Exploration Update on the Carr Boyd Nickel Project
Released
Released
Announcement PDF
8 December 2017
ASX ANNOUNCEMENT
EXTENSIVE SULPHIDE INTERSECTIONS IN NCB0003
HIGHLIGHTS
NCB0003 has thus far reached 630m depth
Disseminated sulphides in gabbros between 353m and 373m downhole
Coarse grained olivine cumulates and poikiloblasts with nickel sulphides between 523m and 553m
downhole
Sulphides increasing with depth
Figure 1. Photograph of a sample of poikilitic olivine rich ultramafic rock with fine grained cloud nickel sulphide assosiated with
silver and red brown iron oxide aggregates from approximately 547m downhole in NCB0003.
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to provide a drilling update on the
Carr Boyd Nickel Project (CBNP or the Project). The CBNP is comprised of the Carr Boyd Layered Complex (CBLC
or the Complex).
NCB0003 PROGRESS
Although NCB0003 is yet to be completed, this interim update is provided at the request of the ASX. The request
was for the Company to provide details of all sulphide intercepts, including widths, abundance, species observed,
and style. These are summarised in Table 1.
The hole was at 630m depth at the time of writing and was intersecting pyroxenites, peridotites, interpreted
harzburgites, and gabbros of the CBLC. Olivine cumulates, olivine poikiloblasts, plagioclase cumulates, and
sulphide accumulations are continuing throughout the hole. Sulphide abundance, although highly variable, appears
to be increasing with depth. The geology continues to be very encouraging, supporting the “Voisey Bay” target
model.
NBC0003 is being drilled as a parallel to contact hole and is testing a gravity/magnetic high located in the south
western area of the CBLC. This is the first time that a hole of this magnitude (depth) has been drilled in this area of
the intrusion and will provide further important geological information as we seek to unlock the “source” of massive
Ni/Cu sulphides located at the dormant Carr Boyd Nickel Mine.
DETAILS OF SULPHIDE INTERCEPTS IN DRILLING
Although observations are very much at a preliminary level on hole NCB0003 given geological logging of the hole
is yet to be completed, and the fact that the sulphides are often fine grained, making it difficult to discriminate
sulphide species, a summary of sulphide intervals identified to date is tabulated below.
Table 1. Sulphide intervals in NCB0001, NBC0002 and NBC0003. Abbreviations are Cpy = Chalcopyrite, Po = Pyrrhotite, Py = Pyrite,
Sp = Sphalerite, Dissem = Disseminated.
Collar Location GDA94
From
To Sulphide
Sulphide
Host
Width
Dip Azimuth
Intersection Description
East
North
RL
m
m
%
Species
Rock
m
NCB0001 186.4 366378 6669672 415 -60
200
76.8
77
1-2
Cpy
Pyroxenite
0.2
Cloud
82.8 86.15 0.5 – 1.5
Po, Cpy
Gabbro
3.35
Cloud
86.15
91
0.5 – 1.5
Cpy, Po
Pyroxenite
4.85
Cloud
98.1
98.2
7 - 10
Cpy, Po
Peridotite
0.1
Blebby
102
104.7 1.5 – 2.5
Cpy, Po
Olivine Pyroxenite 2.7
Blebby
107
107.6 1.5 – 2.5 N/A, too fine grained
Gabbro
0.6
Dissem/Vein
110.5
112
2-3
Cpy, Po
Pyroxenite
1.5
Dissem
116.35 122.6
4-5
Po, Cpy
Gabbronorite
6.25
Dissem
122.5 122.8 20 - 25
Po, Cpy
Gabbronorite
0.3
Matrix
122.8 126.8
3-4
Po, Cpy
Basalt
4
Stringer
145
146
4-5
Po
Breccia
1
Dissem/Breccia
147.7
148
70 - 80
Po, Py
Basalt
0.3
Semi Massive
150.4 150.8 20 - 30
Po, Py
Anorthosite ?
0.4
Blebby/Stinger
152.6 157.4 30 - 40
Po, Py
Shale
4.8
Banded
161
169
4-5
Po
Basalt
8
Stinger
170.3 170.4
40 -50
Po
Shale
0.1
Banded
172.25 172.35 40 - 50
Po
Shale
0.1
Banded
179.7 182.5 30 - 35
Po, Sp, Cpy
Shale
2.8
Banded
NCB0002 143.9 366378 6669672 415 -45
200
92
100.1
3-5
Cpy, Po
Gabbro
8.1
Dissem
102.4 104.5 0.5 - 1.5
Cpy
Gabbro
2.1
Cloud
124.65 126.85 1.5 - 2.5
Py
Anorthosite
2.2
Blebby
NCB0003 630+ 366325 6669766 417 -75
20
275
278.5 0.5 - 1.5
Po
Pyroxenite
3.5
Cloud
281
284
1.5 - 2.5
Po, Cpy
Dunite
3
Dissem
285.7 286.1 1.5 - 2.5
Po
Pyroxenite
0.4
Dissem
289
300.2 1.5 - 2.5
Po
Dunite
11.2
Dissem
344.6 351.3
1-2
Po
Peridotite
6.7
Cloud
353.4 358.2 1.5 - 2.5
Po, Cpy
Gabbro
4.8
Dissem
358.2 362.6 1.5 - 2.5
Po, Cpy
Mafic
4.4
Dissem
368
373
1.5 - 2.5
Po, Cpy
Gabbro
5
Dissem
395.75 408.6 0.5 - 1.5
Po
Pyroxenite
12.85
Cloud
523.2 527.4 0.5 - 1.5 N/A, too fine grained
Harzburgite
4.2
Cloud
528
535.5 0.5 - 1.5 N/A, too fine grained
Harzburgite
7.5
Cloud
542.1
553
0.5 - 1.5 N/A, too fine grained
Harzburgite
10.9
Cloud
Hole ID Length
Figure 2. Map of the Phase I HPEM area, showing the loaction of the new drillholes and historic holes greater than 150m depth.
ABOUT THE PROJECT AND THE CBLC
The CBLC is a 75km2 layered mafic igneous complex, which hosts several occurrences of nickel and copper
sulphides. The most significant occurrence discovered to date is at the Carr Boyd Rocks mine, where mineralisation
is hosted by bronzitite breccias (pyroxenites) emplaced within the gabbroic sequence of the Complex. The CBLC
is in a Tier 1 jurisdiction approximately 80km north north-east of Kalgoorlie Western Australia. An all-weather haul
road accessible by Apollo under a granted miscellaneous license connects the Project to the Goldfields Highway
via Scotia.
A “Voisey Bay” style model has not been adequately explored within the CBLC. This represents a compelling
exploration target opportunity which the Company will continue to aggressively pursue.
Figure 3. Location of Carr Boyd in relation to commercial centres and other major nickel projects.
Table 2. Tenement Schedule of the CBNP.
Schedule of Mining and Exploration Tenements
Country
Australia
Australia
Australia
Australia
Australia
Australia
Australia
Australia
State/Region
WA
WA
WA
WA
WA
WA
WA
WA
Project
CBNP
CBNP
CBNP
CBNP
CBNP
CBNP
CBNP
CBNP
Tenement ID
E 31/1124
E 29/1012
E 29/982
E 31/726
M 31/12
M 31/159
M 31/109
E 31/1162
Area Ha
623
178
89
542
27
8
10
920
Grant Date
1/05/2017
Application
2/01/2017
3/04/2008
20/11/1984
21/01/1997
25/07/1991
Application
Mineral Rights
All
All
All
All
All
All
All
All
Interest %
100
100
100
100
100
100
100
100
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Luke Marshall, who is a consultant to Apollo Phoenix Resources and Estrella Resources, and a member
of The Australasian Institute of Geoscientists. Mr Marshall has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Marshall
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
info@estrella.com.au
APPENDIX 3 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
Not applicable, no sampling has been undertaken.
random chips, or specific specialised industry
standard measurement tools appropriate to the
HXRF readings have been routinely taken on the sulphide mineralisation but are generally not
reported as they are not considered representative.
minerals under investigation, such as down hole
gamma sondes or handheld XRF instruments,
HXRF readings have also been taken on unmineralised rocks
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample
representivity
and
the
Not applicable, no sampling has been undertaken.
appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are material to the Public Report.
Determination of mineralisation has been undertaken on a visual basis with the support of
HXRF readings.
Criteria
JORC Code explanation
Commentary
In cases where ‘industry standard’ work has been
Not applicable, no sampling has been undertaken.
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
NCB0001 was drilled by diamond core HQ triple tube from surface. NCB0002 was drilled by
hammer, rotary air blast, auger, Bangka, sonic,
open hole blade to refusal, then HQ triple tube thereafter. NCB0003 is being drilled by HQ2
etc) and details (e.g. core diameter, triple or
from surface and will switch to NQ2 from approximately 350m downhole.
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
The core is orientated using a Reflex ACTIII orientation tool.
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing core and chip
Sample core recoveries have averaged over 90% for all drilling to date.
sample recoveries and results assessed.
Significant sample loss was encountered in the weathering profile. Very little sample was
Measures taken to maximise sample recovery
recovered from the weathering profile when the open hole blade drilling technique was used.
and ensure representative nature of the samples.
No relationship has been established between sample recovery and reported grade as no
Whether a relationship exists between sample
sampling has been completed.
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature.
Core
(or
costean,
channel,
etc)
photography.
The total length and percentage of the relevant
intersections logged.
Detailed industry standard drill hole logs are collected as the drilling progresses.
Criteria
JORC Code explanation
Commentary
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter,
Not applicable as no sampling is being reported.
half or all core taken.
Host rock for nickel copper mineralisation is mainly pyroxenite and gabbronorite, but also
If non-core, whether riffled, tube sampled, rotary
peridotite, and gabbro.
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness
of
the
sample
preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Not applicable as no assay data is being reported.
Criteria
JORC Code explanation
Commentary
Nature of quality control procedures adopted
Not applicable as no assay data is being reported.
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
Verification
of sampling
and
assaying
The verification of significant intersections by
Not applicable as no assay data is being reported.
either independent or alternative company
personnel.
The use of twinned holes.
No twin holes have been drilled.
Documentation of primary data, data entry
The data for the hole is yet to be loaded into a database.
procedures, data verification, data storage
(physical and electronic) protocols.
Location of
data points
Discuss any adjustment to assay data.
Not applicable as no assay data is being reported.
Accuracy and quality of surveys used to locate
The holes were pegged by Cardno Surveys using a RTDGPS.
drill holes (collar and down-hole surveys),
The rig was setup within 500mm of the peg for each hole.
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
GDA94_51
Criteria
Data spacing
and
distribution
JORC Code explanation
Commentary
Quality and adequacy of topographic control.
More than adequate given the early stage of the project
Data spacing for reporting of Exploration
NCB0001 and NCB0002 are drilled at a 40m separation at the target basal contact position.
Results.
NCB0003 is drilled approximately 270m from west-north-west of NCB0001 and NCB0002.
Whether the data spacing and distribution is
Not Applicable, no Mineral Resource is being stated.
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource
and
Ore
Reserve
estimation
procedure(s) and classifications applied.
Orientation
of data in
relation to
geological
structure
Whether sample compositing has been applied
Not applicable as no assay data is being reported.
Whether the orientation of sampling achieves
The drill line and drill hole orientation is oriented as close as possible to normal the interpreted
unbiased sampling of possible structures and the
target for NCB0001 and NCB0002. The hole orientation for NCB0003 is at a low angle to the
extent to which this is known, considering the
basal contact target position as it will be used as an EM platform.
deposit type.
If the relationship between the drilling orientation
At this stage, we cannot determine the relationship between drilling direction and direction of
mineralised structures.
and the orientation of key mineralised structures
is considered to have introduced a sampling
bias, this should be assessed and reported if
material.
Sample
security
The measures taken to ensure sample security.
Not applicable as no assay data is being reported.
Criteria
JORC Code explanation
Commentary
Audits or
reviews
The results of any audits or reviews of sampling
No audits or reviews have been conducted for this release as there is no data to audit.
techniques and data.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
Apollo Phoenix Pty Ltd holds a 100% interest in the nickel and base metal rights to the project
ownership including agreements or material
which it has agreed to sell to ESR pursuant to a conditional agreement as announced on 16
issues with third parties such as joint
October 2017.
ventures, partnerships, overriding royalties,
native
title
wilderness
interests,
or
historical
national
park
There are no known impediments to operate in the area.
sites,
and
Refer to Table 2 of this announcement for the tenement schedule.
environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration
by other parties.
The Carr Boyd Rocks deposit was discovered by Great Boulder Mines, in a joint venture with
North Kalgurli Ltd in 1968. The deposit was mined between 1972 and 1975, during which time
they explored for additional breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly reopening the mine in 1977 before
closing it permanently shortly thereafter due to a collapse in the nickel price. The mine had
Criteria
JORC Code explanation
Commentary
produced 210,000t at 1.44% Ni and 0.46% Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground over the CBLC outside of the immediate
mine area. Between 1968 and 1971 they conducted extensive exploration programs searching
for large basal contact and/or stratabound Ni-Cu deposits. It was during this time that most of
the disseminated and cloud sulphide occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from Pacminex in 1987 and focused on
exploration for PGE deposits between 1987 and 1990. In 1990 Defiance purchased the Carr
Boyd Rocks mine from WMC and switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
From 1990 Defiance dewatered the mine to conduct testwork and feasibility studies on the
remnant mineralisation. Metallurgical testwork, mineral resource estimations and scoping
studies were completed. Around 1996 the focus shifted again to regional exploration for large
tonnage basal contact deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project and recommenced economic
evaluations of the remnant material at Carr Boyd Rocks before embarking on another regional
exploration program focusing on the basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and continued with some regional
exploration, but focused most attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd (Consmin). Consmin conducted IP
surveys and detailed gravity surveys, but did not drill any targets before selling the project to
Criteria
JORC Code explanation
Commentary
Salt Lake Mining (SLM) in 2013.
SLM completed limited drilling to meet expenditure
commitments, before selling the project to Apollo Phoenix Resources in 2016.
Geology
Deposit type, geological setting and style of
mineralisation.
The Carr Boyd project lies within the Achaean Yilgarn Craton in a 700km belt of elongate
deformed and folded mafic, ultramafic rocks and volcanic sediments intruded by granitoids which
is referred to as the Norseman-Wiluna Belt. The belt has been divided into several geological
distinct terranes, with the project area lying at the northern end of the Gindalbie terrane (Swager,
1996).
The geology of the Carr Boyd area is dominated by the Carr Boyd layered mafic-ultramafic
intrusive complex (CBLC). This layered intrusive covers an area of 17 km by 7 km and has
intruded into an Achaean Greenstone/Granite succession. The CBLC is comprised of a basal
sequence of dunites, which are overlain by peridotites / pyroxenites and above that by gabbros.
The intrusion has been interpreted to have been tilted to the east with the geometry of the
intrusive further complicated by regional deformation and folding. The sequence has been
metamorphosed to upper greenschist to lower amphibolite facies.
Several distinctive styles of Ni and Ni-Cu mineralisation have been identified within the CBLC.
At the Carr Boyd Rocks Nickel Mine Ni-Cu mineralisation is hosted within several 20 - 60m
diameter brecciated pipe-like bodies that appear to be discordant to the magmatic stratigraphy.
Mineralisation is hosted by a matrix of sulphides (pyrrhotite, pentlandite, pyrite and chalcopyrite)
within brecciated Bronzite and altered country rock clasts.
Stratiform Ni-Cu-PGE mineralisation has been identified at several different stratigraphic levels
within the layered magmatic complex. Low grade stratiform disseminated Ni-Cu-PGE sulphides
have been identified at several locations within the basal parts of the complex and at shallower
Criteria
JORC Code explanation
Commentary
stratigraphic levels of the complex. The presence of Ni-Cu-PGE mineralisation within multiple
stratigraphic positions and of several unique styles of mineralisation highlights the potential of
the CBLC for hosting a substantial Ni-Cu deposit.
Drill hole
Information
A summary of all information material to the
NCB0001 is collared at 366578mE, 6669672mN, and 415mRL on GDA94 Zone51. The hole is
understanding of the exploration results
drilling at -60 towards 200 grid azimuth. NCB0002 is collared at 366578mE, 6669672mN, and
including
415mRL on GDA94 Zone51. The hole is drilling at -45 towards 200 grid azimuth. NCB0003 is
a
tabulation
of
the
following
information for all Material drill holes:
collared at 366325mE, 6669766mN, and 415mRL on GDA94 Zone51. The hole is drilling at -75
o
towards 20 grid azimuth.
easting and northing of the drill hole
collar
o
elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception
depth
o
hole length.
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
NCB0001 was terminated at 186.4m depth.
NCB0003 is still in progress.
NCB0002 was terminated at 146.6m depth.
Criteria
JORC Code explanation
Commentary
No information is excluded.
this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging
techniques,
maximum
Not applicable as no assay data is being reported.
and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and
some
typical
examples
of
such
aggregations should be shown in detail.
The assumptions used for any reporting of
No metal equivalents are used in this announcement.
metal equivalent values should be clearly
stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
The drill line and drill hole orientation in relation to mineralisation orientation cannot be
determined at this stage.
True width cannot be determined.
Criteria
JORC Code explanation
Commentary
statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams
Appropriate maps and sections (with scales)
Appropriate maps and tables are included in the body of the Report.
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Balanced
reporting
Where
comprehensive
Exploration
Results
reporting
is
not
of
all
Not applicable as no assay data is being reported.
practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Other
substantive
exploration
data
Other exploration data, if meaningful and
Not applicable as no assay data is being reported.
material, should be reported including (but not
Geological observations are included in the report.
limited
to):
geophysical
geological
observations;
survey results; geochemical
survey results; bulk samples – size and
method
results;
of
bulk
geotechnical
potential
treatment;
metallurgical
test
density,
groundwater,
rock
characteristics;
or
contaminating
and
deleterious
Criteria
JORC Code explanation
Commentary
substances.
Further work
The nature and scale of planned further work
Follow-up exploration drilling is planned and is ongoing.
(e.g. tests for lateral extensions or depth
The potential for extensions cannot be determined at this stage given the preliminary stage of
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
the program.
Share your feedback
Discover