Carr Boyd Exploration Update
Released
Released
Announcement PDF
9 April 2021
ASX ANNOUNCEMENT
Carr Boyd Exploration Update
HIGHLIGHTS
Seismic survey over the T5 to Drinkwater basal contact recently completed by Ultramag. Data
processing and interpretation is underway. Project will qualify for R&D rebate (Figure 1 & 2).
Two diamond core holes completed to collect rock properties (density & velocity readings) to
augment the seismic modelling process and to confirm position of the basal contact (Figure 2).
Mapping of the Carr Boyd Intrusive Complex 50% complete, several new prospects identified
with nickel gossan float material located at surface (Figure 3).
Phase 2 diamond drilling at T5 Prospect completed, Phase 3 infill and step-out holes underway.
o
CBDD042A intersected 4.9m @ 0.96% Ni, 0.35% Cu in feeder zone, net-textured sulphides
Additional Downhole Electromagnetic surveys utilising a very low resistance loop highlighted
additional potential sulphide anomalism which will be tested in the next few weeks (Figure 4).
Combination Reverse Circulation / Diamond Drill Rig has arrived on site (Figure 5) to boost
regional exploration along 30km of untested basal contact.
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to update the market with its
progress at the Carr Boyd Nickel Project in the Eastern Goldfields, Western Australia.
R&D Hard-Rock Seismic Survey by Ultramag and 3D Geological Interpretation
The Seismic Program comissioned by Estrella Resources utilised a new type of impact vibrator called an
e-Vibe (shown in Figure 1) which is operated by Ultramag. This is the first time this system combined with
new seismic nodes from Schlumberger has been deployed in a hard-rock, Archean nickel environment.
This compact seismic source was successfull in allowing the Company to access areas previously
inaccessible to conventional seismic machinery due to their cost, size and environmental impact.
Figure 1: R&D Seismic Survey conducted by Ultramag enabled very low environmental impact seismic surveying at Carr
Boyd, allowing the company to image the prospective basal contact at depth ahead of drill planning. The e-Vibe
system enabled access into areas where traditional seismic systems were too large and destructive to operate
effectively.
Ultramag have recently completed a 20 linear kilometre seismic acquisition process (Figure 2) and initial
data available to the Company shows the experimental system has successfully performed to the
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
specifications of the experiment. A further 8-10 weeks of data processing will take place before the
Company will have a full 3D interpretation of T5 and the embayment area. The Company will update the
market with the modelled results when available.
The Carr Boyd basal contact is the most prospective horizon within the Intrusive Complex. Historically it
been difficult to intersect in drilling due to its variable dip and in places, faulted nature. The use of seismic
will vastly improve the success rate of any targeted drilling at depth.
The company has comissioned Graeme Hird from Rock Solid Seismic to assist with the interpretation. Mr
Hird is Australia’s most experienced hard-rock seismic interpreter. The seismic survey is a necessary derisking tool employed by the company that will increase the success rate of deeper drilling targeting the
basal contact for nickel sulphides. Interpretation will utilise all new and historical, geological and
geophysical datasets available to the company.
Drilling Conducted for the Seismic Program
Diamond drill holes CBDD045 and CBDD046 were completed to gather geophysical rock properties
(density and velocity) as well as geological information to assist in the seismic modelling and interpretation
of the basal contact. The holes were drilled just south and west of the Carr Boyd Mine (Figure 2) and this
information will be incorporated into the seismic data processing and interpretation as a part of the R&D
project.
The holes were planned to intersect the basal contact in the vacinity of seismic lines and were not targeting
sulphides directly (Figure 2). The holes intersected chilled pyroxenitic rubble breccias clearly associated
with the basal contact and DHEM will be completed on the holes to complete the geophysical anyalysis of
the contact zone.
Figure 2: Locations of CBDD045 and CBDD046 with respect to the Seismic lines and T5 Mineralised Contact
Regional Potential
Mapping of the Carr Boyd Intrusive Complex to assist in the 3D structural and geological modelling and
interpretation work has led the Company to an updated interpretation of the local geology with respect to
nickel potential. Regional stratigraphy and geological context has now been established. Geological vectors
known to be important for nickel accumulation are pointing south along the T5 Feeder Zone to an interpreted
embayment at the base of the Intrusive Complex where pyroxenite intrusions have been mapped crosscutting and assimilating sulphidic sediments. The resulting sulphides, once exposed and assimilated by the
pyroxenites, become progressively enriched in nickel and settle onto the base of the embayment. Nickel
gossan float material can be found at surface which represent this mineralised material on the basal contact
(Figure 3).
The company believes that the T5 nickel mineralisation and the Carr Boyd Mine mineralisation may have
a common source at depth within the embayment. Additional work on structural offsets within the complex
should allow Estrella’s geological team to begin to pinpoint these locations, and together with the updated
3D interpretation, to drill test them. A detailed drone DTM and aerial photography survey has been
completed along the length of the contact zone (Figure 3) to assist with the targeted exploration program.
Figure 3: Mapped basal contact in relation to sulphidic sediments, assimilation zones where sulphides enter the intrusion
and nickel sulphides at surface (NiS). Mapping reveals that the paleo-gravity direction is to the west (left) with
younging to the east, confirming the mapped embayment as a significant geological feature.
T5 Drilling and Downhole Electromagnetics (DHEM)
The Company has completed Phase 2 drilling at the T5 discovery area. To date, 15 holes have been
completed at the T5 Prospect for just over 7,659m. Significant intercepts are presented in Table 1 and in
Figures 4 and 6. Drilling has revealed the T5 Prospect to be a feeder zone along which sulphides have
travelled. Due to the deep nature of drilling at T5, de-risking work will be undertaken to enhance drill success
offuture drilling. This de-risking will be based on seismic interpretation, further structural work and advanced
downhole electromagnetics.
DHEM results recently received by the Company show the T5 Conductor continuing to increase with depth
(Figure 4). In particular, DHEM and drill results confirm a steep south plunge to the sulphides at this location.
The next round of infill and step-out drilling has commenced and will test the T5 contact to the north and
south of known mineralisation in order to expand this zone laterally. Deeper drilling will be planned once
results of the Seismic Survey have been fully interpreted and small-scale faulting of the contact has been
taken into account.
Estrella Managing Director Chris Daws commented:
“The experimental seismic program was completed successfully and the initial results are promising, which
should allow our geologists to see the basal contact at depth for the very first time. The combination of
technology and geological science coming togther at Carr Boyd is extremely exciting and eye opening.
Combined with the regional mapping works and the drill rig which continues to uncover mineralisation at
our flagship Carr Boyd Nickel & Copper Project, we are contining to work at full stride so that we can unlock
the source of the nickel and copper sulphides discovered to date at the project. I look forward to the next
round of drilling results and the seismic-geoligical interpretations.”
Combination Reverse Circulation / Diamond Drill Rig has arrived on site
Topdrive Drillers have supplied Estrella Resources a track-mounted Combination Diamond / Reverse
Circulation Drill Rig (RC/DD) capable of up to 400m RC and 1,800m NQ2 diamond holes. This rig (Figure
5) will enable the Company to drill relatively cheap pre-collars ahead of diamond tails which will reduce the
overall costs on deeper drilling. The RC/DD rig will also enable a cost-effective expansion of the regional
exploration effort into the interpreted embayment in Figure 3.
Proposal of Works approvals have been received for the company to progress exploration north, south and
east along the basal contact covering Dunn, Drinkwater, Schmidt, Sir William Wallace, Tregurtha and
Gossan Hill Prospects (Figure 2) as well as other prospects further afield along the basal contact. The
company intends to use the RC capability of the rig to test and refine the Seismic Interpretation of the basal
contact ahead of deeper diamond drilling of targets generated.
Figure 4: T5 Basal Contact Longsection showing significant intersections >0.5% nickel and a broadening zone of Downhole
Electromagnetic conductors.
Figure 5: Track-mounted Combination RC - Diamond Drill Rig from Topdrive Drillers to arive in early April
Figure 6: Cross-sections through the T5 Feeder Zone. The intersections to date have been complicated by a set of flat faults
and sheared dyke intrusion along the basal contact. Further DHTEM and seismic results will assist in Phase 3
targeting.
Table 1: Significant Intersection Summary, SG adjusted
Hole
CBDD028
including
CBDD029
CBDD030
including
CBDD031
CBDD032
CBDD033
including
and
and
CBDD034
CBDD035
including
CBDD036
including
CBDD037
CBDD039
CBDD041
CBDD042A
including
CBDD043
CBDD044
m From
m To
Interval
Ni%
Cu%
165.2
167
1.8
0.73
0.34
165.2
165.6
0.4
1.12
1.07
NSA - Hole did not test T5 contact
431.6
445.5
13.9
1.18
0.39
436.3
439.5
3.2
3.19
0.64
NSA - Hole did not test T5 contact
NSA - Fault blank, T5 contact not tested
368.5
388.6
20.1
1.04
0.67
372.52
378.4
5.88
1.39
0.66
380.7
382.8
2.1
1.37
0.54
386.15
388.6
2.45
1.65
2.01
NSA - Fault blank, T5 contact not tested
516.8
524.85
8.05
0.83
0.49
516.8
520.5
3.7
1.18
0.76
505.6
511
5.4
0.87
0.76
506.15
508.1
1.95
1.34
1.41
NSA - Fault blank, T5 contact not tested
NSA - Sheared T5 contact, low tenor sulphides
NSA - Sheared T5 contact, low tenor sulphides
603.7
608.6
4.9
0.96
0.35
606.89
608.6
1.71
1.63
0.66
Dyked + sheared T5 contact - Awaiting Assays
Sheared T5 contact
Co%
0.04
0.06
2PGE*
0.65
0.91
Ag g/t
1.78
6.80
0.05
0.14
0.45
0.71
1.61
2.56
0.05
0.07
0.06
0.08
0.79
0.90
2.34
0.83
2.45
2.31
2.61
7.31
0.03
0.04
0.04
0.05
0.62
0.97
0.61
0.93
2.84
5.29
3.25
6.12
0.04
0.07
0.29
0.43
1.35
3.12
Note: Intervals quoted are downhole lengths, true widths are not known due to faulting
Interval grades weighted by downhole length and bulk density, 2PGE refers to Pt + Pd in g/t
Table 2: Drill hole collar details for T5 Drilling
Hole ID
CBDD0028
CBDD0029
CBDD0030
CBDD0031
CBDD0032
CBDD0033
CBDD0034
CBDD0035
CBDD0036
CBDD0037
CBDD0039
CBDD0041
CBDD0042A
CBDD0043
CBDD0044
Final
Depth
251
603.8
495.7
591.8
335.6
450
412
581.7
576.8
420.8
609.7
480.7
654.7
495.3
699.8
Easting
Northing
RL
Dip
Azimuth
Status
367048.96
367004.61
367030.37
366943.09
367279.38
367397.53
367361.34
367441.86
367420
367425
367450
367400
367403
367449
367446
6673939.6
6673939.07
6673642.32
6674243.14
6673941.27
6673657.83
6673941.15
6673659.47
6673620
6673625
6673710
6673500
6673500
6673940
6673707
421.8
421.6
418.3
424.5
423.3
422.2
423.5
423
422.4
422.4
423.6
421.9
421.9
432
429.8
-60
-70
-65
-65
-65
-65
-65
-65
-65
-60
-65
-60
-70
-65
-70
90
90
90
90
270
270
270
270
270
270
270
270
270
270
256
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Table 3. List of assay results from CBDD042A
Hole_ID
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
CBDD042A
SampleID
ECB10658
ECB10659
ECB10660
ECB10661
ECB10662
ECB10663
ECB10664
ECB10665
ECB10666
ECB10667
ECB10668
ECB10669
ECB10670
ECB10671
ECB10672
ECB10673
ECB10674
ECB10675
ECB10676
ECB10677
ECB10678
ECB10679
ECB10680
ECB10681
ECB10682
ECB10683
ECB10684
ECB10685
ECB10686
ECB10687
ECB10688
ECB10689
ECB10690
mFrom
589.25
590.75
592.25
593.75
595.25
596.59
597.21
597.93
598.55
599.48
600.75
601.75
602.46
603.7
604.63
605
605.96
606.26
606.89
607.71
608.6
609.7
610.82
611.26
612.53
613.28
614.2
614.5
615.86
617.36
618.92
620.42
621.92
mTo
590.75
592.25
593.75
595.25
596.59
597.21
597.93
598.55
599.48
600.75
601.75
602.46
603.7
604.63
605
605.96
606.26
606.89
607.71
608.6
609.7
610.82
611.26
612.53
613.28
614.2
614.5
615.86
617.36
618.92
620.42
621.92
623.42
Interval
1.5
1.5
1.5
1.5
1.34
0.62
0.72
0.62
0.93
1.27
1
0.71
1.24
0.93
0.37
0.96
0.3
0.63
0.82
0.89
1.1
1.12
0.44
1.27
0.75
0.92
0.3
1.36
1.5
1.56
1.5
1.5
1.5
Ni%
0.07
0.08
0.08
0.10
0.23
0.13
0.14
0.19
0.19
0.33
0.29
0.31
0.37
0.56
1.21
0.43
0.95
0.28
0.73
2.39
0.14
0.12
0.20
0.11
0.06
0.12
0.30
0.07
0.02
0.01
0.01
0.01
0.01
Cu%
0.01
0.02
0.01
0.02
0.05
0.02
0.07
0.74
0.07
0.27
0.11
0.12
0.14
0.15
0.26
0.12
0.38
0.15
0.34
0.93
0.04
0.03
0.68
0.02
0.02
0.13
0.54
0.02
0.03
0.01
0.01
0.01
0.01
Co ppm
72
75
73
79
128
95
110
150
104
125
115
140
184
259
568
200
433
145
329
1055
121
114
149
103
65
122
333
79
74
54
56
63
56
Ag g/t
<0.5
<0.5
<0.5
<0.5
<0.5
<0.5
0.50
6.80
0.60
2.50
1.00
0.60
<0.5
0.50
0.70
<0.5
1.30
<0.5
0.90
5.00
<0.5
<0.5
6.90
<0.5
<0.5
0.70
2.40
<0.5
<0.5
<0.5
<0.5
<0.5
<0.5
_________________________________________________________________________________
Pt g/t
0.02
0.02
0.02
0.03
0.06
0.04
0.03
0.02
0.04
0.10
0.02
0.04
0.13
0.30
0.17
0.04
0.05
0.04
0.06
0.07
0.01
0.01
0.06
<0.005
0.01
0.02
0.01
<0.005
0.01
<0.005
<0.005
<0.005
<0.005
Pd g/t
0.01
0.02
0.02
0.03
0.08
0.03
0.02
0.05
0.03
0.05
0.01
0.03
0.06
0.09
0.13
0.06
0.17
0.04
0.09
0.60
0.01
0.00
0.04
0.00
0.00
0.01
0.02
0.00
<0.001
0.00
<0.001
<0.001
<0.001
As ppm
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
S%
0.02
0.02
0.02
0.03
0.48
0.31
0.61
1.66
0.34
0.56
0.33
0.73
1.92
3.02
6.59
2.23
5.04
1.50
4.10
>10.0
0.61
0.27
1.32
0.27
0.31
1.43
5.45
0.34
0.64
0.18
0.17
0.18
0.20
MgO%
21.31
21.47
20.89
20.97
21.31
19.98
22.22
22.47
21.39
21.89
22.05
21.80
20.89
21.47
20.39
21.89
15.90
21.64
16.66
10.43
21.89
21.56
19.98
19.65
12.25
12.57
10.23
13.28
6.12
6.37
6.67
7.23
6.42
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g.
DD core samples have been half cut with an
techniques
cut channels, random chips, or
automatic core saw.
specific
specialised
industry
0.25m-1.1m samples are collected from the core trays
standard
measurement
tools
as marked out by the supervising geologist.
appropriate to the minerals under
A handheld XRF tool was used to verify the
investigation, such as down hole
mineralisation with samples reporting >0.3% Ni in
gamma sondes or handheld XRF
disseminated zones and >1% Ni in the matrix
instruments, etc.). These examples
sulphide zones.
should not be taken as limiting the
XRF results have not been reported and are used as
broad meaning of sampling.
a logging/sampling verification tool only.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Core is cut and sampled to ensure the sample is
representative and no bias is introduced. Cutting of
specific, banded or stringer sulphide zoned core is
done orthogonal to the banding to ensure there is no
bias.
Aspects of the determination of
mineralisation that are material to the
Public Report.
Determination of mineralisation has been based on
geological logging, visual sulphide estimates and
confirmation using a pXRF machine. Samples were
dispatched to an accredited laboratory for multielement analysis.
.
Diamond core drilling was used to obtain 3m length
samples from the core barrel which are then marked
in one meter intervals, based on core block
measurements.
Samples are selected based on geological logging
boundaries or on nominal meter marks.
Collected samples weigh a nominal 2-3 kg
(depending on sample length).
Samples have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed using a 4-acid digest,
ME-ICP for 33 elements and ore zone samples are
also being tested for Au & PGE elements using ICP
analysis.
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30g charge
for fire assay’). In other cases more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill type (e.g. core, reverse
circulation,
open-hole
hammer,
rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter,
triple or standard tube, depth of
diamond tails, face-sampling bit or
other type, whether core is oriented
and if so, by what method, etc).
Drilling was undertaken using NQ2 sized drill core.
Holes have been collared with mud rotary from
surface, HQ rough cored to top of fresh rock then NQ2
cored to EOH.
_________________________________________________________________________________
Criteria
Drill
sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
JORC Code explanation
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether
sample
sizes
are
appropriate to the grain size of the
material being sampled.
For
geophysical
tools,
spectrometers,
handheld
XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates,
external
laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been established.
Commentary
Core recovery was recorded by the field crew and
verified by the geologist.
RQD measurements were digitally recorded to
ensure recovery details were captured.
Sample recovery in all mineralised zones is high with
negligible core loss observed.
Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very
good condition.
The
Results verified internally by Company personnel
verification
of
significant
Detailed industry standard of collecting core in core
trays, marking meter intervals & drawing core
orientation lines was undertaken.
Core trays were photographed wet and dry prior to
sampling.
Drill hole logs are recorded in Excel spread sheets
and validated in Micromine Software as the drilling
progresses.
The entire length of all holes is logged.
Core is half cut using an automatic core saw to
achieve a half-core sample for laboratory submission.
The sample preparation technique is considered
industry best standard practice.
No field duplicates have been collected in this
program. Field duplicates will be collected once initial
results are returned and resampling of the
mineralised zones is warranted.
Sample sizes are appropriate to the grain size of the
mineralisation.
No handheld XRF results are reported however the
tool was used to verify the mineralisation with
reporting >0.3% Ni in disseminated zones and >1%
Ni in the matrix sulphide zones.
DHTEM parameters are as follows;
Tx Loop size:
500 x 800 m
Transmitter:
GAP HPTX-70
Receiver:
EMIT SMARTem24
Sensor:
EMIT DigiAtlantis
Station spacing: 2m to 10m
Tx Freq:
0.5 Hz
Duty cycle:
50%
Current:
~130 Amp
Stacks:
32-64
Readings:
2-3 repeatable readings per station
Criteria
Verification
of
sampling
and
assaying
Location of
data points
JORC Code explanation
intersections by either independent
or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification,
data
storage
(physical
and
electronic) protocols.
Discuss any adjustment to assay
data.
Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource
and
Ore
Reserve
estimation
procedure(s)
and
classifications applied.
Whether sample compositing has
been applied
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered
to have introduced a sampling bias,
this should be assessed and
reported if material.
The measures taken to ensure
sample security.
The results of any audits or reviews
of sampling techniques and data.
Commentary
Hole CBDD0028 is twinning hole CBP042. No other
twinning is warranted at this stage.
The data was collected and logged using Excel
spreadsheets and validated using Micromine
Software. The data will be loaded into an externally
hosted and managed database.
No adjustments have been made to the assay data
other than length x SG weighted averaging.
The holes were pegged using a hand-held GPS + 3m
The rig was setup over the nominated hole position
and final GPS pickup occurred at the completion of
the hole.
Holes are progressively surveyed by DGPS on a
batch basis.
MGA94_51
Topography is relatively flat and control is more than
adequate given the early stage of the project. A 3D
drone ortho-photographic survey had been used to
create a DTM of the project area.
Refer to Cross Sections and Plans included
Not applicable, no Mineral Resource is being stated.
No compositing has been applied. Intercepts are
quoted as length weighted intervals.
The drill hole orientation does not introduce a sample
bias.
Samples are in the possession of Estrella’s personnel
from field collection to laboratory submission.
No audits or reviews have been conducted for this
release given the early stage of the project.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
Type, reference name/number,
Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of
tenement and
location and ownership including
ESR) holds a 100% interest in the nickel and base metal
land tenure
agreements or material issues with
rights to the project.
status
third parties such as joint ventures,
There are no known impediments to operate in the area.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Exploration
Acknowledgment and appraisal of
The Carr Boyd Rocks deposit was discovered by Great
done by other
exploration by other parties.
Boulder Mines, in a joint venture with North Kalgurli Ltd
parties
in 1968. The deposit was mined between 1972 and
1975, during which time they explored for additional
breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni and 0.46%
Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground
over the CBLC outside of the immediate mine area.
Between 1968 and 1971 they conducted extensive
exploration programs searching for large basal contact
and/or stratabound Ni-Cu deposits. It was during this
time that most of the disseminated and cloud sulphide
occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from
Pacminex in 1987 and focused on exploration for PGE
deposits between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from WMC and
switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
From 1990 Defiance dewatered the mine to conduct
testwork and feasibility studies on the remnant
mineralisation. Metallurgical testwork, Mineral Resource
estimations, and scoping studies were completed.
Around 1996 the focus shifted again to regional
exploration for large tonnage basal contact deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project
and recommenced economic evaluations of the remnant
material at Carr Boyd Rocks before embarking on
another regional exploration program focusing on the
basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC
drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and
continued with some regional exploration, but focused
most attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd
(Consmin). Consmin conducted IP surveys and detailed
gravity surveys, but did not drill any targets before selling
the project to Salt Lake Mining (SLM) in 2013. SLM
completed limited drilling to meet expenditure
Criteria
JORC Code explanation
Commentary
commitments, before selling the project to Apollo
Phoenix Resources in 2016.
Apollo sold the project to ESR in 2018.
Geology
Deposit type, geological setting and
style of mineralisation.
The Carr Boyd project lies within the Achaean Yilgarn
Craton in a 700km belt of elongate deformed and folded
mafic, ultramafic rocks and volcanic sediments intruded
by granitoids which is referred to as the NorsemanWiluna Belt. The belt has been divided into several
geological distinct terranes, with the project area lying at
the northern end of the Gindalbie terrane (Swager, 1996).
The geology of the Carr Boyd area is dominated by the
Carr Boyd mafic-ultramafic intrusive complex (CBIC).
Several distinctive styles of Ni and Ni-Cu mineralisation
have been identified within the CBIC. At the Carr Boyd
Rocks Nickel Mine Ni-Cu mineralisation is hosted within
several 20 - 60m diameter brecciated pipe-like bodies
that appear to be discordant to the magmatic
stratigraphy. Mineralisation is hosted by a matrix of
sulphides
(pyrrhotite,
pentlandite,
pyrite
and
chalcopyrite) within brecciated Bronzite and altered
country rock clasts.
Stratiform Ni-Cu-PGE mineralisation