Timor-Leste to welcome drill rig ahead of maiden campaign
Released
Released
Announcement PDF
ASX: ESR
4 April 2025
Timor-Leste to Welcome RC/Diamond Rig
Ahead of Maiden Minerals Drilling Program
HIGHLIGHTS
➔ Estrella has signed a drilling contract and working partnership with Dili-based CoreSearch
Minerals and Mining Services LDA to establish mineral drilling capability in Timor-Leste
➢ CoreSearch is a division of the H2O group which has 25 years’ experience in Timor-Leste, drilling
over 500 production water bores across the country
➢ Estrella is assisting CoreSearch with capital to bring a custom rig and carriers from Darwin, with
additional RC equipment sourced in Vietnam, into Timor-Leste
➢ The minerals drilling packages put together by CoreSearch are the very first to enter Timor-Leste
to kick-start the next phase of the country’s nascent Minerals Exploration and Mining Industry
➢ The first of the equipment will leave Darwin shortly and is expected to arrive in mid-April
➔ Initial drilling will concentrate on the Ira Miri, Sica and Lalena manganese prospects
➢ Environmental approvals in final stages of assessment with ongoing community engagement
activities encountering positive local support
➢ Drilling is expected to commence in May once all equipment has been assembled and all formal
approvals are in place
Figure 1: CoreSearch Rig 1 - SP6500 SA-RC-MP capable of both diamond and reverse circulation drilling along with one of
two carriers containing two full rod strings and additional downhole equipment.
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce a drilling contract
and working partnership with Core Search Minerals and Mining Services LDA (CoreSearch). CoreSearch
is a Dili-based company currently being incorporated by H2O Pump and Power which has been drilling
water bores across Timor-Leste for the past 25 years and have extensive experience operating in the
country.
Estrella has assisted CoreSearch with capital to put together and import to Timor-Leste a complete RC and
diamond capable package to service the nascent Exploration and Mining Industry. The US$200,000 capital
inserted into the venture by Estrella will be treated as an unsecured loan and repaid in lieu of exploration
services rendered at US$10 per metre drilled over the first 20,000 metres. Estrella retains exclusive rights
to use of the equipment until the debt owed, and mobilisation costs have been fully recouped.
Under the agreement, CoreSearch has been contracted to complete an initial round of exploration
consisting of 10,000m of RC drilling and 3,000m of diamond drilling. A secondary round of drilling is also
under contract, consisting of a further 10,000m of RC drilling to be conducted after geological review.
The drill rig is owned by H2O and was based in Darwin. CoreSearch is bringing over a track carrier to hold
the rod string, spare rod string and additional RC and diamond equipment. An additional carrier for the bulk
fuel and compressor was sourced from Vietnam along with the cyclone and splitter. The cyclone and splitter
will be mounted to the drill rig once in Dili. While much of Estrella’s Timor-Leste licenses cover very
accessible region, the track-mounted drill rig and carriers increase mobility across rolling hills and also
permit unhindered travel in wet weather.
Both the carriers and the drill rig are self-loading onto the back of a flatbed truck which enables fast
mobilisation between drill lines and across the program in general. The front and rear jacks enable the gear
to be stable when drilling in hilly terrain and also enable quick loading onto the back of a flatbed truck
(pictured in Figure 1)
Figure 2: The Ingersol Rand 1070/350 compressor mounted on the additional track carrier.
Figure 3: Rod slew carrier being loaded into one of four 40 foot sea containers ready to transport by ANL to the Dili Port
Commenting on recent activities, Estrella Managing Director Chris Daws said:
“The partnership between Estrella and CoreSearch is poised to make history, representing the first group to
break ground in Timor-Leste following its adoption of a modern mining code.
I would particularly like to thank CoreSearch Minerals and Mining LDA for the incredible effort to mobilise the
full RC and Diamond Drill packages over the last 3 months, bringing together gear sourced across Asia and
Northern Australia destined for shipping to Timor-Leste. Their utmost professionalism is greatly appreciated
and we look forward to strengthening this cooperation as we begin to test this unexplored geology.
I would also like to thank our joint-venture partner Murak Rai Timor for their ongoing support as we finalise
our program of works and community consultation. Operating with respect for the local environment and
culture, as well as building economic strength for the community are key pillars of our approach in TimorLeste.
With completely undrilled targets that are prospective for high grade manganese, it is a very exciting time for
Estrella Resources shareholders and management.”
Figure 4: CoreSearch Managing Director Leon Merrington and Timor-Leste Operations Manager Natalino Mendes preparing
the drill rig and anciliry equipment for shipping in Darwin
CoreSearch Managing Director Leon Merington and Timor-Leste Operations Manager Natalino Mendes
have worked together in Timor-Leste for the last 25 years, drilling production water bores and conducting
humanitarian aid. Leon founded H2O Pump and Power LDA in Timor-Leste in 1999 and has worked side
by side with Mendes to build a highly successful business employing many local staff. The CoreSearch
team is joined by Dave Birkett, a highly regarded and experienced Australian exploration driller who will
assist the partnership with his decades of knowledge from multiple countries.
Estrella intends to drill a series of holes at its Ira Miri, Sica and Lalena manganese prospects to test
outcropping supergene manganese horizons as well as testing its exploration model. Up to 90 RC holes
are currently being assessed for approval by the country’s Minerals Authority (ANM) and the Company is
busy communicating this information to the local communities within the region.
The drilling will primarily target manganese mineralisation however the holes will also provide confirmation
of the geology encountered in the recent IP trials. Comparison of the geology with interpreted geophysical
responses will assist the Company to develop in-country IP capability to more accurately target further
buried manganese deposits ahead of drilling. Further IP trials with a more powerful system have been
planned so as to open up more targets areas for future drill testing.
The local communities have been very welcoming and engaged in Estrella’s plans to explore in the area.
Estrella along with CoreSearch intend to employ as much local labour as necessary to fill the various roles
required, so that the exploration efforts are of direct benefit to the communities whilst the program is in full
swing.
Figure 5: The Ira Miri, Sica and Lalena Prospects straddle the border between ESR-RP-01 and MEL2023-CA-ZA001. The
black box shows the location of the inaugural RC drill program.
Figure 6: Planned drill targets showing access roads to be developed in red and RC drill sites in yellow, targeting
manganese horizons within the Noni Formation.
The Company is in the final stages of gaining environmental approvals to commence ground works ahead
of drilling. The Category B environmental license has been conditionally granted by the ANM and the
Environmental Impact Statement and Environmental Management Plan have been submitted to round out
the environmental permitting process.
As a part of the closing stages of approvals from the ANM, community education and consultation is well
underway with final meetings with stakeholders to be completed in early May. The affected communities
will register cultural sites and other areas of significance with Estrella’s team that will be safeguarded during
the program. Both Estrella and CoreSearch will source additional workers from the local worker pool along
with other concessions to assist these communities.
Next Steps
The end of the wet season in mid-April should coincide with the arrival of full RC and diamond drill capability
in Timor-Leste. By that stage, all community consultations should be nearing completion along with
finalisation of workers accommodation and lay-down and equipment storage areas within the closest local
communities.
In addition, all environmental approvals are expected to have been granted by that stage, paving the way
for work to commence.
The Company will update shareholders as the approvals process is completed and further equipment
arrives into the port of Dili.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Share your feedback
Discover