Induced Polarisation Trial Successful
Released
Released
Announcement PDF
ASX: ESR
26 November 2024
Induced Polarisation Trial Targeting
Supergene Manganese
HIGHLIGHTS
➔ Induced Polarisation (IP) trials at the Samalari and Sica manganese prospects ongoing
➢ FlashRes Universal 64 system chosen for its transportability and robustness in the field
➢ Estrella’s geophysics personnel trained and operating the system independently
➔ Preliminary imaging of the Samalari and Sica supergene zones appears to have been successful
➢ The supergene manganese blanket on the southern side of the Samalari prospect was detected
where expected
➢ Sica supergene response shows low resistivity anomalies under cover where predicted
➔ IP trial has been extended from Sica to the Lalena Prospect and also over the new Ira Miri Prospect,
concentrating on Estrella’s joint-venture ground with Murak Rai Timor (MRT)
Figure 1: Western end of Salamari Line 1 over the supergene manganese zone previously announced 16 October
2024 with preliminary resistivity inversion below showing a low resistivity anomaly 70m west of the line centre
point. High resistive responses are coloured yellow and red whilst low resistive responses are in blue and green.
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce a positive initial
outcome to the Induced Polarisation trial the Company is conducting in Timor-Leste, targeting supergene
mineralisation within the Noni Formation.
Commenting on the new discoveries Estrella Managing Director Chris Daws said:
“These IP trials give Estrella it’s first look at potential manganese discoveries at depth. Timor-Leste is virtually
unexplored, so these findings are not just important for Estrella Resources but also relevant for the future of
its developing minerals exploration industry.
“From the early work completed, we are very encouraged to be identifying low resistivity anomalies. Pairing
our data with visual observations tells us that the exploration method is capable of identifying supergene
manganese. “While further chargeability work is required, the plan will be to expand the trial to systematically
apply IP across our licenses and permits, building our exploration database to make further discoveries.”
Figure 1 shows Line 1 over the southern side of the Samalari Prospect where supergene manganese
mineralisation was found outcropping in a creek wall some 450m south of the main deposit. This outcrop
was previously announced to the ASX on 16 October 2024.
This outcrop was chosen for testing as the mineralisation can be located below the hill with some certainty,
thus an IP line over the top should give a positive anomalous response.
Resistivity Results
As can be seen in the preliminary resistivity inversion at Samalari (not yet corrected for changes in
elevation) there was a low resistive response 70m west of the line centre point, correlating well with the
outcropping manganese mineralisation. Manganese supergene typically shows low resistivity (blue and
green hues in Figure 1) in contrast to the Noni Formation cherts (highly resistive, red and yellow hues).
Buoyed by this result, the trial moved to the Sica Prospect where supergene mineralisation was found
outcropping in the hills above a valley floor littered with high-grade supergene fragments (see ASX
announcements dated 1 August 2024 and 18 November 2024) where these discoveries have been detailed.
The mapped geology of Line 1 at the Sica Prospect is shown in Figure 2 along with the position of the subcropping supergene (located and announced previously) and also showing a low resistivity anomaly below
the Baucau Formation, in the position where supergene manganese has been predicted.
Figure 2: Line 1 at the Sica Prospect targeting supergene manganese mineralisation within Noni Formation and buried
beneath the Baucau Formation which was deposited over the top. The low resistivity response depicted in blue
and green corresponds with the theoretical location of the Noni Formation and potential supergene development.
It should be noted that this is preliminary inversion data and that there can also be low resistive responses
from perched water tables, clay zones or water sitting along the unconformable contact between the Noni
and Baucau Formations.
Chargeability Results
To properly distinguish between supergene manganese and clay horizons requires chargeability
measurements to be taken with the IP technique. The FlashRes Universal 64 system used in the trial was
selected for portability as it uses 12-volt car batteries as a power source to transmit current into the ground.
However, due to the prevalence of clays in the weathered Noni Formation, the chargeability decay response
in both the clays and the supergene horizon was too low and quick to be modelled accurately. The solution
to this is to pump more power into the ground during surveys, requiring a small generator rather than
batteries.
Work on the chargeability response detected in the trial is ongoing to see if parts of it can be used. Future
trials will incorporate a larger power source so that chargeability data can be captured over a longer decay
period
Figures 3, 4 and 5 below show the locations of the trial IP lines within Estrella’s Exploration and Evaluation
Licenses. These licenses are the subject of a joint-venture between Estrella and Murak Rai Timor.
Figure 3: Locations of the Sica, Lalena and Ira Miri IP lines within Exploration and Evaluation License MEL2023-CA-ZA001
Figure 4: Location of the Samalari IP lines within Exploration and Evaluation License MEL2024-DA-ZB001
Figure 5: Location of Estrella’s prospects where the IP trials have taken place
Figure 6: Estrella's Geophysicist, Eustaquio Amaral (right) with Mat Cooper of Core Geophysics during the IP trial
As a part of our Community Engagement commitment, Estrella employed a team of eight local Timorese to
facilitate the transport of the gear and setting up the IP lines. In addition, we included two university students
who are studying Geophysics at the National University. The students learned all practical aspects of the
IP process from setup to acquisition and processing.
Next Steps
The trial was overseen by Mathew Cooper, the Principal Geophysicist of Core Geophysics, based in Perth,
Western Australia. Mr Cooper assisted in training Estrella’s personnel in Timor-Leste and will continue to
work on the interpretation of the data.
The data now needs to be corrected for topography with further checks and balances before the final
resistivity sections can be processed. This is not expected to markedly change the resistivity interpretation.
Further work on chargeability modelling will not likely yield a satisfactory result. Additional trials with a higher
power output are being planned.
The Company is in the process of converting its Environmental License to a higher category which will
enable the in-country team to start trenching activities and to plan drilling to verify the current IP trials’
findings.
The Company will update shareholders as more information comes to hand.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists, Beau Nicholls, who is a Director of Sahara Natural Resources and is the Exploration Manager for Estrella
Timor-Leste, and a fellow of The Australasian Institute of Geoscientists, and Mathew Cooper, the Principal Geophysicist
of Core Geophysics and a member Australian Society of Exploration Geophysicists, Society of Geophysicists, the Society
of Economic Geologists, the Australian Institute of Geoscientists and the Canadian Exploration Geophysical Society. Mr
Warriner, Mr Nicholls and Mr Cooper have sufficient experience relevant to the style of mineralisation and type of deposit
under consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner
and Mr Nicholls consent to the inclusion in the report of the matters based on their information in the form and context in
which it appears.
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological mapping, visual
mineral estimates and confirmation of
metallic concentration using a Bruker S1
Titan Portable XRF instrument.
•
Initial rock-chip samples were taken and
pXRF determinations on uncrushed
samples made in the field.
•
Samples are then brought back to Dili and
pulverized to 100% passing 1mm before
the powder is again subjected to PXRF
•
A sub-sample of 150g is then dispatched
through customs and quarantine in
Australia to ALS in Malaga for multielement analysis.
•
Exported samples are analysed using a 4acid digest, ME-XRF26s, ME-MS61L at
ALS in Malaga
•
No drilling has been undertaken to date.
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
•
No drilling has been undertaken to date.
The installation of pulverising sample prep
facilities in Timor-Leste ensures sample
representivity when presented to the
PXRF.
•
Rock-chip samples were geologically
logged
for
mineral
content
and
photographed prior to sending for assay or
screening by pXRF.
•
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling
stages
to
maximise
•
Sample sizes are appropriate to the grain
size of the mineralisation which in
manganese oxides is very fine.
The exploration program is in its very early
stages and initial sample sizes are kept
small due to freight and customs /
quarantine restrictions. They are not
considered representative of the bulk of
mineralisation.
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
•
•
•
•
•
•
Verification
of sampling
and
assaying
Location of
data points
•
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
•
Three sample types are quoted:
1 – Uncrushed Field PXRF (a fresh mineral
face is chipped from samples prior to the
XRF determination in the field)
2 – Crushed PXRF (samples from above
are taken back to Dili, 1-3kg of material,
and crushed/pulverised to 100% passing
1mm in the company’s dedicated sample
preparation facility, and 15g of powder is
then taken for PXRF analysis. Crushed
PXRF
determinations
have
been
subjected to repeat samples, standards
and confirmation of accuracy by laboratory
analysis.
3 – Assay, where 150g of material is
exported to ALS in Malaga via quarantine
in Darwin. Standards and blanks have not
been included in samples sent to Australia.
The company relies on the internal
standards and blanks used by ALS.
Samples are being analysed at ALS in
Malaga using a 4-acid digest, ME-ICP for
61 elements and all samples are also
being tested for Pt, Pd and Au by fire assay
and ICP-MS finish on a 50g sub-sample.
Currently, uncrushed field samples are
being analysed by PXRF on location,. The
Cautionary statement is included when
assessing pXRF.
No prior modern exploration has been
conducted in the area.
•
No adjustments to assay data were
undertaken save where the ME-XRF26s
method reports MnO%.
•
Mn% is derived by dividing MnO by 1.2912
•
Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
Topographic control is accomplished
using 30m spaced satellite point data.
No systematic sampling has been
conducted at this early stage.
•
•
•
No orientation-based sampling bias has
been identified.
Criteria
Sample
security
JORC Code explanation
introduced a sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure sample
security.
Commentary
•
•
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
•
•
•
Exported samples are in the possession of
ESR personnel from field collection to
customs
submission
in
Darwin.
Possession
then
passes
to
the
Department of Agriculture, Forestry and
fisheries where Northline Couriers pick up
the samples and take them by road to ALS
in Malaga.
Non-exported samples remain with ESR
personnel past Darwin Airport Customs.
No independent audit or review has been
undertaken.
Internal QAQC involves frequent standard
checks on the PXRF instrument to
determine any drift of accuracy.
Additional checks involve analysis of any
assayed samples in comparison to the
crushed and uncrushed in-country PXRF
determinations so as to provide
confidence in in-country analysis.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
ESR-RP-05, ESR-RP-06, ESR-RP-07
and ESR-RP-08 are awarded to Estrella
Resources
Limited
Representante
Permanente (100%)
•
Exploration and Evaluation Concessions
MEL2024-DA-ZB001,
MEL2024-DAZB002 and MEL2024-DA-ZB003 are
awarded for four years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Estrella
Resources
Limited
Representante Permanente and Estrella
Murak Rai are registered in Timor-Leste
and is a wholly-owned subsidiary of
Estrella Resources Limited (Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Local geologists and companies have
sporadically explored the area however
there has been no documentation
collected nor systematic exploration to
quantify mineral occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Concessions and Permits
host three main forms of manganese
mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
processes exist.
•
Secondary mineralisation exists as a
supergene blanket above the cherts
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Commentary
where they have been exposed to
chemical weathering.
•
Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels or scree deposits.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
• No drilling has been undertaken in the
area.
• Sample locations are shown in the body of
the text.
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used.
Metal equivalent values have not been
used.
•
Any relationships have been discussed
within the body of the text.
•
Relevant diagrams have been included
within the main body of text.
•
No new information has been withheld.
Criteria
Other
substantive
exploration
data
Further work
JORC Code explanation
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
•
•
•
No other substantive data exists as the
program is in its early stages.
All observations are discussed within the
body of the text.
Further work by ESR will include
systematic mapping and sampling along
with
stratigraphic
and
structural
classification.
Additional work on specific areas will be
included under the heading Next Steps in
the body of the text when appropriate to
do so.
Share your feedback
Discover