Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Release: 31 July 2025
QUARTERLY ACTIVITIES REPORT
Quarter ending 30 June 2025
Estrella Resources Limited
ABN 39 151 155 207
ASX Code: ESR
Board and Management
Managing Director
Christopher Daws
Non-Executive Directors
Les Pereira
John Kingswood
Company Secretary
Stephen Brockhurst
Benjamin Smith
Address
Level 8, London House
216 St Georges Terrace Perth
WA 6000
PO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
HIGHLIGHTS
Post period-end drilling update:
• Ten diamond holes successfully completed and logged for
485.5m drilled with a further 1,200m of diamond drilling
planned over the next two months
• Drone-mounted
magnetic
and
MobileMT
surveying
anticipated to commence shortly to identify low-resistive and
conductive bodies in close association with known
manganese occurrences
Quarterly activities:
• Estrella commences maiden drilling program, representing
first ever modern minerals drilling in Timor-Leste following
the adoption of a modern mining code
• Only 6 months taken from the initial discovery in November
2024 to successful drilling in May 2025, including full
mobilisation of exploration diamond and RC drill packages by
CoreSearch from Darwin
• Drill campaign to consist of initial 3,000m diamond and
10,000m RC drilling. A secondary round to consist of a further
10,000m RC drilling to be conducted after geological review
• Maiden hole EMDD001 completed at Ira Miri via man-portable
rig which encountered 6.45m of friable manganese oxides and
ended in mineralisation
• Followup hole EMDD002 completed using more powerful
track-mounted diamond drill rig, which reported 7.76m of
manganese oxides 30cm below surface
• Trenching 8m to the southeast encounters non-outcropping
massive Manganese Oxides 0.7m below surface
• Community consultation and preliminary scoping works
commenced at Werumata Limestone Project with potential for
future drilling campaign targeting large 3.9km2 prospective
area
• Master Agreement entered with PT Raka Energi Mandiri
(REM), a leading Indonesian mining services company, to
assist in marketing and selling limestone from Timor-Leste
mining concessions
• Four Reconnaissance Permits upgraded to Exploration and
Evaluation Licenses (EELs) increasing EEL holding in Lautém
Municipality from 121.5 km2 to 268.7 km2
•
•
•
Successful site visit by potential investors and significant shareholders to Ira Miri and
Werumata including dignitaries from the Timorese regulatory authority (ANM), state mining
company (MRT), the Timor-Leste Parliament, Local Government and national media outlets
Timor-Leste Prime Minister, Xanana Gusmão met with Estrella Management, investors and
partners to express his full support for the Company’s projects
Strengthened balance sheet with Strategic Investor exercising an Option under a
Subscription Agreement to contribute $5,000,000 to the Company, subject to shareholder
approval.
TIMOR-LESTE
Commenting on activities completed during the quarter, Managing Director Chris Daws said:
“While there is plenty more to do, the operational progress recently reported by Estrella is exceptional
and eclipses our expectations.
Inside six months the Company has entered Timor-Leste – a nation with an almost non-existent history
of mining – identified very prospective targets through mapping, accessed bespoke drilling rigs
sourced from overseas, secured all necessary permitting and then successfully executed a drilling
campaign which has uncovered some highly encouraging manganese results.
With a large-scale campaign currently unfolding, we are looking forward to more exciting discoveries
to come.
All of this should be seen as a clear signal of the immense support which exists across a broad
spectrum within Timor-Leste. Whether it is the local communities, the mining industry or even Prime
Minister Xanana Gusmão, Estrella has been welcomed and encouraged every step of the way.
Concurrently, Estrella has also been developing a potential limestone opportunity via the identification
of a highly prospective 3.9km2 target and a Master Agreement with a leading Indonesian mining
services company.
Estrella will continue to keep shareholders informed as we prepare to progress our next schedule of
operations which is shaping up to be even more momentous. Go Estrella!”
Figure 1: Diamond Drilling at EMD002 during a well-attended Timor-Leste site visit
Post period-end activities
Estrella is pleased to provide an update on the progress of its Timor-Leste drilling program which is
currently underway with diamond drill testing a number of key targets throughout the Company’s Lautém
permits and RC commencing this current quarter.
To date, ten exploration diamond drill holes have been completed and logged for 485.5m of PQ3
diamond core, which provides vital geological information for modelling and interpretation. A further
1,200m of diamond drilling is anticipated to be completed over the next two months. The Company will
release exploration updates on sample assays once analysis has been completed by the laboratory.
All holes have contributed to Estrella’s emerging geological model with recent drill targets north of the
Ira Miri outcrop being tested. Further access tracks are being cleared at Ira Miri and Sica to facilitate
this exploration drilling.
In addition to drilling activity, Estrella is in discussions with consultants Expert Geophysics as well as
Indonesian suppliers to test the feasibility of Mobile Magnetotelluric (MobileMT) surveying via drone.
MobileMT is a surveying technology developed by Expert Geophysics which combines airborne
electromagnetic technology with sophisticated signal processing techniques. This system has been very
successful in passively detecting buried low-resistive and highly conductive bodies.
Estrella intends to use drone-mounted MobileMT to image areas surrounding known mineralisation in
order to trace potential extensions under cover, delivering highly accurate geological data and reducing
the cost of future drill targeting.
Concurrent with the Company’s manganese exploration activities, Estrella is also progressing its
Werumata limestone project, with stakeholder engagement activities well received by the local
community. Environmental baseline surveys are being completed ahead of drill permit applications.
Maiden Drilling Campaign
In April, Estrella reported that ahead of a maiden drilling campaign the Company had executed a drilling
contract and working partnership with Core Search Minerals and Mining Services LDA (CoreSearch) 1.
CoreSearch is a Dili-based company currently being incorporated by H2O Pump and Power which has
been drilling water bores across Timor-Leste for the past 25 years and have extensive experience
operating in the country.
Estrella has assisted CoreSearch with capital to put together and import to Timor-Leste a complete RC
and diamond capable package to service the nascent Exploration and Mining Industry. The US$200,000
capital inserted into the venture by Estrella will be treated as an unsecured loan and repaid in lieu of
exploration services rendered at US$10 per metre drilled over the first 20,000 metres. Estrella retains
exclusive rights to use of the equipment until the debt owed, and mobilisation costs have been fully
recouped.
Under the agreement, CoreSearch has been contracted to complete an initial round of exploration
consisting of 10,000m of RC drilling and 3,000m of diamond drilling. A secondary round of drilling
consisting of a further 10,000m of RC drilling to be conducted after geological review.
The drill rig is owned by H2O and was based in Darwin. In addition to the rig, CoreSearch has brought
a track carrier to hold the rod string, spare rod string and additional RC and diamond equipment. An
additional carrier for the bulk fuel and compressor was also sourced from Vietnam along with the cyclone
and splitter.
At the end of May, the Company was able to successfully mobilise the man-portable diamond drill to the
Ira Miri Manganese Prospect and commence drilling the first modern metallic minerals exploration hole
in the country’s history2.
The drill program is targeting manganese and limestone mineralisation observed at the Ira Miri and Sica
Prospects within the Lautem Project (Figure 2). Exploration will initially start with the Diamond Drill
targeting the manganese outcrop observed during the mapping phase whilst using the excavator to
conduct trenching to locate the correct Noni Formation contact. This information will then be used to set
up drill positions stratigraphically above the target horizon for the drills to intersect a short distance below
surface. Intended drill locations can be seen in Figure 3.
Figure 2: Updated tenure map showing the Ira Miri, Sica and Lalena Manganese Prospects
1
2
Refer to ASX Announcement dated:4 April 2025
Refer to ASX Announcement dated: 29 May 2025
Figure 3: Intended drill locations at Ira Miri, Sica and Lalena
Results from the maiden hole EMDD001 were reported in June with drilling encountering mineralisation
1.35m down hole, with the drillhole ending in manganese oxides at 7.8m depth 3. The drillhole was
collared 3m from outcropping mineralisation.
EMDD0001 was a vertical hole, drilled into the outcropping Ira Miri manganese mineralisation which
was discovered by the Estrella Murak Rai team in November 2024 (refer to ASX Announcement dated
18 November 2024 entitled “Two Outcropping Supergene Manganese Discoveries in Lautem
Exploration Licenses”).
Rock chip assays reported in February 2025 from the outcrop indicated the mineralisation was very high
grade (refer to ASX Announcement dated 12 February 2025 entitled “High-Grade Assays Received for
New Lautem Discoveries”).
The drillhole ended in mineralisation due to poor recovery of the friable manganese oxides along with a
rostered break required under the Timor-Leste mining law.
A summarised drill log and visual estimates of the drillhole is given in Table 1.
PXRF determinations on the core indicate that the high-grade manganese mineralisation assayed on
the outcrop face continue under cover to the northeast. The PXRF determinations are shown in Table
2 with accompanying cautionary statement.
Table 1: Visual estimates of EMDD00013
3
m From
m To
Description
0
1.35
Colluvial soil
1.35
1.45
Mn bleed into soil
50% MnO, 50% Colluvial soil
1.45
2.8
Massive MnO
100% Low-Si high grade MnO
2.8
2.95
Silicious Massive MnO
60% MnO, 40% Manganiferous Chert
2.95
6.2
Massive MnO
100% Low-Si high grade MnO
Refer to ASX Announcement dated: 3 June 2025
Visual Estimate
6.2
6.9
Silicious Massive MnO
50% MnO, 50% Manganiferous Chert
6.9
7.4
Massive MnO
100% Low-Si high grade MnO
7.4
7.8
Silicious Massive MnO
50% MnO, 50% Manganiferous Chert
Cautionary Statement of Visual Estimates
Table 1 contains references to visual results and visual estimates of mineralisation. The Company draws attention
to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be considered a proxy
or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations.
Table 2: PXRF Mn% Determinations3
Comment
PXRF
Mn%
x
4.7 100% MnO
46.1
1.5 100% MnO
12.5
4.9 100% MnO
46.1
1.7 100% MnO
27.6
5.1 100% MnO
56.2
1.9 100% MnO
30.9
5.3 100% MnO
62.6
2.1 100% MnO
65
5.5 100% MnO
45.6
2.3 100% MnO
56.5
5.7 100% MnO
56.8
2.5 100% MnO
39
5.9 100% MnO
30.9
2.7 100% MnO
40.1
6.1 100% MnO
41
2.9 100% High-Silica MnO
27.2
6.3 100% MnO
17
3.1 100% MnO
52.3
6.5 100% High-Silica MnO
20.2
3.3 100% MnO
42
6.7 100% High-Silica MnO
24.1
3.5 100% MnO
25.4
6.9 100% High-Silica MnO
28.7
3.7 100% MnO
40.4
7.1 100% MnO
42.3
3.9 100% MnO
36
7.3 100% MnO
41.8
4.1 100% MnO
69.1
7.5 100% MnO
35.2
4.3 100% MnO
58
7.7 100% High-Silica MnO
20.3
4.5 100% MnO
42
Depth
Comment
0
PXRF
Mn%
Depth
Cautionary Statement of PXRF - PXRF results that are announced in this report are from uncrushed, diamond
core samples and are preliminary only. The use of the PXRF is an indication only of the order of magnitude of
expected final assay results. Samples that are the subject of this report will not be submitted for assay due to the
poor recovery of the friable drill core. The hole will be redrilled with a more suitable drill rig when mobilised to site
in the coming days.
The PXRF results averaged 40.1% Mn on a weighted average over the 6.45m intersection.
In addition to the drilling, a trench was dug 8m to the southeast of the drillhole collar into an area covered
by colluvial soils. A foot track running over this area has been used by the local community and the
Estrella exploration crew to access the areas to the south. There was no indication that the massive
manganese oxides were continuing from the outcrop underneath this area.
Massive manganese oxides were encountered just 0.7m below the surface and were exposed to a depth
of 3m. The mineralisation was still strong and massive in the base of the trench.
This understanding of the colluvial soils development and subsequent obscuration of the Noni Formation
and associated manganese mineralisation confirms there is a high potential for further mineralisation
covered by a moderately thin layer of soil and scree in locations predicted by Estrella’s exploration
model.
EMD001 was subsequently twinned at EMDD002 using a more powerful Boart Longyear Deltabase 525
track-mounted diamond drill which confirmed results, encountering 7.76m of massive manganese oxide
from 0.29m down hole (Figure 4)4.
Figure 4: Tray 1 (right) to tray 3 (left) of EMDD002 showing the full intersection of PQ core with visual estimates presented
in Table 3
4
Refer to ASX Announcement dated: 23 June 2025
Similar to EMDD001, the mineralisation in the outcrop appears to also be observed at depth and is
interpreted to be derived directly from the Noni Formation, as predicted by our exploration model.
The weathering that gave rise to the mineralisation appears well preserved given that it was buried
below over 2.5km of the Baucau Formation for the past million years.
A summarised drill log and visual estimates of the drillhole is given in Table 3.
Table 3: Visual estimates of EMDD00024
From
To
Interval
Description
Visual Estimate
0
0.29
0.29
Recent soil cover
Colluvial sediments
0.29
0.54
0.25
Manganese oxides with remnant silica
80% MnO, 20% Silica
0.54
1.6
1.06
Manganese oxides
100% MnO
1.6
2
0.4
Manganese oxides with remnant clays
70% MnO, 30% Clay
2
6
4
Manganese oxides
100% MnO
6
6.4
0.4
Remnant clays with manganese bleed zones 90% Clay, 10% MnO
6.4
7.8
1.4
Manganese oxides
100% MnO
7.8
8.05
0.25
Manganese oxides with remnant clays
60% Clay, 40% MnO
8.05
17.9
9.85
Clay zone
100% Clay
17.9
20.2
2.3
Saprock
100% Noni Mudstone
Cautionary Statement of Visual Estimates
Table 3 contains references to visual results and visual estimates of mineralisation. The Company draws attention
to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be considered a proxy
or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations.
For comparison, the mineralisation at Groote Eylandt Manganese Deposit 5 located in the Gulf of
Carpentaria ranges from 0.1m to 11.5m thickness, and averages 3m in width. Although the age of the
mineralisation of Groote Eylandt is the same as at Ira Miri, the method of formation of manganese at Ira
Miri is terrestrial in origin consisting of in-situ supergene enrichment of the Noni Formation.
The EMDD002 intersection contained significantly broad zones of mineralisation with evidence of local
physical weathering features such as cracking and tree-root infiltration. This is to be expected on the
leading edge of the exposed mineralisation. Subsequent drilling will determine continuity of the
mineralisation.
Estrella’s management has invested considerable time developing its in-country geological, geophysical
and community liaison capability.
This maiden discovery not only reflects the predictive power of Estrella’s exploration model but is also
contingent on the strong uptake of training to develop local exploration capability.
Concurrently, Estrella completed a site visit with current and potential investors. The visit also included
dignitaries from the Local Governments of Lautém and Baucau, from the National Government, from
Refer to Munson TJ, Ahmad M and Dunster JN 2013. Chapter 39: Carpentaria Basin ‘Geology and mineral resources of the
Northern Territory’. Northern Territory Geological Survey, Special Publication 5.
5
the Autoridade Nacional dos Minerais (ANM), Estrella’s joint-venture partner Murak Rai Timor (MRT)
and the Timor-Leste national media.
The trip started off with recognition from current Prime Minister, Xanana Gusmão who expressed TimorLeste’s commitment to companies like Estrella which embrace the advancement of the nation through
exploration and investing in the development of Timor-Leste’s capabilities to sustain itself into the future.
Figure 5: Timor-Leste Prime Minister Xanana Gusmão welcoming Estrella’s Managing Director Chris Daws during a
meeting with management, shareholders and investors.
The site visit included the Com Port, the drilling at Ira Miri and the potential Werumata Limestone Project
in Baucau.
Community consultation and preliminary scoping works have begun at Werumata to clear the way for
the environmental licensing required for Estrella to begin drilling.
The Company is initially targeting a very large and highly prospective resource area estimated to cover
approximately 3.9km2. The project is located in a very low population area with no habitation occurring
in the project site, with easy access to grid power, major transport and to the ocean.
Partnership to Drive Limestone Projects
In May, Estrella announced its wholly owned Timor-Leste subsidiary Estrella Resources Limited R.P
had entered into a binding Master Agreement (the “Agreement”) with Indonesian mining services
company PT Raka Energi Mandiri (“REM”), paving the way for large-scale limestone sales into
Southeast Asia6.
6
Refer to ASX Announcement dated: 21 May 2025
Under the Agreement, Estrella has granted REM exclusive marketing and offtake rights to support the
marketing and sale of limestone to be mined from Estrella’s Timor-Leste mining concessions and
exported into Indonesia.
During the past 12 months of exploration our geologists have mapped the Baucau Formation, a clean
coral and chalk rich limestone which was deposited on top of the Noni Formation, the target horizon for
supergene manganese (Figure 6). Drilling for manganese necessitates drilling through the Baucau
Formation limestone, enabling the Company to cost effectively explore for the two products.
Figure 6: Conceptual geological cross-section showing the manganese exploration target zone underlying the Baucau
limestone as seen by Estrella with respect to the mapped stratigraphy
The Baucau Formation in places is several hundred metres thick (source: Institute of Geology, TimorLeste and Estrella’s stratigraphic mapping). Nine samples from fresh sources within MEL2025-DAZA003 were imported to Australia and assayed for their chemical and acid neutralisation content. The
rock type is known for its pure coral content and the limestone is predominantly calcite with a small but
varying silica content. Small amounts of dolomite (calcium magnesium carbonate) and siderite (iron
carbonate) are present (sample results in Table 4).
The very high lime content, lack of impurities and neutralisation potential makes the rock amenable to
many industrial and environmental processes where lime is necessary.
The Agreement provides for a total limestone sales target of up to 500 million dry metric tonnes over a
five-year period starting from the first shipment. As consideration for successfully facilitating limestone
sales over the five-year period, Estrella will grant REM up to 500 million unlisted share options,
exercisable at A$0.05 each (subject to shareholder approval).
These options will be issued (subject to shareholder approval) on a performance basis with one option
for each tonne of limestone that is ordered and paid for during each twelve-month period over the fiveyear period. This incentivises PT Raka Energi Mandiri by being exposed to the success of Estrella
Resources if REM achieve their targets.
The Agreement is also subject to Estrella satisfying (to its satisfaction) a number of conditions within
certain timeframes, which will facilitate entry into the definitive Offtake Agreement.
These include:
•
•
•
•
Estrella obtaining all material licenses, permits and approvals in respect of the mining and
export of limestone on Estrella’s mining concessions by 31 December 2025
Estrella announcing a JORC Code compliant resource of at least 500 million dry metric tons of
contained limestone on the Estrella Mining Concessions by 30 September 2025, which will
facilitate REM achieving the Minimum Sale Volume;
Estrella announcing the completion of a positive Scoping Study in relation to the Mining
Concessions by 30 November 2025; and
Obtaining all permits, approvals for infrastructure required to export product extracted from the
mining concessions from a port facility in Timor-Leste, by 31 December 2025.
The Agreement is also subject to Estrella obtaining any necessary shareholder, board, regulatory and
third-party approvals required to implement the Agreement and the proposed issue of the unlisted share
options.
Estrella has already started discussions in regards to the development of a port to handle the export of
the products. Once the resource starts to take shape these talks will intensify to ensure permitting can
meet the above deadlines. Estrella is also looking at utilising the existing port of Com whilst a new facility
is being built and this will form part of these discussions.
The agreement remains in effect until the earlier of five years from first shipment or 28th February 2035,
unless terminated earlier in accordance with the agreement’s provisions.
Once conditions are met, Estrella and REM will enter into a formal Offtake Agreement, providing REM
or its nominees the right to purchase limestone from Estrella Murak Rai Timor Lda each year at a price
agreed between the parties.
Estrella will keep shareholders updated as it progresses the Conditions Precedent.
Aspirational Statements
The statements which may appear in this announcement regarding the aspirations of Estrella to produce
and sell 500 million tonnes of limestone over a 5-year period should be considered a marketing and
sales target and not a projection of production and nor does it guarantee any production from the project
at the sales target rate. These statements are marketing and sales targets and Estrella does not yet
have sufficient objective reasonable grounds to believe that the statements can be achieved.
Importantly, the statements are considered aspirational, because as detailed in the announcement, the
Company is yet to obtain, environmental drilling permits, prove a JORC code compliant Mineral
resource, complete a scoping study and obtain a mining license under the Jurisdictional Mining Code,
which is subject to completion of the scope of works and conditions outlined above.
Four Reconnaissance Permits converted to Exploration and Evaluation Licenses
During the period, Estrella announced the successful conversion of four Reconnaissance Permits to
Exploration and Evaluation Licenses, the first such action by any company under Timor-Leste’s new
mining laws (Figure 2)7. These new exploration concessions will automatically be part of the joint venture
concessions with the state-owned mining company Murak Rai Timor, E.P. on free carry term, until
completion of a feasibility study.
The Reconnaissance Permits allowed the holder to perform mapping and limited sampling activities
within the Permit Area. The conversion to an Exploration and Evaluation Licence requires successful
exploration results from the initial reconnaissance activity and allows the holder to pursue much more
intensive exploration such as road development, trenching and drilling.
The Licenses are granted for 4 years and can be extended up to another 6 years if required. During that
time, the holder is encumbered to explore for and economically evaluate mineralisation within the
License area, culminating in resource definition and an economic pre-feasibility study if warranted.
Exploration and Evaluation Licenses MEL2025-DA-ZA001 (ex RP-01) & MEL2025-DA-ZA002 (ex RP02) host the northern and western extensions to the Sica-Lalena trend of the Noni Formation, the rock
unit responsible for the development of the secondary and tertiary manganese that Estrella is evaluating
on MEL2023-CA-ZA001.
Figure 7 below shows the northern extension of the trend onto MEL2025-DA-ZA001 where significant
tertiary manganese was located.
7
Refer to ASX Announcement dated: 14 May 2025
Figure 7: Sica and Lalena Prospects straddle the border between MEL2025-DA-ZA001 and MEL2023-CA-ZA001 with
Noni Formation highlighted (in green) and assays from ASX Announcement dated 11 October 2024.
All four of the new Exploration and Evaluation Licenses have significant amounts of clean limestone
material, as shown in Figure 8. The Exploration and Evaluation License provides the Company with an
opportunity to evaluate the geochemistry and abundance of these clean limestone sources at depth.
Figure 8: Location of suitable limestone resources near to the coast in Estrella’s tenure.
The Batu Putih (White Rock) and Baucau Limestones that outcrop over MEL2025- DA-ZA002 and
MEL2025-DA-ZA003 are stratigraphically above the Noni Formation. Any future drill testing of the
manganese potential of the Noni Formation will necessitate the drilling of the limestones, and vice versa.
This is a win-win for optimising exploration expenditure.
The stratigraphy responsible for this clean lime forms part of the Baucau Formation and in places is
several hundred metres thick (source: Institute of Geology, Timor-Leste and Estrella’s stratigraphic
mapping). Nine samples from fresh sources within MEL2025-DA-ZA003 were imported to Australia and
assayed for their chemical and acid neutralisation content. The rock type is known for its pure coral
content which is reflected in the assays received in Table 4.
The limestone is predominantly calcite with a small but varying silica content. Small amounts of dolomite
(calcium magnesium carbonate) and siderite (iron carbonate) are present. The Neutralisation Value is
a calculation derived from acid-testing the samples and expressing the result as percent calcite (calcium
carbonate). The very high lime content, lack of impurities and neutralisation potential makes the rock
amenable to many industrial and environmental processes where lime is necessary, and Estrella will
explore these opportunities across various Asian markets.
Table 4: Results from limestone sampling in MEL2025-DA-ZA0037
CORPORATE
CAPITAL
At the end of the quarter, Estrella advised a Strategic Investor had exercised an Option under a
previously announced Subscription Agreement8 to contribute a further $5M to the Company subject to
Shareholder Approval 9 at a general meeting to be held on 15 August 2025. The Company’s cash
balance as at 30 June 2025 was $6.58M, with $5M to be held on trust until shareholder approval is
obtained.
The Investor will receive 136,761,488 fully-paid ordinary shares representing a 20% discount to the 10day VWAP of $0.0457 prior to the date of exercise of the option. The Company is obligated in line with
the Subscription Agreement to pay the following fee in settlement of the Tranche 2 Subscription option:
•
8
9
2.5% of the value of the Tranche 2 Subscription amount, which may be settled in cash, shares
or ESROB options (at the election of the Company at the time of receipt of funds for the issue
of Tranche 2 Subscription Shares).
Refer to ASX Announcement dated: 2 September 2024
Refer to ASX Announcement dated: 30 June 2025
The issue of any shares or ESROB options in respect of the fee for Tranche 2 Subscription Shares will
be subject to shareholder approval at 15 August 2025 general meeting.
Total amount paid to related parties of Estrella and their associates, as per item 6.1 of the Appendix 5B,
was $102k for Directors fees, salaries and superannuation and the total amount paid to related parties
of Estrella and their associates, as per item 6.2 of the Appendix 5B, was $46k for Director’s salaries.
The Company continues to take steps to protect its legal rights and interests in the Mt Edwards Lithium
Royalty. The Board will protect these important assets of the Company and will be providing further
updates as material developments occur in accordance with the ASX Listing Rules and the Company’s
continuous disclosure obligations. Refer to ASX announcement dated 6 September 2024.
Table 5: Estrella Capital structure as at 30 June 2025
Fully Paid Ordinary Shares
2,051,956,864
Listed options exercisable
561,235,525
Unlisted options exercisable
31,250,000
Share Performance Rights
102,250,000
EXPLORATION
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure during the Quarter was $1.355M.
ASX Listing Rule 5.3.2: There were no mining production and development activities during the Quarter.
ASX Listing Rule 5.3.3: Refer to Appendix 1 for Estrella Tenement Information. The Company notes:
•
•
•
Timor-Leste
Share your feedback
Discover