HIGHLIGHTS
Following major appreciation in the nickel price Estrella will seek to rapidly transition its 100% owned
Spargoville nickel sulphide project to a producing asset
Mining professionals engaged to begin development activities at Spargoville
Diamond drill rig secured to confirm Spargoville Mineral Resource Estimate and provide metallurgical
sampling material
Commencement of Definitive Feasibility Study (DFS) on 5A open pit mine (Spargoville)
Previous ESR drill results from 5A Nickel Deposit in 2018 included1:
15m @ 10.45% Ni & 0.78% Cu, 0.20% Co, 0.87g/t Pd, 1.15g/t Pt from 20m in KWC0004
5m @ 11.32% Ni & 0.54% Cu, 0.21% Co, 0.42g/t Pd, 0.22g/t Pt from 61m in KWC0001
3m @ 12.90% Ni & 1.37% Cu, 0.29% Co, 1.86g/t Pd, 0.67g/t Pt from 69m in KWC0002
Scoping Study on the pre-developed 5B Nickel Deposit to commence
Spargoville development to run concurrently with ongoing exploration at Carr Boyd Project
Estrella Managing Director Chris Daws commented:
“Timing is everything and the time is right for Estrella to kick-off development activities for our
Spargoville nickel sulphide assets. Estrella bought the rights to mine and explore four nickel sulphide
deposits, located 20km South-West of Kambalda, when nickel projects were out of favour. Nickel
prices are now at high levels that provide strong financial metrics to warrant mine development. In
response, we have put together an experienced team of mining professionals to assist the Company
transition through to producer status. It is a very exciting development, with drilling and a number of
technical studies set to get underway which hold the potential to fast-track access to early cashflow
and place Estrella as the next nickel producer in Australia.”
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce that following a
major appreciation in the global nickel price, the Company is seeking to transition its Spargoville nickel
sulphide project, which is located approximately 20km South-W est of Kambalda, into a producing asset.
About Spargoville
The Spargoville nickel sulphide project was acquired by Estrella via the purchase of WA Nickel Pty Ltd (see
ASX release 4 September 2017). Nickel sulphides were first discovered in the area by Selcast Exploration
in the late 1960s. Since then, the 1A, 5A, 5B, and 5D deposits were discovered and partially developed on
two of the three mining leases for which the Nickel Rights were purchased (Figure 2). All these mines have
remnant nickel sulphide mineralisation left behind and extensive exploration potential at depth.
1 Refer ASX announcement 6 December 2018 (ASX: ESR)
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Figure 1: Longsection looking west through the 5A Nickel Resource showing abundance of Oxide, Transitional and Fresh
Metallurgical Zones as well as an outline of the optimised pit shell from the 2020 Scoping Study.
Figure 2: Mining Leases and Nickel Deposit locations for which the Nickel Rights were purchased by Estrella in 2017
Within the Spargoville area, three ultramafic units can be mapped. Mining Leases 15/395 and 15/703 lie
over these ultramafic units which are separated by basalts and graphitic shales. Within the ultramafic units,
Kambalda-style channels have formed in which nickel sulphides have been deposited. Historical ore zones
have consisted of significantly high nickel tenor. Arsenic and gold can also occur within the nickel
mineralisation. It is expected that significant advances in the treatment of arsenic-nickel ores will assist the
Company to realise the current value of the remaining deposits.
5A Nickel Deposit
The Company’s initial focus will be on the remaining resource at the 5A Nickel Deposit. The mineralisation
at 5A consists of a 30m deep Oxide Zone, which was mined in an open pit by Amalg Resources NL in 19961997. Beneath this, and which will be the focus of the DFS, remains a 20m thick Transitional Zone
(dominated by the nickel mineral violarite), underlain by another 30m of Fresh Sulphides (dominated by
pentlandite) as can be seen in Figure 1. The metallurgical significance of this will be outlined later.
Historical intercepts through the 5A mineralisation are shown in Figure 3 below.
Figure 3: Historical significant intersections below the 5A Open Pit
Estrella conducted a new resource estimation released to the market on 18 October 2019 as follows:
Table1 – 5A October 2019 Mineral Resource Estimate (0.5% Nickel Cut-off)
Type
Saprolite
Saprock
Fresh
Total
Type
Saprolite
Saprock
Fresh
Total
Tonnage
kt
12
38
19
69
Ni
%
1.0
2.2
3.7
2.4
Indicated Mineral Resource
Cu
Ni
%
t
0.10
120
0.19
830
0.24
680
0.19
1,630
Cu
t
10
70
40
130
Tonnage
kt
11
17
29
58
Ni
%
0.9
1.0
1.6
1.3
Inferred Mineral Resource
Cu
Ni
%
t
0.10
100
0.14
170
0.10
470
0.11
730
Cu
t
10
20
30
70
Type
Saprolite
Saprock
Fresh
Total
Tonnage
kt
24
55
48
127
Ni
%
0.9
1.8
2.4
1.9
Total Mineral Resource
Cu
Ni
%
t
0.10
220
0.17
1,000
0.15
1,140
0.15
2,370
Cu
t
20
100
70
190
5A Deposit Metallurgical Drilling and Testing; Impact on the DFS
The planned diamond drilling program to commence shortly will accomplish several aims, including
updating the Oct 2019 Resource estimate. The major objective is to confirm the metallurgical “Top of Fresh”
zone for the DFS. This depth, where the Transitional Zone ends, and Fresh mineralisation starts (refer to
Figure 1) is critical to the final economics of the project.
Fresh Zone Sulphides
Fresh mineralisation is dominated by two minerals, pyrrhotite (iron sulphide) and pentlandite (nickel
sulphide). The combination of these two minerals in a nickel concentrate is important for both the flotation
and recovery of nickel, and for the smeltability of the concentrate. As such, off-take and payment terms are
derived from the quality of the concentrate, whilst the quantity of nickel is a function of recovery and grade.
These have a direct effect on the revenue from the project. It is therefore necessary to estimate the amount
of nickel in the Fresh Zone to a high degree of certainty to de-risk the project.
These variables along with their associated positive or negative influences on revenue will impact the final
optimised pit size and shape in the DFS.
As a necessary step in the DFS process, the Company will utilise mineralised core from the Fresh Zone
blended from across the length of the deposit to estimate concentrator recoveries and monitor potential
deleterious elements such as arsenic and magnesium. Optimum crush and grind size and power
consumption will also be studied. The results will then be supplied to potential buyers of the ore and
resulting concentrate for indicative payment terms.
Transitional Zone Sulphides
The Transitional Zone occurs from partial weathering of fresh sulphides near to the surface. Sulphide
mineralogy at 5A is dominated by pyrite (iron sulphide) and violarite (nickel sulphide) as well as pyrrhotite
and pentlandite. As the name suggests, the deposit mineralogy is transitioning from Oxide near surface to
Fresh some 50m to 60m below surface, and its composition will vary (transition) with depth.
The composition of the Transitional Zone is important for metallurgical testwork. Whilst pyrite will float well
through a traditional nickel circuit, violarite flotation can be inhibited by the surface properties of the mineral.
A resulting, “traditionally floated” concentrate from Transition Zone feed could therefore be lower in nickel,
impacting recovery.
Core from the Transition Zone will undergo testing to ascertain the level below surface where “traditional
flotation” becomes profitable through improved nickel recovery, and this potential feed can then be included
in the mining schedule to add to projected sales revenue.
Additional test material will be supplied to third parties or potential buyers of the Transitional Zone material
prior to mining of the Fresh Zone . These companies operate processors using various leach technologies
which can and are successfully treating Transitional and Oxide feeds in Western Australia. Deleterious
elements do not impact recovery or nickel concentrate quality through these processors.
Successful testing of the 5A Transition and Oxide material may well lead to additional revenue to be realised
over and above that gained by treating the Fresh Sulphides as defined in the DFS.
5A Scoping Study Update
Indicative offers from the recent asset sales process of the Spargoville Nickel Rights conducted by
Estrella did not reach the threshold set by the Company whereby shareholders would receive fair value
from the sale.
This deficit was heightened by the recent rise in the nickel price coupled with a more favourable exchange
rate, a position that the Company estimates may be sustained for a significant period of time.
As a result, the 2019 5A Scoping Study was recently revisited by Estrella who have engaged a professional
mining team to coordinate the generation of a mining reserve once the updated resource model is complete.
The following work has already been completed:
Open pit geotechnical assessment;
Aerial digital survey; and,
Initial environmental approval assessment.
Once a mining reserve is identified, the mining engineering team will complete the task of assembling the
appropriate permits and approvals so that mining can recommence.
5B Nickel Deposit
The 5B Nickel Deposit is another Kambalda-style komatiite deposit similar to 5A with massive and matrix
sulphides accumulating at the base of a lava channel. The deposit outcropped at surface and has been
drilled to 340m vertical depth. The deposit is open below that depth (Figure 5).
The deposit was mined between 1975 and 1982 and again between 1992 and 1993 via an open pit (Figure
9), targeting the existing gold and nickel mineralisation. Approximately 14,000t of nickel was produced
between the two mining campaigns.
A 600m long decline (120m vertical depth) was established post the open pit mining phase to allow drilling
of the nickel and gold mineralisation from underground, yet no nickel was ever mined. The decline remains
intact and accessible for refurbishment to allow mining activities to proceed.
A drilling program completed by Minotaur Exploration Ltd in 2014 (see ASX announcement MEP: 23 July
2014) confirmed historic nickel intercepts, with results including:
15m @ 1.41% Ni in hole SPRC001
16m @ 0.98% Ni in hole SPRC002
16m @ 1.82% Ni (including 6m @ 3.60% Ni) in hole SPRC003
24m @ 1.53% Ni (including 6m @ 3.08% Ni) in hole SPRC005
Mineral Resource estimates were completed on 5B by previous operators, but they were not completed to
JORC Code 2012 reporting standards and therefore cannot be stated here.
There is a lack of survey control on the location of underground drill collars and drillhole deviation
information. To rectify this, the decline would need to be dewatered and survey control re-established. A
campaign of downhole surveying would follow for the deeper drillholes along with additional diamond drilling
and metallurgical classification before a JORC 2012 compliant resource could be established.
Additional metallurgical work would need to be conducted to explore the potential of rejecting arsenic
(associated with gold mineralisation) to keep a potential concentrate within smelting parameters.
Alternatively, other processes, such as HPAL, may yield better nickel recovery whilst negating the
deleterious effects of arsenic.
Figure 4: Long section of the 5B deposit, pit and decline, showing Minotaur’s significant intersections from 2014.
5D Andrew’s Nickel Deposit
The 5D Nickel Deposit is thought to be a westerly continuation of the 5A komatiite channel. The deposit is
larger and more continuous than both 5A and 5B. The estimated pre-mining resource was around 18,000
tonnes of nickel metal at a grade of 2.48% Ni (Minotaur 2016) of which around 7,800 nickel tonnes were
extracted. The last drive excavated at Andrew’s 11 Level was 320m long, averaging 2m ore width at 3.04%
nickel.
The deposit was mined via a 250m deep shaft (Figure 6) and previous work has identified several remnant
pillars that were left behind, including the unmined Oxide Zone identified in drilling by Amalg Resources NL
in 1999.
Figure 5: Long section of the 5D Andrew's Mine showing the unmined oxide cap, in-situ pillars and DHEM targets generated
by Breakaway Resources and Minotaur Exploration
1A Nickel Deposit
This deposit is situated around 4km to the North of 5A, 5B and 5D on M15/703. It is another Kambaldastyle channel deposit which has been structurally deformed, with at least three major, stacked thrusts
dislocating mineralisation.
The deposit was mined between 1990 and 1992 via a 150m shaft and an internal decline down to 175m,
seeing almost 4,300 nickel tonnes extracted at a grade of 3.8% Ni.
Remnant Inferred Resources have been calculated however they are not to JORC standards and so cannot
be stated. Drill data shows good down-plunge intercepts close to the workings. However, the mineralisation
appears to break up shortly after on a fold nose and another thrust. Deeper intersections down to 550m
below surface confirm the continuation of mineralisation at depth, meaning the deposit remains open.
Figure 6: Cross sectional view of the 1A Nickel Mine showing the discontinuous Inferred Resource shapes at depth
Spargoville Development Plan
Considering favourable nickel prices and exchange rates are projected to continue, Estrella has elevated
the priority of the Spargoville nickel project to run concurrently with exploration at the Carr Boyd Project.
The Spargoville work plan developed by the Company consists of the following steps:
5A Nickel Deposit
1.
Commence diamond drilling for metallurgical confirmation and potential expansion of the Fresh
Sulphide JORC 2012 Resource of the 5A Nickel Mine.
2.
Commence the Definitive Feasibility Study of the pit cut-back at 5A to mine and process the
Transitional and Fresh Resource
3.
Commence work and discussions on processing routes for the 5A Transitional and Oxide
Resources
4.
Submit Mining Approvals
5B Nickel Deposit
1.
Commence Scoping Study on the viability of the remaining non-JORC Resource
2.
Pending favourable results, drill test and acquire metallurgical samples for Transitional and Fresh
mineralisation
3.
Consider DFS level studies
5D Nickel Deposit
1.
Compile or re-acquire data on the un-mined Oxide and Transitional mineralisation to JORC
Resource standard
2.
Seek processing routes for Oxide and Transitional material
3.
Consider DFS level studies
1A Nickel Deposit – No work recommended at this time
The Company looks forward in providing further information as the various programs progress.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve
Warriner, who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr. Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Compliance Statement
With reference to previously reported Exploration results and mineral resources, the company confirms that it is not
aware of any new information or data that materially affects the information included in the original market
announcement and, in the case of estimates of Mineral Resources or Ore Reserves that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
Forward Looking Statements
This announcement contains certain forward looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Reliance on Third Party Information
Due care and attention has been taken in the preparation of this announcement. However, the information contained
in this presentation (other than as specifically stated) has not been independently verified nor has it been audited.
Accordingly, the company does not warrant or represent that the information contained in this presentation is accurate
or complete. To the fullest extent permitted by law, no liability, however arising, will be accepted by ESR or its directors,
officers or advisers, for the fairness, accuracy or completeness of the information contained in this announcement.
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut The Spargoville landholding has been drilled by
Sampling
channels, random chips, or specific
techniques
Diamond (surface and underground, 504
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
holes), RC (198 holes), RAB and Percussion
(1514 holes) and Aircore (33), drilling both for
nickel and gold. Drilling data exists for 3041 drill
holes for 122051 metres in the tenement area.
A total of 434 holes had one or more intercepts
over 1% Ni. All of the holes were drilled by
previous operators prior to Estrella Resources
taking over the prospect in 2018.
Diamond holes were selectively sampled
through the visible mineralised zones on a
nominal 1m sample length, adjusted to
geological and domain boundaries. Sample
lengths vary from 0.03m to 3m.
Diamond core and RC sampling techniques
conducted prior to 2005 are not known but are
assumed to be industry standard at the time of
collection. Pre-2005 data was compared to
post-2005 data and the two datasets generally
correlated well. From 2005 onwards, diamond
core samples have been sampled by a
combination of quarter core and half core cut
samples, and a combination of BQ, NQ and HQ
diameter.
From 2005 onwards RC drill holes were
sampled by 1m riffle split composites. RC
drilling was 5 ¼ inch in diameter.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
From 2005 onwards sample representivity for
Aspects
of
the
determination
of
mineralisation that are material to the Public
Report.
Sample lengths for diamond drilling range from
diamond core was ensured by the sampling of
an average length of 1m of core, which,
depending on the company operating at the
time was then cut to quarter or half, for
laboratory analysis. RC sampling was riffle split
from 1m composite bulk samples, producing a
nominal 3kg – 5kg representative sample.
0.03 to 3m with the modal value approximately
1.0m. RC samples ranged from 4m in waste
material and 1m in or near mineralisation
Criteria
JORC Code explanation
Commentary
Nickel mineralisation consists of contact
massive
sulphides
(pyrite,
pyrrhotite,
pentlandite, violarite, chalcopyrite) typically
less than 1.5m thick, overlain by matrix
sulphides and disseminated sulphides. At 5A
the sulphides have been weathered to produce
supergene sulphides of pyrite and violarite.
Most of the drilling, sampling and assaying was
completed by Selcast Exploration and Amalg
Resources. It is unknown how samples were
collected, but it is assumed to be industry
standard at the time. The data from this drilling
compared well with drilling conducted post2005 by Breakaway Resources and others. For
post 2005 drilling, representative samples from
RC and diamond drilling were collected and
sent to accredited laboratories for analysis.
Accredited laboratories in Kalgoorlie and Perth
crushed and pulverised the samples in entirety
and took a 50g pulp for analysis.
For post 2005 samples, nickel and
multielement analysis was performed by 4 acid
digest and a combination of ICP-MS and ICPOES analysis techniques. Gold and PGEs were
determined by a fire assay fusion, followed by
aqua regia digest and atomic absorption
spectrometer (AAS) finish.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information
Minor copper and cobalt occur in the nickel
mineralisation along with fairly high arsenic
levels.
Drilling
techniques
Drill sample
recovery
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
The database used in the Mineral Resource for
nickel is comprised of Diamond drilling samples
(64), RC drilling samples (39) and unspecified
drilling samples (231).
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential
loss/gain
of
fine/coarse
material.
It is unknown whether core recoveries were
The majority of drilling was conducted by RC.
Diamond drilling was used exclusively for
deeper holes and underground drilling.
recorded by previous operators. Core
recoveries were recorded for all resource
database diamond core collected by Titan
Resources. All drilling activities were recorded
on handwritten geotechnical logging sheets.
Core recoveries are recorded in the database.
Diamond core recoveries were close to 100%,
where core recoveries were recorded.
RC samples recoveries or weights were not
recorded.
No relationship has been established between
sample recovery and reported grade.
Criteria
Logging
JORC Code explanation
Commentary
Detailed drill hole logs are available for the
majority of the drilling.
Prior to 2005 it is unknown whether duplicates,
standards and blanks inserted for QA/QC
purposes were taken. Hard copy sample
logging sheets were kept. This includes
samples numbers for duplicates, standards
and blanks taken for QA/QC purposes. All data
are available for the work conducted Post 2005.
The logging is of a detailed nature and of
sufficient detail to support the current Mineral
Resource estimate categories.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether
logging
is
qualitative
or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
The total length of drill intersections used in the
nickel mineral resource is 255.79m.
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling
stages
to
maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
From 2005 onwards core was halved or
quartered, depending on which company and
phase of work, by sawing before sampling.
From 2005 RC drilling was riffle split directly
from the sample collection cyclone on the
drilling rig.
From 2005 sample condition field to record
moisture and sample recovery is included in the
sampling log sheet and populates the assay
table of the database. Unfortunately, only a
very small percentage of the logs have
captured this information, so no determination
can be made about the quality of the RC
samples.
From 2005 sample preparation is appropriate
for RC and diamond drilling as per industry
standard practices for managing RC samples
and diamond core.
Prior to 2005 it is unknown whether quality
control procedures have been used. From 2005
Quality control procedures included the
inclusion of field duplicates, standard samples
and blank samples into the sampling stream for
laboratory analysis. Standards were placed
every 30 samples with a combination of blank,
low-grade
and
high-grade
standards.
Dependent on the geology a suitable was
standard
selected.
Blank
standards
(OREAS22P) were generally placed after an
ore zone and at the start of the hole sampling
within each hole. Duplicate sampling was
undertaken for the RC drilling for 4m
composites. Further duplicates were taken
from the RC drilling of the 1m samples at the
discretion of the geologist.
Host rock for nickel mineralisation is mainly a
serpentinite lens at the base of an ultramafic
sequence. It is assumed that prior to 2005
sampling would have been appropriate for the
style of mineralisation and from 2005 onwards
it is appropriate.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
From 2005 onwards quality control procedures
included the inclusion of field duplicates,
standard samples and blank samples into the
Criteria
laboratory
tests
JORC Code explanation
Commentary
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
sampling stream for laboratory analysis. One
standard, blank and field duplicate were
inserted into the sample stream every 30
samples. These were offset through the
sampling stream and placed in areas of interest
i.e. high-grade standards and blanks in the
mineralised zone where possible. The QAQC
results are acceptable.
No umpire assaying has been documented.
No geophysical methods or hand-held XRF
units have been used for determination of
grades in the Mineral Resource estimate.
Verification
of sampling
and
assaying
The verification of significant intersections
by either independent or alternative
company personnel.
Multiple intersections reported have been
The use of twinned holes.
No twin holes have been drilled
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Drill hole data were sourced from digital
Discuss any adjustment to assay data.
Assays were composited to 1m lengths and
checked back to original logs and assay data.
sources and original hard-copy sampling and
assay records, and imported into a central
electronic database. Datashed software was
used to validate and manage the data.
where necessary, top cuts applied for resource
estimation. Only gold grades were cut to
account for outliers in the populations.
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Surface topography is derived from drill hole
collars and the historical mine and dump pickups. Holes drilled by Titan Resources and as
many historical holes as possible were picked
up by RTDGPS by Spectrum Surveys in 2006.
Prior to 2005 it is assumed that the majority of
the drillholes were downhole surveyed by a
single shot tool and by collar measurement
with a clinometer and compass. From 2005 of
holes were down hole surveyed by a gyro.
Data
spacing
and
distribution
Specification of the grid system used.
Prior to 2005 original surveying was
undertaken in Kambalda Nickel Operations
Grid (KNO) and from 2005 in GDA94 grid.
Quality and
control.
Topographic control is considered reasonable
adequacy
of
topographic
but checks should be carried out
Data spacing for reporting of Exploration
Results.
The Mineral Resource area has been drilled on
a regular pattern and spacing. The average
spacing is estimated to be approximately 20m
by 10m within th