Assays Received and Exploration Update
Released
Released
Announcement PDF
24 November 2021
Assays Received from Step-out Drilling at T5
ASX:ESR
And Exploration Update
HIGHLIGHTS
The first 60m south step-out diamond hole CBDD057 has returned some of the best grades to date
Upper zone - 11.62m(1) @ 0.9% Ni and 0.46% Cu with 0.61 g/t 2PGEs(2)
Including 0.95m @ 2.78% Ni and 0.23% Cu with 1.00 g/t 2PGEs (Figure 1 Left)
Lower zone - 12.8m(1) @ 0.96% Ni and 0.79% Cu with 0.85 g/t 2PGEs(2)
Including 1.81m @ 2.8% Ni and 0.44% Cu with 1.53 g/t 2PGEs
Including 0.7m @ 4.30% Ni and 0.16% Cu with 1.88 g/t 2PGEs (Figure 1 Centre)
Confirmed new zone – 3.7m(1) @ 1.76% Ni and 0.66% Cu with 1.10 g/t 2PGEs(2)
Including 0.7m @ 3.35% Ni and 0.63% Cu with 1.00 g/t 2PGEs (Figure 1 Right)
The upper two zones confirm the south plunge of the T5 Conductors
Assays also confirmed the nickel-copper bearing sulphide nature of the new massive sulphide zone
that is emerging below T5 with additional downhole electromagnetic (DHEM) plates identified
RC Rig upgrade in progress to increase speed and depth of Phase 4 exploration
Figure 1: Massive and highly-disseminated sulphide from the Upper, Lower and new zones respectively in CBDD057.
(1) Downhole intersection quoted, true width is roughly one half of the downhole intersection width.
(2) 2PGE’s is derived from Pt + Pd
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the presence of
further massive nickel-copper sulphides which have returned significant assays in the first 60m southern
step-out drilling at the Company’s Carr Boyd project, located approximately 80km north of Kalgoorlie.
Three zones of nickel-copper sulphides were intersected over the last 170m of diamond drill hole CBDD057
with all three zones containing significant widths of massive sulphides with accompanying globular, highly
disseminated, disseminated, stringer and cloud sulphides.
Significant intersections are presented Table 3 and shown on the T5 long section in Figure 2 along with
downhole electromagnetics (DHEM) results from CBDD060.
Table 1: Significant Intersections from CBDD057
Hole
CBDD057
Including
CBDD057
Including
Including
Including
CBDD057
Including
m From
406.8
413.96
508.6
517.48
519.11
519.85
567
569
m To
418.42
414.91
521.4
520.92
520.92
520.55
570.7
569.7
Interval
11.62
0.95
12.8
3.44
1.81
0.7
3.7
0.7
Ni%
0.90
2.78
0.96
1.92
2.80
4.30
1.76
3.35
Cu%
0.46
0.23
0.79
1.94
0.44
0.16
0.66
0.63
Co%
0.04
0.12
0.04
0.07
0.11
0.16
0.07
0.12
2PGE *
0.61
1.00
0.85
1.19
1.53
1.88
1.10
1.00
Ag g/t
2.05
1.34
3.34
8.18
2.67
1.05
2.79
2.55
* 2PGE refers to Pt + Pd in g/t
Estrella Managing Director Chris Daws commented:
“In what is fast becoming a common theme, Estrella Resources is continuing to unearth more nickel
at Carr Boyd and these latest results are some of the best nickel assays that we have received to
date.
Our team is getting a very good understanding of the Carr Boyd geological setting with the results of
CBDD057 demonstrating our ability to unlock further prospective mineralisation.
We have made numerous massive nickel and copper sulphide intersections with only a very small
portion of the basal contact area tested.
As we progress the drilling towards Christmas and New Year, I can only get more excited about what
we may uncover next for our shareholders, I look forward to reporting any significant updates.”
Figure 2: Location of CBDD057 Significant Intercepts in relation to T5 and additional DHEM plates generated from CBDD060
As can be seen in Figure 3, the top two significant intersections relate to the Upper and Lower T5
Conductors that have been drilled previously. These conductors have a substantial massive sulphide core
that is overlain by heavily-disseminated and globular nickel-copper sulphides.
Of note is the lowest intersection from CBDD057 which corresponds to nickel-copper sulphide
mineralisation intersected in CBDD042A(3). This new zone occurs as massive matrix breccia sulphides.
Due to the nature of this style of mineralisation, a DHEM response is not always seen by adjacent drilling.
This is due to the disconnected nature of semi-massive sulphides when forming these basal breccia zones.
The finding highlights the importance of drilling and geological interpretation, augmented by geophysics in
the exploration and resource development process.
Figure 3 shows a cross section through CBDD057 and depicts the three massive to semi-massive sulphide
zones. Additional wedge holes are underway to better constrain the mineralisation intersected prior to
DHEM surveying.
(3) See ASX Announcement dated 9 April 2021
Figure 3 Left: Cross section through CBDD057 Right: Cross Section 100m to the North. The vectored exploration model
incorporating magma flow direction predicts multiple zones of sulphide occurrences as observed in core.
Figure 4: Figure 4: 3D rendering of the Basal Contact showing the CBDD057 intersection down plunge of the T5 Discovery
in relation to the entire Broonhill – T5 prospective basal contact and Phase 4 Significant Intersections to date.
Phase 4 RC Update
The Phase 4 RC drilling has enabled the Company to trace the basal contact some 2km to the North of T5
towards the Broonhill sulphide discovery, completing some 4,600m in the last 8 weeks. There is currently
a significant delay in the return of assays from the laboratories, in excess of 10 to 12 weeks.
The Company is using this lag in assay return to allow for the upgrade of the RC capability on the current
rig, a process which will take approximately one week. This will involve a new booster for increased air to
run a larger hammer and a number of other efficiencies to increase rig production. The rig is currently
tagging the basal contact between 100m and 300m depth. However, in some instances the holes are being
pushed to 370m. The additional depth results in slower drill rates and the drill contractor, Topdrive Drillers
Australia has heavily invested in additional equipment to facilitate more efficient drilling to this depth.
After CBDD076 intersected sulphides 325m down hole at Broonhill, additional RC holes drilled south have
not reached the basal contact below this level due to the technical capabilities of the RC rig. These
additional holes will either be diamond tailed or additional RC holes drilled to follow up on the Broonhill
discovery. It is expected that the rig will be capable of deeper drilling within the next few days and the
Company looks forward to learning more about this new area.
The Company is aiming to complete at least 25,000m of RC drilling into the Broonhill, Mossgiel and Gossan
Hill Prospects during the 2021 / 2022 Financial Year (Figure 5). These areas have been identified as the
most prospective western basal contact areas and yet have received very little if any historical drilling.
Mapping and drilling of the Carr Boyd Igneous Complex clearly shows multiple sites around the intrusion
edge where sedimentary sulphides are being assimilated into the melt. These sulphides, once in the melt
have the ability to travel and to become enriched with nickel, copper, silver and PGE elements such as
palladium and platinum.
Geological indicators from within and outside of the intrusion show that gravity, at the time of emplacement,
was essentially to the west. This means that the western basal contact is the most prospective for
accumulated sulphides.
Broonhill Prospect – Northern Shoulder (+3.5km strike)
The T5-Broonhill Prospect lies on the northern side of what is interpreted to be the main channel of the
intrusion. Local sulphur assimilation in this area has led to the nickel-copper sulphides at T5 and to
sulphides intersected in drilling at Broonhill (assays pending). The proximity to the sulphide sources means
that the amount of nickel and copper in sulphides can vary over small distances, as was seen in the close
spaced drilling during Phase 3.
Gossan Hill Prospect – Southern Shoulder (+3.5km strike)
A similar shoulder to that seen at Broonhill exists 5km to the south at the Gossan Hill Prospect. No drilling
into the basal contact has been performed at Gossan Hill and the Company has received the regulatory
approvals to commence setting up for RC drilling in this area.
Mossgiel Prospect – Main Channel Base (+2km strike)
The Mossgiel Prospect represents the very base of the intrusion. This area is highly prospective and the
Company intends to drill this prospect at the conclusion of the current Broonhill RC program. All regulatory
approvals to explore this area have already been received and preparations are underway to establish
drilling positions. The Company intends to collar at least one or two holes into the Mossgiel Prospect before
a 2-week maintenance shutdown over Christmas and New Year.
These three areas are deemed to be of very high potential to accumulate nickel and copper sulphides. As
such the Company wishes to explore the geology rapidly within the next six months.
Figure 5: Sulphide assimilation within the Carr Boyd Layered Igneous Complex and potential sulphide migration directions
into basal trap sites. These areas warrant early exploration.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Table 2: Drill hole collar details
Hole ID
Final Depth
Easting
Northing
RL
Dip
Azimuth
Status
CBDD057
CBDD058
CBDD059
CBDD060
606.7
TBA
TBA
741.6
367370
6673580
431.9
-69.5
258
367372
6673580
431.9
-76
270
Completed
Planned
Planned
Completed
Table 3: CBDD057 Assay Details
Hole ID
Sample ID
From
To
Interval
Ni%
Cu%
CBDD057
Upper T5
Conductor
ECB11748
ECB11749
ECB11750
ECB11751
ECB11752
ECB11753
ECB11754
ECB11755
ECB11756
ECB11757
ECB11758
ECB11759
ECB11760
ECB11761
ECB11762
ECB11763
ECB11764
ECB11765
ECB11766
ECB11767
ECB11768
ECB11769
ECB11770
ECB11771
ECB11772
ECB11773
ECB11774
ECB11775
ECB11776
ECB11777
ECB11778
ECB11779
ECB11780
ECB11781
ECB11782
ECB11783
ECB11784
ECB11785
ECB11786
ECB11787
ECB11788
ECB11789
ECB11790
ECB11791
380.1
382.1
382.94
383.78
396
398
399.4
400.8
402.8
404.8
406.8
407.6
408.4
409.2
410
410.8
411.6
412.4
412.72
413.34
413.96
414.28
414.6
414.91
415.61
416.31
417.01
417.71
418.42
419.35
420.28
421.21
422.14
423.07
424
424.93
425.86
426.79
427.72
428.65
429.58
430.51
431.44
432.34
382.1
382.94
383.78
385.78
398
399.4
400.8
402.8
404.8
406.8
407.6
408.4
409.2
410
410.8
411.6
412.4
412.72
413.34
413.96
414.28
414.6
414.91
415.61
416.31
417.01
417.71
418.42
419.35
420.28
421.21
422.14
423.07
424
424.93
425.86
426.79
427.72
428.65
429.58
430.51
431.44
432.34
433.34
2
0.84
0.84
2
2
1.4
1.4
2
2
2
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.32
0.62
0.62
0.32
0.32
0.31
0.7
0.7
0.7
0.7
0.71
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.9
1
0.08
0.14
0.23
0.11
0.19
0.22
0.22
0.09
0.09
0.10
0.48
0.77
0.86
0.86
0.78
0.76
0.60
0.08
0.53
0.57
1.98
3.61
2.60
0.42
0.91
0.66
0.99
0.85
0.07
0.10
0.20
0.10
0.11
0.11
0.09
0.40
0.09
0.62
0.30
0.38
0.27
0.26
0.33
0.17
0.00
0.02
0.06
0.02
0.12
0.13
0.19
0.05
0.02
0.02
0.24
0.29
1.09
0.42
0.57
0.36
0.42
0.06
0.63
0.22
0.26
0.06
0.39
0.28
0.27
0.78
1.17
0.21
0.02
0.04
0.16
0.06
0.04
0.03
0.08
0.24
0.02
0.27
0.19
0.29
0.15
0.13
0.17
0.10
Hole ID
Sample ID
From
To
Interval
Ni%
Cu%
CBDD057
Lower T5
Conductor
ECB11792
ECB11793
ECB11794
ECB11795
ECB11796
ECB11797
ECB11798
ECB11799
ECB11800
ECB11801
496.77
498.59
500.4
501.25
501.7
502.2
502.5
503.1
503.9
504.75
498.59
500.4
501.25
501.7
502.2
502.5
503.1
503.9
504.75
505.6
1.82
1.81
0.85
0.45
0.5
0.3
0.6
0.8
0.85
0.85
0.15
0.10
0.41
0.12
0.28
0.23
0.33
0.13
0.25
0.26
0.06
0.04
0.51
0.17
0.29
0.44
0.17
0.04
0.14
0.16
Co
ppm
80
100
133
99
117
135
130
75
72
76
232
347
398
391
356
351
282
55
247
266
852
1535
1130
192
414
306
439
374
69
81
107
77
85
85
74
189
76
297
151
184
158
150
164
98
Co
ppm
96
77
205
95
166
144
194
111
146
149
2PGE's
0.02
0.04
0.07
0.02
0.10
0.13
0.23
0.07
0.06
0.05
0.64
0.49
0.72
0.74
0.57
0.63
0.39
0.04
0.87
0.23
1.31
0.94
0.77
0.37
0.94
0.54
0.56
0.42
0.02
0.04
0.11
0.27
0.08
0.05
0.04
0.22
0.05
0.34
0.17
0.22
0.30
0.19
0.26
0.11
2PGE's
0.15
0.07
0.34
0.16
0.30
0.44
0.21
0.12
0.16
0.19
Ag
g/t
<0.5
<0.5
<0.5
<0.5
1.20
1.20
1.70
<0.5
<0.5
<0.5
1.20
1.30
4.60
1.70
2.50
1.50
1.80
0.50
2.00
1.10
1.00
0.80
2.30
1.10
1.60
3.50
5.20
1.10
<0.5
<0.5
0.70
<0.5
<0.5
<0.5
<0.5
0.90
<0.5
1.30
0.90
1.40
0.60
0.60
0.70
<0.5
Ag
g/t
0.60
0.60
3.50
2.00
2.70
3.40
1.30
0.50
1.20
0.90
MgO%
22.7
24.6
24.8
24.5
21.1
21.1
21.6
21.0
21.1
20.6
18.8
18.3
17.8
18.7
19.3
19.6
21.1
9.7
14.3
15.8
13.4
4.2
10.2
22.1
20.2
15.8
15.1
14.0
16.5
15.5
20.8
19.5
17.1
17.5
15.2
17.6
16.1
19.6
23.1
22.3
23.0
23.3
21.1
7.9
MgO%
21.6
20.3
22.2
19.8
19.6
22.8
22.9
24.0
23.3
22.2
Au
g/t
0.00
0.00
0.02
0.00
0.09
0.11
0.13
0.07
0.02
0.02
0.06
0.03
0.10
0.04
0.09
0.04
0.06
0.06
0.07
0.01
0.01
0.02
0.23
0.06
0.02
0.06
0.07
0.03
0.01
0.01
0.02
0.02
0.05
0.04
0.02
0.05
0.01
0.04
0.02
0.04
0.03
0.02
0.02
0.02
Au
g/t
0.07
0.06
0.17
0.24
0.23
0.18
0.11
0.03
0.08
0.09
Pt
g/t
0.01
0.03
0.04
0.01
0.05
0.06
0.14
0.04
0.03
0.02
0.43
0.14
0.35
0.39
0.22
0.33
0.15
0.02
0.78
0.12
0.93
0.18
0.10
0.20
0.62
0.31
0.23
0.15
0.01
0.02
0.07
0.25
0.04
0.03
0.01
0.05
0.03
0.12
0.07
0.08
0.23
0.11
0.14
0.04
Pt
g/t
0.09
0.04
0.14
0.12
0.20
0.33
0.07
0.08
0.07
0.09
Pd
g/t
0.01
0.02
0.04
0.01
0.05
0.07
0.09
0.03
0.03
0.02
0.20
0.34
0.37
0.34
0.35
0.31
0.24
0.02
0.09
0.11
0.38
0.76
0.68
0.17
0.31
0.23
0.33
0.28
0.01
0.03
0.04
0.02
0.04
0.02
0.03
0.17
0.02
0.22
0.09
0.14
0.08
0.08
0.13
0.07
Pd
g/t
0.06
0.03
0.20
0.04
0.10
0.11
0.14
0.04
0.09
0.10
As
ppm
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
As
ppm
<5
<5
<5
<5
<5
<5
<5
<5
<5
<5
S%
SG
0.05
0.30
0.80
0.26
0.78
1.10
1.21
0.27
0.09
0.19
3.23
5.06
6.40
6.07
5.52
5.22
4.56
0.59
4.11
3.73
15.25
30.10
20.20
2.65
6.27
5.02
6.69
4.82
0.21
0.45
1.06
0.46
0.15
0.28
0.43
2.19
0.39
3.67
1.96
2.51
1.81
1.60
2.10
1.02
3.01
3.00
2.97
3.01
2.96
3.03
2.96
3.02
3.06
3.01
3.14
3.26
3.28
3.24
3.23
3.19
3.14
2.90
3.12
3.16
3.50
4.22
3.71
3.35
3.36
3.04
3.33
3.22
3.04
3.02
3.03
3.04
3.06
3.11
3.07
3.13
3.05
3.15
3.07
3.11
3.07
3.07
3.08
3.18
S%
SG
0.44
0.18
2.68
0.56
1.69
1.89
2.16
0.39
1.32
1.54
3.03
3.09
3.11
3.15
3.17
3.33
3.22
3.23
3.24
3.29
ECB11802
ECB11803
ECB11804
ECB11805
ECB11806
ECB11807
ECB11808
ECB11809
ECB11810
ECB11811
ECB11812
ECB11813
ECB11814
ECB11815
ECB11816
ECB11817
ECB11818
ECB11819
ECB11820
ECB11821
ECB11822
505.6
507.6
508.6
509.3
510.26
511.22
512.18
513.14
514.1
515.06
516.02
516.76
517.48
517.96
518.42
519.11
519.85
520.2
520.55
520.92
521.4
507.6
508.6
509.3
510.26
511.22
512.18
513.14
514.1
515.06
516.02
516.76
517.48
517.96
518.42
519.11
519.85
520.2
520.55
520.92
521.4
523
2
1
0.7
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.74
0.72
0.48
0.46
0.69
0.74
0.35
0.35
0.37
0.48
1.6
Hole ID
Sample ID
CBDD057
New Zone
ECB11823
ECB11824
ECB11825
ECB11826
ECB11827
ECB11828
ECB11829
ECB11830
ECB11831
ECB11832
ECB11833
ECB11834
ECB11835
0.10
0.23
0.43
0.50
0.48
0.62
0.55
0.42
0.17
0.66
0.82
0.84
0.95
1.13
0.51
1.11
4.49
4.13
2.49
0.93
0.11
0.03
0.09
0.12
0.15
0.43
0.34
0.31
0.22
0.07
0.21
0.37
1.00
8.40
3.08
0.76
0.68
0.19
0.14
0.62
0.24
0.01
From
To
567
567.7
568
568.37
568.68
569
569.35
569.7
570.05
570.4
570.7
572.7
574.7
567.7
568
568.37
568.68
569
569.35
569.7
570.05
570.4
570.7
572.7
574.7
576.7
Interval
Ni%
Cu%
0.7
0.3
0.37
0.31
0.32
0.35
0.35
0.35
0.35
0.3
2
2
2
0.36
1.10
2.63
1.72
1.47
3.27
3.42
1.51
1.86
0.36
0.05
0.01
0.01
0.12
0.55
0.44
0.87
1.11
0.43
0.82
1.64
0.45
0.65
0.05
0.01
0.00
80
125
199
221
206
247
221
173
93
257
313
326
380
452
211
425
1670
1520
1095
364
54
Co
ppm
164
413
1015
650
547
1200
1215
563
691
151
62
37
32
0.05
0.25
0.43
0.41
0.63
0.62
0.67
0.37
0.41
0.54
1.98
0.89
1.76
0.37
0.33
1.07
1.86
1.90
1.55
1.34
0.05
2PGE's
0.68
1.45
2.17
0.80
1.07
0.98
1.01
1.29
1.32
0.30
0.02
0.02
0.02
<0.5
0.60
0.50
0.80
2.20
1.60
1.30
1.00
<0.5
0.90
1.50
3.80
32.90
11.90
3.30
3.90
1.10
1.00
4.20
1.90
<0.5
Ag
g/t
0.70
2.60
2.40
3.80
4.20
2.10
3.00
6.40
2.30
2.40
<0.5
<0.5
<0.5
21.3
19.9
19.6
19.2
19.5
19.6
18.9
20.0
19.4
18.3
14.8
17.4
8.7
12.1
15.6
15.6
1.9
2.0
6.8
13.5
3.3
MgO%
17.9
16.7
12.1
15.8
15.6
6.7
6.9
13.4
12.1
17.5
5.6
4.9
4.5
0.02
0.05
0.06
0.07
0.10
0.08
0.05
0.05
0.03
0.05
0.04
0.06
0.69
0.15
0.08
0.06
0.01
0.02
0.12
0.01
0.01
Au
g/t
0.08
0.49
0.02
0.04
0.04
0.02
0.03
0.02
0.01
0.02
0.01
0.00
0.00
0.03
0.15
0.22
0.21
0.44
0.38
0.48
0.21
0.34
0.25
1.69
0.61
1.30
0.07
0.11
0.46
0.83
0.66
0.55
1.05
0.02
Pt
g/t
0.56
1.11
1.57
0.39
0.72
0.31
0.27
0.71
0.73
0.15
0.01
0.01
0.01
0.02
0.10
0.22
0.20
0.19
0.23
0.20
0.16
0.07
0.29
0.29
0.29
0.47
0.30
0.22
0.61
1.03
1.24
1.00
0.30
0.03
Pd
g/t
0.12
0.34
0.60
0.41
0.35
0.67
0.74
0.58
0.59
0.16
0.02
0.01
0.01
<5
<5
<5
<5
<5
5
5
<5
<5
<5
<5
5
<5
<5
<5
<5
<5
6
<5
6
<5
As
ppm
<5
5
5
9
<5
16
10
7
7
<5
5
<5
<5
0.30
1.25
2.75
3.11
3.12
3.82
3.32
2.51
0.80
3.95
5.25
5.64
15.15
9.89
3.58
6.44
34.00
33.50
19.95
5.00
0.68
3.16
3.26
3.23
3.18
3.16
3.18
3.16
2.94
3.08
3.13
3.42
3.51
3.52
3.74
3.13
3.36
4.07
4.73
3.45
3.23
2.81
S%
SG
2.07
7.53
18.75
12.80
9.64
23.80
24.40
11.25
13.25
2.54
0.48
0.03
0.01
3.05
3.28
3.65
3.44
3.19
3.90
3.98
3.46
3.65
3.30
3.10
2.88
2.88
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut DD core samples have been half cut with an automatic
techniques
channels, random chips, or specific
core saw.
specialised
industry
standard 0.25m-1.1m samples are collected from the core trays as
measurement tools appropriate to the
marked out by the supervising geologist.
minerals under investigation, such as A handheld XRF tool was used to verify the mineralisation
down hole gamma sondes or handheld
with samples reporting >0.3% Ni in disseminated zones
XRF
instruments,
etc.).
These
and >1% Ni in the matrix sulphide zones.
examples should not be taken as XRF results have not been reported and are used as a
limiting the broad meaning of sampling.
logging/sampling verification tool only.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
Core is cut and sampled to ensure the sample is
representative and no bias is introduced. Cutting of
specific, banded or stringer sulphide zoned core is done
orthogonal to the banding to ensure there is no bias.
Aspects of the determination of
mineralisation that are material to the
Public Report.
Determination of mineralisation has been based on
geological logging, visual sulphide estimates and
confirmation using a pXRF machine. Samples were
dispatched to an accredited laboratory for multi-element
analysis.
.
Diamond core drilling was used to obtain 3m length
samples from the core barrel which are then marked in
one meter intervals, based on core block measurements.
Samples are selected based on geological logging
boundaries or on nominal meter marks.
Collected samples weigh a nominal 2-3 kg (depending on
sample length).
Samples have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed using a 4-acid digest, MEICP for 33 elements and ore zone samples are also being
tested for Au & PGE elements using ICP analysis.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill sample
recovery
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Drilling was undertaken using NQ2 sized drill core.
Holes have been collared with mud rotary from surface,
HQ rough cored to top of fresh rock then NQ2 cored to
EOH.
Core recovery was recorded by the field crew and verified
by the geologist.
RQD measurements were digitally recorded to ensure
recovery details were captured.
Sample recovery in all mineralised zones is high with
negligible core loss observed.
Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very good
condition.
_________________________________________________________________________________
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines
was undertaken.
Core trays were photographed wet and dry prior to
sampling.
Drill hole logs are recorded in Excel spread sheets and
validated in Micromine Software as the drilling
progresses.
The entire length of all holes is logged.
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Results verified internally by Company personnel
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
Core is half cut using an automatic core saw to achieve a
half-core sample for laboratory submission.
The sample preparation technique is considered industry
best standard practice.
No field duplicates have been collected in this program.
Field duplicates will be collected once initial results are
returned and resampling of the mineralised zones is
warranted.
Sample sizes are appropriate to the grain size of the
mineralisation.
No handheld XRF results are reported however the tool
was used to verify the mineralisation with reporting >0.3%
Ni in disseminated zones and >1% Ni in the matrix
sulphide zones.
DHTEM parameters are as follows;
Tx Loop size:
500 x 800 m
Transmitter:
GAP HPTX-70
Receiver:
EMIT SMARTem24
Sensor:
EMIT DigiAtlantis
Station spacing: 2m to 10m
Tx Freq:
0.5 Hz
Duty cycle:
50%
Current:
~130 Amp
Stacks:
32-64
Readings:
2-3 repeatable readings per
station
Hole CBDD0028 is twinning hole CBP042. No other
twinning is warranted at this stage.
The data was collected and logged using Excel
spreadsheets and validated using Micromine Software.
The data will be loaded into an externally hosted and
managed database.
No adjustments have been made to the assay data other
than length weighted averaging.
The holes were pegged using a hand-held GPS + 3m
The rig was setup over the nominated hole position and
final GPS pickup occurred at the completion of the hole.
Criteria
JORC Code explanation
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data
spacing
and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Commentary
Holes are progressively surveyed by DGPS on a batch
basis.
MGA94_51
Topography is relatively flat and control is more than
adequate given the early stage of the project. A 3D drone
ortho-photographic survey had been used to create a
DTM of the project area.
Refer to Cross Sections and Plans included
Not applicable, no Mineral Resource is being stated.
No compositing has been applied. Intercepts are quoted
as length weighted intervals.
The drill hole orientation does not introduce a sample
bias.
Samples are in the possession of Estrella’s personnel
from field collection to laboratory submission.
No audits or reviews have been conducted for this release
given the early stage of the project.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
Type, reference name/number,
Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of
tenement and
location and ownership including
ESR) holds a 100% interest in the nickel and base metal
land tenure
agreements or material issues with
rights to the project.
status
third parties such as joint ventures,
There are no known impediments to operate in the area.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Exploration
Acknowledgment and appraisal of
The Carr Boyd Rocks deposit was discovered by Great
done by other
exploration by other parties.
Boulder Mines, in a joint venture with North Kalgurli Ltd
parties
in 1968. The deposit was mined between 1972 and
1975, during which time they explored for additional
breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni and 0.46%
Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground
over the CBLC outside of the immediate mine area.
Between 1968 and 1971 they conducted extensive
exploration programs searching for large basal contact
and/or stratabound Ni-Cu deposits. It was during this
time that most of the disseminated and cloud sulphide
occ
Share your feedback
Discover