Investor Presentation
Released
Released
Announcement PDF
ASX:ESR
TARGET = WORLD CLASS
HIGH QUALITY NICKEL
SULPHIDE RESOURCE
INVESTOR PRESENTATION
AUGUST 2021
1
DISCLAIMER & DECLARATION
This presentation has been prepared by Estrella Resources Limited (“ESR”) as a summary of the company’s exploration and development activities, with particular reference to the
Carr Boyd Ni/Cu Project near Kalgoorlie, WA.
No Offer of Securities
The presentation is not, and should not, be considered as an offer or invitation to subscribe for, or purchase any securities in ESR, or as an inducement to make an offer or invitation
with respect to those securities. No agreement to subscribe for securities in ESR will be entered into on the basis of this presentation.
Forward Looking Statements
Reliance on Third Party Information
Due care and attention has been taken in the preparation of this presentation. However, the information contained in this presentation (other than as specifically stated) has not been
independently verified nor has it been audited. Accordingly, the company does not warrant or represent that the information contained in this presentation is accurate or complete. To
the fullest extent permitted by law, no liability, however arising, will be accepted by ESR or its directors, officers or advisers, for the fairness, accuracy or completeness of the
information contained in this presentation.
Competent Person Declaration
2
ASX: ESR
The information in this announcement relating to Exploration Results is based on information compiled by Mr. Neil Hutchison, who is a Director of Estrella Resources and a member
of The Australasian Institute of Geoscientists and Mr. Steve Warriner, who is the Exploration Manager, an employee of Estrella Resources and also a member of The Australasian
Institute of Geoscientists. Mr. Hutchison and Mr. Warriner have sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity
being undertaking to qualify as Competent Persons as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore
Reserves”. Mr. Hutchison and Mr. Warriner consent to the inclusion in the report of the matters based on his information in the form and context in which it appears.
ESTRELLA RESOURCES
This presentation contains certain forward looking statements which have not been based solely on historical facts but, rather, on ESR’s current expectations about future events and
on a number of assumptions which are subject to significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and advisers.
INVESTMENT OPPORTUNITY
WA-focussed nickel exploration company in a Tier-1 mining
jurisdiction
ESTRELLA RESOURCES
100% owned Carr Boyd project only 80km from Kalgoorlie, W.A.
Initial drilling programs have discovered Massive Nickel Sulphide
at the T5 prospect
Major exploration activity underway to locate a world class, high
quality, nickel sulphide resource
*Photograph from ASX release dated 1 June 2021
ASX: ESR
Highly experienced board and management
3
CAPITAL STRUCTURE (AS AT 26 JULY 2021)
1,162,043,740
Options
10,000,000 10c exercise June 2022
5,000,000 5c exercise June 2022
11,500,000 3c exercise Nov 2022
254,363,575 2c exercise July 2023
16,600,000 20c exercise Nov 2023
(ASX:ESROA)
Convertible Notes
ESTRELLA RESOURCES
FPOS
$190,000 1c conversion, expiry Feb 2022 12%PA
Source: ASX
Major Shareholders
10.69%
Gallin
3.46%
Sunset Capital Management
3.23%
ASX: ESR
CASH
Regal Funds Management
~ A$9.1M (As at 26 July 2021 with ~A$5.4M “options in the money”)
4
EXPERIENCED BOARD & MANAGEMENT
CHRISTOPHER DAWS
Managing Director
Strong experience in running junior resources companies, including previous involvement with Niagara Mining
(Poseidon Nickel), US Nickel and KMC Limited. Director and founder of Apollo “Phoenix” Resources Pty Ltd and a
Director of Nimbus Mines Pty Ltd.
JOHN KINGSWOOD
Non-Executive Director
Strong track record of identifying potential projects and implementing effective business strategies. Successfully
been involved with some of Western Australia’s largest projects – from BHP RGP3, 5 and 6 and Rio Tinto Argyle
Diamond underground operations. Currently a Director of Nimbus Mines Pty Ltd (a resource investment group) and
Mt Edwards Lithium Pty Ltd.
STEVE BROCKHURST
Non-Executive Director &
Company Secretary
15 years’ experience in the finance and corporate advisory industry and is a Director of Mining Corporate Pty Ltd.
His experience includes corporate and capital restructuring, corporate advisory, company secretarial services,
capital raising, ASX and ASIC compliance requirements. Has served on the Board and acted as Company Secretary
for numerous ASX listed and private companies.
NEIL HUTCHISON
Non-Executive Technical Director
A geologist with over 30 years’ experience in conducting regional and minesite exploration, target generation,
resource drill out, project reviews and evaluations. Extensive nickel experience having been the General Manager
for Geology at Poseidon Nickel for 11 years as well as the Exploration Superintendent at Jubilee Mines Cosmos
Nickel Project for 5 years.
STEVE WARRINER
Exploration Manager
Experience in exploration of nickel sulphide deposits and resource drill-outs and was previously Chief Geologist at
Poseidon Nickel Limited. Over 30 years’ experience in the resource/mining industry in WA and overseas with over
20 of these years exploring for and mining intrusive and extrusive nickel deposits in WA.
5
ASX: ESR
Experienced investor and businessman with a strong involvement in small companies and maximising their potential
value. Heavily involved in driving growth of Majestic Resources / Petra Diamonds – now merged with Petra
Diamonds – and, subsequently, Kangaroo Resources (Indonesia)
ESTRELLA RESOURCES
LESLIE PEREIRA
Non-Executive Chairman
EV Demand Driving Nickel Outlook
These batteries projected to hold
63% of EV market in
six years1
Strong growth in EV
production and demand with
increasing Government
incentives globally
Nickel demand for EV battery
manufacturing to experience annual av.
growth rate of 29.2% over 2021-2030
—outpacing demand for both lithium
and cobalt.2
20,000
Supply deficits in nickel forming
over the decade
EV car manufacturers busy
locking in nickel supply
agreements
Prices anticipated to rise to
incentivise new
production capacity
ESTRELLA RESOURCES
Car manufacturers adopting
battery chemistries with higher
nickel content1
Ni Price Forecast
10,000
ASX: ESR
Nickel, $/t
15,000
5,000
0
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2030
2035
Source: World Bank
1.
2.
Source: Trafigura Research, SMM, CIAP
Source: Fitch Solutions
Source: Fitch Solutions
6
6
CARR BOYD
OVERVIEW
100% owned Ni-Cu-PGE Project
Continuous tenure covering 259km2
ESTRELLA RESOURCES
Tenements cover entire 75km2 mafic and ultramafic igneous
complex with multiple nickel and copper sulphide occurrences –
most significant being the Carr Boyd Rocks mine
Comprises:
3 Mining Licences
ASX: ESR
6 Exploration Licences
1 Miscellaneous Licence
7
CARR BOYD - HISTORY
GBM and NK
acquired by WMC,
mined from 19731977
Placed into new ASX
float Defiance Mining
(1987) additional
areas consolidated
Titan JV to Yilgarn
Mining (2006)
Pallinghurst sell
WA assets to Salt
Lake Mining
(2013)
Apollo sell Carr
Boyd to Estrella
Resources (2017)
ESTRELLA RESOURCES
WMC concentrated
on its Kambalda and
Leinster operations
Defiance transitions
to biotechnology and
sells asset to Titan
Resources (2001)
Titan retain 100%
but now owned by
Pallinghurst
SLM sell Carr
Boyd to
Apollo
Phoenix
(private)
(2015)
Massive
Sulphides
Discovered
at T5
8
8
ASX: ESR
Discovered by Great
Boulder Mines Ltd
North Kalgurli JV
1972)
Yilgarn (now
Brockman)
withdraw from JV
(2009)
CARR BOYD – MINE SOURCE?
Mined from 1973 to 1977 by WMC
Total production: 202,100t at 1.43% Ni and 0.46%
Cu producing a 9.7% Ni concentrate
Four ore pipes occur containing a central zone of
brecciated and stringer sulphides surrounded by
broader zones of strongly disseminated sulphide
mineralisation
Estrella is exploring the possible links at depth
between this mineralisation and the massive
sulphides discovered at T5
9
ASX: ESR
Development was completed on 3 levels with
partial stoping completed on all levels, including a
glory hole through to the surface
ESTRELLA RESOURCES
High tenor nickel mineralisation is confined to
coarse grained, bronzite pyroxene rich rocks with
sulphide minerals forming a matrix around
brecciated xenoliths of unmineralised country rocks
T5 – DIAMOND DRILLING
T5 has yielded several highly significant intersections to date2 containing nickel, copper,
cobalt, platinum, palladium and silver in the Company’s Phase 2 step-out drilling
6,464m drilled in 13 diamond holes
Interval
1.8
0.4
13.9
3.2
20.1
5.88
2.1
2.45
8.05
3.7
5.4
1.95
4.9
1.71
Ni%
0.73
1.12
1.18
3.19
1.04
1.39
1.37
1.65
0.83
1.18
0.87
1.34
0.96
1.63
Cu%
0.34
1.07
0.39
0.64
0.67
0.66
0.54
2.01
0.49
0.76
0.76
1.41
0.35
0.66
Co%
0.04
0.06
0.05
0.14
0.05
0.07
0.06
0.08
0.03
0.04
0.04
0.05
0.04
0.07
2PGE **
0.65
0.91
0.45
0.71
0.79
0.90
2.34
0.83
0.62
0.97
0.61
0.93
0.29
0.43
Ag g/t
1.78
6.80
1.61
2.56
2.45
2.31
2.61
7.31
2.84
5.29
3.25
6.12
1.35
3.12
Note: Intervals quoted are downhole lengths, true widhts are not known
** 2PGE refers to Pt + Pd in g/t
2. See ASX Announcement dated: 1/2/2021
10
ASX: ESR
m To
167
165.6
445.5
439.5
388.6
378.4
382.8
388.6
524.85
520.5
511
508.1
608.6
608.6
ESTRELLA RESOURCES
Hole
m From
CBDD028
165.2
including
165.2
CBDD030
431.6
including
436.3
CBDD033
368.5
including 372.52
and
380.7
and
386.15
CBDD035
516.8
including
516.8
CBDD036
505.6
including 506.15
CBDD042A 603.7
including 606.89
T5 DISCOVERY – PHASE 3
Phase 3 drilling has yielded further massive sulphide intercepts in almost all holes
ESTRELLA RESOURCES
ASX: ESR
11
11
T5 DISCOVERY – PHASE 3 & 4
Phase 3 drilling aims to
determine plunge
direction, geological
vectors and confirm basal
mineralisation.
12
ASX: ESR
Phase 4 will step North
(for 3km) and South
(1.5km) and also begin
testing at depth utilising
seismic results and
DHEM.
ESTRELLA RESOURCES
Phase 3 combines close
spaced drilling and stepout drilling with DHEM to
achieve goals.
T5 DISCOVERY –
HIGHLY SUCCESSFUL
PHASE 3 DRILLING
** 2PGE refers to Pt + Pd in g/t
Interval
6.9
0.64
0.35
6.91
1.87
3.29
0.6
6.39
1.03
0.68
0.97
6.82
0.48
0.41
8.23
1.89
2
4.83
0.42
0.85
13.41
6.26
1.11
26.33
1.06
1.15
2.71
25.32
4.96
7.78
0.3
7.04
0.96
18.43
8.49
1.87
0.33
4.25
1.48
0.3
0.53
24.32
7.12
2.93
0.72
14.14
5.41
2.78
1.32
1.18
True
Width
3.3
3.3
1.6
3.1
3.3
4.0
1.0
2.3
6.4
3.0
12.6
1.3
12.2
2.4
3.7
3.4
8.8
4.1
2.0
11.7
3.4
1.4
6.8
2.6
s
Ni%
0.54
1.52
1.32
0.75
1.74
0.75
1.19
0.76
1.38
1.14
1.14
0.58
1.51
1.02
0.69
1.40
0.46
0.63
1.14
1.14
1.31
2.08
3.92
0.73
1.03
1.47
1.10
0.79
1.15
1.14
3.49
0.60
0.77
0.64
0.91
1.12
1.44
0.99
0.90
1.07
0.99
0.82
1.10
1.10
2.45
1.05
1.45
1.39
1.07
2.07
Cu%
0.26
0.21
0.36
0.54
0.54
0.53
1.07
0.44
1.25
0.71
0.23
0.51
0.90
0.64
0.32
0.34
1.43
0.50
0.62
0.47
0.44
0.63
0.16
0.44
0.55
1.02
0.65
0.58
0.71
0.93
0.08
0.53
1.17
0.92
1.01
1.96
0.44
1.03
4.23
7.92
5.14
0.44
0.61
0.41
0.36
0.58
0.88
1.10
0.77
0.31
Co%
0.03
0.08
0.06
0.04
0.08
0.04
0.06
0.04
0.07
0.06
0.06
0.03
0.08
0.05
0.03
0.07
0.02
0.03
0.05
0.05
0.06
0.09
0.17
0.04
0.06
0.08
0.06
0.04
0.06
0.05
0.15
0.03
0.04
0.03
0.05
0.06
0.07
0.05
0.04
0.05
0.05
0.04
0.05
0.05
0.12
0.04
0.06
0.06
0.04
0.09
2PGE **
0.41
0.95
0.61
0.48
0.90
0.58
0.72
0.48
1.42
0.50
0.28
0.59
0.71
0.90
0.45
0.59
0.52
0.47
0.92
0.72
0.46
0.67
0.59
0.70
0.47
1.97
1.03
0.58
1.13
0.72
0.89
0.70
0.53
0.53
0.74
1.03
0.85
0.77
0.45
0.58
0.57
0.57
0.58
0.68
0.68
0.59
0.83
0.69
0.94
0.47
Ag g/t
1.10
1.35
2.10
2.39
2.60
2.35
5.23
1.62
4.72
3.40
1.10
1.83
4.70
2.60
1.34
1.49
6.50
2.58
4.30
2.52
1.93
2.78
0.80
1.84
2.00
4.70
3.16
1.92
2.45
3.14
<0.5
2.28
6.00
3.76
4.09
8.72
1.90
4.05
18.34
34.20
21.40
1.85
2.33
1.82
2.40
2.46
3.91
4.43
3.20
13
1.18
ASX: ESR
See ASX announcement dated 30th July 2021 and 2nd August 2021
m To
388.4
383.14
386.2
393.58
390.36
375.96
373.27
394.79
390.59
393.47
394.79
403.51
397.63
399.52
446.29
443
428
426.64
423.05
426.64
405.71
401.11
398.98
387.54
362.27
365.56
379.05
382.32
363.56
376.11
368.63
363.1
357.02
397.53
392.27
385.65
386.87
392.27
397.53
396.35
397.53
372.64
365.52
371.12
378.93
422.48
413.75
414.39
417
422.48
ESTRELLA RESOURCES
Massive and globular nickel-copper-iron sulphide
breccias in CBDD054B at 368m
Hole
m From
CBDD048
381.5
including
382.5
and
385.85
CBDD049A 386.67
including 388.49
CBDD049C 372.67
including 372.67
CBDD050
388.4
including 389.56
including 392.79
including 393.82
CBDD050A 396.69
including 397.15
including 399.11
CBDD053 438.06
including 441.11
CBDD053A
426
CBDD053B 421.81
including 422.63
including 425.79
CBDD054
392.3
including 394.85
including 397.87
CBDD054A 361.21
including 361.21
including 364.41
including 376.34
CBDD054B
357
including
358.6
including 368.33
including 368.33
CBDD055 356.06
including 356.06
CBDD055
379.1
With
383.78
including 383.78
including 386.54
including 388.02
And
396.05
including 396.05
including
397
CBDD055A 348.32
including
358.4
including 368.19
CBDD055A 378.21
CBDD055B 408.34
With
408.34
including 411.61
including 415.68
including
421.3
T5 BASAL CONTACT
ASX: ESR
14
ESTRELLA RESOURCES
3D rendering of the T5 Basal in relation to the suspected
south plunge line of massive sulphide mineralisation.
Examination of core from
Phase 3 drilling shows strong
possibility T5 Conductor is
one of several south-plunging
targets along the surface of
the T5 Basal Contact.
These “banks” of deposited
sulphides appear to be
connected within a halo of
blebby to globular sulphides.
Only two of these “banks”
have been drilled (the Upper
and Lower T5 Conductors) in
what appears to be quite a
small area with respect to the
prospective surface at T5
EXPANDED OPPORTUNITY
The basal pyroxenite host rock at T5 extends both north and
south of the current drill position
Historical drilling of the basal contact has been sporadic,
however nickel sulphides (NiS) have been located in the past
ESTRELLA RESOURCES
Exploration will involve systematically imaging the contact in
3D through mapping, historical drilling and new seismic
surveying
Accurately knowing the basal contact position will allow much
better refined targeting of known nickel sulphide occurrences
(NiS) with surface, fixed-loop EM
ASX: ESR
This in turn will provide better targeting of ESR’s drilling and
subsequent DHTEM
15
GEOLOGICAL MODELLING ENHANCES
EXPLORATION
ASX: ESR
16
ESTRELLA RESOURCES
Geological understanding of
the mineralisation process at
T5 should allow the vectoring
to additional Ni-Cu intercepts
by following the progression
of assimilated sulphides
through the T5 pyroxenite
The silica-sulphide plume
that exists above the massive
sulphides will enable this
vectoring
This model can be applied
across the Carr Boyd
Igneous Complex
CARR BOYD
INTRUSIVE
COMPLEX
Mapping of the prospective basal contact
and footwall geology is underway
The prospective basal contact is in the process of being fully mapped (location in yellow and red)
3D modelling of the contact and
surrounding geology will form the basis
for future geophysical and drill targeting
at multiple prospects
17
ASX: ESR
The mapped location of sulphide sources
adjacent to the basal contact directly
correlate with nickel sulphide formation
within the complex due to assimilation
ESTRELLA RESOURCES
Estrella’s geological understanding of the
Carr Boyd Igneous Complex &
surrounding stratigraphy is growing
rapidly
CARR BOYD EXPLORATION STRATEGY
Near term catalysts and continual news flow
Carr Boyd Project
Phase 3
Q3 FY22
Q4 FY22
FY23-FY24
Upper T5 Discovery Area
2,500m RC to test T5 up-plunge
extensions
JORC Indicated Resource
Metallurgical Studies
Scoping Studies and JORC Indicated Resource
Drilling
T5 Discovery Area Step-out
Sections
1,500m RC pre-collars
3,500m DD with DHEM
Metallurgical Studies
Inferred Resource Drilling ahead of Scoping Study
T5 North & Dunn Basal Contact
12,500m RC testing basal contact to
300m
Follow-up RC/DD on new targets
T5 South and Carr Boyd
800m DD with DHEM (R&D seismic
holes)
T5 Discovery Area Step-out
Sections
2,500m RC pre-collars
3,500m DD + DHEM
T5 North & Dunn Basal Contact
5,000m RC pre-collars
6,000m DD + DHEM
5,000m RC pre-collars
6,000m DD + DHEM
800m RC/DD with DHEM (R&D
seismic)
1,200m RC/DD with DHEM (R&D
seismic)
T5 South and Carr Boyd
800m RC/DD with DHEM (R&D
seismic)
CSIRO and ESR Research
Partnership
Intrusion emplacement, timing,
chemical and mineralisation studies
with CSIRO
2,500m RC pre-collars
3,500m DD + DHEM
Statutory Tenement Reductions
(East & South)
RC = Reverse Circulation Drilling
1,200m RC/DD with DHEM
(R&D seismic)
RC drilling of CSIRO Partnership generated targets
Follow-up diamond drilling
Resource drilling<?>
10,000m RC testing basal
contact to 300m
FLTEM + DHEM
Follow-up diamond drilling
ASX: ESR
Tregurtha Pyroxenite Basal
Contact
Licensing
Inferred Resource Drilling ahead of Scoping Study
Regolith and mineralisation
vectoring studies with CSIRO
10,000m RC testing basal
contact to 300m
FLTEM + DHEM
Schmidt Pyroxenite Basal
Contact
Phase 5
Q2 FY22
Possible camp upgrade as
necessary
DD = Diamond Drilling DHEM = Downhole Electromagnetics FLTEM = Surface Fixed Loop Transient Electromagnetics
Our focus is on the exploration and development of nickel projects and
increasing shareholder value
ESTRELLA RESOURCES
Phase 4
Q1 FY22
18
INVESTMENT
OPPORTUNITY
Active nickel explorer in a tier-1 mining jurisdiction
Focused on discovery of a World Class, High Quality,
Nickel Sulphide Resource
ESTRELLA RESOURCES
Using knowledge and technology as a key weapon
Experienced board and management in exploration with
innovative approach to mining and development of metal
deposits
Well funded to progress exploration campaigns
ASX: ESR
Highly leveraged to success
19
19
Contact:
Chris Daws
Managing Director
M: +61 8 9481 0389
E: info@estrellaresources.com.au
Share your feedback
Discover