Spargoville 5A Bulk Sample and DFS Update
Released
Released
Announcement PDF
ASX:ESR
16 February 2023
Spargoville 5A Bulk Sample and DFS Update
HIGHLIGHTS
Spargoville 5A Bulk Sample successfully delivered to Glencore’s Murrin Murrin Operations (MMO)
2,413 tonnes of high-grade transitional material trucked late January to early February
All elements were within required metallurgical specifications and processing of the bulk sample by
MMO to begin in February
Pricing and final payments to be determined over March and April
Definitive Feasibility Study (DFS) progressing
Final optimised pit design, schedule and site layout completed by Minecomp in Kalgoorlie
MBS Environmental engaged to assist with permitting, waste management and Mine Closure Plan
Detailed financial modelling set to commence with receipt of the optimised mine schedule
Figure 1: BKay truck exiting the Murrin Murrin Operations after delivery of sample material
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce that the delivery
of the bulk metallurgical sample from the Spargoville 5A Nickel Mine, located approximately 20km
Southwest of Kambalda, to MMO’s HPAL Plant was successfully concluded on the 3rd of February 2023.
_________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Managing Director Chris Daws commented:
“With the successful delivery of the metallurgical sample to Glencore, Estrella has passed a very
significant milestone on the way to getting the Spargoville Nickel Project into production.
The backdrop of strong nickel prices is providing confidence that Estrella should be able to
commence the 5A Nickel Mine open pit project this financial year subject to statutory approvals,
positive DFS and financing.”
The total 5A bulk metallurgical sample landed at Glencore’s MMO was 2,413 wet metric tonnes (WMT),
with an average moisture content of 3.34%. Assays received from the laboratory confirmed that the trial
parcel was within all specifications stipulated by Glencore, and MMO has begun processing the sample.
Details on the performance of the 5A mineralisation through the HPAL process will be determined during
the current quarter and will inform the DFS.
A 50% provisional payment for 1,994 WMT of material delivered in January has been received from
Glencore. Final payment to be calculated based upon March’s LME nickel weighted average price (WAP).
A similar arrangement will occur for the balance of 418 WMT delivered in February where pricing will be
the April LME nickel WAP.
The Company anticipates a successful outcome to the bulk sample trial at MMO which will pave the way
for the completion of the 5A Definitive Feasability Study (DFS) which is currently well underway. The basis
of the DFS involves a simple open-pit cut-back to access the very high-grade transitional massive sulphide
material of which there is around 16,000t grading 7.8% Ni within the Measured Resource category (see
Table 1). This will be blended with the matrix mineralisation and trucked to a third party.
Table 1: October 2022 Mineral Resource Estimate - Mineralisation Type (0.5% Ni Cut-off)
Type
Disseminated
Matrix/Breccia
Massive
Total
Tonnage kt
76
32
16
124
Ni%
0.6
2.0
7.8
1.9
Total Mineral Resource
Cu%
Co%
Ni T
0.07
0.02
490
0.14
0.03
650
0.59
0.19
1,230
0.15
0.04
2,370
Cu T
50
40
90
190
Co T
10
10
30
50
Minecomp in Kalgoorlie has completed the open pit cutback design with structural and stability input from
Green Geotechnical. Minecomp is in the last stages of finalising the site lay-out plans required for
environmental and departmental approvals. The ore and waste schedules have been finalised which can
now be used to inform a more detailled financial model and revenue forecast.
MBS Environmental has been engaged to assist the company with the statutory approvals process, waste
management and the Mine Closure Plan. Testing of the expected waste material to date has indicated that
all waste from the mine should be self-neutralising and will not pose any environmental risk. Any waste
sulphide material can be safely managed by encaptulating it within the waste dump.
A long-section through the 5A Measured Resource with the existing and optimised open pits is presented
in Figure 2. The majority of the measured category is expected to be extracted, leaving behind the thinner
fringe zones of mineralisation that would suffer too much dilution during mining to be economic.
The Company looks forward to updating shareholders further as the Spargoville Nickel Project progresses.
Figure 2: Longsection of Spargoville 5A Measured Resource with optimised pit cut-back w.r.t. existing open pit
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve
Warriner, who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr. Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Compliance Statement
With reference to previously reported Exploration Results and Mineral Resources, the Company confirms that it is not
aware of any new information or data that materially affects the information included in the original market
announcement and, in the case of estimates of Mineral Resources, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.