Mobile MTd UAV Survey Defines Drill Targets
Released
Released
Announcement PDF
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103 Email info@estrellaresources.com.au
12 August 2026
Mobile MTd UAV SURVEY DEFINES DRILL TARGETS
Engage with this announcement on our interactive Investor Hub
HIGHLIGHTS
• Results from the Mobile MTd UAV passive electromagnetic geophysical survey at the Ira
Miri Manganese Project in Timor-Leste have generated new, highly-prospective targets.
• Multiple high-conductivity anomalies identified, with the strongest of these anomalies
appearing as “plumes” extending upwards from depth.
• The high conductivity “plumes” have a spatial relationship with the Laleno Dome and
possibly represent hydrothermal-fluid pathways that deposited sulphide mineralisation.
• Estrella developed an initial ~3,000m RC and Diamond tails drilling campaign to test three
compelling targets.
• These holes will be the deepest mineral-exploration drilling completed to-date in Timor-
Leste.
• In addition, shallow-dipping conductivity anomalies have been identified that may
represent manganese mineralisation and the best anomaly will be tested by 3 drill-holes.
• Limestone in the Sagadate region will be investigated with a ~4,000m RC and Diamond
drilling campaign to be developed that augments the Werumata Limestone Deposit.
Commenting on survey activity, Managing Director Robert Mencel said:
“The results of the Mobile MTd survey have provided Estrella with a compelling new set of drill targets at Ira
Miri.
“The identification of strong conductivity anomalies extending from depth towards surface, particularly where
they coincide with the Laleno Dome, provides an important new exploration vector for the Company.
“While the conductivity anomalies are not, by themselves, proof of mineralisation, their geometry and
geological setting provide a strong basis for drill testing.
“We are particularly encouraged by the scale and continuity of several of these anomalies and are excited by
opportunity to test them with our first deep drilling program in this part of Timor-Leste.
“At the same time, the identification of shallow-dipping conductivity anomalies provides an opportunity to test
for extensions of manganese-bearing horizons within the Noni Formation.
“With drilling planned to commence in September, further ground geophysics underway and a major regional
airborne MT survey planned across our Timor-Leste tenure, Estrella is continuing to systematically build its
exploration dataset and advance multiple discovery opportunities.”
ASX: ESR
Mobile MTd Survey location
Estrella Resources Limited (ASX: ESR) is pleased to advise that the Mobile Magneto-Telluric drone
survey (Mobile MTd) completed at the Company’s Ira Miri project in Timor-Leste, has yielded
encouraging results.
The survey covered the existing Ira Miri pit area within a broader 3.5km x 4.2km corridor, which also
covered a small portion of the eastern part of the Laleno Dome (Figures 1 and 2).
Figure 1: Location of the MTd survey, shown by an example of the resulting conductivity anomaly
images.
Figure 2: Location of the MTd survey in relation to the Laleno Dome.
Mobile MTd Data and Results
The MTd survey recorded data that was processed to define anomalous areas of high conductivity,
manganese mineralisation, as well as mineralisation containing abundant sulphide minerals, is highly
conductive.
The size and intensity of the high-conductivity anomalies vary, and each anomaly also varies at depth.
Also, some anomalies are only apparent at specific frequencies, while others are consistently defined
at all frequencies. The best anomalies are those that are the most consistent across all data sets and
these anomalies warrant investigation through drilling.
Some anomalies present as zones of high conductivity that extend up to the surface from great depth,
appearing like a “plume,” while others dip at low to moderate angles. The “plumes” may represent
sulphide-bearing hydrothermal mineralisation, while the dipping anomalies may represent manganese-
bearing beds of the Noni Formation.
Drill Targets
Following the successful identification of these drill-targets the Company’s geological team has
developed a high-impact exploration program.
Drill-holes have been planned to investigate three targets; locations in Figure 3, with details in Table 1.
Figure 3: Potential Drill-holes to test conductivity targets defined from data acquired by MTd survey.
Table 1: Proposed Drill-holes to test conductivity anomalies
Holes 1-3 and 7-9 will form part of an initial ~3,000m exploration program, with holes 4-6 to be
considered for follow-up drilling, subject to results.
Proposed Hole_01
This drill-hole tests a pronounced VLF conductivity anomaly coinciding with a 3D inversion conductivity
anomaly (Figure 4) These coincident anomalies are approximately 500m north of a differentiated mafic
intrusion (mostly variable-textured gabbro) and an occurrence of copper mineralisation that is
approximately 250m east of the intrusion.
Figure 4: Oblique view towards the northeast showing the terrain and location of drill-holes. (Image is DTM
drape, overlying 19.8 KHz VLF (upper slice below DTM), overlying 3D inversion slice, cut as sections).
NOTE: Hole 01 testing VLF anomaly (underlying coincident 3D inversion anomaly obscured) and Hole 03
penetrating a distinct plume, visible in the section cut through the plume. Holes 2, 7 and 8 not labelled:
Hole 02 behind Hole 06; Hole 7 and Hole 8 close to Hole 9.
Proposed Hole_02
This drill-hole tests a pronounced 3D inversion conductivity anomaly approximately 800m south of
Proposed Hole_01 and is also located upon the flank of the Laleno Dome.
Proposed Hole_03
This drill-hole will test a pronounced “plume” on the flank of the Laleno Dome. This plume is evident as
a highly conductive anomaly revealed through the 3D inversion image (Figure 5). The presence of
copper mineral occurrences around the Laleno Dome (refer to Figure 2), likely to have formed from a
sulphidic hydrothermal system which adds significance to the “plumes” revealed by the MTd survey.
Figure 5: Oblique view towards the northeast showing the terrain and location of drill-holes. (Image is DTM
drape, overlying 19.8 KHz VLF (upper slice below DTM), overlying 3D inversion slice). Note that Hole 03 is
intended to penetrate a distinct plume. Refer to Figure 4 also.
The initial drilling of the “plumes” will focus upon “proof of concept” using simple vertical drill-holes. For
these drill-holes, a Reverse Circulation Percussion (RC) pre-collar will be drilled to approximately 100m
depth, with the hole continued as a Diamond Drill-Hole (DDH) “tail” to approximately 500m depth.
These will be the deepest mineral exploration drill-holes completed in Timor-Leste, although some on-
shore Petroleum drill-holes have been completed to greater depths.
There are other significant “plume” anomalies, which proposed drill-holes 4, 5 and 6 would test. The
anomalies to be tested by proposed holes 5 and 6 are associated and substantial (Figure 6).
Figure 6: Oblique view to the Northeast showing 3D inversion, displaying apparent conductivity, cut as
two orthogonal sections, showing the linked plume clearly.
Holes 7-9 will be drilled to test a shallow-dipping conductive anomaly (Figure 7) that may represent a
manganese-bearing bed of the Noni Formation.
Figure 7: Section of 3D inversion conductivity anomaly with Hole-8 indicated.
Conclusions
The MTd survey has successfully defined conductive anomalies that warrant drill-testing.
The imminent regional MT (helicopter) survey will yield data that greatly complements the MTd survey
and will be merged with the MTd data, extending coverage across the entirety of the Laleno Dome.
Given the find of copper-rich massive sulphide mineralisation on the northern flank of the Laleno Dome
(reported last month; “High-Grade Copper manganese, Nickel and Silver Discoveries,” 13 July 2026),
the extended coverage is eagerly awaited as any occurrence of massive sulphides at depth, although
invisible at surface, will create a strong conductive anomaly.
Estrella’s ground is extensive and the widespread, numerous occurrences of mineralisation and signs
of hydrothermal alteration suggests that there is high potential to discover significant mineralisation
beneath the cover of clay and vegetation that obscures so much of Timor Leste’s geology. Careful use
of geophysical surveys will enable Estrella to unlock the hidden mineral potential in its ground.
Next Steps
Preparation of drill sites and the access tracks will be initiated in the next week, to enable drilling to test
the MTd geophysical drill-targets with operations anticipated to commence in the first week of
September.
Ground geophysics (Resistivity/Induced Polarisation [“Res/IP” or “IP”] surveys have been completed in
three areas, with processing of data continuing and additional surveys planned.
A large regional helicopter magnetotelluric (MT) survey, extending over Estrella’s entire tenure, is
scheduled to commence in September, yielding results before the end of the year and anticipated to
identify further substantial drill-targets.
In addition, progress towards drilling of limestone in the Sagadate region is advancing and, after
approvals have been attained, a 4,000m combined RC and diamond (core) drilling programme will
commence, to be completed before year’s end. This limestone is intended to supplement the established
Mineral Resource defined for the Werumata Limestone Deposit, increasing the quantity and range of
limestone products able to be produced.
Ira Miri Manganese Bulk Sample
Estrella continues to advance shipment preparation and export approval processes for the Category B
market appraisal stockpile.
The Company advises that it has completed the customer selection process for its maiden manganese
trial parcel.
The Company anticipates selling its entire manganese stockpile, currently estimated at approximately
27,000 tonnes (Wet), as a single shipment.
Export approval documentation has been lodged with the Government of Timor-Leste. Execution of the
sales agreement is conditional on receipt of that approval. The Company will update the market once
approval is granted and binding terms are executed.
This announcement has been approved by the board for release to the ASX.
ENDS
About Estrella Resources Ltd
Estrella Resources Ltd has exploration projects and mineral rights in Western Australia but is currently
focussing its efforts on the exploration of its Timor Leste portfolio of tenements (known in Timor Leste
as “Concessions”), Figure 8.
Figure 8: Estrella concessions, Timor Leste, with currently developing prospects.
To-date, Estrella has discovered manganese mineralisation at several sites, with the Ira Miri deposit
having been excavated to extract a 27,000t bulk sample to be sold as a market appraisal exercise.
Exploration for manganese continues.
In addition, Estrella has identified several occurrences of copper mineralisation and is actively pursuing
the growing copper and gold potential.
FURTHER INFORMATION CONTACT
Robert Mencel
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
dtasker@chapteroneadvisors.com.au
+61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical
facts but, rather, on ESR’s current expectations about future events and on a number of assumptions which are
subject to significant uncertainties and contingencies many of which are outside the control of ESR and its
directors, officers and advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by
Eustachio Amaral, Geophysicist for Estrella Resources Ltd, with guidance from Peter Spitalny, who is the
Exploration Manager Timor Leste of Estrella Resources Ltd, and a Fellow of The Australasian Institute of Mining
and Metallurgists. Mr Spitalny has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”.
Mr Spitalny consents to the inclusion in the report of the matters based on their information in the form and context
in which it appears.
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld
XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
• This announcement does not discuss drilling
results.
• The rock-chip samples reported were
collected during reconnaissance and mapping
fieldwork. They have been collected through
a range of standard field sampling techniques,
including knapped fragments from outcrops,
grab samples from lag, and composite samples
from lag or outcrop.
• Most of the samples are specimens observed
to be altered or mineralised or inferred to be
mineralised and have been collected to
provide confirmation of mineralisation (or
lack of mineralisation) at a particular point. As
such, these samples are not fully
representative of the body of rock (or lag)
sampled.
• The sample nature and context have been
recorded to ensure the context of the sample
is understood; the sampled locations, sampling
method and sample descriptions are included
in this announcement.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• This announcement does not discuss drilling
results.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
• This announcement does not discuss drilling
results.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• This announcement does not discuss drilling
results.
Sub-sampling
techniques
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• This announcement does not discuss drilling
results.
• The rock-chip samples reported were
Criteria JORC Code explanation Commentary
and sample
preparation
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
collected during reconnaissance and mapping
fieldwork.
• The nature of the samples is described in the
sample register. Some samples are from a
single point whereas others are composite
samples.
• Samples were mostly collected from outcrops
or lag proximal to eroding outcrops. Some
samples that are transported but
compositionally significant have also been
collected, as they provide evidence of the
presence of mineralisation in the broader
area.
• Most of the samples are specimens observed
to be altered or mineralised or inferred to be
mineralised and have been collected to
provide confirmation of mineralisation (or
lack of mineralisation) at a particular point. As
such, these samples are not fully
representative of the body of rock (or lag)
sampled.
• If significant grades of important elements
are detected within the samples, follow-up
fieldwork that includes collection of samples
that are more representative of the
mineralisation will be collected.
• Samples were submitted to PT Geoservices
in Jakarta, Indonesia where the entirety of
each sample is crushed, with a sub-sample
then pulverized to 90% passing 75 um, from
which a sample for geochemical analysis is
split and then analysed.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
• Exported samples of manganese
mineralisation are analysed using method
XRFFMN, an XRF Fusion package reporting
Mn as elemental Mn and 13 additional
elements as oxides, namely Al2O3, BaO, CaO,
Cr2O3, Fe2O3, K2O, MgO, Na2O, P2O5, SiO2, SO3,
SrO and TiO2.
• Exported samples of potential copper/base
metal or gold mineralisation are analysed
through method ARA40_DG (Aqua Regia
digest of 40g split from pulp) followed by
method ARA40_AUSX determining
concentration of Au and a suite of 40
elements through (Inductively Coupled
Plasma Optical Emission Spectrometry
(ICPOES). For those samples in which Au
exceeds 10ppm, FAA40 (Fire Assay of a 40g
charge) is completed to provide greater
accuracy.
• Method MAHG_01 is utilized to accurately
determine Hg concentration.
• Quantitative X-ray Diffraction was completed
to identify mineral species for 4 samples.
Criteria JORC Code explanation Commentary
• Laboratory QA/QC strategies are considered
adequate for verification of the reliability of
the results, as this is merely first-pass
sampling.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• This announcement does not discuss drilling
results.
• No prior modern exploration has been
conducted in the area, so there is no pre-
existing data to compare.
• No adjustments to assay data received from
the laboratory were undertaken.
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• This announcement does not discuss drilling
results.
• All sample locations have been
determined using a hand-held Garmin GPS,
accurate to +/- 1.8m in open ground.
• The grid system used is WGS-84 Zone 52S.
Data spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• This announcement does not discuss drilling
results and cannot be used to complete a
Mineral Resource estimate.
• Some of the samples are composites and if this
is the case, it is stated in the sample register
included in this announcement.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• This announcement does not discuss
drilling.
• The sampling is of a reconnaissance
nature and relationships between
locations of geochemically anomalous
samples and structures remain to be
defined by additional investigation.
Sample
security
• The measures taken to ensure sample security. • Exported samples are in the possession of
ESR personnel from field collection, through
transport to Dili and through completion of
governmental inspections (IGTL, ANM,
Customs and Quarantine) in Dili. Possession
then passes to Ceva Logistics, an
international courier that delivers the
samples to PT Geoservices in Jakarta,
Indonesia.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• No independent audit or review has been
undertaken at this stage.
Section 2 - Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
• Exploration and Evaluation Concessions
MEL2023-CA-ZA001, MEL2023-CA-ZA002 and
MEL2023-CA-ZA003 are awarded for four
years (26/03/2024 – 25/03/2028) to Estrella
Resources Representação Permanente, who
are exploring the concessions as a Joint
Venture (JV) project through the JV company
Estrella Murak Rai, comprised of Estrella
Resources Representação Permanente (70%)
and Murak Rai Timor (30%).
• Reconnaissance Permits ESR-RP-01, ESR-RP-
02, ESR-RP-03, ESR-RP-04, ESR-RP-05, ESR-
RP-06, ESR-RP-07 and ESR-RP-08 were
awarded to Estrella Resources Limited
Representação Permanente (100%).
Subsequently, ESR-RP-01 to ESR-RP-04 were
converted to Exploration and Evaluation
Concessions MEL2024-DA-CA-ZA001 to
MEL2024-DA-CA-ZA004 respectively,
awarded for four years (14/05/2025 –
1305/2025). ESR-RP-06 has been
relinquished but applications to convert ESR-
RP-05, ESR-RP07 and ESR-RP-08 into
Exploration and Evaluation Concessions have
been submitted; approval is pending.
• Exploration and Evaluation Concessions
MEL2024-DA-CA-ZB001 to MEL2024-DA-CA-
ZB004, awarded for four years (26/09/2024 –
25/09/2029) to Estrella Resources
Representação Permanente, who are
exploring the concessions as a Joint Venture
(JV) project through the JV company Estrella
Murak Rai, comprised of Estrella Resources
Representação Permanente (70%) and
Murak Rai Timor (30%).
• Estrella Resources Limited Representação
Permanente is registered in Timor-Leste and
is a wholly-owned subsidiary of Estrella
Resources Limited (Australia).
• All the Concessions and Permits are current
and in good standing
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration
by other parties.
• The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese, gold
and construction material was conducted.
The exploration was not systematic and
hampered by difficult access.
• Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
Criteria JORC Code explanation Commentary
potential.
• Local geologists and companies have
sporadically explored the area however
there has been no documentation collected
nor systematic exploration to quantify
mineral occurrences.
• No minerals drilling has taken place.
• No close-spaced geophysics has taken place.
• No systematic, modern exploration has
taken place.
• The Geological Institute of Timor-Leste
(IGTL) has recently (and still is) conducting
stratigraphic analysis and fossil dating to
reconstruct the geological history of Timor-
Leste.
Geology • Deposit type, geological setting and style of
mineralisation.
• The current Concessions and Permits host
three main forms of manganese
mineralisation.
• Primary mineralisation formed in a marine
environment from direct precipitation of
Manganese oxides onto the sea floor. The
mineralisation occurs as layers of
manganese oxide interbedded with
mudstone, thin lenses of sandstone, and
chert..
• Secondary mineralisation exists as a
supergene blanket above the interbedded
chert-manganese oxide unit where they
have been exposed to chemical weathering.
• Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into river
paleo-channels or scree deposits.
• Within the broad region, copper and gold
mineralisation has been reported to occur,
but information of the nature of the
mineralisation, including the mineralisation
style or type is lacking. However, primary
gold or copper-gold mineralization is a valid
exploration target in the project area.
• Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
• Estrella will use and expand upon the
current known stratigraphy to evaluate and
document mineralisation styles and relate
them back to the tectono-stratigraphic
genesis of the area.
• The limestone potential is still being
investigated however the stratigraphy and
unit thicknesses are well known in the
literature. The units under assessment are
coralline in nature or large chalk beds with
very low silica and other impurities. They are
mostly fresh and devoid of alteration.
Criteria JORC Code explanation Commentary
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
• Drilling results are not discussed in this
announcement.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• Drilling results are not discussed in this
announcement.
• No aggregation methods have been used.
• Metal equivalent values have not been used.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
not known’).
• Drilling results are not discussed in this
announcement.
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be included
for any significant discovery being reported.
These should include, but not be limited to a
plan view of drill hole collar locations and
appropriate sectional views.
• Drilling results are not discussed in this
announcement however, relevant maps
depicting sample locations have been
included within the main body of text.
Balanced
Reporting
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid
Share your feedback
Discover