts. Core was cut in half with a
core saw.
Drilling Techniques
ESR drilling included RC drilling with 5.5 inch hammer and diamond core of HQ and NQ diameter with 3m
standard tubes.
Classification Criteria
The 5A Mineral Resource was classified as Measured, Indicated and Inferred Mineral Resource based on
data quality, sample spacing, and lode continuity. The Measured Mineral Resource was defined in the core
of the deposit that was drilled with close spaced RC and diamond drilling of less than 10m by 10m. The
Indicated Mineral Resource was defined within areas of close spaced RC and diamond drilling of less than
20m by 20m, and where the continuity and predictability of the lode positions was good. The Inferred
Mineral Resource was assigned to areas where drill hole spacing was greater than 20m by 20m, where
small, isolated pods of mineralisation occur outside the main mineralised zones, and to geologically
complex zones.
Sample Analysis Method
Sample analysis was undertaken at Intertek laboratory in Kalgoorlie and ALS laboratories in Perth. Nickel
and multielement analysis were performed by 4 acid digest and a combination of ICP-MS and ICP-OES
analysis techniques. Gold and PGEs were determined by a 25g fire assay fusion, followed by aqua regia
digest and ICP-MS finish.
Estimation Methodology
The mineralisation was constrained by wireframes prepared using a variety of cut-offs for the various
sulphide mineralisation types. Disseminated sulphide was domained using a nominal 0.4% nickel cut-off,
plus geological logging, matrix sulphide was domained using a nominal 1.0% nickel cut-off, plus geological
logging; and semi-massive to massive sulphide mineralisation was domained using a 4.0% nickel cut-off,
plus geological logging. Following a review of the population histograms and log probability plots and noting
the low coefficient of variation statistics, it was determined that the application of high-grade cuts was not
warranted.
The block model parent block dimensions used were 10m NS by 5m EW by 5m vertical with sub-cells of
0.625m by 0.625m by 0.625m. The parent block size dimension was selected on the results obtained from
KNA that suggested this was the optimal block size for the 5A dataset. Composites in areas of drill hole
spacing of 10m by 10m or less were interpolated into a block size of 5m by 5m by 2.5m. The Mineral
Resource block model was created and estimated in Surpac using Ordinary Kriging (“OK”) grade
interpolation. An orientated ‘ellipsoid’ search was used to select data and adjusted to account for the
variations in lode orientations, however all other parameters were taken from the variography. Up to three
passes were used for each domain. First pass had a range of 30m, with a minimum of 6 samples. For the
second pass, the range was extended to 60m, with a minimum of 4 samples. For the third pass, the range
was extended to 100m, with a minimum of 2 samples. A maximum of 16 samples was used for all passes,
with a maximum of 4 samples per hole.
A total of 404 bulk density measurements were taken on core samples collected from diamond holes drilled
at the deposit using the dry weight / wet weight technique. Bulk densities were assigned a density versus
nickel regression equation for transitional and fresh mineralisation. Bulk densities for the oxide
mineralisation were assigned in the block model based on the average of the measurements of 2.7t/m 3.
Average waste densities were assigned based on lithology and weathering from measurements.
Cut-off Grade
The Statement of Mineral Resources has been constrained by the mineralisation solids and reported above
a cut-off grade of 0.5% nickel.
Mining and Metallurgical Methods and Parameters
It is assumed that the 5A deposit can be mined using open pit techniques. A high-level optimisation analysis
shows that this can be achieved at current nickel prices and assuming the 5A material is treated by total
ore digestion.
Metallurgical testing has been conducted on samples obtained from the 5A deposit. Testing indicates that
the 5A material shows more than 90% recovery utilising total digestion.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The Mineral Resource has been compiled under the supervision of Mr. Shaun Searle who is a director of Ashmore
Advisory Pty Ltd and a Registered Member of the Australian Institute of Geoscientists. Mr. Searle has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that
he has undertaken to qualify as a Competent Person as defined in the JORC Code.
All Mineral Resources figures reported in the table above represent estimates as at October 2022. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the location,
shape and continuity of the occurrence and on the available sampling results. The totals contained in the above table
have been rounded to reflect the relative uncertainty of the estimate. Rounding may cause some computational
discrepancies.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
The information in this announcement relating to Exploration Results is based on information compiled by Steve
Warriner, who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr. Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”.
Both Mr. Searle and Mr. Warriner consent to the inclusion in the report of the matters based on their information in the
form and context in which it appears.
Forward Looking Statements
This announcement contains certain forward looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
JORC Table 1
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
Commentary
The Spargoville landholding has been
drilled by DD (surface and underground),
RC, RAB and Percussion and air core,
drilling both for nickel and gold.
DD and RC sampling techniques
conducted prior to this drilling program are
not known but are assumed to be industry
standard at the time of collection. Pre-this
program, data was compared to historic
data and the two datasets generally
correlated well.
From KWC series holes reported in this
announcement, RC drill holes were
sampled by 1m cone split composites
through mineralisation and 4m spear
samples in unmineralised material. RC
drilling was 5 ¼ inch in diameter.
For ESR RC holes, sampling was cone
split from 1m composite bulk samples,
producing a nominal 3kg to 5kg
representative sample.
RC samples ranged from 4m in waste
material and 1m in or near mineralisation.
Nickel mineralisation consists of contact
massive sulphides (violarite, pyrite,
pyrrhotite,
pentlandite,
chalcopyrite)
typically 1.5m to 4m thick, overlain by
matrix sulphides and disseminated
sulphides. At 5A the sulphides have been
weathered
to
produce
supergene
sulphides of pyrite and violarite and
secondary oxide material.
Most of the drilling, sampling and assaying
was completed by Selcast Exploration and
Amalg Resources. It is unknown how
samples were collected, but it is assumed
to be industry standard at the time. The
data from this drilling program compared
well with drilling conducted by previous
explorers.
For this drilling program,
representative samples from RC drilling
were collected and sent to Intertek
laboratory in Kalgoorlie for analysis.
Intertek crushed and pulverised the
samples in entirety and took a 50g pulp for
analysis.
For ESR drilling, nickel and multielement
analysis was performed by 4 acid digest
and a combination of ICP-MS and ICPOES analysis techniques. Gold and PGEs
were determined by a 25g fire assay
fusion, followed by aqua regia digest and
ICP-MS finish.
Minor copper, cobalt, and significant
arsenic occur in the nickel mineralisation.
XRD analysis was performed in Perth by
ALS Metallurgy using coarse crushed
reject from the diamond drilling.
The database is comprised of DD
samples, RC samples and RAB/AC drilling
samples. DD drilling included NQ, HQ and
BQ diameter core.
Criteria
JORC Code explanation
what method, etc).
Commentary
Drill sample
recovery
Logging
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling
stages
to
maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
RC sample recoveries were inferred from
sample weights reported by the laboratory
for this program.
No sample weight
information is available for historic drilling.
No relationship exists between sample
recovery and grade.
Diamond core was measured and
recoveries calculated.
Detailed drill hole logs are available for
97.4% of the historic drilling and 100% of
the new drilling.
Prior to the ESR drilling, it is unknown
whether duplicates, standards and blanks
taken for QA/QC purposes were taken.
Hard copy sample logging sheets were
kept. This includes samples numbers for
duplicates, standards and blanks taken for
QA/QC purposes. All data are available
for the work conducted from the current
program.
The logging is of a detailed nature and of
sufficient detail to support the current
reporting of a Mineral Resource.
DD sampling techniques are unconfirmed
for historic drilling.
For the ESR RC drilling, samples were
collected by a rig mounted cyclone and
cone splitter.
For the ESR RC drilling, sample condition
fields to record moisture and sample
recovery is included in the sampling log
sheet and populates the assay table of the
database.
For the ESR RC drilling, sample
preparation is appropriate for RC drilling
as per industry standard practices for
managing RC samples.
For the ESR DD drill holes were carried
out with HQ or NQ core diameter, using
standard tube. DD holes were sampled at
1m intervals or to geological contacts.
Core was cut in half with a core saw.
For the ESR drilling, quality control
procedures included the inclusion of field
duplicates, standard samples and blank
samples into the sampling stream for
laboratory analysis. Standards were
placed every 30 samples with a
combination of blank, low-grade and highgrade standards. Dependent on the
geology, a suitable standard was selected.
Blank standards (OREAS22C) were
generally placed after a mineralised zone
and routinely every 25 samples. Duplicate
sampling was undertaken for the RC
drilling every 20 samples.
Host rock for nickel mineralisation is
mainly a serpentinite lens at the base of an
ultramafic sequence. It is assumed that
prior to the current program sampling
would have been appropriate for the style
of mineralisation; and from the current
program, it is appropriate.
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
Commentary
For the ESR drilling, quality control
procedures included the inclusion of field
duplicates, standard samples and blank
samples into the sampling stream for
laboratory analysis. One standard, blank
and field duplicate were inserted into the
sample stream every 30 and 20 samples
respectively. These were offset through
the sampling stream and placed in areas
of interest i.e. high-grade standards and
blanks in the mineralised zone where
possible. The QAQC results have been
assessed and are acceptable.
No geophysical methods or hand-held
XRF units have been used for
determination of grades in the Mineral
Resource.
Significant intersections were visually field
verified by company geologists and Shaun
Searle of Ashmore during the 2019 site
visit.
Multiple intersections reported have been
checked back to original logs and assay
data.
No twin holes have been drilled.
Drill hole data were sourced from digital
sources and original hard-copy sampling
and assay records and imported into a
central electronic database. Datashed
software was used to validate and manage
the data.
No adjustments have been made to the
assay data.
Surface topography is derived from drill
hole collars and the historical survey
control of the Spargoville open pit. The
new holes were set out and picked up by
Cardno Surveys and downhole surveyed
by ABIMS Solutions.
Prior to the current program it is assumed
that the majority of the drill holes were
down hole surveyed by a single shot tool
and by collar measurement with a
clinometer and compass. This was rarely
recorded in the database. From the
current program of holes were down hole
surveyed by a gyro.
Prior to ESR drilling, original surveying
was undertaken in Kambalda Nickel
Operations Grid (KNO) and from the
current program in GDA94 grid.
The 5A area has been drilled on a regular
pattern and spacing by various previous
operators.
The average spacing is
estimated to be approximately 10m by
10m within the 5A mine area.
The drill data spacing, and sampling is
adequate to establish the geological and
grade continuity required for the current
announcement.
Samples were composited to 1m intervals
prior to estimation.
The drill line and drill hole orientation are
oriented as close as practicable to
perpendicular to the orientation of the
general mineralised orientation.
Most of the drilling intersects the
mineralisation at close to 90 degrees
ensuring intersections are representative
Criteria
JORC Code explanation
introduced a sampling bias, this should be
assessed and reported if material.
Sample
security
The measures taken to ensure sample
security.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
Commentary
of true widths. KWC0004 and KWC0005
are the exception; these holes were
purposefully drilled at a low angle to
mineralisation for the purpose of collecting
bulk sample for metallurgical test work.
No orientation based sampling bias has
been identified in the data.
Sample security measures are unknown
for previous drilling. For the ESR drilling,
sample security measures adopted
include the daily movement of samples to
the Kalgoorlie laboratory, where samples
were securely stored before processing.
For the ESR drilling, RC split samples
were transported from site daily and
delivered to the accredited laboratory
depot in Kalgoorlie for preparation and
analysis.
Industry standard sample security
standards were followed for ESR drilling.
Reports and original log files indicate that
a thorough process of logging, recording,
sample storage and dispatch to labs was
followed at the time of drilling.
Shaun Searle of Ashmore reviewed drilling
and sampling procedures during the 2019
site visit and found that all procedures and
practices conform to industry standards.
For the ESR drilling, sample data reviews
have included an inspection and
investigation of all available paper and
digital geological logs to ensure correct
entry into the drill hole database
Visualisation of drilling data was
completed in three-dimensional software
(Micromine and Surpac), and QA/QC
sampling
review
using
Maxwell
Geoservices QAQCR Software was
undertaken.
Section 2 Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
JORC Code explanation
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Acknowledgment
and
appraisal
of
exploration by other parties.
Commentary
ESR has entered into agreements to hold
a 100% interest in all base metal rights to
the project. The area is held under
M15/395.
The tenement is in good standing with no
known impediments.
Between 1966 and 1971 Australian
Selection Pty Limited (later Selcast
Exploration)
conducted
regional
exploration throughout the Spargoville
area (“WS5” series holes). During this
period, numerous prospective targets
were identified including the 5A, 5B and
5D deposits.
During 1974, Selcast
commenced underground mining at the
5D deposit which was renamed Andrews.
Prior to the cessation of mining at
Andrews in 1979, a decline was
developed into the footwall of the 5B ore
body, however elevated arsenic levels in
Criteria
JORC Code explanation
Commentary
the ore and falling nickel prices prevented
production from the mine at this time.
Despite substantial deep diamond drilling
at 5A the tonnage of the nickel sulphide
ore body defined did not warrant mining at
the time.
In the early 1980s, BP Minerals Australia
acquired
Selcast
and
continued
exploration in the Spargoville area, to
determine the potential for economic gold
mineralization
Share your feedback