QUARTERLY ACTIVITIES
REPORT
Estrella Resources Limited
ABN 39 151 155 207
Quarter ending 31 March 2021
ASX RELEASE 29 April 2021
ASX Code: ESR
HIGHLIGHTS
Board and Management
Managing Director
Christopher Daws
Non-Executive Directors
Les Pereira
John Kingswood
Stephen Brockhurst
Neil Hutchison
Company Secretary
Stephen Brockhurst
Address
Level 11, London House
216 St Georges Terrace Perth
WA 6000
PO Box 2517 Perth WA 6831
Phase 2 diamond drilling at Carr Boyd’s T5 discovery
completed and Phase 3 has now commenced.
Drilling for Seismic Survey completed to understand
velocity and density information away from T5 discovery
Ultramag finished seismic data collection and Graeme
Hird, Australia’s most experienced hard-rock seismic
geologist, has commenced interpretation work.
Downhole Electromagnetic (DHEM) surveys utilising a low
resistance loop at T5 highlighted additional anomalism.
Mapping of the Carr Boyd Intrusive Complex continued
with several new basal contact prospects identified.
Combination Reverse Circulation / Diamond Drill Rig
(RC/DD) has arrived on site to boost exploration.
Estrella Resources Limited (ASX: ESR) (“Estrella” or “the Company”)
is pleased to provide its Activities Report for the quarter ended 31
March 2021.
The focus of work during the quarter was our exploration program at
the Carr Boyd Igneous Complex (CBIC), specifically diamond drilling,
DHEM surveying and geological interpretation of the T5 nickel-copperPGE discovery. A R&D Seismic Survey and associated drill program
was also conducted and processing of the data continues.
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
Picture 1. Lower portion of CBDD0042A intersection (606.9m – 608.6m) showing
nickel rich sulphides in feeder accumulation zone in the T5 Prospect.
CARR BOYD NICKEL PROJECT (100%)
The Company has completed Phase 2 drilling at the T5 discovery within the CBIC. To date, 15 holes
have been completed for just over 7,659m.
Estrella Managing Director Chris Daws commented “Our team has been solidly pushing forward our
exploration efforts over the March Quarter. We have learned a lot about the geology of CBIC in the last
12 months and will continue to strive to unlock the value we believe it holds. So far we have only explored
1.2km of strike at our T5 discovery along a 30 kilometre basal contact. Less than 3 kilometres of the
basal contact has ever been explored below 30 metres depth. We believe we have a significant
opportunity at Carr Boyd.”
T5 Drilling and Downhole Electromagnetics (DHEM)
Significant intercepts to date are presented in Table 1 and in Figures 2 and 3. Drilling has revealed the
T5 Prospect to be a feeder zone along which sulphides have travelled. Due to the deep nature of drilling
at T5, de-risking work has been undertaken to enhance drill success for Phase 3 drilling. This de-risking
was based on further structural interpretation and advanced downhole electromagnetics using a newly
purchased, aluminium core, low-resistance loop.
DHEM results recently received by the Company show the T5 Conductor Zone continuing to increase
with depth (Figure 2). In particular DHEM and drill results to date appear to confirm a steep south plunge
to the sulphides at this location.
The current Phase 3 round of drilling underway is testing the T5 contact to the immediate north and
south of known mineralisation in order to expand this zone laterally as well as further definition below
the discovery hole CBDD030. Deeper drilling will be planned once results of the Seismic Survey have
been fully interpreted and late-stage faulting of the contact has been taken into account.
Figure 2: T5 Basal Contact Longsection showing significant intersections >0.5% nickel and a broadening zone of
Downhole Electromagnetic conductors which are currently being targeted by Phase 3 drilling.
Table 1: Significant Intersection Summary, SG adjusted
Hole
CBDD028
including
CBDD029
CBDD030
including
CBDD031
CBDD032
CBDD033
including
and
and
CBDD034
CBDD035
including
CBDD036
including
CBDD037
CBDD039
CBDD041
CBDD042A
including
CBDD043
CBDD044
m From
m To
Interval
Ni%
Cu%
165.2
167
1.8
0.73
0.34
165.2
165.6
0.4
1.12
1.07
NSA - Hole did not test T5 contact
431.6
445.5
13.9
1.18
0.39
436.3
439.5
3.2
3.19
0.64
NSA - Hole did not test T5 contact
NSA - Fault blank, T5 contact not tested
368.5
388.6
20.1
1.04
0.67
372.52
378.4
5.88
1.39
0.66
380.7
382.8
2.1
1.37
0.54
386.15
388.6
2.45
1.65
2.01
NSA - Fault blank, T5 contact not tested
516.8
524.85
8.05
0.83
0.49
516.8
520.5
3.7
1.18
0.76
505.6
511
5.4
0.87
0.76
506.15
508.1
1.95
1.34
1.41
NSA - Fault blank, T5 contact not tested
NSA - Faulted T5 contact
NSA - Faulted T5 contact
603.7
608.6
4.9
0.96
0.35
606.89
608.6
1.71
1.63
0.66
Dyked + sheared T5 contact - Awaiting Assays
NSA, Faulted T5 contact
Co%
0.04
0.06
2PGE*
0.65
0.91
Ag g/t
1.78
6.80
0.05
0.14
0.45
0.71
1.61
2.56
0.05
0.07
0.06
0.08
0.79
0.90
2.34
0.83
2.45
2.31
2.61
7.31
0.03
0.04
0.04
0.05
0.62
0.97
0.61
0.93
2.84
5.29
3.25
6.12
0.04
0.07
0.29
0.43
1.35
3.12
Note: Intervals quoted are downhole lengths, true widths are not known due to faulting
Interval grades weighted by downhole length and bulk density, 2PGE refers to Pt + Pd in g/t
Figure 3: Cross-sections through the T5 Feeder Zone. The intersections to date have been complicated by a set of flat
faults and sheared dyke intrusion along the basal contact. Further DHTEM and seismic results will assist in Phase 3
targeting.
Recent Mapping Increases Potential
Mapping of the Carr Boyd Intrusive Complex has led the Company to an updated interpretation of the
local geology with respect to nickel potential. Geological vectors known to be important for nickel
accumulation are pointing south along the T5 Feeder Zone to an interpreted embayment at the base of
the Intrusive Complex where pyroxenite intrusions have been mapped cross-cutting and assimilating
sulphidic sediments. The resulting sulphides, once exposed and assimilated by the pyroxenites, become
progressively enriched in nickel and settle onto the base of the embayment. Gossanous material with
elevated nickel can be found at surface which represent this mineralised material on the basal contact
(Figure 4).
The company believes that the T5 nickel mineralisation and the Carr Boyd Mine mineralisation may
have a common source at depth within the embayment. A structural interpretation of the T5 Prospect
and links to the embayment area, Carr Boyd Mine and the Tregurtha Prospect on the southern side of
the embayment is underway.
Figure 4: Mapped basal contact in relation to sulphidic sediments, assimilation zones where sulphides enter the intrusion
and nickel sulphides at surface (NiS). Mapping reveals that the paleo-gravity direction is to the west (left) with younging
to the east, confirming the mapped embayment as a significant geological feature.
Upon completion of Phase 3 the RC/DD rig will progressively test the basal contact north and south of
the T5 discovery and the Carr Boyd Mine and also begin to test the embayment area.
Drilling for R&D Seismic Program
CBDD045 and CBDD046 were drilled to gather geological information to assist in seismic interpretation
of the basal contact just south and west of the Carr Boyd Mine before the drill rig headed back to T5 to
commence Phase 3. The information gathered from the 2 holes will enable geology, velocity and density
to be determined for a suite of rocks ahead of data processing and interpretation as a part of the R&D
Seismic Program.
The holes have intersect the basal contact in the vicinity of seismic lines and are not targeting sulphides
directly (Figure 5). DHEM will be completed on the holes in case sulphides are located near-by.
The drillholes intersected rock-types that are indicitive of rubble accumulations on the floor of the CBIC
just east of the Drinkwater Prospect assimilation zones. This is significant as it begins to confirm the
geological model that the Company has been developng for the Carr Boyd Intrusive Complex and the
embayment area.
Figure 5: Locations of CBDD045 and CBDD046 with respect to the Seismic lines and T5 Mineralised Contact
Preparing for Further Regional Exploration
Topdrive Drillers Australia has supplied the Company with a track-mounted Combination Diamond /
Reverse Circulation Drill Rig (RC/DD) capable of up to 400m RC and 1,800m NQ2 diamond holes. This
rig (Figure 6) will enable the Company to drill low-cost pre-collars ahead of diamond tails which will
reduce the spend on deeper drilling, particularly at the T5 discovery. The RC/DD rig will also enable a
cost-effective expansion of the regional exploration effort into the interpreted embayment in Figure 4.
Figure 6: Track-mounted Combination RC - Diamond Drill Rig from Topdrive Drillers to arive in early April
Proposal of Works approvals have been received by the company to progress exploration north, south
and east along the basal contact covering Dunn, Drinkwater, Schmidt, Sir William Wallace, Tregurtha
and Gossan Hill Prospects (Figure 5). The company intends to use the RC capability of the rig to test
the Seismic Interpretation of the basal contact ahead of deeper diamond drilling of targets generated.
R&D Hard-Rock Seismic Survey by Ultramag
The Seismic Program comissioned by Estrella Resources utilised a new type of impact vibrator called
an e-Vibe (shown in Figure 7) which is operated by Ultramag. This is the first time this system combined
with new seismic nodes from Schlumberger has been deployed in a hard-rock, Archean nickel
environment. If successful, this electronically controlled seismic source allowed the Company to access
areas previously inaccessible to conventional seismic machinery due to their cost, size and
environmental restrictions.
Figure 7: R&D Seismic Survey conducted by Ultramag enabled very low environmental impact seismic surveying at
Carr Boyd, allowing the company to image the prospective basal contact at depth ahead of drill planning. The e-Vibe
system enable access into areas where traditional seismic systems would be too large and destructive to operate
effectively.
The Carr Boyd basal contact has been difficult to intersect historically, due to its variable and faulted
nature. The use of seismic will vastly improve the success rate of any targeted drilling at depth.
Therefore, the company will await the seismic results before progressing with deeper regional drilling at
Carr Boyd.
Ultramag have completed a 20 linear kilometre seismic acquisition process and data available to the
company shows the system is performing at specification successfully. The data generated will require
a further 6-8 weeks of data processing before the Company will have a 3D interpretation of T5 and the
embayment area.
Estrella has acquired the services of Graeme Hird, founder of Rock Solid Seismic, to assist in the data
processing and to conduct the seismic inerpretation. Mr Hird has 30 years of exploration experience,
over half of this time specialising in geological modelling. Until recently he had been the Principal
Interpretation Geologist at HiSeis for nearly 7 years. His involvement in over 200 hard rock seismic
projects perhaps qualifies him as the most experienced hard rock seismic interpreter in Australia.
Mr Hird will assist the Company to interpret the seismic results in combination with current mapping and
a wealth of historical geophysical datasets. More information regarding this program will be released to
the market once data interpretation is completed over the current quarter.
SPARGOVILLE NICKEL PROJECT (100%)
The Company has over the March quarter continued to work up a development strategy for the highgrade nickel resource at the Spargoville 5A nickel project. The strategy involves the development of a
small open cut mine at the 5A to access the high-grade nickel oxide and transitional nickel ore for
transportation to a near-by treatment facility. The Company is currently planning to explore the
metallurgical characteristics more closely by obtaining a 3,000-tonne exploration sample from within the
5A resource. Permitting is being sought so this work can commence upon a suitable contract being
entered into for the removal and transportation of the exploration sample.
Table 4: Spargoville JORC Mineral Resource 5A Nickel Sulphide Deposit
October 2019 Mineral Resource Estimate - Min Type (0.5% Ni Cut-off)
Total Mineral Resource
Type
Tonnage
Ni
Cu
Ni
Cu
kt
%
%
t
t
Disseminated
78
0.7
0.08
520
60
Matrix/Breccia
37
2.3
0.16
840
60
Semi-massive/Massive
13
8.0
0.61
1,000
80
Total
127
1.9
0.15
2,370
190
CORPORATE
The Company continues to hold exposure to future financial upside from the sale of the Mt Edwards
Lithium Project to Neometals Limited (see ASX release dated 15 March 2018) via milestone payments
of A$2,000,000 and a royalty on future lithium bearing ore processed.
Steve Warriner commenced as Exploration Manager significantly boosting the geological team.
The Company is pleased to report the direct impacts from Covid-19 continue to be minimal at this time.
Our staff and contractors have implemented safe working protocols and are adhering to the Government
directives.
Payments to related parties and their associates
The total amount paid to related parties of Estrella and their associates, as per item 6.1 of the Appendix
5B, was $107k. Included in this amount is $70k for Directors fees and $37k paid to Mining Corporate,
an entity controlled by Stephen Brockhurst for bookkeeping, accounting and company secretarial fees.
The total amount paid to related parties of Estrella and their associates, as per item 6.2 of the Appendix
5B, was $318k. Included in this amount is $49k for Directors fees and $269k paid to Geolithic Pty Ltd,
an entity controlled by Neil Hutchison for the provision of geological services including providing a
contract geological team.
CAPITAL
The Company’s cash balance as at 31 March 2021 was approximately $1.54M. During the quarter the
Company received $650k from milestone payments at the Munda Gold Project. As at 31 March 2021
the Company has potentially up to approximately $17M worth of options in the money.
Table 3: Estrella Capital structure as at 31 March 2021
Fully Paid Ordinary Shares
908,089,741
Listed options exercisable
$0.05 on or before the 27 June 2021 – 227,054,495
Listed options exercisable
$0.02 on or before the 31 July 2023 – 255,067,725
Unlisted options exercisable
$0.03 on or before 20 November 2022 – 11,500,000
$0.05 on or before 15 May 2021 – 4,500,000
$0.20 on or before 17 November 2023 - 4,850,000
Convertible Notes
Unlisted Convertible Notes (unsecured) with an aggregate face value of $390,000 and a
maturity date of 2 years from the date of issue. Convertible into fully paid ordinary shares
in the capital of the Company at a conversion price $0.01 per share. A maximum of
48,921,600 fully paid ordinary shares may be issued on conversion of the Convertible
Notes on the terms announced to ASX on 31 January 2020.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve
Warriner, who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr. Warriner has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr.
Warriner consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
ENDS
The Board of Directors of Estrella Resources Limited authorised this announcement to be given to ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
info@estrellaresources.com.au
P: +61 (08) 9481 0389
Appendix 1 – Tenement Information as Required by Listing Rule 5.3.3
Change in
Holding (%)
Current
Interest (%)
Country
Location Project
Tenement
Australia
WA
Carr Boyd Nickel Project
E29/1012
-
100
Australia
WA
Carr Boyd Nickel Project
E29/0982
-
100
Australia
WA
Carr Boyd Nickel Project
L24/0186
-
100
Australia
WA
Carr Boyd Nickel Project
E31/0726
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1124
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0012
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0109
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0159
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1215
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1162
-
100
Australia
WA
Spargoville Nickel Project
M15/395
Australia
WA
Spargoville Nickel Project
M15/703
Australia
WA
Spargoville Nickel Project
M15/1828
Australia
WA
Spargoville Nickel Project
L15/128
Australia
WA
Spargoville Nickel Project
L15/255
*Nickel rights only
-
100*
100*
100*
100*
100*
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Estrella Resources Limited
ABN
Quarter ended (“current quarter”)
39 151 155 207
31 March 2021
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (9
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(100)
(220)
(e) administration and corporate costs
(119)
(372)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
1
1.5
Interest and other costs of finance paid
-
(3)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(219)
(594)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(85)
(440)
(2,201)
(4,435)
(1)
(51)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
650
1,894
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
- Payment for termination of Munda royalty
-
(144)
(1,637)
(3,176)
-
1,420
-
-
(b) tenements
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
173
4,219
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
20
(318)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
Repayment of convertible note
-
(50)
193
5,271
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
3,200
36
Net cash from / (used in) operating
activities (item 1.9 above)
(219)
(594)
(1,637)
(3,176)
4.2
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date (9
months)
$A’000
Net cash from / (used in) financing activities
(item 3.10 above)
193
5,271
Effect of movement in exchange rates on
cash held
-
-
1,537
1,537
Consolidated statement of cash flows
4.4
4.5
4.6
5.
Cash and cash equivalents at end of
period
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,537
3,200
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,537
3,200
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
107
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
318
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(2,201)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(2,420)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,537
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
(219)
1,537
0.6
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: The Company has potentially up to approximately $17M of options in the money as
at 31 March 2021. The Company continues to receive offers of financing support
from major shareholders in the form of option conversions to fund ongoing
operations.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, for the reasons noted in 8.8.2.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date: 29 April 2021
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5