QUARTERLY ACTIVITIES REPORT
Quarter ending 30 September 2021
Estrella Resources Limited
ABN 39 151 155 207
HIGHLIGHTS
Early success with Phase 4 drilling (Figure 1).
o T5 mineralised plunge length extended to 1.5km
with diamond and reverse circulation (RC) drilling
o CBP048 (RC Hole) intersects 4m 1 semi-massive
sulphides above T5 Discovery zone
o CBP062 (RC Hole) intersects 4m 2 of stringer
sulphides 750m up plunge (north) of the T5
Discovery zone (post-quarter end)
o Diamond hole CBDD056 intersects 11m3 cloud to
disseminated nickel-copper sulphides 750m down
plunge (south) of the T5 Discovery zone (postquarter end)
Phase 3 diamond and reverse circulation drilling at Carr
Boyd T5 Discovery completed.
CBDD054A returned 26.3m @ 0.73% Ni & 0.44% Cu, 1.84g/t
Ag & 0.46g/t Pt + Pd
o Including 1.15m @ 1.47% Ni & 1.02% Cu, 4.70g/t Ag &
1.97g/t Pt + Pd
o And 2.71m @ 1.10% Ni & 0.65% Cu, 3.16g/t Ag & 1.03g/t
Pt + Pd
CBDD054B returned 25.32m(1) @ 0.8% Ni & 0.6% Cu.
o Including 4.96m(1) @ 1.15% Ni & 0.71% Cu, 2.45 g/t Ag,
1.13 g/t Pt + Pd.
o And 7.78m(1) @ 1.14% Ni & 0.93% Cu, 3.14 g/t Ag, 0.72
g/t Pt + Pd.
ASX Code: ESR
Board and Management
Managing Director
Christopher Daws
Non-Executive Directors
Les Pereira
John Kingswood
Stephen Brockhurst
Neil Hutchison
Company Secretary
Stephen Brockhurst
Address
Level 11, London House
216 St Georges Terrace Perth
WA 6000
PO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (“Estrella” or “the Company”)
is pleased to provide its activities report for the quarter ended 30
September 2021.
The focus of work during the quarter was the Company’s exploration
program at the Carr Boyd Igneous Complex (CBIC), finishing the
Phase 3 diamond and RC drilling at the T5 nickel-copper-PGE
discovery, and then commencing the wider Phase 4 exploration effort.
Phase 3 was successful in identifying the magma flow direction and
sulphide deposition mechanisms responsible for the T5 nickel-copperPGE mineralisation (Figure 1), allowing for a more predictive, vectored
exploration model to be used during Phase 4.
1 See ASX Announcement: 10 September 2021
2 See ASX Announcement: 5 October 2021
3 See ASX Announcement: 5 October 2021
Phase 4 exploration has commenced involving RC drilling up to 3.5km to the north of the discovery area,
and deeper diamond drilling below T5 and the Carr Boyd Rocks Mine, following the flow direction and
increasing nickel-copper sulphide potential predicted by the model (Figure 1 and Figure 2). Both the RC
and diamond programs have intersected basal contact nickel-copper sulphides over a plunge length of
1.5km.
Commenting on the completion of Phase 3 drilling and commencement of Phase 4 step-out drilling,
Estrella Managing Director Chris Daws said:
“The September quarter was a pivotal time for Estrella in which the Company continued to produce
further successful results from Phase 3 drilling. The results have greatly assisted the Company in
modelling the potential source of the mineralised system which is producing high-grade nickel sulphides.
“The historic Carr Boyd mine, which consisted of two mineralised pipes and produced over 200,000
tonnes of nickel-copper ore has never been fully explained. The combined historical exploration,
production and the Phase 3 results have now allowed us to better understand and model the system.
“Current interpretation suggests the site may sit above a much larger feeder zone which has seen nickel
sulphides form and eventually settle onto the basal contact in one or more trap sites. The Carr Boyd
mine is interpreted to be the result of a sulphur bleed off from this basal contact.
“The Phase 4 drilling which is underway now is particularly exciting as it sees us step-out from the known
mineralisation at T5 to explore for further additional nickel sulphides at depth to improve the size and
scale of the project.”
Figure 1: Sulphides discovered over 1.5km length on the T5 Basal Contact during Phase 3 and Phase 4 drilling, open to
the north and at depth.
Figure 2: Plan view of the regional magnetics and the location of the Basal Contact, in particular A-B-C location points
of the 3D rendered surface.
CARR BOYD NICKEL PROJECT (100%)
Phase 3 RC Hole CBP048 Intersects Semi-Massive Sulphides Above the T5 Discovery
Ten RC holes were drilled above the T5 Discovery Zone to close off mineralisation above an interpreted
fault intersected in previous drilling (Figure 3). Most of the holes intersected sulphides on or just above
the basal contact. CBP048 intersected 4m of semi-massive sulphides (50%) with visual pentlandite and
chalcopyrite. The Company believes that this is the very upper edge of the T5 mineralisation that has
been fault-offset 80m to the west.
The plunge direction above the fault appears to mirror that of the T5 Discovery mineralisation and
strongly suggests (along with previous Phase 3 drilling) that the real potential lies at depth where the
sulphide accumulations appear to be thickening. Core studies showed nickel-sulphide potential to
increase in a direction perpendicular to the shallow, south plunge of mineralisation.
Assays from the drilling have not yet been received.
Figure 3: Drill hole locations on the T5 Basal Contact above the T5 Discovery with CBP048 highlighted as the yellow star
Phase 4 Diamond Hole CBDD052 Intersects Remobilised Nickel Sulphide Clasts
Diamond hole CBDD052 (location shown in Figure 1) targeted a Priority 1 Seismic Survey Anomaly which
arose out of a “Point Source Anomaly” of very high acoustic impedance. This type of anomaly is potentially
generated by massive sulphides and lies upon an arc perpendicular to the seismic line. This anomaly has
the potential of being generated from the near-by Carr Boyd Pipes style mineralisation. As such,
CBDD052 targeted the arc where it intersects the T5 Basal Contact as this is postulated as the most
prospective geological target area.
The Basal Contact was hit without the hole intersecting an obvious seismic anomaly however the T5
Pyroxenite at depth on the contact was mineralised with rip-up clasts of massive nickel-sulphides (Figure
4). The Company’s interpretation is that massive sulphides did form at depth on the contact. However,
just prior to solidification of the magma, crystal growth and settling enabled the cooling melt to scour the
contact clean and remobilise sulphides further “downstream”. This was discovered in the close-spaced
Phase 3 drilling, particularly at the leading edge of the T5 mineralisation where similar scouring was
identified.
Figure 4 shows one such clast of fine-grained, chilled basal pyroxenite in which several large
accumulations of nickel, copper and iron sulphides can be seen. This piece of basal contact has been
remobilised and was suspended a couple of metres above the scoured basal contact.
Figure 4: Fragments of nickel-copper sulphides wrapped in clasts of, at the time, semi-solid basal chill zone.
Phase 4 Deep Diamond Hole CBDD056 Intersects Stringer and Disseminated Sulphides
Post-quarter end, CBDD056 was drilled to test the T5 Basal Contact 200m to the north of the CBDD052
intersection where the exploration model predicts increasing nickel-sulphide potential. This position also
coincided with the projected plunge of the T5 Mineralisation as can be seen in Figure 1.
The hole intersected primary, disseminated to highly-disseminated nickel sulphides on the T5 basal
contact (Figure 5). The intersection occurred between 730.41 and 741.75 metres down hole which
equates to approximately 700 metres below surface. Intersection details and visual sulphide estimates
can be seen in Table 1.
Table 1: CBDD056 Visual Sulphide Estimates
Hole ID
m
From
m To
Interval
Sulphide Texture
CBDD056
730.41
730.63
730.93
731.05
731.62
731.76
732.00
733.00
734.09
734.32
734.45
735.18
737.74
741.32
730.63
730.93
731.05
731.62
731.76
732.00
733.00
734.09
734.32
734.45
735.18
737.74
741.32
741.75
0.22
0.30
0.12
0.57
0.14
0.24
1.00
1.09
0.23
0.13
0.73
2.56
3.58
0.43
Stringer
Globular
Dolerite Dyke
Stringer
Disseminated
Highly Disseminated
Disseminated
Cloud
Disseminated
Barren Pyroxenite
Blebby
Disseminated
Cloud
Basal Breccia
Visual
Sulphide
Estimation
Visual
Pentlandite
Estimation
Visual
Chalcopyrite
Estimation
5%
25%
4%
2%
1%
5%
10%
2%
35%
5%
1%
5%
1%
1%
1%
4%
1%
4%
1%
2%
3%
1%
30%
1%
1%
4%
1%
2%
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide abundance should
never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine the widths
and grade of mineralisation. The Company will update the market when laboratory analytical results become available.
The sulphide textures in CBDD056 (Figure 5: Disseminated and matrix breccia nickel sulphides in
CBDD056 at 732m down hole.) indicate primary sulphide deposition of nickel-copper-iron sulphides onto
the T5 basal contact. This differs from that observed in CBDD052 some 200m to the south where the
sulphides were being remobilised by the flow, suspended as globules and xenoliths (Figure 4).
Figure 5: Disseminated and matrix breccia nickel sulphides in CBDD056 at 732m down hole.
The Company’s vectoring model of a northerly flow direction is being confirmed by these two holes. The
Company believes that sulphide deposition should therefore increase to the north and also at depth.
CBDD056 also targeted a large footwall DHEM anomaly generated by the electromagnetic surveying of
CBDD052 (Figure 6). The Company can confirm that the hole intersected a thin Volcanogenic Massive
Sulphide zone around 30cm in width that exists within the footwall sediments of the Morelands
Formation. Thin zones of chalcopyrite and sphalerite (copper and zinc minerals) were observed. This
zone warrants further testing as and when it coincides with nickel exploration as it lies some way into
the footwall and is not expressed at surface.
Figure 6: Cross section showing CBDD056 in relation to the Carr Boyd Mine and the DHEM plate
Phase 4 100m North and South Step-out Sections at T5
Also following the end of the quarter, a series of RC pre-collared DHEM platform holes and wedged
daughter holes are in the process of being collared to enable the Company to incrementally grow the T5
mineralisation. The close-spaced Phase 3 drilling enabled the Company to understand the many controls
on mineralisation and also the variable DHEM responses generated from known mineralisation which
failed to give an EM anomaly.
These learnings and drill techniques will be used to increase the size of the T5 zone in combination with
additional DHEM and the seismic survey so as to accurately target the basal contact, known plunge
direction and also test for further, parallel lodes generated by the perpendicular flow direction (Figure 51).
Phase 4 Northern Exploration
In addition to the work around the T5 Zone, additional RC holes (which have commenced following quarter
end) will target the full 3.5km northern extent of the T5 Basal Pyroxenite (green targets to the right of T5
in Figure 1). The aim of this drilling will be to seek additional parallel lodes to the T5 Zone which are
postulated could exist along the contact.
Further infill drilling will be completed once the stratigraphy and location of the basal contact is clearly
understood. The Phase 4 program will target the contact between 100m and 250m below surface with at
least 2 holes on each section. DHEM will be performed on all holes. The Company is confident that any
mineralisation within the T5 flow will be located and deeper, follow-up RC and diamond drilling will be
instigated.
Some 7,500m of RC has been planned which will commence directly after the completion of the South
100m T5 pre-collars. Works Approvals have been received and access tracks, pads and sumps are
currently being completed ready for drilling to commence.
Figure 7: The T5 Basal Contact and the locations of Phase 3 RC pre-collars and Phase 4 RC drilling with respect to the
size of the T5 Pyroxenite. The Company believes that the entire T5 basal surface is prospective for massive nickel
sulphides.
Last Assays Received for Phase 3 Drilling at T5 and Geological Interpretation of the Phase 3 Program
Assays for the last holes of the Phase 3 diamond program at T5 were received during the quarter. The
assays received have confirmed the Company’s belief that the T5 basal contact can host economically
significant nickel-copper sulphides with significant credits for platinum, palladium and silver. A full list of
significant results can be seen in Table 2 below.
Of note are the intersections received for CBDD054, CBDD054B (Figure 8) and CBDD055B (Figure 9)
which are some of the best results intersected at the T5 Prospect to date. The strong grades coincide
with a thickening of the mineralisation within the core zone of the Upper T5 Mineralised Zone.
Figure 8: Globular to massive sulphides intersected in CBDD054B
Figure 9: Massive to globular nickel-copper-iron sulphides in diamond drill hole CBDD055B at 407m to 418m.
The assays confirm the Company’s geological interpretation of the settling, remobilisation and re-settling
of massive sulphides along the T5 Pyroxenite Feeder basal contact. The intersections from diamond
drillholes CBDD048, CBDD049A and CBDD049C show higher-grade massive and breccia sulphides on
the basal contact with only a thin zone of lower-grade material stratigraphically above. The lower-grade
material consists of disseminated sulphides that grade into globular sulphides just above the massive
sulphide zones. This represents the active erosion of massive sulphides in this location at the time of
solidification of the melt.
These sulphides are carried “down-stream” and are piled up above the massive sulphides intersected
in CBDD054, CBDD054A and CBDD054B. In CBDD054B there are two massive sulphide zones, a
lower basal contact breccia zone, and an upper semi-massive zone where remobilised globular
sulphides from the eroded area mentioned above are beginning to coagulate and descend through the
melt. Above this is a much broader zone of disseminated to blebby sulphides which remain suspended
by flow turbulence.
Further down-stream, around holes CBDD053, CBDD053A and CBDD053B, a broad zone of globular,
blebby and disseminated sulphides was intersected and is interpreted to be an area where higher
turbulence prevented massive sulphide formation and in areas may even have scoured the contact of
massive sulphides.
This is expected to be a cyclic repetition of scouring and redeposition of nickel-copper sulphides along
the flow direction as evidenced by the intersection of massive sulphides further down the contact in
Phase 2 diamond holes CBDD035, CBDD036 and CBDD042A (Figure 1 and Figure 10).
Figure 10: Location of drill hole intercepts at T5 in relation to the conductor plates and massive sulphide intersections.
Table 2: Full Significant Intersection Composites for Phase 3 Drilling at T5
Hole
m From
CBDD048
381.5
including
382.5
and
385.85
CBDD049A 386.67
including 388.49
CBDD049C 372.67
including 372.67
CBDD050
388.4
including 389.56
including 392.79
including 393.82
CBDD050A 396.69
including 397.15
including 399.11
CBDD053 438.06
including 441.11
CBDD053A
426
CBDD053B 421.81
including 422.63
including 425.79
CBDD054
392.3
including 394.85
including 397.87
CBDD054A 361.21
including 361.21
including 364.41
including 376.34
CBDD054B
357
including
358.6
including 368.33
including 368.33
CBDD055 356.06
including 356.06
CBDD055
379.1
With
383.78
including 383.78
including 386.54
including 388.02
And
396.05
including 396.05
including
397
CBDD055A 348.32
including
358.4
including 368.19
CBDD055A 378.21
CBDD055B 408.34
With
408.34
including 411.61
including 415.68
including
421.3
m To
388.4
383.14
386.2
393.58
390.36
375.96
373.27
394.79
390.59
393.47
394.79
403.51
397.63
399.52
446.29
443
428
426.64
423.05
426.64
405.71
401.11
398.98
387.54
362.27
365.56
379.05
382.32
363.56
376.11
368.63
363.1
357.02
397.53
392.27
385.65
386.87
392.27
397.53
396.35
397.53
372.64
365.52
371.12
378.93
422.48
413.75
414.39
417
422.48
** 2PGE refers to Pt + Pd in g/t
Interval
6.9
0.64
0.35
6.91
1.87
3.29
0.6
6.39
1.03
0.68
0.97
6.82
0.48
0.41
8.23
1.89
2
4.83
0.42
0.85
13.41
6.26
1.11
26.33
1.06
1.15
2.71
25.32
4.96
7.78
0.3
7.04
0.96
18.43
8.49
1.87
0.33
4.25
1.48
0.3
0.53
24.32
7.12
2.93
0.72
14.14
5.41
2.78
1.32
1.18
True
Width
3.3
3.3
1.6
3.1
3.3
4.0
1.0
2.3
6.4
3.0
12.6
1.3
12.2
2.4
3.7
3.4
8.8
4.1
2.0
11.7
3.4
1.4
6.8
2.6
Ni%
0.54
1.52
1.32
0.75
1.74
0.75
1.19
0.76
1.38
1.14
1.14
0.58
1.51
1.02
0.69
1.40
0.46
0.63
1.14
1.14
1.31
2.08
3.92
0.73
1.03
1.47
1.10
0.79
1.15
1.14
3.49
0.60
0.77
0.64
0.91
1.12
1.44
0.99
0.90
1.07
0.99
0.82
1.10
1.10
2.45
1.05
1.45
1.39
1.07
2.07
Cu%
0.26
0.21
0.36
0.54
0.54
0.53
1.07
0.44
1.25
0.71
0.23
0.51
0.90
0.64
0.32
0.34
1.43
0.50
0.62
0.47
0.44
0.63
0.16
0.44
0.55
1.02
0.65
0.58
0.71
0.93
0.08
0.53
1.17
0.92
1.01
1.96
0.44
1.03
4.23
7.92
5.14
0.44
0.61
0.41
0.36
0.58
0.88
1.10
0.77
0.31
Co%
0.03
0.08
0.06
0.04
0.08
0.04
0.06
0.04
0.07
0.06
0.06
0.03
0.08
0.05
0.03
0.07
0.02
0.03
0.05
0.05
0.06
0.09
0.17
0.04
0.06
0.08
0.06
0.04
0.06
0.05
0.15
0.03
0.04
0.03
0.05
0.06
0.07
0.05
0.04
0.05
0.05
0.04
0.05
0.05
0.12
0.04
0.06
0.06
0.04
0.09
2PGE **
0.41
0.95
0.61
0.48
0.90
0.58
0.72
0.48
1.42
0.50
0.28
0.59
0.71
0.90
0.45
0.59
0.52
0.47
0.92
0.72
0.46
0.67
0.59
0.70
0.47
1.97
1.03
0.58
1.13
0.72
0.89
0.70
0.53
0.53
0.74
1.03
0.85
0.77
0.45
0.58
0.57
0.57
0.58
0.68
0.68
0.59
0.83
0.69
0.94
0.47
Ag g/t
1.10
1.35
2.10
2.39
2.60
2.35
5.23
1.62
4.72
3.40
1.10
1.83
4.70
2.60
1.34
1.49
6.50
2.58
4.30
2.52
1.93
2.78
0.80
1.84
2.00
4.70
3.16
1.92
2.45
3.14
<0.5
2.28
6.00
3.76
4.09
8.72
1.90
4.05
18.34
34.20
21.40
1.85
2.33
1.82
2.40
2.46
3.91
4.43
3.20
1.18
Figure 11: Sulphide remobilisation in the flow direction and subsequent settling "down stream".
Sulphide assimilation mapped at Carr Boyd and study of the geological textures at T5, combined with
mapping and 3D interpretation of the Carr Boyd Igneous Complex, leads the Company to believe that
the entire T5 Pyroxenite surface is in the correct orientation to be a sulphide trap with respect to the
flow direction and resulting flow dynamics as demonstrated by Figure 11 and Figure 12.
Figure 12: Carr Boyd sulphur assimilation, transport and deposition geological model at the T5 Trap Site
Exploration Approach at Carr Boyd – Summary to Date
Phase 1 at T5 involved drilling 2 RC holes into a geochemically and geophysically prospective area.
Both holes (CBP042 and CBP043) located significant sulphides (see ASX releases dated 28 May 2019
and 8 July 2019).
Phase 2 included discovery hole CBDD030 which intersected the first massive sulphides to be found at
Carr Boyd in 50 years outside the immediate Carr Boyd mine area (see ASX release dated 8 October
2020). Phase 2 involved step-out drilling with downhole electromagnetics (DHEM) which showed mixed
results, now understood to be due to a late-movement structural overprint complicated by the flow model
described above. Ni-Cu-Fe sulphides have been intersected outside the DHEM conductors such as in
CBDD042A.
Phase 3 was a geologically driven exploration push involving stratigraphic studies, seismic surveying
and close spaced drilling to ascertain the exact nature of sulphide precipitation, flow dynamics and to
get a good understanding of the structural overprint. The program used two diamond rigs, both drilling
multiple wedge holes from diamond or RC platform holes.
Phase 4 described above is currently underway, using the vectored exploration and structural model
developed by the ESR team over the last 9 months to step away from the T5 Discovery area in the
search for more massive sulphides.
SPARGOVILLE NICKEL PROJECT (100%)
Over the September quarter, the Company has continued to work up a exploration and development
strategy for the nickel resources within the greater Spargoville Nickel Rights project areas.The Company
is currently planning targeted drilling to define extentions to the known nickel sulphide deposits at 1A,
5A, 5B and Andrews Mine. Subject to statutory approvals and drill rig availability the Company expects
to be able to commence drilling activities during the current quarter.
Table 3: Spargoville JORC Mineral Resource 5A Nickel Sulphide Deposit
October 2019 Mineral Resource Estimate - Min Type (0.5% Ni Cut-off)
Total Mineral Resource
Type
Tonnage
Ni
Cu
Ni
Cu
kt
%
%
t
t
Disseminated
78
0.7
0.08
520
60
Matrix/Breccia
37
2.3
0.16
840
60
Semi-massive/Massive
13
8.0
0.61
1,000
80
Total
127
1.9
0.15
2,370
190
CORPORATE
The Company continues to hold exposure to future financial upside from the sale of the Mt Edwards
Lithium Project to Neometals Limited (see ASX release dated 15 March 2018) via milestone payments
of A$2,000,000 and a royalty on future lithium bearing ore processed.
The Company is pleased to report the direct impacts from COVID-19 continue to be minimal at this time.
Our staff and contractors have implemented safe working protocols and are adhering to the Government
directives.
Payments to related parties and their associates
The total amount paid to related parties of Estrella and their associates, as per item 6.1 of the Appendix
5B, was $115k. Included in this amount is $77k for Directors fees and $38k paid to Mining Corporate,
an entity controlled by Stephen Brockhurst for bookkeeping, accounting and company secretarial fees.
The total amount paid to related parties of Estrella and their associates, as per item 6.2 of the Appendix
5B, was $120k. Included in this amount is $33k for Directors fees and $87k paid to Geolithic Pty Ltd, an
entity controlled by Neil Hutchison for the provision of geological services including providing a contract
geological team.
CAPITAL
The Company’s cash balance as at 30 September 2021 was bolstered considerably to approximately
$7.5M due to the shortfall underwriting of the 27 June 2021 $0.05 exercise options raising a total of
$7.2M (before costs) (refer ASX announcement 6 July 2021).
Table 4: Estrella Capital structure as at 30 September 2021
Fully Paid Ordinary Shares
1,162,043,740
Listed options exercisable
$0.02 on or before the 31 July 2023 – 254,363,575
Unlisted options exercisable
$0.03 on or before 20 November 2022 – 11,500,000
$0.05 on or before 1 June 2022 – 5,000,000
$0.10 on or before 30 June 2022 – 10,000,000
$0.20 on or before 17 November 2023 - 16,600,000
Convertible Notes
Unlisted Convertible Notes (unsecured) with an aggregate face value of $190,000 and a
maturity date of 2 years from the date of issue. Convertible into fully paid ordinary shares
in the capital of the Company at a conversion price $0.01 per share. A maximum of
23,833,600 fully paid ordinary shares may be issued on conversion of the Convertible
Notes on the terms announced to ASX on 31 January 2020.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve
Warriner, who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr. Warriner has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr.
Warriner consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
Compliance Statement
With reference to previously reported Exploration Results and Mineral Resources, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the original market
announcement and, in the case of estimates of Mineral Resources, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcement.
ENDS
The Board of Directors of Estrella Resources Limited authorised this announcement to be given to ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
info@estrellaresources.com.au
P: +61 (08) 9481 0389
Media Contact:
David Tasker
Chapter One Advisors
Email: dtasker@chapteroneadvisors.com.au
Tel: 0433 112 936
Appendix 1 – Tenement Information as Required by Listing Rule 5.3.3
Change in
Holding (%)
Current
Interest (%)
Country
Location Project
Tenement
Australia
WA
Carr Boyd Nickel Project
E29/1012
-
100
Australia
WA
Carr Boyd Nickel Project
E29/0982
-
100
Australia
WA
Carr Boyd Nickel Project
L24/0186
-
100
Australia
WA
Carr Boyd Nickel Project
E31/0726
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1124
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0012
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0109
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0159
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1215
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1162
-
100
Australia
WA
Spargoville Nickel Project
M15/395
Australia
WA
Spargoville Nickel Project
M15/703
Australia
WA
Spargoville Nickel Project
M15/1828
Australia
WA
Spargoville Nickel Project
L15/128
Australia
WA
Spargoville Nickel Project
L15/255
*Nickel rights only
-
100*
100*
100*
100*
100*
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Estrella Resources Limited
ABN
Quarter ended (“current quarter”)
39 151 155 207
30 September 2021
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (3
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(85)
(85)
(e) administration and corporate costs
(298)
(298)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
1
1
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(382)
(382)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(133)
(133)
(1,747)
(1,747)
(56)
(56)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
- Payment for termination of Munda royalty
-
-
(1,936)
(1,936)
7,041
7,041
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(768)
(768)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
6,273
6,273
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
3,549
3,549
Net cash from / (used in) operating
activities (item 1.9 above)
(382)
(382)
(1,936)
(1,936)
4.2
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.4
4.5
4.6
5.
Current quarter
$A’000
Year to date (3
months)
$A’000
6,273
6,273
-
-
7,504
7,504
Net cash from / (used in) financing activities
(item 3.10 above)
Effect of movement in exchange rates on
cash held
Cash and cash equivalents at end of
period
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
7,504
3,549
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7,504
3,549
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
115
6.2
Aggregate amount of payments to related parties and their
Share your feedback
Discover