High Grade Nickel Results Spargoville
Released
Released
Announcement PDF
ASX:ESR
23 August 2022
Further High-Grade Results Received Beneath the
Spargoville 5A Nickel Mine
HIGHLIGHTS
High-grade results over good widths continue to be returned from below the Spargoville 5A Nickel Mine:
SPDD018 – 6.80m* @ 4.40% Ni from 66.2m including 1.76m @ 10.21% Ni
SPDD017 – 4.05m* @ 3.05% Ni from 76.9m including 1.28m @ 7.28% Ni
SPDD016 – 3.0m* @ 1.15% Ni from 23.3m including 2.0m @ 1.23% Ni
SPDD015 – 19.0m* @ 0.74% Ni from 36m including 3.3m @ 1.09% Ni
SPDD019 intersected 2.65m Massive and Matrix Sulphides, waiting on assays
SPDD020 intersected 2.63m Massive and Semi-Massive Sulphides, waiting on assays
Removal of drill water from base of open pit nearing completion which will allow for the extraction of the
bulk metallurgical sample
Infrastructure acquired from Main Roads Contractor include a 1 megalitre, fully lined and fenced turkeys
nest dam at the Andrews Shaft and a 5-acre cleared pad at the 5B Nickel Mine suitable for crushing,
load and haul operations
Figure 1: Spargoville 5A Open Pit Nickel Mine as at 10th August 2022
* Down hole widths quoted. For true widths refer to Table 1
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce that work on the
Company’s Spargoville Nickel Project, located approximately 20km Southwest of Kambalda, Western
Australia, continues to gather momentum.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Managing Director Chris Daws commented:
“As expected, we continue to see very high-grade assays returned from the recent confirmation
diamond drilling of the 5A nickel deposit. Planning for the extraction of the bulk sample has
progressed significantly and I look forward to updating shareholders on how, where and when we
are able to deliver these valuable nickel tonnes for processing as the Company steps towards a
profitable nickel operation.
Outlook for nickel prices continue to look very favourable and now couldn’t be a better time to plan
and develop a nickel mining operation.”
With the second last batch of assays returned from the laboratory confirming good mining widths and high
grades below the 5A Open Pit’s southern and central sections, preparations to produce an updated Mineral
Resource are well underway. The resource update is expected to be completed around three weeks after
the receipt of final assays. Significant delays in assay returns are still evident in the minerals industry with
standard assay returns taking up to 70 days, this will have flow on effects to the completion of the
Company’s DFS which we are now hopeful of completing prior the end of this calendar year.
The first set of XRD results have been received which confirm the mineralogy of the upper transitional
(violarite dominated) zone. With these results beginning to arrive the Company can now progress the
required metallurgical test work it needs to quantify nickel, copper and cobalt recoveries expected during
mining.
Figure 2 below depicts a long section of the 5A Nickel Resource with recent drill intersection locations
plotted. Table 1 below shows significant intercepts from the current drill program whilst Table 2 summarises
the remaining visual estimates that still have assays pending.
Figure 2: Longsection showing current intercept locations against historical intercepts
Table 1: Estrella 5A Significant Intercepts to Date
Metallurgical
Length
From (m) To (m)
Type
(m)
Hole ID
SPDD001
47.00
52.00
5.00
3.10
65.16
68.55
3.39
2.46
65.64
68.30
2.66
90.95
92.50
1.55
90.95
91.55
0.60
OXIDE
70.85
73.00
2.15
Including
TRANSITIONAL
72.40
73.00
0.60
Lower
NSA - Dolerite dyke on contact
Total
Including
SPDD003
SPDD004
SPDD005
Total
Including
Total
OXIDE
TRANSITIONAL
TRANSITIONAL
Total
SPDD006
SPDD007
SPDD008
SPDD009
Ni %
Cu % Co ppm Pt g/t Pd g/t
S%
Fe %
MgO% As ppm
SG
1.50
0.01
239
0.02
0.04
0.0
9.0
21.1
181
2.7
Core loss in massive sulphide - redrill with SPDD020
Total
SPDD002
T.W.
(m)
0.94
1.49
0.63
1756
0.34
0.18
21.5
28.1
4.5
460
3.1
0.79
2195
0.42
0.22
27.1
30.2
2.8
448
3.1
5.06
0.21
1102
0.29
0.30
12.6
21.0
2.1
1176
2.9
11.00
0.44
2280
0.58
0.31
28.5
33.9
0.5
672
3.2
2.35
0.06
711
0.06
1.30
4.5
11.3
18.2
2613
2.8
6.54
0.19
2290
0.15
4.65
15.7
22.2
3.1
6380
2.7
1.68
0.07
372
0.09
0.15
2.8
9.0
24.5
410
2.9
1.85
0.07
269
0.08
0.18
1.3
7.8
18.1
180
2.7
59.48
70.60
11.12
Including
OXIDE
61.38
62.87
1.49
And
TRANSITIONAL
69.12
70.60
1.78
6.93
0.27
1493
0.41
0.57
15.8
24.1
7.0
2186
2.9
Including
TRANSITIONAL
70.20
70.60
0.70
13.05
0.61
2350
0.99
0.60
36.5
28.9
0.4
1990
2.7
74.35
77.05
2.70
2.47
0.21
420
0.07
0.20
5.8
20.3
9.5
1594
3.0
76.00
77.05
1.05
4.90
0.45
787
0.13
0.44
12.4
22.0
4.6
3849
2.9
5.46
0.21
1689
0.11
0.43
13.5
22.8
2.2
1334
3.1
Total
including
TRANSITIONAL
Lower
NSA - Sheared out base
Total
69.85
73.30
3.45
7.48
8.22
10.34
1.54
2.33
Including
OXIDE
69.85
72.10
2.25
2.37
0.02
365
0.02
0.03
0.3
20.4
3.2
402
3.0
And
TRANSITIONAL
72.10
73.30
1.20
10.85
0.55
4000
0.27
1.12
36.6
27.1
0.5
2960
3.2
SPDD010
Lower
NSA - Sheared out base
SPDD011
Lower
NSA - Did not intersect footwall
Total
SPDD012
56.30
63.75
7.45
1.32
0.02
326
0.06
0.13
0.6
11.7
13.5
1153
2.8
Including
OXIDE
60.58
62.37
1.79
1.80
0.01
295
0.02
0.04
0.1
15.5
9.6
1702
2.7
And
TRANSITIONAL
62.37
62.80
0.43
4.67
0.02
1945
0.45
1.20
6.9
15.9
2.5
4120
3.2
63.7
73.65
9.95
1.25
0.07
217
0.03
0.03
1.0
9.1
7.3
273
2.7
Total
SPDD013
5.34
5.78
Including
OXIDE
67.6
70.25
2.65
1.63
0.02
181
0.02
0.01
0.2
9.7
4.0
113
2.7
And
TRANSITIONAL
72.1
73.65
1.55
2.54
0.32
613
0.12
0.04
5.5
11.9
2.7
445
2.7
SPDD014
Lower
NSA - Dolerite dyke on contact
36.00
55.00
19.00
0.74
0.01
147
0.01
0.03
0.0
8.6
11.3
178
2.8
SPDD015
including
OXIDE
39.20
40.02
0.82
1.15
0.01
195
0.02
0.05
0.0
10.5
14.8
163
2.7
and
OXIDE
50.00
53.30
3.30
1.09
0.02
140
0.02
0.02
0.0
8.7
3.5
225
2.9
23.30
26.30
3.00
1.15
0
228
0.06
0.2
0.0
10.2
22
13.6
2.62
24.30
26.30
2.00
1.23
0
226
0.06
0.2
0.0
9.9
23
13.5
2.61
0.55
0.01
129
0.00
0.01
0.2
7.3
28.0
391
2.8
1.74
0.01
302
0.01
0.01
0.1
11.9
25.0
800
2.8
3.05
0.18
695
0.14
0.23
8.5
19.5
4.1
790
3.2
7.28
0.45
1636
0.29
0.45
20.7
29.9
3.2
1392
3.5
1.37
0.00
169
0.00
0.01
0.0
8.7
20.3
1057
2.7
4.40
0.31
946
0.18
0.51
12.0
19.8
10.4
953
3.3
10.21
0.69
2140
0.24
0.94
29.4
30.1
1.5
2007
3.6
Total
Total
SPDD016
SPDD017
SPDD018
Including
OXIDE
Lower
TRANSITIONAL NSA - Sheared out base
Total
56.56
59.46
2.90
including
59.16
59.46
0.30
Total
76.95
81.00
4.05
11.15
1.85
1.70
2.40
including
TRANSITIONAL
79.72
81.00
1.28
Total
OXIDE
57.53
59.80
2.27
1.71
Total
TRANSITIONAL
66.20
73.00
6.80
4.50
70.86
72.62
1.76
Including
SPDD019
Visual 2.65m Massive and Matrix Sulphides - Awaiting Assays *
SPDD020
Visual 2.63m Massive and Semi-Massive Sulphides - Awaiting Assays *
Results for SPDD001 to SPDD014 have previously been released to the market
Table 2: Current Drilling Visual Estimates*
Hole ID
m
From
m To
Interval
True
Width
SPDD019
73.15
75.8
2.65
1.65
SPDD020
66.40
69.03
2.63
1.70
Mineralisation
Type
Massive /
Matrix
Massive /
Semi-Massive
Nickel
Oxide
Percentage
Transitional
Sulphide
Percentage
Fresh
Sulphide
Percentage
Gangue
Mineral
Percentage
0%
50%
30%
20%
0%
60%
20%
20%
*In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide abundance should
never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine the widths
and grade of mineralisation. The Company will update the market when laboratory analytical results become available.
The removal of drill water from the base of the open pit is nearing completion and is expected to take
another 10 days. Once this has been completed, pit-floor clean-up and preparations for the removal of the
bulk sample will commence. The bulk sample is expected to be completed in October.
With the completion of the Goldfields-Esperance Highway upgrade, the Main Roads Contractor has handed
over control of key infrastructure to Estrella. This includes a one million litre lined and fenced dam (turkey’s
nest) at the Andrews Mine and a cleared, 5-acre pad at the 5B Nickel Mine. Both these are critical
infrastructure that enable the fast-tracking of the bulk sample acquisition in October. Figure 3 shows the
close location of these assets with respect to the 5A Open Pit.
Figure 3: Areal view of the Spargoville Project and location of infrastructure
Figure 4: Turkey's nest located at the Andrew's Shaft providing readily available water source
The Company looks forward to updating shareholders when the last batch of assays are received.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve
Warriner, who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr. Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Forward Looking Statements
This announcement contains certain forward looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Table 3: Collar and Survey Details
Hole ID
SPDD001
SPDD002
SPDD003
SPDD004
SPDD005
SPDD006
SPDD007
SPDD008
SPDD009
SPDD010
SPDD011
SPDD012
SPDD013
SPDD014
SPDD015
SPDD016
SPDD017
SPDD018
SPDD019
SPDD020
Easting
357981.5
357981.5
357981.5
357977.5
357977.5
357971.0
357971.0
357971.0
357971.0
357971.0
357971.0
357971.0
357971.0
357971.0
357966.4
357966.8
357977.5
357977.5
357977.5
357981.5
Northing
6530249.5
6530249.5
6530249.5
6530214.7
6530214.7
6530187.5
6530187.5
6530187.5
6530187.5
6530187.5
6530187.5
6530187.5
6530187.5
6530187.5
6530154.2
6530154.2
6530214.7
6530214.7
6530214.7
6530249.5
RL
345.1
345.1
345.1
347.3
347.3
348.1
348.1
348.1
348.1
348.1
348.1
348.1
348.1
348.1
348.8
348.8
347.3
347.3
347.3
345.1
Depth
85
82
105
90
110
85
90
99
85
110
115
90
97
103
75
85
90
90
100
85
Dip
-47.4
-43.1
-55
-45
-60
-43
-51
-57
-45
-60
-65
-41
-50
-58
-45
-55
-52
-45
-50
-46
Azimuth
286.6
267.6
267.6
270
270
288
288
288
270
270
270
253
253
253
270
270
288
288
270
286
Status
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Table 4: Assay results
Hole ID
m
From
m To
Interval
Sample #
Ni
%
Cu
%
Co
ppm
Pt
g/t
Pd
g/t
S
%
Fe
%
MgO
%
As
g/t
SG
SPDD015
30.4
31.9
1.5
CBR115501
0.25
0.01
87
0.01
0.02
0.03
4.94
29.02
28
2.171
SPDD015
31.9
34
2.1
CBR115502
0.28
0.00
90
0.01
0.03
0.03
4.53
30.43
79
SPDD015
34
36
2
CBR115503
0.40
0.01
123
0.01
0.03
0.01
4.63
29.10
87
SPDD015
36
38.1
2.1
CBR115505
0.57
0.01
141
0.01
0.03
0.01
5.63
22.96
53
2.681
SPDD015
38.1
39.2
1.1
CBR115506
0.71
0.01
156
0.02
0.04
0.01
7.38
19.15
79
2.677
SPDD015
39.2
40.02
0.82
CBR115507
1.15
0.01
195
0.02
0.05
0.01
10.50
14.76
163
2.713
SPDD015
40.02
41.36
1.34
CBR115508
0.62
0.01
124
0.02
0.04
0.01
7.00
13.22
168
2.722
SPDD015
41.36
42.9
1.54
CBR115509
0.28
0.00
123
0.01
0.02
0.00
6.17
23.13
47
2.89
SPDD015
42.9
44.8
1.9
CBR115510
0.72
0.01
253
0.02
0.04
0.01
10.85
14.94
400
2.91
SPDD015
44.8
45.64
0.84
CBR115511
0.66
0.02
223
0.02
0.03
0.00
10.65
14.51
330
2.91
SPDD015
45.64
47.5
1.86
CBR115512
0.39
0.01
71
0.01
0.02
0.00
7.96
5.31
62
2.90
SPDD015
47.5
48.4
0.9
CBR115513
0.79
0.01
140
0.01
0.02
0.01
11.55
4.15
222
2.91
SPDD015
48.4
50
1.6
CBR115514
0.92
0.01
104
0.01
0.01
0.01
9.47
5.32
160
2.92
SPDD015
50
50.8
0.8
CBR115515
1.09
0.01
108
0.01
0.01
0.01
6.72
4.51
109
2.92
SPDD015
50.8
53.3
2.5
CBR115517
1.09
0.03
150
0.02
0.03
0.03
9.37
3.12
262
2.92
SPDD015
53.3
54.3
1
CBR115518
0.86
0.01
124
0.01
0.01
0.10
9.60
4.10
203
2.92
SPDD015
54.3
55
0.7
CBR115519
0.65
0.01
184
0.01
0.01
0.25
9.56
5.65
239
2.626
SPDD015
55
56
1
CBR115520
0.29
0.01
85
0.01
0.01
0.12
8.25
5.39
101
2.748
SPDD015
56
56.8
0.8
CBR115521
0.05
0.01
59
0.01
0.01
0.04
6.49
5.50
16
2.891
SPDD015
56.8
58
1.2
CBR115522
0.02
0.01
56
0.01
0.01
0.11
6.26
5.22
10
2.892
SPDD015
58
59
1
CBR115523
0.02
0.01
57
0.01
0.01
0.03
7.15
7.98
5
2.954
SPDD016
23.3
24.3
1
CBR115599
0.99
0.09
230
0.07
0.17
0.06
10.65
21.64
14
2.653
SPDD016
24.3
25.3
1
CBR115600
1.35
0.07
213
0.06
0.12
0.01
8.71
24.79
11
2.637
SPDD016
25.3
26.3
1
CBR115601
1.10
0.12
240
0.06
0.19
0.02
11.20
20.73
16
2.577
SPDD016
26.3
27.35
1.05
CBR115603
0.43
0.04
118
0.01
0.06
0.01
8.01
25.78
6
SPDD016
27.35
28.4
1.05
CBR115604
0.25
0.01
89
0.01
0.04
0.01
7.39
28.60
0
SPDD016
28.4
30
1.6
CBR115605
0.39
0.03
87
0.01
0.05
0.00
4.19
35.65
5
SPDD016
48.7
49.9
1.2
CBR115606
0.47
0.02
127
0.01
0.05
0.00
8.29
9.24
115
SPDD016
49.9
51.3
1.4
CBR115607
0.25
0.01
47
0.01
0.02
0.00
8.15
5.59
25
2.667
SPDD016
51.3
52.7
1.4
CBR115608
0.42
0.01
55
0.01
0.02
0.00
7.55
4.56
SPDD016
52.7
53.9
1.2
CBR115609
0.28
0.01
44
0.01
0.01
SPDD016
53.9
55.1
1.2
CBR115610
0.29
0.01
63
0.02
0.02
SPDD016
55.1
56.3
1.2
CBR115611
0.19
0.01
55
0.02
SPDD016
56.3
57.6
1.3
CBR115612
0.10
0.01
49
SPDD016
57.6
59
1.4
CBR115613
0.07
0.01
SPDD016
59
60
1
CBR115614
0.29
0.01
SPDD017
52
54
2
CBR115631
0.18
0.01
SPDD017
54
55.28
1.28
CBR115632
0.24
SPDD017
55.28
56.56
1.28
CBR115633
0.26
SPDD017
56.56
57.85
1.29
CBR115634
SPDD017
57.85
59.16
1.31
SPDD017
59.16
59.46
SPDD017
59.46
60.72
SPDD017
60.72
61.98
SPDD017
61.98
SPDD017
SPDD017
86
0.02
5.96
4.76
49
0.01
12.15
4.16
133
0.02
0.01
12.90
3.50
159
0.02
0.01
0.07
7.60
4.38
26
45
0.01
0.01
0.12
8.59
4.33
0
2.589
90
0.01
0.01
0.17
9.28
5.12
9
2.705
74
0.01
0.00
0.28
5.23
26.61
47
2.832
0.01
89
0.01
0.02
0.02
5.25
25.04
181
2.669
0.01
183
0.01
0.01
0.03
6.32
25.78
505
2.614
0.56
0.01
127
0.01
0.01
0.03
8.72
28.10
528
2.612
CBR115635
0.28
0.00
91
0.00
0.00
0.31
5.01
28.60
176
2.877
0.3
CBR115636
1.74
0.01
302
0.01
0.01
0.06
11.85
25.04
800
2.841
1.26
CBR115637
0.31
0.01
101
<0.005
0.00
0.25
5.69
28.44
229
2.894
1.26
CBR115638
0.43
0.02
164
0.01
0.01
0.70
6.95
26.94
268
2.969
63.24
1.26
CBR115639
0.20
0.01
84
<0.005
0.01
0.14
5.64
28.10
196
2.959
63.24
64.5
1.26
CBR115641
0.19
0.01
84
0.01
0.00
0.09
5.54
28.35
147
2.712
64.5
65.76
1.26
CBR115642
0.24
0.02
92
0.01
0.01
0.15
5.57
27.77
215
2.847
SPDD017
65.76
67.02
1.26
CBR115643
0.22
0.00
91
<0.005
0.00
0.06
5.91
29.51
328
2.832
SPDD017
67.02
68.28
1.26
CBR115644
0.27
0.01
99
<0.005
0.01
0.25
7.97
25.53
143
2.789
SPDD017
68.28
69.54
1.26
CBR115645
0.18
0.01
93
0.02
0.02
0.50
7.86
25.37
355
2.776
SPDD017
69.54
70.8
1.26
CBR115646
0.24
0.01
94
0.03
0.05
0.22
6.27
28.10
956
2.751
SPDD017
70.8
72.06
1.26
CBR115647
0.23
0.00
100
0.02
0.02
0.07
6.26
31.84
1195
2.727
SPDD017
72.06
73.32
1.26
CBR115648
0.20
0.01
94
0.02
0.03
0.11
6.21
29.76
894
2.889
SPDD017
73.32
74.58
1.26
CBR115649
0.18
0.00
103
0.01
0.01
0.13
6.64
30.51
672
2.902
SPDD017
74.58
75.85
1.27
CBR115650
0.20
0.00
89
<0.005
0.00
0.02
7.44
29.76
1275
2.934
SPDD017
75.85
76.34
0.49
CBR115651
0.07
0.02
88
0.02
0.02
0.47
14.60
13.98
241
3.16
SPDD017
76.34
76.95
0.61
CBR115652
0.27
0.08
110
0.05
0.03
0.77
8.65
6.60
162
2.715
SPDD017
76.95
77.25
0.3
CBR115653
4.87
0.05
986
0.28
0.55
11.65
25.90
6.18
861
3.632
SPDD017
77.25
78.41
1.16
CBR115654
0.26
0.03
104
0.03
0.07
0.79
10.65
3.90
426
2.868
SPDD017
78.41
79.42
1.01
CBR115655
0.10
0.04
48
0.01
0.01
0.31
13.00
4.61
79
3.143
SPDD017
79.42
79.72
0.3
CBR115656
0.57
0.04
124
0.06
0.12
1.43
15.15
5.47
1535
3.042
SPDD017
79.72
80.16
0.44
CBR115657
12.10
0.28
2660
0.48
0.62
32.10
36.30
0.85
1265
3.847
SPDD017
80.16
80.67
0.51
CBR115658
6.54
0.86
1535
0.27
0.50
21.30
28.50
4.11
1745
3.312
SPDD017
80.67
81
0.33
CBR115660
1.04
0.10
225
0.05
0.14
2.25
22.20
5.39
1050
3.36
SPDD017
81
82
1
CBR115661
0.49
0.02
120
0.03
0.03
1.07
7.64
4.46
120
2.828
SPDD017
82
83
1
CBR115662
0.02
0.02
52
0.01
0.01
0.10
5.85
4.11
109
2.752
SPDD017
83
84
1
CBR115663
0.09
0.02
59
0.02
0.02
0.32
6.80
5.01
39
2.618
SPDD017
84
85
1
CBR115664
0.03
0.01
48
0.01
0.01
0.19
7.28
5.34
12
2.899
SPDD018
54
55
1
ECB13052
0.21
0.00
112
0.00
0.00
0.13
7.10
37.80
7
2.878
SPDD018
55
56
1
ECB13053
0.22
0.01
113
0.00
0.00
0.17
6.52
35.15
20
2.892
SPDD018
56
57
1
ECB13054
0.25
0.00
123
0.01
0.01
0.16
6.81
38.80
36
2.864
SPDD018
57
57.53
0.53
ECB13056
0.44
0.00
140
0.00
0.00
0.14
6.16
33.00
39
3.009
SPDD018
57.53
58.8
1.27
ECB13057
1.20
0.00
156
0.00
0.01
0.01
7.33
17.91
694
2.664
SPDD018
58.8
59.8
1
ECB13058
1.59
0.00
185
0.00
0.02
0.01
10.35
23.21
1510
2.715
SPDD018
59.8
60.9
1.1
ECB13059
0.71
0.00
125
0.00
0.00
0.06
5.73
26.20
378
2.768
SPDD018
60.9
62
1.1
ECB13060
0.29
0.00
107
0.00
0.00
0.02
5.33
33.33
899
2.717
SPDD018
62
63
1
ECB13061
0.28
0.00
105
0.00
0.01
0.03
5.23
37.64
1095
2.84
SPDD018
63
64
1
ECB13062
0.26
0.00
106
0.00
0.01
0.03
5.20
37.14
1055
2.806
SPDD018
64
65
1
ECB13063
0.32
0.00
109
0.01
0.03
0.02
5.08
36.15
1840
2.792
SPDD018
65
66.2
1.2
ECB13064
0.27
0.00
88
0.00
0.01
0.07
4.67
25.29
889
2.681
SPDD018
66.2
67.25
1.05
ECB13065
0.73
0.04
170
0.04
0.04
1.21
8.00
22.38
565
2.936
SPDD018
67.25
68
0.75
ECB13066
1.90
0.10
471
0.18
0.11
4.29
16.95
16.66
85
3.308
SPDD018
68
68.6
0.6
ECB13067
1.35
0.08
368
0.05
0.08
2.67
16.35
12.70
74
3.168
SPDD018
68.6
69.7
1.1
ECB13068
2.22
0.16
490
0.18
0.10
5.01
13.70
14.19
158
3.192
SPDD018
69.7
70.86
1.16
ECB13069
3.66
0.27
785
0.34
1.16
9.79
23.20
8.62
1475
3.321
SPDD018
70.86
71.7
0.84
ECB13070
10.90
0.89
2260
0.30
1.13
30.30
33.30
1.54
2280
3.753
SPDD018
71.7
72.62
0.92
ECB13072
9.52
0.49
2020
0.19
0.75
28.50
26.90
1.53
1735
3.436
SPDD018
72.62
73
0.38
ECB13073
1.94
0.43
385
0.02
0.10
6.41
12.95
3.00
207
2.982
SPDD018
73
74
1
ECB13074
0.04
0.02
81
0.01
0.01
0.15
5.53
3.88
87
2.814
SPDD018
74
75
1
ECB13075
0.08
0.02
54
0.02
0.03
0.25
6.67
5.92
35
2.919
SPDD018
75
76
1
ECB13076
0.58
0.07
154
0.03
0.07
1.53
8.84
5.80
113
2.914
SPDD018
76
77
1
ECB13077
0.43
0.04
130
0.02
0.04
1.13
7.74
6.72
82
2.95
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut Diamond core is HQ sized. Core samples are
techniques
channels, random chips, or specific
quarter cut with one quarter sent to the lab for
specialised
industry
standard
assay and three quarters kept frozen at Carr
measurement tools appropriate to the
Boyd for metallurgical sampling. Sulphide
minerals under investigation, such as
determinations for visual estimates are
down hole gamma sondes or handheld
assisted with the use of a handheld Bruker
XRF
instruments,
etc.).
These
XRF.
examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to All core is measured against actual drill depths
ensure sample representivity and the
and recovery calculated to ensure samples are
appropriate
calibration
of
any
representative. Core is cut perpendicular to
measurement tools or systems used.
sulphide/olivine layering.
Drilling
techniques
Drill sample
recovery
Aspects of the determination of
mineralisation that are material to the
Public Report.
Intersections
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Nickel mineralisation consists of contact
massive
sulphides
(pyrite,
pyrrhotite,
pentlandite, violarite, chalcopyrite) typically
less than 1.5m thick, overlain by matrix
sulphides and disseminated sulphides. At 5A
the sulphides have been weathered to produce
supergene
sulphides
of
pyrite
and violarite.
Nickel and multielement analysis is performed
by 4 acid digest and a combination of ICP-MS
and ICP-OES analysis techniques. Gold and
PGEs are determined by a fire assay fusion,
followed by aqua regia digest and atomic
absorption spectrometer (AAS) finish.
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Diamond core is predominantly HQ triple tube
are visually assessed to
determine oxide, transitional and fresh nickel
mineral species. Handheld XRF assists in the
identification of sulphide and arsenic levels.
to maximise recovery.
All core is measured against actual drill depths
and recovery calculated to ensure samples are
representative and to identify core loss.
Logs will include lithology, oxidation, mineral
species, RQD, alteration and gangue mineral
determination.
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Detailed drill hole logs are produced on 100%
The
verification
of
significant
intersections by either independent or
alternative company personnel.
Significant intersections have been reviewed
The use of twinned holes.
Several of the current drillholes twin existing
of the core as per current industry best practise.
All core is photographed and all digital and
paper records will be kept.
Core is ¼ cut for assay with the remaining ¾
stored in a freezer for metallurgical sampling.
Procedures ensure the appropriateness of
samples in line with this style of high-grade
mineralisation.
Standards and blanks have been inserted
into the sample stream at a ratio of 20:1
The size of the core is adequate for this
style of mineralisation.
Standards and blanks are inserted into the
sample stream at a ratio of 20:1
Handheld XRF results are for internal use
within the company and will not be
published. A Bruker XRF instrument was
recently purchased by the company.
by alternative company personnel.
drilling. SPDD005 twins 5ADD002; SPDD009
twins 5ADD018; SPDD018 twins KWC0006.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Drill hole is captured into the LogChief digital
Discuss any adjustment to assay data.
No adjustments are necessary to assay data
system and later validated in 3D using
Micromine. All core will be photographed and
all digital and paper records will be kept.
for this style of mineralisation.
Criteria
Location of
data points
JORC Code explanation
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Commentary
Surface topography is derived from drill hole
collars and the historical mining pick-ups. Drill
holes were set out using an RTK theodolite and
final hole pickups will use DGPS or similar.
Initial drill hole line-ups will be controlled using
a Reflex Azimuth Alligner and drillholes are
surveyed using a Reflex North Seeking Gyro.
Specification of the grid system used.
The MGA94/51 grid system is used.
Quality and adequacy of topographic
control.
Topographic control is considered good. The
Data spacing for
Exploration Results.
of
The Mineral Resource area is drilled on roughly
a 20 x 10m spacing.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied
The drill data spacing and sampling is
The drill line and drill hole orientation is oriented
as close as practicable to perpendicular to the
orientation of the general mineralised
orientation.
Sample
security
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
Visualisation of drilling data will be completed
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
reporting
open pit was surveyed by production personnel
during mining and this has been checked
recently using an RTK system and found to be
accurate in MGA94/51.
adequate to establish the geological and grade
continuity required for the Mineral Resource
estimate.
Significant intersections and metallurgical
samples are composited based upon individual
assays received as per current industry
practise.
Drillholes will intersect mineralisation at a range
of angles. These angles will be measured for
each intersection.
Industry standard sample security standards
will be followed. Samples
Share your feedback
Discover