ASX Release: 29 April 2025
QUARTERLY ACTIVITIES REPORT
Quarter ending 31 March 2025
Estrella Resources Limited
HIGHLIGHTS
•
ABN 39 151 155 207
•
ASX Code: ESR
•
Board and Management
•
Managing Director
Christopher Daws
•
•
Non-Executive Directors
Les Pereira
John Kingswood
Company Secretary
Stephen Brockhurst
Benjamin Smith
•
•
•
Address
Level 8, London House
216 St Georges Terrace Perth
WA 6000
PO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
Estrella prepares to conduct maiden drilling program,
representing first ever minerals drilling in Timor-Leste
following the adoption of a modern mining code
Post period-end, RC/Diamond drill rig shipped to Timor-Leste
with drill contract and working partnership signed with
CoreSearch Minerals and Mining Services LDA
Environmental approvals in final stages of assessment with
ongoing community engagement activities encountering
positive local support
Drill targets finalised after completion of IP data modelling
and geological surveying
Drilling is expected to commence in May once all equipment
has been assembled and all formal approvals are in place
Further high-grade manganese rock chip assays returned:
o Ira Miri Prospect – assays between 40.0% Mn and
58.6% Mn
o Sica Prospect – In-situ supergene returned between
46% Mn and 49.3% Mn
o Sica Prospect – detrital manganese systematically
sampled, assays averaged 40.1% Mn
Surficial alluvial manganese mapped over wide area at the
newly discovered Soru Manganese Prospect
$3.75m Share Placement completed to fund upcoming drilling
campaign
The Company has $3.15M Cash on hand at 31 March 2025
Estrella Resources Limited (ASX: ESR) (“Estrella” or “the Company”)
is pleased to provide an activities report for the period ended 31 March
2025.
Commenting on activities completed during the quarter,
Managing Director Chris Daws said:
We are entering a momentous period for Estrella Resources as we
prepare to launch our maiden Timor-Leste drilling campaign.
Not only does it represent the first ever exploration drilling campaign
in the country since the launch of its modern mining code, it is also
our first chance to test targets below surface where high-grade
manganese has already been widely encountered.
We are thrilled to have excellent support from Murak Rai Timor, our
joint-venture partner, the Timor-Leste government and the local
communities. Their assistance has been vital and we look forward to
further strengthening these ties as we begin the next phase of
exploration.
To all of our loyal shareholders, partners and followers – stay tuned
and stay engaged as we prepare for a milestone period.
TIMOR-LESTE
Maiden Drilling Campaign
Throughout the period, Estrella Resources has conducted a significant amount of work ahead of its
maiden drilling campaign, with the Company preparing to test the Ira Miri, Sica and Lalena manganese
prospects (Figure 1). Post period-end the Company executing a drilling contract and working partnership
with Core Search Minerals and Mining Services LDA (CoreSearch) (Figure 2)1.
Figure 1: Location of the Ira Miri and Sica Prospects
Figure 2: CoreSearch Rig 1 - SP6500 SA-RC-MP capable of both diamond and reverse circulation drilling along with
one of two carriers containing two full rod strings and additional downhole equipment.
1 Refer to ASX Announcement dated: 4 April 2025
CoreSearch is a Dili-based company currently being incorporated by H2O Pump and Power which has
been drilling water bores across Timor-Leste for the past 25 years and has extensive experience
operating in the country.
Estrella has assisted CoreSearch with capital to put together and import to Timor-Leste a complete RC
and diamond capable package to service the nascent Exploration and Mining Industry. The US$200,000
capital inserted into the venture by Estrella will be treated as an unsecured loan and repaid in lieu of
exploration services rendered at US$10 per metre drilled over the first 20,000 metres. Estrella retains
exclusive rights to use of the equipment until the debt owed, and mobilisation costs have been fully
recouped.
Under the agreement, CoreSearch has been contracted to complete an initial round of exploration
consisting of 10,000m of RC drilling and 3,000m of diamond drilling. A secondary round of drilling is also
under contract, consisting of a further 10,000m of RC drilling to be conducted after geological review.
The drill rig is owned by H2O and comes from Darwin. CoreSearch is bringing over a track carrier to
hold the rod string, spare rod string and additional RC and diamond equipment. An additional carrier for
the bulk fuel and compressor was sourced from Vietnam along with the cyclone and splitter. The cyclone
and splitter will be mounted to the drill rig once in Dili. While much of Estrella’s Timor-Leste licenses
cover very accessible region, the track-mounted drill rig and carriers increase mobility across rolling hills
and also permit unhindered travel in wet weather.
Up to 90 RC holes are currently being assessed for approval by the country’s Minerals Authority (ANM)
(Figure 3) and the Company is busy communicating this information to the local communities within the
region.
The drilling will primarily target manganese mineralisation however the holes will also provide
confirmation of the geology encountered in the recent IP trials. Comparison of the geology with
interpreted geophysical responses will assist the Company to develop in-country IP capability to more
accurately target further buried manganese deposits ahead of drilling. Further IP trials with a more
powerful system have been planned so as to open up more targets areas for future drill testing.
The local communities have been very welcoming and engaged in Estrella’s plans to explore in the area.
Estrella along with CoreSearch intend to employ as much local labour as necessary to fill the various
roles required, so that the exploration efforts are of direct benefit to the communities whilst the program
is in full swing.
The Company is in the final stages of gaining environmental approvals to commence ground works
ahead of drilling. The Category B environmental license has been conditionally granted by the ANM and
the Environmental Impact Statement and Environmental Management Plan have been submitted to
round out the environmental permitting process.
As a part of the closing stages of approvals from the ANM, community education and consultation is
well underway with final meetings with stakeholders to be completed in early May. The affected
communities will register cultural sites and other areas of significance with Estrella’s team that will be
safeguarded during the program. Both Estrella and CoreSearch will source additional workers from the
local worker pool along with other concessions to assist these communities.
Figure 3: Planned drill targets showing access roads to be developed in red and RC drill sites in yellow, targeting
manganese horizons within the Noni Formation.
Timor-Leste Manganese Exploration
In February, Estrella announced the return of excellent assays for the two new in-situ supergene
manganese discoveries made in its Lautém Manganese Project in Timor-Leste, along with a bulk
determination for the detrital material that has accumulated on the Sica valley floor2.
The in-situ secondary supergene manganese outcrops at Ira Miri and Sica lie on either side of a river
valley and are around 4.5km apart. The duplication of the Noni Formation, into areas previously thought
to be devoid of the Noni Formation highlights the predictive capacity of the model and opens up new
areas of prospectivity which the company will now look to capitalise upon.
The Ira Miri (New Water) Manganese Discovery
The outcrop at Ira Miri consists of the top three metres of an in-situ supergene blanket formed within the
Noni Formation (Figure 4). The mineralisation is covered by scree from the overlying limestones,
however the trend can be followed over 4 kilometres within which primary, secondary and tertiary
manganese has been located. Whilst outcrop is limited, the identification of manganese oxide clasts in
the scree at the top of the Noni Formation contact suggests that secondary supergene mineralisation
lies just below the surficial soil cover which is estimated to be only a few meters thick.
Five samples from reconnaissance mapping were exported from Timor-Leste to Australia and submitted
to ALS for geochemistry. The results, presented in Table 1 below, show the Ira Miri secondary
supergene outcrops to be highly enriched in manganese and stripped of deleterious elements (samples
CBR114689 and CBR114690). Both the Ira Miri secondary supergene outcrop samples exceeded 58%
manganese (75% MnO) and were very low in boron, phosphorus and silica.
The primary chert grades up to 20% Mn. Estrella is exploring for the secondary enrichment zones that
have formed on the top of this primary manganese source, such as the outcrop at Ira Miri. The tertiary
manganese occurs as a result of the erosion of the secondary manganese and detrital deposition into
current and historic valley areas. These accumulations can be significant, such as at Sica, and may well
form a supplementary feed to any future mining operation.
Environmental surveys have been completed in the area to accompany applications that have been
submitted to Timor-Leste’s mineral resources and regulatory body (A.N.M. – Autoridade Nacional dos
Minerais, I.P.) to allow access tracks to be developed ahead of the commencement of drilling.
2 Refer to ASX Announcement dated: 12 February 2025
Table 1: Rock chip assays from initial Ira Miri reconnaissance mapping2
Sample #
Longitude
Latitude
Description
Mn%
Al2O3%
SiO2%
P2O5%
B ppm
CBR114685
CBR114686
126.90766
126.90768
-8.421499
-8.421498
Tertiary Manganese
Tertiary Manganese
39.96
51.26
1.89
1.05
20.83
8.85
0.13
0.04
10
10
CBR114687
126.90715
-8.421548
Primary Noni Chert
19.64
3.31
37.56
4.62
40
CBR114689
126.91213
-8.424796
Secondary Manganese
58.39
0.61
2.24
0.11
10
CBR114690
126.90968
-8.423507
Secondary Manganese
58.60
0.67
1.61
0.3
10
Figure 4: Estrella MD Chris Daws at the partially outcropping supergene manganese exposure at Ira Miri within
concession MEL2023-CA-ZA001. Lab assays from this outcrop returned a grade of 58.4%.2
Sica Manganese Discovery
The in-situ secondary enrichment at the Sica Prospect was discovered by using the geological model
Estrella has developed. The Sica Valley is the location of a significant accumulation of tertiary
manganese (Figure 5).
The Sica in-situ secondary mineralisation was sampled and returned assays of 46.0% Mn and 49.3%
Mn (CBR114691 and CBR114692 in Table 2). The secondary supergene is a flat oxide layer that is now
being exposed through erosion. The erosion is responsible for concentrating tertiary manganese on the
Sica Valley floor. Another 48 large samples were taken to estimate the tertiary mineralisation grade that
has accumulated in the Sica Valley. The assay results are presented in Table 2.
Figure 5: Example of detrital supergene manganese from the Sica valley floor which averaged 40.1% Mn.2
Table 2: Assay results from the Sica Prospect2
Sample #
Longitude
Latitude
CBR114691
126.8739289
-8.4092643
CBR114692
126.8726578
-8.4120545
CBR114680
126.8711556
CBR114652
Description
Mn%
Al2O3%
SiO2%
P2O5%
B ppm
45.96
1.67
6.76
0.07
20
49.26
1.43
8.08
0.07
20
-8.4115466
57.06
1.19
3.25
0.07
10
126.8711344
-8.4116659
56.66
0.9
3.41
0.21
10
CBR114684
126.8712157
-8.4116885
54.56
1.03
3.45
0.09
10
CBR114679
126.8712791
-8.4115802
54.36
0.98
3.36
0.08
20
CBR114657
126.8714479
-8.4115298
54.10
0.92
3.78
0.1
10
CBR114672
126.8715742
-8.4117501
53.54
1.29
5.68
0.1
10
CBR114671
126.8715709
-8.4116464
53.39
1.09
4.66
0.06
20
CBR114678
126.871244
-8.4115217
53.14
0.96
3.8
0.1
10
CBR114681
126.8713225
-8.411724
53.01
1.04
4.94
0.12
10
Sica In-situ Secondary
Manganese
Sica valley tertiary Mn
CBR114658
126.8716286
-8.4115062
52.94
0.96
4.61
0.31
20
CBR114675
126.8714328
-8.4116498
52.76
1.19
4.5
0.09
10
CBR114656
126.8715295
-8.4115155
52.20
1.16
6.65
0.07
10
CBR114674
126.8714098
-8.411737
52.03
0.88
4.02
0.12
10
CBR114670
126.8715965
-8.4115831
51.84
1.22
4.15
0.13
20
CBR114677
126.8713737
-8.4115929
51.80
1.26
5.34
0.08
20
CBR114654
126.8712675
-8.4114441
49.59
1.23
4.92
0.1
20
CBR114655
126.8713115
-8.4114572
48.66
1.52
6.44
0.26
20
CBR114676
126.8713525
-8.4116195
47.25
1.8
8.16
0.23
20
CBR114683
126.8713154
-8.4117689
46.48
1.49
6.75
0.06
20
CBR114673
126.8715087
-8.4117325
46.24
1.91
6.52
0.09
20
CBR114651
126.8714381
-8.4112951
45.67
1.53
5.53
0.08
30
CBR114659
126.8715927
-8.4113492
44.56
2.22
7.95
0.05
30
CBR114660
126.8716017
-8.4113074
44.28
1.95
7.16
0.06
30
CBR114661
126.8715334
-8.4112625
43.47
2.02
8.84
0.08
30
CBR114663
126.8717301
-8.4113087
43.34
2.31
9.68
0.04
30
CBR114665
126.8717238
-8.4112917
42.67
2.12
9.83
0.05
30
CBR114662
126.8716824
-8.4112482
42.04
2.21
10.92
0.4
30
CBR114669
126.871568
-8.4112573
37.04
2.39
10.46
0.38
40
CBR114664
126.8716988
-8.4113301
36.49
2.99
13.78
0.28
40
CBR114612
126.8710248
-8.41128
36.33
2.84
13.19
0.42
30
CBR114667
126.8717733
-8.4112194
34.77
2.9
19.04
0.2
40
CBR114666
126.8717694
-8.4112817
34.40
2.88
19.54
0.55
40
CBR114668
126.8717154
-8.4111957
33.57
3.03
21.63
0.34
40
CBR114644
126.8712133
-8.4111916
33.19
2.49
8.17
0.18
30
CBR114611
126.8710564
-8.4111781
32.64
2.89
14.54
0.41
30
CBR114648
126.8711945
-8.4113523
28.57
3.45
15.2
0.17
40
CBR114645
126.8711379
-8.41127
27.23
4.08
20.22
0.23
40
CBR114649
126.8713941
-8.4113955
27.15
2.65
10.34
0.14
30
CBR114650
126.8714155
-8.4113043
26.91
3.21
10.36
0.1
40
CBR114647
126.8712713
-8.4113175
26.50
3.64
15.73
0.18
40
CBR114613
126.8711256
-8.4111765
26.37
3.07
13.81
0.38
30
CBR114653
126.8713288
-8.411402
24.03
4
18.58
0.19
40
CBR114646
126.8711934
-8.4112687
23.69
4
16.89
0.17
40
CBR114610
126.8709952
-8.4110633
17.43
3.01
10.16
9.89
40
CBR114608
126.8708011
-8.4108702
12.45
2.91
8.08
14.3
40
CBR114606
126.8709622
-8.4108173
9.91
2.62
7.38
13.86
40
CBR114607
126.8709157
-8.4107704
8.61
2.49
7.51
15.09
40
CBR114609
126.8707244
-8.4110037
LNR
The average grade of the Sica Valley tertiary mineralisation is 40.1% Mn. There is an inverse
relationship between manganese and silica, phosphorus and iron. This reflects the difference in
mineralogy within the supergene process where manganese is progressively stripped from the source
cherts (high in silica, phosphorus and iron) and deposited as manganese oxides elsewhere in the
weathering profile.
The assays also show that the majority of manganese resides towards the south at the back of the Sica
valley. This dispersion is due to the higher-grade nodules being heavier than the lower grade nodules
which contain lighter minerals such as iron oxides and silicates from the source chert. This dispersion
of grade indicates that water flow down the valley floor during the wet season is sorting and
concentrating high-grade nodules and washing away the lighter minerals further down the valley. These
are good directional indicators in exploration that point towards the zones of economic interest in the
hills above the valley floor.
The average phosphorus grade for all the samples is 0.17% when not including chert contaminated
samples CBR114607 – CBR104610, which represent the lighter material washed towards the northern
foot of the valley. CBR114609 appears to have been lost in transit through Australian customs and did
not arrive at the lab.
Estrella submitted all samples for additional testing to ascertain their boron and arsenic levels. All
samples are very low in boron and arsenic which suggests that Timor-Leste manganese should also be
a marketable product to the steel industry. Steel quality can be improved with the addition of high-grade
manganese ores that are also low in boron and arsenic. This allows for more control when creating
specific steels with properties for hardness, weldability and wear resistance.
Soru Manganese Prospect
During the period, Estrella further bolstered its manganese discoveries with the identification of a
significant area of tertiary (alluvial / colluvial) manganese near the Soru Prospect3.
Figure 6: Very large clasts of supergene manganese washed into a small creek from the hillsides. Both photos show
Noni Chert fragments with supergene enrichment (both ~35% Chert, 65% manganese-iron oxides). Samples have been
brought back to Australia for analysis with assays due in May3.
Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual
estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to
valuations.
The alluvial and colluvial deposits so far cover a mapped area of 1.5 km x 0.7 km. The alluvial
mineralisation can be found scattered in creek debris and in the alluvial layered sediments within creek
walls. Typically, clasts range from a 5cm to several 10’s of centimetres in size with an average thickness
of 4-5 cm.
The colluvial mineralisation occurs as sub-centimetre to 1 metre sized clasts derived from the soils over
adjacent hills to the tertiary deposits. Erosion on the hills is slowly uncovering supergene mineralisation
that formed on the hill slopes (what we call secondary manganese) and moving it onto the alluvial fans
that occur along the wider rivers (tertiary manganese).
3 Refer to ASX Announcement dated: 26 February 2025
AUSTRALIA
Carr Boyd Ni/Cu Project, Western Australia
The Company has applied for the State Governments Exploration Incentive Scheme (EIS) which will
co-fund up to $180,000 of drilling. Estrella aims to drill 4 diamond holes into the Carr Boyd Intrusion and
the Colreavy Komatiite under the EIS grant and also continue R&D work with the CSIRO to quickly
determine the fertility and potential of the intersected geology. Post quarter the Company did receive
confirmation of the success of their application and will begin work on the location and targeting of the
drillholes.
CORPORATE
CAPITAL
The Company’s cash balance as at 31 March 2025 was $3.15M.
In January, Estrella announced the Company received firm commitments from an existing
professional/sophisticated investor or their nominee/s to raise $3,750,000 (before costs) through the
placement of 125,000,000 fully-paid ordinary shares at an issue price of $0.03 per share (Placement
Shares)4.
The Company intends for the funds raised from the Placement to be used primarily to continue
exploration efforts and commence a drilling program at its Timor-Leste operations and working capital.
The Placement was managed by Barclay Wells Ltd and was accompanied by a 6% Management Fee
on funds raised from the placement.
Total amount paid to related parties of Estrella and their associates, as per item 6.1 of the Appendix 5B,
was $80k for Directors fees, salaries and superannuation and the total amount paid to related parties of
Estrella and their associates, as per item 6.2 of the Appendix 5B, was $40k for Director’s salaries.
The Company continues to take steps to protect its legal rights and interests in the Mt Edwards Lithium
Royalty. The Board will protect these important assets of the Company and will be providing further
updates as material developments occur in accordance with the ASX Listing Rules and the Company’s
continuous disclosure obligations. Refer to ASX announcement dated 6 September 2024.
Table 3: Estrella Capital structure as at 31 March 2025
Fully Paid Ordinary Shares
2,051,936,864
Listed options exercisable
561,255,525
Unlisted options exercisable
51,250,000
Performance Rights
90,000,000
EXPLORATION
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure during the Quarter was $807k.
ASX Listing Rule 5.3.2: There were no mining production and development activities during the Quarter.
ASX Listing Rule 5.3.3: Refer to Appendix 1 for Estrella Tenement Information.
ENDS
The Board of Directors of Estrella Resources Limited authorised this announcement to be given to ASX.
4 Refer to ASX Announcement dated: 31 January 2025
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
info@estrellaresources.com.au
P: +61 (08) 9481 0389
Media Contact:
David Tasker
Chapter One Advisors
Email: dtasker@chapteroneadvisors.com.au
Tel: 0433 112 936
Compliance Statement
With reference to previously reported Exploration Results and Mineral Resources, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the original market
announcement and, in the case of estimates of Mineral Resources, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcement.
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical
facts but, rather, on ESR’s current expectations about future events and on a number of assumptions which are
subject to significant uncertainties and contingencies many of which are outside the control of ESR and its directors,
officers and advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve
Warriner, who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute
of Geoscientists, Beau Nicholls, who is a Director of Sahara Natural Resources and is the Exploration Manager for
Estrella Timor-Leste, and a fellow of The Australasian Institute of Geoscientists. Mr Warriner and Mr Nicholls have
sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the
activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner and Mr Nicholls
consent to the inclusion in the report of the matters based on their information in the form and context in which it
appears.
Appendix 1 – Tenement Information as Required by Listing Rule 5.3.3
Country
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Timor-Leste
Change
in
Holding
(%)
Current
Interest (%)
Location Project
Tenement
WA
Carr Boyd Nickel Project
E29/1012
-
100
WA
Carr Boyd Nickel Project
E29/0982
-
100
WA
Carr Boyd Nickel Project
L24/0186
-
100
WA
Carr Boyd Nickel Project
E31/0726
-
100
WA
Carr Boyd Nickel Project
E31/1124
-
100
WA
Carr Boyd Nickel Project
M31/0012
-
100
WA
Carr Boyd Nickel Project
M31/0109
-
100
WA
Carr Boyd Nickel Project
M31/0159
-
100
WA
Carr Boyd Nickel Project
E31/1215
-
100
WA
Carr Boyd Nickel Project
E31/1162
-
100
WA
Carr Boyd Nickel Project
E31/1381
100
100
WA
Spargoville Nickel Project
M15/395
-
100*
WA
Spargoville Nickel Project
M15/703
-
100*
WA
Spargoville Nickel Project
M15/1828
-
100*
WA
Spargoville Nickel Project
L15/128
-
100*
WA
Spargoville Nickel Project
L15/255
-
100*
Lautem
Lautem Exploration Project
MEL2023-CA-ZA001
-
100**
Lautem
Lautem Exploration Project
MEL2023-CA-ZA002
-
100**
Lautem
Lautem Exploration Project
MEL2023-CA-ZA003
-
100**
Lautem
Lautem Exploration Project
ESR-RP-01
-
100
Lautem
Lautem Exploration Project
ESR-RP-02
-
100
Lautem
Lautem Exploration Project
ESR-RP-03
-
100
Lautem
Lautem Exploration Project
ESR-RP-04
-
100
Lautem
Lautem Exploration Project
ESR-RP-05
-
100
Lautem
Lautem Exploration Project
ESR-RP-06
-
100
Lautem
Lautem Exploration Project
ESR-RP-07
-
100
Lautem
Lautem Exploration Project
ESR-RP-08
-
100
Baucau
Baucau Exploration Project
MEL2024-DA-ZB001
-
100**
Baucau
Baucau Exploration Project
MEL2024-DA-ZB002
-
100**
Baucau
Baucau Exploration Project
MEL2024-DA-ZB003
-
100**
Baucau
Baucau Exploration Project
MEL2024-DA-ZB004
-
100**
* Nickel rights only
** Free carry Murak Rai Timor 30% up to publication of DFS or similar
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Estrella Resources Limited
ABN
Quarter ended (“current quarter”)
39 151 155 207
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (9
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(80)
(246)
(e) administration and corporate costs
(254)
(692)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
6
9
1.5
Interest and other costs of finance paid
-
(6)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(328)
(935)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
34
(64)
(807)
(1,451)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment *
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
199
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
R&D expenditure refund
29
200
(744)
(1,116)
2.6
Net cash from / (used in) investing
activities
*During the previous quarter and March 2025 quarter, the Company made down payments on
drilling/exploration equipment to be used in Timor Leste. This resulted in a loan/prepayment agreement in lieu
of exploration services with CoreSearch Minerals and Mining LDA as announced to ASX on 4 April 2025. Refer
for further detail.
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3,760
5,360
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(263)
(353)
3.5
Proceeds from borrowings
-
143
3.6
Repayment of borrowings
-
(143)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
3,497
5,007
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
728
197
Net cash from / (used in) operating
activities (item 1.9 above)
(328)
(935)
4.2
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date (9
months)
$A’000
Net cash from / (used in) investing activities
(item 2.6 above)
(744)
(1,116)
Net cash from / (used in) financing activities
(item 3.10 above)
3,497
5,007
-
-
3,153
3,153
Consolidated statement of cash flows
4.3
4.4
4.5
4.6
5.
Effect of movement in exchange rates on
cash held
Cash and cash equivalents at end of
period
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
3,153
728
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,153
728
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
(80)
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
(40)
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Share your feedback
Discover