Carr Boyd Drilling Update
Released
Released
Announcement PDF
16 December 2020
ASX ANNOUNCEMENT
Carr Boyd Drilling Update
HIGHLIGHTS
• Ongoing diamond core drilling at T5 Prospect during Phase II has completed 7 diamond holes
with a new hole currently in progress
• Assay results from diamond core hole CBDD033 returned (Table 1);
o
20.10m (~12m true width) at 1.02% Ni, 0.65% Cu, 2.43g/t Ag & 0.84g/t PGE’s which
includes
o
5.88m at 1.38% Ni, 0.64% Cu, 2.30g/t Ag & 0.98g/t PGE’s and
o
2.10m at 1.43% Ni, 0.61% Cu, 3.03g/t Ag & 2.22g/t PGE’s and
o
2.45m at 1.64% Ni, 1.97% Cu, 7.18 g/t Ag & 0.90g/t PGE’s including
o
0.78m at 5.45% Cu, 19.3 g/t Ag, 1.17% Ni and 0.74 g/t PGEs (Figure 1).
• Assay results from diamond core hole CBDD034 located 300m north returned;
o
0.15m at 1. 23% Ni, 0.81% Cu, 4.10g/t Ag & 0.16g/t PGE’s
• CBDD035 intersected a ~24.7m wide sulphide zone (~14m true width) ~100m below CBDD030
• CBDD036 intersected a 16.5 m wide sulphide zone (~9m true width) ~90m below and 30m south
of CBDD030
• Numerous holes are awaiting assay results and are still being processed in the laboratory
• Seismic survey scheduled for early 2021
• DHTEM undertaken and interpretation completed for further targeted drilling
Figure 1. Copper rich breccia sulphide zone (chalcopyrite+pyrrhotite+pentlandite) within drill hole CBDD033 which returned
0.78m at 5.45% Cu, 1.17% Ni, 19.30g/t Ag & 0.74g/t PGE’s from the T5 Prospect, Carr Boyd Rocks Project (387.2m-387.8m
shown).
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to update the market with
drilling progress at the T5 Ni-Cu Prospect within the Carr Boyd Project. The Company has progressed
drilling at our T5 discovery area utilizing 2 diamond core rigs with meter rates improving as knowledge of
conditions improve and practices adjusted.
To date, 7 holes have been completed at the T5 Prospect for just over 3,386m during the Phase II drilling
program (Figure 2 & Table 3), with a new hole recently started over the weekend. Two holes (CBDD032 &
CBDD034) were completed under the original T5 holes CBP042 & CBDD028 returning minor sulphide
development on the contact (Figures 2 & 3). The remainder of the holes have been drilled in the vicinity of
the massive nickel sulphide discovery hole CBDD030. Two additional holes (CBDD038 and CBDD040)
were drilled at Target A to the southwest and will be reported separately once field and DHTEM modelling
data is available.
Assay results for CBDD033 and CBDD034 have now been returned (Table 1, Table 4 & Figure 2), with
numerous holes still being processed in the laboratory. The recently completed hole CBDD039 is currently
being processed in the field for transport to the laboratory. Sulphides have been intersected in holes
CBDD035, CBDD036 and CBDD037 as per the details in Table 2 and as shown by Figures 4, 5 & 6. Down
Hole Transient Electro-Magnetic surveying (DHTEM) of the holes has been completed with a conductive
body of ~8,000-14,000S being modelled from the drill holes surrounding CBDD030. The recently
commenced hole CBDD041 has been stepped 150m south of CBDD030 (Figure 3) to further test the extent
of the mineralised basal contact southwards and below anomalous shallow historical drill intersections.
The matrix and massive/breccia sulphides seen in hole CBDD030 as well as the net-textured matrix
sulphides and copper rich mineralisation observed in the surrounding drill holes, demonstrate the sulphides
are remobilsed sulphides that have been injected up the subvertical contact via a deep seated feeder zone.
The hot liquid sulpides are injected under pressure during emplacement, then via gravitational forces they
settle back down the contact squeezing between the crysalizing rock fragments to form the net-texured
matrix and disseminated sulphide zones identified to date. As the heavy metal-rich sulphides settle back
down the feeder conduit they can form thick-dense zones of massive sulphide in favourable trap sites close
to the feeder conduits. In addition, the sulphide bearing conduits are fed from a sulphide rich source
chamber at depth and is the primary target for discovering large volumes of potentially economic nickelcopper sulphide mineralisation which the Company is actively searching for and is believed to have
provided the mineralised sulphides that created the Carr Boyd Ni/Cu “pipes” mined in the 70’s by WMC.
Estrella has committed to completing a seismic survey over the western contact zone in early 2021 to assist
with modelling the Carr Boyd Intrusion at depth and to understand the nature of the mineralised contact
which could assist with targetting and drilling of these conduits, trap sights and source chambers. The
Company will take a slight pause in drilling activities over the Christmas-New Year Festive Season which
will allow for rig servicing and we will recommence activities in early 2021 once the site facilities upgrades,
which are well underway, are fully established and ready for the start of the 2021 field season.
Estrella Resources MD and CEO, Mr Chris Daws, said:
“Since our initial discovery hole at T5, the drill bit has not stopped as we continue to ramp up our efforts to
establish a solid exploration base with which to continue our aggressive exploration of the Carr Boyd
intrusion. Mineralisation continues to be intersected in drilling and I fully believe that we have not seen the
best of it yet. Our team will be bolstered in the New Year with Steve Warriner and with our facilities fully on
target to be upgraded, I look forward to hitting the ground running in early 2021”.
Figure 2. Longsection (looking west) along the T5 Prospect Zone showing shallow historical pierce points into the basal
contact which are coloured by intersection-width (m) x Ni% grade. Recent drilling by Estrella is labelled and details are
tabulated in Tables 1-3. The DHTEM anomaly plate area from recent survey work is shown by the green zone.
Table 1: Sulphide Intersection Summary (Downhole width)
Ni
Cu
Hole ID
From
To
Width
%
%
CBDD033
incl
&
&
incl
CBDD034
CBDD032
CBDD035
CBDD036
CBDD037
CBDD039
368.50
388.60
372.52
378.40
380.70
382.80
386.15
388.60
387.00
387.78
208.15
208.30
In Laboratory
In Laboratory
In Laboratory
In Laboratory
In prep
20.1
5.88
2.1
2.45
0.78
0.15
1.02
1.38
1.43
1.64
1.17
1.23
0.65
0.64
0.61
1.97
5.45
0.81
Co
Ag
%
ppm
Au+Pt+Pd
ppm
0.05
0.07
0.07
0.08
0.05
0.10
2.43
2.30
3.03
7.18
19.30
4.10
0.84
0.98
2.22
0.90
0.74
0.16
Table 2: Sulphide Intersection Summary (Downhole width)
CBDD0036
Total Sulphides
= 16.5m
CBDD0035
Total Sulphides
= 24.68m
Hole ID
CBDD0037
mFrom
mTo
Width
Texture Type
Sulphides
Visual S%
Estimation
511.03
516.80
5.77
Po, py, cpy, pe
5-25%
516.80
518.90
2.1
Po, cpy, pe
65-80%
518.90
521.70
2.8
Cpy, po, pe
15-45%
521.70
524.86
3.16
Po, pe, cpy
50-100%
524.86
526.10
1.24
Po, cpy, pe
45-50%
526.10
527.38
1.28
Po, cpy, pe
50-100%
527.38
535.71
8.33
Po, py, cpy, pe
20-30%
505.60
508.10
2.50
Po, cpy, pe
15-40%
508.10
512.25
4.15
Dissem-Blebby
Matrix-Semimassive
Dissem-Matrix
Matrix-Massive
Veins/Stringers
(10-40mm wide)
Matrix-Blebby
Matrix-Massive
Veins/Stringers
(10-30mm wide)
Dissem-BlebbyStringers
Blebby-MatrixStringer
Dissem-Blebby
Po, cpy, pe
10-15%
512.25
514.05
1.80
Blebby-Dissem
Po, cpy, pe
25-30%
514.05
522.10
8.05
Dissem-Blebby
Po
10-15%
347.00
357.00
10.00
Disseminated
Po
5%
*po=pyrrhotite, py=pyrite, cpy=chalcopyrite, pe=pentlandite
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide
and oxide material abundance should never be considered a proxy or substitute for laboratory
analysis. Laboratory assay results are required to determine the widths and grade of the visible
mineralisation reported in preliminary geological logging. The Company will update the market when
laboratory analytical results become available.
Table 3: Drill hole collar details for T5 Phase II Drilling
Hole ID
CBDD032
CBDD033
CBDD034
CBDD035
CBDD036
CBDD037
CBDD039
CBDD041
Final Depth
335.6m
450.0m
412.0m
581.7m
576.8m
420.8m
609.7m
~500m
Easting
367279
367397
367361
367442
367420
367419
367450
367400
Northing
6673941
6673658
6673941
6673659
6673620
6673620
6673710
6673500
Dip
-65
-65
-65
-65
-65
-60
-65
-60
Azimuth
270
270
270
270
270
270
270
270
Status
Completed
Completed
Completed
Completed
Completed
Completed
Completed
In Progress
Targeted
Contact
Zone
CBDD030
Target
Zone
CBDD041
Figure 3. Drone aerial photo of the T5 drill area showing the colour contrast of the targeted ultramafic contact zone between
the darker footwall zone (west) and the red iron-rich intrusion (east). The completed drill holes are on the western side of
contact and were drilled from the footwall side of the intrusion, the current drill holes are now drilling from the eastern side
through the intrusion and back towards the contact zone. Historical holes can still be seen and did not locate this blind
nickel sulphide mineralsation as they were drilled to shallow.
Figure 4. Cross-Section through 6673665mN showing intersection through the sulphide zone and corresponding DHTEM
anomaly modelled plate zone. The mineralisation is open up and down the mineralised basal contact zone.
Figure 5. Ni-Cu bearing disseminated, matrix and stringer/vein sulphides within diamond drill hole CBDD035 at the T5 NiCu discovery (513.3m- 531.1m shown).
Figure 6. Ni-Cu bearing disseminated, matrix and stringer/vein sulphides within diamond drill hole CBDD036 at the T5 NiCu discovery (503.6m- 512.5m shown).
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Neil Hutchison, who is the non-executive Technical Director of Estrella Resources, and a
member of The Australasian Institute of Geoscientists. Mr. Hutchison has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration, and to the activity he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource
and Ore Reserves”. Mr. Hutchison consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director & Chief Executive Officer
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
ABOUT THE PROJECT AND THE CBLC
The Carr Boyd Nickel Project (CBNP) is a magmatic
hosted sulphide system which comprises the Carr Boyd
Layered Complex (CBLC or the Complex). The CBLC is
in a Tier 1 jurisdiction approximately 80km north northeast of Kalgoorlie Western Australia. An all-weather haul
road accessible by Estrella under a granted
miscellaneous license connects the Project to the
Goldfields Highway via Scotia. Estrella holds 259km2 of
contiguous tenure over the entire magmatic maficultramafic layered complex
The CBLC hosts the historic Carr Boyd Rocks nickel
mine which was the first magmatic hosted style of nickel
deposit discovered and mined in WA. It was discovered
an the late 1960’s and produced 202,110t of ore at an
average grade of 1.43% Ni and 0.46% Cu between
1973-1977.
Location of Carr Boyd Project
Komatiites flows have been the main source of developed nickel sulphide mines in WA and have been explored
extensively since the late 1960’s. Due to their well understood geochemistry, formation, and high-grade
sulphide enrichment process within defined channels, most of the studies and exploration programs in WA
have focused on discovering this style of mineralisation. The Kambalda-Kalgoorlie-Leinster-Laverton
Goldfields Region has been the main focus for komatiite exploration, with limited potential existing outside this
region. Greenfields discoveries of komatiite nickel have all bar dried up in the Goldfields Region and its only
deep brownfields exploration that is delivering new nickel deposits.
Elsewhere around the world, large scale magmatic nickel deposits are the norm, producing world-class
deposits with long productive mine lives. In WA, magmatic nickel deposits occur scattered throughout the
state, however, they have had a long and slow history of discovery, development and understanding. Its only
in recent years, since the discovery of the Nova-Bollinger deposit (2012) in the Fraser Range (which had been
historically explored for over 40yrs), that a string of magmatic nickel deposit have suddenly been discovered.
As komatiite sources dry up, focus and understanding around magmatic nickel deposits is starting to gain
momentum, resulting in exploration companies looking at various mafic-ultramafic bodies which have had
limited to no exploration completed over them to date. This is resulting in a new level of understanding in WA
on the formation/deposition of nickel-copper sulphides within magmatic rocks, leading to a wave of new
discoveries.
Interest in magmatic nickel-copper deposits have had a resurgence with the recent discoveries of magmatic
hosted sulphide mineralisation at Legend Mining’s (ASX:LEG) Rockford Project and Chalice Gold Mines
(ASX:CHN) Julimar Projects. A “Voisey Bay” magmatic style model has not been adequately explored within
the CBLC. This represents a compelling exploration target opportunity which the Company will continue to
aggressively pursue.
Table 4. List of assay results from CBDD033 & CBDD034 with selected relevant elements
Hole_ID
Sample No
m_From
m_To
m_Interval
Ni_%
Cu_%
Co_%
Au+Pt+Pd
Au_ppm
Pt_ppm
Pd_ppm
Ag_ppm
S_%
As_ppm
CBDD033
ECB10370
368.50
369.37
0.87
0.93
0.45
0.05
0.453
0.028
0.196
0.229
1.8
6.72
<5
CBDD033
ECB10371
369.37
370.22
0.85
0.89
0.24
0.04
0.509
0.062
0.179
0.268
0.9
6.28
<5
CBDD033
ECB10372
370.22
371.11
0.89
0.73
0.29
0.03
0.322
0.013
0.030
0.279
0.9
4.95
<5
CBDD033
ECB10373
371.11
371.54
0.43
0.73
0.19
0.04
0.594
0.018
0.287
0.289
0.5
5.26
<5
CBDD033
ECB10374
371.54
372.52
0.98
0.97
0.38
0.05
0.983
0.038
0.545
0.400
1.6
6.07
<5
CBDD033
ECB10375
372.52
373.50
0.98
1.05
0.33
0.05
0.823
0.044
0.264
0.515
0.9
7.85
<5
CBDD033
ECB10376
373.50
374.50
1.00
1.50
0.74
0.07
0.928
0.036
0.351
0.541
3.0
10.10
<5
CBDD033
ECB10377
374.50
375.50
1.00
1.48
0.50
0.07
0.706
0.040
0.234
0.432
1.7
10.10
<5
CBDD033
ECB10378
375.50
376.50
1.00
1.66
0.67
0.08
0.840
0.087
0.160
0.593
2.2
10.10
<5
CBDD033
ECB10379
376.50
376.85
0.35
1.75
0.88
0.08
0.867
0.072
0.038
0.757
2.8
10.10
<5
CBDD033
ECB10380
376.85
377.50
0.65
1.22
0.52
0.06
0.746
0.141
0.114
0.491
1.6
9.34
<5
CBDD033
ECB10381
377.50
378.10
0.60
1.23
0.31
0.06
1.386
0.013
0.907
0.466
0.9
9.29
<5
CBDD033
ECB10382
378.10
378.40
0.30
1.00
2.37
0.05
2.784
0.408
1.775
0.601
10.7
10.10
<5
CBDD033
ECB10383
378.40
379.24
0.84
0.48
1.13
0.02
0.630
0.041
0.374
0.215
4.5
4.46
<5
CBDD033
ECB10384
379.24
379.70
0.46
0.85
0.32
0.04
0.583
0.032
0.124
0.427
1.1
6.26
<5
CBDD033
ECB10385
379.70
380.70
1.00
0.39
0.16
0.02
0.454
0.045
0.148
0.261
0.3
3.04
<5
CBDD033
ECB10386
380.70
381.50
0.80
1.55
0.43
0.07
3.366
0.050
2.610
0.706
1.8
10.10
<5
CBDD033
ECB10387
381.50
381.90
0.40
0.95
0.58
0.05
1.587
0.018
1.125
0.444
2.5
7.80
<5
CBDD033
ECB10388
381.90
382.42
0.52
1.38
0.62
0.06
1.516
0.080
0.468
0.968
3.9
10.10
<5
CBDD033
ECB10389
382.42
382.80
0.38
1.76
1.01
0.08
1.432
0.034
0.223
1.175
5.0
10.10
<5
CBDD033
ECB10390
382.80
384.00
1.20
0.20
0.15
0.01
0.298
0.039
0.154
0.105
0.5
1.44
<5
CBDD033
ECB10391
384.00
385.00
1.00
0.20
0.19
0.01
0.158
0.016
0.035
0.107
0.6
1.49
<5
CBDD033
ECB10392
385.00
385.53
0.53
0.12
0.12
0.01
0.124
0.018
0.033
0.073
0.3
0.96
<5
CBDD033
ECB10393
385.53
386.15
0.62
0.24
0.27
0.01
0.234
0.060
0.068
0.106
1.0
1.99
<5
CBDD033
ECB10394
386.15
387.00
0.85
2.28
0.52
0.11
1.041
0.121
0.306
0.614
2.5
10.10
<5
CBDD033
ECB10395
387.00
387.78
0.78
1.17
5.45
0.05
0.744
0.080
0.199
0.465
19.3
10.10
<5
CBDD033
ECB10396
387.78
388.60
0.82
1.42
0.16
0.06
8.09
<5
CBDD034
ECB10421
208.15
208.30
0.15
1.23
0.81
0.10
10.10
<5
0.903
0.164
0.018
0.126
_________________________________________________________________________________
0.391
0.494
0.023
0.015
0.5
4.1
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
• Nature and quality of sampling (e.g. cut • DD core samples have been half cut with automatic core
techniques
channels, random chips, or specific
saw
specialised
industry
standard • 0.3m-1.1m samples are collected from the core trays as
measurement tools appropriate to the
marked out by the supervising geologist
minerals under investigation, such as • A handheld XRF tool was used to verify the mineralisation
down hole gamma sondes or handheld
with samples reporting >0.3% Ni in disseminated zones
XRF
instruments,
etc.).
These
and >1% Ni in the matrix sulphide zones.
examples should not be taken as • XRF results have not been reported and are used as a
limiting the broad meaning of sampling.
logging/sampling verification tool only.
• No other measurement tools other than directional survey
tools have been used in the holes.
• Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill sample
recovery
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• Method of recording and assessing
core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
• Core is continuously cut on the same side of the
orientation line and the same side is sampled to ensure
the sample is representative and no bias is introduced.
• Determination of mineralisation has been based on
geological logging and confirmation using a pXRF
machine. Samples were dispatched for laboratory ultielement analysis.
.
• Diamond Core drilling was used to obtain 3-6m length
samples from the barrel which are then marked in one
meter intervals based on the drillers core block
measurement.
• Assay samples are selected based on geological logging
boundaries or on the nominal meter marks.
• Collect samples weigh a nominal 2-3 kg (depending on
sample recovery) was sent to lab and pulverised.
• Samples have been dispatched to a commercial
laboratory in Perth for analysis
• Samples are being analysed using a 4 acid digest for MEICP for 33 elements and ore zone samples are also being
tested for PGM-ICP testing for Au & PGE elements
• Drilling was undertaken using NQ2 sized drill core.
• Hole was collar with mud rotary from surface, HQ rough
cored to top of fresh rock then NQ2 cored to EOH.
• Core recovery was recorded by the drill crew and verified
by the geologist.
• RQD measurements were digitally recorded to ensure
recovery details were captured.
• Sample recovery in both holes was high with negligible
loss of recovery observed.
• Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very good
condition.
_________________________________________________________________________________
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
• The
verification
of
significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
Commentary
• Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines
was undertaken
• Core trays were photographed wet and dry prior to
sampling.
• Drill hole logs are recorded in Excel spread sheets and
validated in Micromine Software as the drilling
progressed.
• The entire length of both holes was logged.
• Core is half cut using an automatic core saw to achieve a
nominal 2-3kg split sample for laboratory submission
• The sample preparation technique is considered industry
best standard practice
• No field duplicates have been collected in this program.
Field duplicates will be collected once initial results are
return and resampling of the mineralised zones is
warranted.
• Sample sizes are appropriate to the grain size of the
mineralisation.
• No handheld XRF results are reported however the tool
was used to verify the mineralisation with reporting >0.3%
Ni in disseminated zones and >1% Ni in the matrix
sulphide zones.
• DHTEM parameters are as follows;
• Tx Loop size:
500 x 800 m
• Transmitter:
GAP HPTX-70
• Receiver:
EMIT SMARTem24
• Sensor:
EMIT DigiAtlantis
• Station spacing: 2m to 10 m
• Tx Freq:
0.5 Hz
• Duty cycle:
50%
• Current:
~130 Amp
• Stacks:
32-64
• Readings:
2-3 repeatable readings per
station
• Results verified by Company CEO
• Hole CBDD0028 is twinning hole CBP042
• The data was collected and logged using Excel
spreadsheets and validated using Micromine Software.
The data will be loaded into an externally hosted and
managed database and loaded by an independent
consultant, before being validated and checked, then
exported and send back to ESR for analysis.
• No adjustments have been made to the assay data other
than length weighted averaging.
Criteria
Location of
data points
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
JORC Code explanation
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
• Whether sample compositing has been
applied
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• The measures taken to ensure sample
security.
• The results of any audits or reviews of
sampling techniques and data.
Commentary
• The holes were pegged by Geolithic Geological Services
using a hand held GPS + 3m
• The rig was setup over the nominated hole position and
final GPS pickup occurred at the completion of the hole.
• MGA94_51
• Topography is relatively flat and is more than adequate
given the early stage of the project. A 3D drone orthophotographic survey is planned the create a DTM of the
project area.
• Refer to Cross Sections and Plans included
• Not applicable, no Mineral Resource is being stated.
• No compositing has been applied. Intercepts are quoted
as length weighted intervals.
• The drill line and drill hole orientation are oriented as
close as possible to normal the target contact zone.
• Samples are in the possession of Geolithic personnel
from field collection to laboratory submission.
• No audits or reviews have been conducted for this release
given the very small size of the dataset.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
• Type, reference name/number,
• Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of
tenement and
location and ownership including
ESR) holds a 100% interest in the nickel and base metal
land tenure
agreements or material issues with
rights to the project.
status
third parties such as joint ventures,
• There are no known impediments to operate in the area.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Exploration
• Acknowledgment and appraisal of
• The Carr Boyd Rocks deposit was discovered by Great
done by other
exploration by other parties.
Boulder Mines, in a joint venture with North Kalgurli Ltd
parties
in 1968. The deposit was mined between 1972 and
1975, during which time they explored for additional
breccia pipe occurrences near the mine.
• WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni and 0.46%
Cu before its closure.
• From 1968 Pacminex Pty Ltd held most of the ground
over the CBLC outside of the immediate mine area.
Between 1968 and 1971 they conducted extensive
exploration programs searching for large basal contact
and/or stratabound Ni-Cu deposits. It was during this
time that most of the disseminated and cloud sulphide
occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
• Defiance Mining acquired the regional tenements from
Pacminex in 1987 and focused on exploration for PGE
deposits between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from WMC and
switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
• From 1990 Defiance dewatered the mine to conduct
testwork and feasibility studies on the remnant
mineralisation. Metallurgical testwork, Mineral Resource
estimations, and scoping studies were completed.
Around 1996 the focus shifted again to regional
exploration for large tonnage basal contact deposits.
• In 2001 Titan Resources Ltd (Titan) acquired the project
and recommenced economic evaluations of the remnant
material at Carr Boyd Rocks before embarking on
another regional exploration program focusing on the
basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC
drilling were completed.
• From 2005 Yilgarn Mining entered a JV with Titan and
continued with some regional exploration, but focused
most attention in and around the Carr Boyd Rocks mine.
• In 2007 Titan was acquired by Consolidated Minerals Ltd
(Consmin). Consmin conducted IP surveys and detailed
gravity surveys, but did not drill any targets before selling