Exploration Target Estimated for the Carr Boyd Project, and
Maiden T5 Mineral Resource Estimate Declared
HIGHLIGHTS
Sizable JORC Exploration Target defined for the Carr Boyd Nickel Project
5Mt to 7Mt at 0.7% to 1.5% Nickel and 0.3% to 0.5% Copper
Between 35,000 to 105,000 Nickel tonnes and 15,000 to 35,000 Copper tonnes
Target supported by maiden T5 Inferred Mineral Resource Estimate
0.86 Mt @ 0.66% Nickel and 0.42% Copper, T5 is open at depth
Contains an additional >12,000oz platinum and palladium and ~55,000 oz silver
T5 Inferred Resource used to underpin the Exploration Target grade ranges
Carr Boyd boasts 16km of basal contact (Figure 1) to be targeted by drilling and geophysics
Broonhill: CBDD076 – 6.23m (True Width) @ 0.6% Ni & 0.7% Cu including 1.2m @ 1.2% Cu
Gossan Hill: CBP098 – 3m* @ 0.6% Ni & 0.3% Cu, 0.8g/t 3PGE’s at 114m
Gossan Hill: CBDD082 intersects 5.5m* of cloud sulphides at 531.5m, awaiting assays
T5 Extended - CBDD078A hits 1.8m* of remobilised, semi-massive sulphides within dyke
awaiting assays
* Down hole length quoted, true width cannot be estimated at this stage
Figure 1: Location of the T5 MRE in red with respect to the 16km prospective basal contact informing the Exploration Target
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the maiden T5
JORC 2012-compliant Mineral Resource Estimate (MRE) which underpins an Exploration Target of 5-7
_________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
million tonnes for the basal contact at the 100%-owned Carr Boyd Nickel Project located 80km northeast
of Kalgoorlie.
Estrella Managing Director Chris Daws commented:
“I am pleased to report this initial MRE for T5 which is a significant milestone for Estrella and is a major step
towards quantifying a sizeable Exploration Target estimate for the Carr Boyd basal contact.
We will continue to progress with systematically testing the approximately 16km of basal contact strike within
Carr Boyd, as well as test for possible sulphide occurrences off the basal contact, such as those forming at
the Carr Boyd Nickel Mine, with drilling and geophysics and I look forward to updating the market as results
are received.”
This initial Inferred T5 MRE is based upon 43 diamond holes and 3 reverse circulation holes drilled by
Estrella Resources at T5, covering a strike length of 500 metres and running from near surface to 720m
depth. The MRE is entirely north of the Proterozoic Dyke which Estrella has interpreted to split the T5
mineralisation (Figure 2). The JORC 2012 Mineral Resource Estimate was compiled by Ashmore Advisory
Pty Ltd and is presented in Table 1.
Table 1: T5 September 2022 Inferred Mineral Resource Estimate (0.5% Ni + Cu Cut-off Grade)
Inferred Mineral Resource
Type
Tns
Ni+Cu
Ni
Cu
Co
Pt
Pd
Ag
Ni
Cu
Co
Pt
Pd
kt
%
%
%
%
g/t
g/t
g/t
Transitional
10
0.70
0.45
0.24
0.04
0.02
0.08
1.10
Fresh
850
1.08
0.66
0.42
0.03
0.22
0.22
1.99
5,700
3,600
300
Total
860
1.08
0.66
0.42
0.03
0.22
0.22
1.98
5,700
3,600
300
Ag
t
t
t
oz
oz
oz
30
10
10
210
6,200
6,100
54,600
6,200
6,100
54,800
Note: All Mineral Resources figures reported in the table above represent estimates as at September 2022. Mineral Resource estimates are not
precise calculations, being dependent on the interpretation of limited information on the location, shape and continuity of the occurrence and on
the available sampling results. The totals contained in the above table have been rounded to reflect the relative uncertainty of the estimate.
Rounding may cause some computational discrepancies. Mineral Resources are reported in accordance with the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
In addition to the nickel and copper, the T5 MRE contains over 12,000 ounces of platinum and palladium
and almost 55,000 ounces of silver which are associated with the sulphide mineralisation. The nickelcopper-PGE sulphide resource is free of Arsenic and is low in MgO.
The T5 Mineral Resource Estimate, with an additional 34 regional diamond holes and 56 reverse circulation
holes, has been used to estimate an Exploration Target for the 16km of the prospective Carr Boyd Basal
Contact of between 5Mt and 7Mt at a nickel grade between 0.7% and 1.5% as presented in Table 2.
Additional work on the existing Carr Boyd remnant resource will also be carried out. The resource is
currently not JORC 2012 compliant and so cannot be quoted here. Estrella has intersected remnant
massive nickel-copper sulphides below the historical workings. The results of CBDD064 were released to
the market 8th March 2022 with the drillhole intersecting 16.2m* @ 3.12% Ni and 0.60% Cu from 192.35m
and a further 12.97m* @ 1.07% Ni and 0.25% Cu from 256.0m downhole.
The Exploration Target is based on the results of exploration activities undertaken to date and references
an extensive dataset of historical drilling, geological and geophysical information, which includes recent
exploration data obtained by Estrella. The T5 Mineral Resource Estimate forms the basis for grade ranges
and tonnage factors for the Exploration Target.
Estrella plans to continue to systematically test the approximately 16km of basal contact strike within the
Project’s tenure, as well as testing for possible sulphide occurrences off the basal contact, such as those
forming at the Carr Boyd Nickel Mine.
Table 2: Carr Boyd Nickel Project September 2022 Exploration Target
Range
Tonnage (Mt)
Nickel Grade (%)
Copper Grade (%)
Lower
5.0
0.7
0.3
Upper
7.0
1.5
0.5
Note: The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a
Mineral Resource for all target areas reported. It is uncertain if further exploration will result in the estimation of a Mineral Resource. The
Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC Code.
T5 Extensions
CBDD078A was collared across the Proterozoic Dyke to assess its true thickness (approximately 120m)
and into the basal contact at depth below the Carr Boyd Nickel Mine (Figure 2). The drillhole intersected a
mixed suite of T5 Pyroxenite along with cross-cutting sills from the Proterozoic Dyke. A number of zones
of disseminated sulphides in pyroxenite and remobilised sulphides within the Proterozoic Dyke were
logged, including a zone of 1.8m downhole length of semi-massive sulphides (see ASX announcement 21
July 2022).
Interpretation of the drill core reveals that the area is similar to that intersected north of the dyke and just
south of the T5 resource. These areas have been modified by the intrusion of the Proterozoic Dyke along
the Carr Boyd basal contact, and sulphides have been partially assimilated by the dyke or remobilised along
the contact. Infill drilling in these areas is required and will be undertaken at a later date once the regional
drill programs conclude.
Figure 2: Long Section of the T5 MRE with respect to the Carr Boyd Mine (left) and the Broonhill Discovery
Broonhill Exploration Update
Results have been received for CBDD076 which intersected nickel-copper mineralisation at Broonhill
(Figure 2). Assays from the drillhole averaged 6.23m (True Width) @ 0.6% Ni & 0.7% Cu including 1.2m
@ 1.2% Cu and another 0.6m @ 1.81% Cu. Additional mineralisation above and below the higher-grade
core was noted in the assays which can be seen in Table 4.
The Broonhill mineralisation is associated with a thick sub-intrusion just below the main Carr Boyd Complex.
This area is interpreted as where the initial stage of the Carr Boyd Complex was intruding the Morelands
Formation by splitting it apart with numerous dyke-like fingers which thickened over time and assimilated
sulphidic material from the country rock. Figure 3 depicts the drill area in cross-section.
It is envisaged that drilling will continue to define mineralisation in a similar plunge direction to that of T5
(back to the southeast) and the drill rig has been mobilised back to Broonhill to perform additional testing.
The drilling will be specifically targeted to gauge the size of this emerging deposit and to identify the
geometrical relationship between the Broonhill off-shoot dyke and the greater Carr Boyd Complex.
Figure 3: Cross section through the first Broonhill drill line where mineralisation was discovered in a thickened dyke just
below the base of the main Carr Boyd Complex.
Gossan Hill
To date Estrella has drilled 4 reverse circulation holes and 5 diamond holes at Gossan Hill (Figure 4). The
initial hole CBP098 intersected 3m down hole length @ 0.6% Ni & 0.3% Cu, 0.8g/t 3PGE’s at 114m,
confirming the Company’s prospectivity analysis of the Gossan Hill Pyroxenite. The assays for CBP098 are
presented below in Table 4.
A downhole electromagnetic (DHEM) program has commenced at Gossan Hill to systematically test the
4km strike length of the basal contact. DHEM platform hole CBDD082 intersected 5.5m of cloud to
disseminated nickel-copper sulphides at 531m down hole. The mineralisation is part of a much broader
sulphide assimilation zone associated with sulphidic sediments in the footwall.
The environment is conducive to nickel-copper sulphide formation as evidenced by CBP098 and CBDD082.
Further drilling plus DHEM testing of the contact will continue.
Figure 4: The Gossan Hill and Southern Mossgiel Basal Contacts remain mostly untested and will be systematically covered
with diamond drilling and downhole geophysics
Tregurtha and Sir William Wallace
The Tregurtha and Sir William Wallace prospects lie along the basal contact between Gossan Hill and
Mossgiel (Figure 4). Little drilling has occurred here in the past 2 years, however historical exploration by
Apollo-Phoenix and others have intersected nickel-copper sulphides within these prospects.
With additional information gathered by Estrella from the seismic program, the Company now understands
the orientation of the basal contact better and why it has been missed in previous drilling, as it tends to
undercut to the south, as shown in the cross-section in Figure 5. At Tregurtha, the vast majority of drilling
intersecting sulphides ran parallel to the basal contact. The basal contact has thus never been tested.
This untested basal contact will be targeted either late this year or early next year as it presents the Company
with further significant opportunities at Carr Boyd. With the additional help from the seismic program, the
company can target and hit this contact at depth with much more confidence.
Figure 5: Cross section through the Tregurtha basal contact showing the parallel nature of the historical drilling with the
basal contact orientation as determined through seismic interpretation.
Technical Details of the T5 Mineral Resource Estimate
Geology and Geological Interpretation
The Project lies within the Achaean Yilgarn Craton in a 700km belt of elongate deformed and folded mafic,
ultramafic rocks and volcanic sediments intruded by granitoids which is referred to as the Norseman-Wiluna
Belt. The belt has been divided into several geological distinct terranes, with the project area lying at the
northern end of the Gindalbie terrane. The geology of the Carr Boyd area is dominated by the Carr Boyd
mafic-ultramafic intrusive complex (“CBIC”).
Several distinctive styles of nickel and nickel-copper mineralisation have been identified within the CBIC. At
the Carr Boyd Rocks Nickel Mine, nickel-copper mineralisation is hosted within several 20 to 60m diameter
brecciated pipe-like bodies that appear to be discordant to the magmatic stratigraphy. Mineralisation is hosted
by a matrix of sulphides (pyrrhotite, pentlandite, pyrite and chalcopyrite) within brecciated bronzite and altered
country rock clasts. Stratiform nickel-copper-platinum group elements (“PGE”) mineralisation has been
identified at several different locations within the layered magmatic complex, including the T5, Broonhill,
Mossgiel and Gossan Hill basal contacts.
Sampling and Sub-Sampling Techniques
For ESR drilling, nickel sulphide 6entralized6on was sampled with the following techniques:
(i)
Diamond core – half core samples with a maximum of 1.1m and minimum 0.25m length,
sampled predominantly at 1m intervals or to geological contacts. Core was sawn in half with
half sent for assaying and the other half retained for future reference;
(ii)
RC drilling – 1m samples of 6entralize chips, sampled by a rig mounted cone splitter, with
approximately 3kg collected in individual calico bags.
Drilling Techniques
ESR drilling included RC drilling with 5.5 inch hammer and diamond core of HQ and NQ diameter with 6m
standard tubes.
Classification Criteria
The Mineral Resource was classified as Inferred Mineral Resource based on data quality, sample spacing,
and lode continuity. The Inferred Mineral Resource was assigned to the interpreted mineralisation defined
with a maximum drill hole spacing of 40m by 80m.
Sample Analysis Method
For ESR drilling, samples were analysed at Intertek and ALS Laboratories in Perth using a 4-acid digest,
ME-ICP for 33 elements; and all samples were analysed for Au & PGE elements using ICP analysis.
Estimation Methodology
The mineralisation was constrained by mineralisation envelopes prepared using a nominal 0.4% nickel plus
copper cut-off grade for sulphide mineralisation, with internal higher grade constrained by wireframes at a
nominal 1.2% nickel plus copper cut-off grade. A minimum down-hole length of 1m was adopted for the
interpretation.
Samples were composited to 1m based on an analysis of sample lengths inside the wireframes. Top cuts
were not applied to the composite data after review of the composite statistics.
The block model was created and estimated in Surpac using Ordinary Kriging (“OK”) grade interpolation
using parameters derived from modelled variograms in up to three passes. Linear grade estimation was
deemed suitable for the T5 Mineral Resource due to the geological control on mineralisation.
The block dimensions used in the model were 10m NS by 5m EW by 5m vertical with sub-cells of 1.25m
by 0.625m by 0.625m. This was selected as the optimal block size as a result of kriging neighbourhood
analysis (“KNA”).
A total of 2,922 bulk density measurements were taken on core samples collected from diamond holes
drilled at the deposit using the dry weight / wet weight technique. Bulk densities were interpolated within
mineralisation domains that contained more than two drill hole intercepts and sufficient readings. Smaller
domains were assigned a density versus nickel regression equation. Bulk densities for the transitional
mineralisation were assigned in the block model based on the average of the measurements of 2.9t/m3.
Average waste densities were assigned based on lithology and weathering from measurements.
Cut-off Grade
The Statement of Mineral Resources has been constrained by the mineralisation solids and reported above
a nickel plus copper cut-off grade of 0.5% for the T5 mineralisation that could potentially be mined with
underground techniques, however mining optimisation studies and further detailed metallurgical test work
is recommended.
Mining and Metallurgical Methods and Parameters
It is assumed the T5 material can be extracted with underground mining methods and toll treating.
Metallurgical test work has not yet been conducted. It is assumed the T5 mineralisation will achieve similar
metallurgical recoveries to the nearby Carr Boyd Mine.
Carr Boyd T5 Nickel-Copper Sulphide Deposit
September 2022 Mineral Resource Estimate (0.5% Ni+Cu Cut-off)
Type Tonnes Ni+Cu
kt
%
Trans.
10
0.70
Fresh
850
1.08
Total
860
1.08
Ni
%
0.45
0.66
0.66
Cu
%
0.24
0.42
0.42
Inferred Mineral Resource
Pt
Pd
Ag
Ni
Cu
g/t
g/t
g/t
t
t
0.02
0.08 1.10
30
10
0.22
0.22 1.99 5,700 3,600
0.22
0.22 1.98 5,700 3,600
Co
%
0.04
0.03
0.03
Co
t
Pt
oz
Pd
Ag
oz
oz
10
210
6,200 6,100 54,600
6,200 6,100 54,800
300
300
2.5
64,000
2.0
48,000
1.5
32,000
1.0
16,000
0.5
0
0.0
Grade (%)
Tonnage (t)
Carr Boyd T5 Deposit - Total 0.5% Ni + Cu Cut-off
80,000
-300
-280
-260
-240
-220
-200
-180
-160
-140
-120
-100
-80
-60
-40
-20
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
Bench Top RL (m)
Fresh
Transitional
Ni %
Cu %
Ni+Cu %
Figure 6: Tonnes and grade with elevation. The area between the 220 RL and 140 RL is the Flat Fault blank area.
Bench Top RL (m)
TVM
Figure 7: Tonnes per vertical metre
Ni t
Cu t
-300
-280
-260
-240
-220
-200
-180
-160
-140
-120
-80
-100
-60
-40
0
-20
20
40
60
80
100
120
140
160
180
200
Tonnes/Vm
0
220
0
240
6
260
800
280
12
300
1,600
320
18
340
2,400
360
24
380
3,200
400
30
420
Tonnage/Vm
Carr Boyd T5 Deposit - Tonnes Per Vertical Metre
4,000
Grade
Range
Ni+Cu
0.1 -> 0.2
0.2 -> 0.3
0.3 -> 0.4
0.4 -> 0.5
0.5 -> 0.6
0.6 -> 0.7
0.7 -> 0.8
0.8 -> 0.9
0.9 -> 1.0
1.0 -> 1.1
1.1 -> 1.2
1.2 -> 1.5
1.5 -> 2.0
2.0 -> 2.5
2.5 -> 3.0
3.0 -> 5.0
Total
Tonnes
t
77
791
45,131
81,320
187,303
147,920
130,481
57,090
33,508
17,878
18,714
51,213
109,081
79,939
17,220
9,375
987,041
Ni+Cu
%
0.20
0.27
0.37
0.47
0.55
0.65
0.74
0.85
0.93
1.03
1.13
1.36
1.70
2.22
2.67
3.79
1.00
Ni
%
0.13
0.19
0.24
0.29
0.33
0.38
0.45
0.54
0.63
0.70
0.72
0.85
1.08
1.34
1.62
1.98
0.61
Incremental Estimate
Cu
Co
%
%
0.06
0.02
0.09
0.01
0.13
0.01
0.17
0.02
0.22
0.02
0.28
0.02
0.30
0.02
0.30
0.03
0.31
0.03
0.33
0.03
0.41
0.03
0.51
0.04
0.61
0.05
0.88
0.06
1.05
0.07
1.81
0.08
0.38
0.03
Pt
g/t
0.06
0.08
0.03
0.11
0.11
0.14
0.20
0.25
0.20
0.26
0.16
0.24
0.35
0.41
0.40
0.57
0.20
Pd
g/t
0.09
0.10
0.05
0.11
0.11
0.14
0.18
0.21
0.23
0.24
0.23
0.27
0.35
0.39
0.43
0.59
0.20
Ag
g/t
0.95
0.52
0.73
0.83
1.19
1.44
1.54
1.72
2.04
1.61
1.61
2.11
2.53
3.90
4.43
7.48
1.83
Figure 8: Tonnes and grade per incrimental cut-off
Figure 9: Tonnes Grade Curve for the T5 MRE
Cut-off Grade Ni_Cu %
Ni+Cu %
Ni %
Cu %
3.00
2.50
2.00
0.60
Tonnes
1.50
Grade %
0.0
1.20
0
1.10
0.8
1.00
200,000
0.90
1.6
0.80
400,000
0.70
2.4
0.50
600,000
0.40
3.2
0.30
800,000
0.20
4.0
0.10
Tonnage
Carr Boyd T5 Deposit - Grade Tonnage Curve - Ni+Cu, Ni, Cu
1,000,000
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”.
The T5 Mineral Resource has been compiled under the supervision of Mr. Shaun Searle who is a director of Ashmore
Advisory Pty Ltd and a Registered Member of the Australian Institute of Geoscientists. Mr. Searle has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that
he has undertaken to qualify as a Competent Person as defined in the JORC Code.
Mr Warriner and Mr Searle consent to the inclusion in the report of the matters based on their information in the form and
context in which it appears.
Table 3: Drill Hole Collar Details
Hole ID
Final Depth
Easting
Northing
RL
Dip
Azimuth
Status
CBDD076
CBDD078A
CBDD082
CBP098
519.7
1100
700
149
367728
367633
368115
369038
6674691
6673416
6670335
6669951
439.8
426.16
412.4
406.4
-78
-60
-75
-59
301
225
049
005
Completed
Completed
Completed
Completed
Table 4: Full Assay Listing
Hole ID
Sample ID
CBP098
CBP098
CBP098
CBP098
CBP098
CBP098
CBP098
CBP098
CBP098
CBP098
CBR112936
CBR112937
CBR112938
CBR112939
CBR112940
CBR112941
CBR112942
CBR112943
CBR112944
CBR112945
Hole ID
Sample ID
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
CBDD076
ECB13207
ECB13208
ECB13209
ECB13210
ECB13211
ECB13212
ECB13213
ECB13214
ECB13215
ECB13216
ECB13217
ECB13218
ECB13219
ECB13220
ECB13221
ECB13222
ECB13223
ECB13224
ECB13225
ECB13226
ECB13227
ECB13228
ECB13229
ECB13230
ECB13231
ECB13232
ECB13233
ECB13234
ECB13235
ECB13236
ECB13237
M
From
110
111
112
113
114
115
116
117
118
119
M
From
409.18
410.82
412.47
413.1
413.4
413.75
415.05
416.14
416.77
417.97
418.6
419.38
420.16
420.83
421.75
422.37
424.23
425.7
426.57
427.02
428.26
428.78
429.34
430.8
432.26
433.72
434.03
436
438
440
442
M To
Interval
Ni%
Cu%
111
112
113
114
115
116
117
118
119
120
1
1
1
1
1
1
1
1
1
1
0.11
0.11
0.12
0.05
0.65
0.54
0.49
0.20
0.11
0.12
0.01
0.00
0.00
0.02
0.23
0.33
0.26
0.07
0.00
0.01
M To
Interval
Ni%
Cu%
410.82
412.47
413.1
413.4
413.75
415.05
416.14
416.77
417.97
418.6
419.38
420.16
420.83
421.75
422.37
424.23
425.7
426.57
427.02
428.26
428.78
429.34
430.8
432.26
433.72
434.03
436
438
440
442
444
1.64
1.65
0.63
0.3
0.35
1.3
1.09
0.63
1.2
0.63
0.78
0.78
0.67
0.92
0.62
1.86
1.47
0.87
0.45
1.24
0.52
0.56
1.46
1.46
1.46
0.31
1.97
2
2
2
2
0.04
0.04
0.16
0.99
0.26
0.11
0.12
0.78
0.76
0.35
0.98
0.53
0.16
0.18
0.70
0.10
0.03
0.86
0.02
0.27
0.02
0.10
0.12
0.10
0.12
0.14
0.02
0.01
0.01
0.01
0.00
0.01
0.00
0.08
0.45
0.22
0.04
0.12
0.22
1.22
0.69
0.47
0.45
0.19
0.20
1.81
0.03
0.02
0.30
0.07
0.33
0.02
0.04
0.06
0.02
0.02
0.23
0.02
0.02
0.02
0.01
0.01
Co
ppm
98
97
100
67
207
181
177
112
96
101
Co
ppm
55
60
118
582
156
84
81
421
399
184
513
287
106
103
373
71
49
437
27
139
44
63
75
80
101
118
66
51
57
39
21
Au
g/t
0.005
0.002
0.001
0.019
0.113
0.144
0.101
0.039
0.004
0.007
Au
g/t
0.01
0.00
0.01
0.02
0.03
0.00
0.01
0.01
0.13
0.01
0.01
0.01
0.01
0.01
0.06
0.00
0.00
0.01
0.01
0.02
0.00
0.00
0.02
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
Pt
g/t
0.012
0.014
0.016
0.004
0.230
0.227
0.237
0.080
0.010
0.033
Pt
g/t
-0.01
-0.01
0.02
0.09
0.08
0.03
0.01
0.03
0.01
0.03
0.03
0.18
0.01
0.02
0.04
-0.01
-0.01
0.03
-0.01
0.01
-0.01
-0.01
-0.01
-0.01
-0.01
-0.01
-0.01
-0.01
-0.01
-0.01
-0.01
Pd
g/t
0.015
0.011
0.021
0.005
0.552
0.374
0.349
0.103
0.019
0.018
Pd
g/t
0.00
0.00
0.04
0.21
0.09
0.02
0.02
0.16
0.08
0.07
0.14
0.07
0.02
0.01
0.06
0.00
0.00
0.15
0.00
0.03
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CBDD0078A assays released to ASX on 21/7/22 (ASX:ESR). Awaiting assays for CBDD082.
Ag
g/t
0.00
0.00
0.50
0.00
2.00
3.00
2.50
0.70
0.00
0.00
Ag
g/t
-0.50
-0.50
-0.50
2.10
0.70
-0.50
-0.50
0.70
3.90
1.90
1.70
1.50
0.60
0.50
7.00
-0.50
-0.50
1.40
-0.50
1.30
-0.50
-0.50
-0.50
-0.50
-0.50
0.90
-0.50
-0.50
-0.50
-0.50
-0.50
MgO%
20.45
20.94
21.80
13.09
19.43
22.02
20.12
18.40
19.07
20.78
MgO%
13.66
15.06
13.99
7.46
10.60
15.39
7.94
6.42
10.05
2.98
11.66
14.86
10.99
16.15
12.35
13.96
6.09
12.75
2.72
12.98
5.75
11.24
12.92
15.20
17.66
4.05
3.70
4.28
3.27
3.98
2.07
As
ppm
0
0
0
0
0
0
0
0
0
0
As
ppm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
S%
SG
0.03
0.03
0.02
0.04
2.27
2.26
2.02
0.36
0.04
0.06
S%
SG
0.06
0.04
1.33
9.09
2.33
0.79
1.39
6.46
7.48
3.78
7.88
4.65
1.50
1.18
6.77
0.38
0.25
6.88
0.24
2.29
0.19
0.57
0.68
0.21
0.27
2.97
0.35
0.22
0.39
0.20
0.29
2.94
2.97
3.03
3.17
3.02
3.03
2.89
3.07
3.22
2.83
3.30
3.20
3.17
3.04
3.23
2.96
2.96
3.24
2.77
3.03
2.96
2.95
2.94
2.95
3.03
2.92
2.86
2.94
2.95
2.88
2.85
APPENDIX 1 JORC TABLE 1 – CARR BOYD EXPLORATION
Section 1 – Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry
standard
measurement
tools
appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld
XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
Logging
Sub-sampling
techniques
If core, whether cut or sawn and whether
quarter, half or all core taken.
Commentary
ESR drilling included diamond core – half
core samples with a maximum of 2m and
minimum 0.25m length. DD core samples
have been half cut with an automatic core
saw.
Core is cut and sampled to ensure the sample
is representative and no bias is introduced.
Cutting of specific, banded or stringer
sulphide zoned core is done orthogonal to the
banding to ensure there is no bias.
Determination of mineralisation has been
based on geological logging, visual sulphide
estimates and confirmation using a pXRF
machine. Samples were dispatched to an
accredited laboratory for multi-element
analysis.
Diamond core drilling was used to obtain 6m
length samples from the core barrel which are
then marked in one metre intervals, based on
core block measurements and core recovery.
Samples are selected based on geological
logging boundaries or on nominal meter
marks. Collected samples weigh a nominal 23 kg (depending on sample length). Samples
have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed using a 4-acid
digest, ME- ICP for 33 elements and all
samples are also being tested for Au & PGE
elements using ICP analysis.
Drilling was undertaken using NQ2 sized drill
core.
Holes have been collared with mud rotary
from surface, HQ rough cored to top of fresh
rock then NQ2 cored to EOH.
Core recovery was recorded by the field crew
and verified by the geologist.
RQD measurements were digitally recorded to
ensure recovery details were captured.
Sample recovery in all mineralised zones is
high with negligible core loss observed.
Diamond core drilling is the highest standard
and no relationship has been established
between sample recovery and reported grade
as the core is in very good condition.
Detailed industry standard of collecting core
in core trays, marking metre intervals and
drawing core orientation lines were
undertaken.
Core trays were photographed wet and dry
prior to sampling.
Prior to 2021 drill hole logs were recorded in
Excel spread sheets and validated in
Micromine
Software
as the
drilling
progressed.
In 2021 a digital logging system, Logchief,
was implemented which validates data as it is
recorded and uploads that data remotely to a
centralised database.
The entire length of all holes are logged.
Core is half cut using an automatic core saw
to achieve a half-core sample for laboratory
_________________________________________________________________________________
Criteria
and sample
preparation
JORC Code explanation
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or dry.
Quality of
assay data
and
laboratory
tests
Verification of
sampling and
assaying
Location of
data points
Data spacing
and
distribution
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the
Share your feedback
Discover