New Massive Nickel Sulphide Discovery
Released
Released
Announcement PDF
27 October 2021
ASX ANNOUNCEMENT
New Massive Nickel-Copper Sulphide Discovered at Broonhill
During Phase 4 Northern Exploration Program at Carr Boyd
HIGHLIGHTS
Reverse Circulation (RC) drillhole CBP076 intersects 12m(1) zone of nickel-copper sulphides
including 2m of basal massive sulphides (Figure 1 and Figure 2) at Broonhill
Intersection occurred 1.4km north of the T5 Discovery in virgin territory and is
hosted by the same pyroxenite basal unit as the T5 sulphides
The CBP076 intersection bears all the hallmarks of the 2019 RC hole CBP043 which
led to the T5 Discovery at depth(2)
The total strike length of variably mineralised basal contact (T5 to Broonhill) now
exceeds 2km with the vectored exploration model proving effective
The Phase 4 Northern Program has another 2km of untested basal contact to cover
Assays received for CBP048 RC drillhole above T5 (Figure 2 and Figure 4)
6m(1) @ 1.0% Ni & 0.8% Cu, 0.5g/t Pt+Pd, 2.3 g/t Au
Including 3m(1) @ 1.1% Ni & 0.8% Cu
(1) Downhole intersection quoted, true width cannot be estimated due to the spacing of the RC drilling and variation in the
orientation of the basal contact.
(2) See ASX Announcement dated 28 May 2019
Figure 1: Disseminated and basal massive nickel-copper sulphides in CBP076.
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the discovery of
a new zone of massive nickel-copper sulphides at Broonhill, 1.4km north of the T5 massive sulphide
discovery, within the T5 Pyroxenite (Figure 2).
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Managing Director Chris Daws commented:
“We are extremely excited with the CBP076 intersection of massive nickel-copper sulphides on the
contact, which is reminiscent of the intersection achieved by CBP043 in 2019.
“It was this historic hole that led the Company to drill and locate the T5 massive sulphides at depth,
so we are particularly encouraged by what may come of this find.
“In addition, the intersection of further nickel-copper sulphides in an area which already hosts the
historic Carr Boyd mine and our T5 Discovery illustrates the significant potential of this region for
discoveries.
“I want to take this opportunity to thank our team for their hard work and diligence in making this
new discovery. We will continue to accelerate our Phase 4 drilling to expand our understanding of
this emerging region and I look forward to updating shareholders as we progress with this work.”
Phase 4 RC hole CBP076 has intersected a broad zone of sulphides, with the lower 10m consisting of
disseminated nickel-copper sulphides and a lower 2m of massive sulphides on the T5 Pyroxenite basal
contact.
The basal contact in this area has not received any historic drilling and the Company’s vectored exploration
model has been pointing towards this area as being highly prospective (Figure 2). The Phase 4 Northern
RC Program was initiated to address this and to date has intersected varying degrees of sulphide
mineralisation, some of which have been previously reported as significant (see ASX announcements dated
10th September 2021 and 5th October 2021).
Table 1 shows visual sulphide percentage estimates encountered in CBP076. As can be seen from the
estimates, the intersection adheres to typical nickel-copper sulphide conventions where gravity
accumulation sees an increasing sulphide abundance within a broad interval, in this case 33m downhole,
with the last 12m of basal accumulation being highest in nickel and copper sulphides. The higher
chalcopyrite visuals are likely occurring due to in-situ sulphide fractionation.
Table 1: Visual Sulphide Estimates of CBP076
Hole ID
m From
m To
Interval
Sulphide Texture
Visual
Sulphide
Estimation
Visual
Pentlandite
Estimation
Visual
Chalcopyrite
Estimation
299
314
15
Cloud Sulphides
Trace%
0.01%
0.1%
314
315
1
Highly Disseminated
10%
0.5%
8%
315
318
3
Disseminated
8%
1%
1%
318
319
1
Disseminated
5%
1%
1%
319
321
2
Disseminated
2%
1%
1%
CBP076
321
322
1
Cloud Sulphides
1%
0.1%
0.2%
322
323
1
Disseminated
2%
1%
1%
323
324
1
Disseminated
5%
1%
1%
324
325
1
Massive Sulphide
70%
6%
6%
325
326
1
Massive Sulphide
65%
4%
8%
326
332
6
Basalt
0%
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide abundance should never
be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine the widths and grade
of mineralisation. The Company will update the market when laboratory analytical results become available.
CBP076 will be cased for downhole geophysics and ahead of diamond drilling which will commence once
the downhole geophysical results have been interpreted.
The Company’s exploration model, developed over the last 10 months, has been predicting this northern
contact to be of high nickel-copper sulphide potential, due to the magma flow direction, mapped locations
of sulphide assimilation and the T5 to Broonhill contact orientation.
The Phase 4 RC program still has another 2km of highly prospective basal contact yet to explore (Figure 2
and Figure 3). Historically, this area has received no historical drilling specifically targeting sulphides on the
basal contact.
Figure 2: 3D rendering of the Basal Contact showing the CBDD056 intersection down plunge of the T5 Discovery.
Figure 3: Plan view of the regional magnetics and the location of the Basal Contact, in particular A-B-C location points of
the 3D rendered surface.
Assay results have finally been received for CBP048 which hit semi-massive sulphides above the T5
Discovery Zone as announced to the market on 10th September 2021.
A 6m interval starting at 182m down hole averaged 1.0% Ni, 0.8% Cu, 0.5g/t Pt+Pd and 2.3 g/t Ag. The full
list of assays is presented in Table 2 and collar / survey details in Table 3.
Figure 4 below shows the relationship between CBP048 (Semi-Massive), CBP043 (the 2019 discovery RC
hole, 8m @ 1.11%Ni & 0.36% Cu) and the main T5 Massive Sulphide. This relationship highlights the
significance of the CBP076 intersection announced above, and the potential that exists on the T5 – Broonhill
basal contact at depth for the discovery of more massive sulphides (Figure 2).
Figure 4: Drill hole locations on the T5 Basal Contact above the T5 Discovery
Figure 5: TDA Multipurpose RC Diamond Rig drilling CBP076.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Table 2: Assay results for CBP048
Hole_ID
CBP048
CBP048
CBP048
CBP048
SampleID
CBR102189
CBR102190
CBR102191
CBR102192
mFrom
178
179
180
181
mTo
179
180
181
182
Interval
1
1
1
1
Ni%
0.01
0.02
0.25
0.99
Cu%
0.02
0.01
0.31
1.73
Co
ppm
44
37
144
491
Ag
g/t
0.00
0.00
1.10
6.10
Pt
g/t
0.021
0.004
0.020
0.303
Pd
g/t
0.017
0.004
0.077
0.300
As
ppm
0
0
0
0
S%
0.09
0.25
2.65
11.15
CBP048
CBP048
CBP048
CBP048
CBP048
CBP048
CBR102193
CBR102194
CBR102195
CBR102196
CBR102197
CBR102198
182
183
184
185
186
187
183
184
185
186
187
188
1
1
1
1
1
1
0.71
0.97
1.23
0.76
1.26
0.34
0.35
0.19
0.75
1.20
0.43
0.75
361
491
626
406
648
197
0.80
0.00
1.70
4.00
1.00
2.30
0.186
0.147
0.252
0.140
0.224
0.092
0.192
0.266
0.483
0.325
0.394
0.112
0
0
0
0
0
0
6.25
8.54
13.10
8.47
13.30
3.71
CBP048
CBP048
CBP048
CBP048
CBP048
CBP048
CBR102199
CBR102200
CBR102201
CBR102202
CBR102203
CBR102204
188
189
190
191
192
193
189
190
191
192
193
194
1
1
1
1
1
1
0.16
0.14
0.10
0.07
0.07
0.02
0.23
0.13
0.15
0.04
0.03
0.01
94
113
66
67
74
50
1.00
0.00
0.00
0.00
0.00
0.00
0.100
0.017
0.073
0.035
0.020
0.008
0.057
0.073
0.071
0.076
0.031
0.011
0
0
0
0
0
0
1.83
1.84
1.10
0.17
0.15
0.35
CBP048
CBR102205
194
195
1
0.01
0.01
50
0.00
0.001
0.002
0
0.22
Table 3: Collar and survey details
Hole ID
CBP048
CBP076
Final
Depth
239
371
Easting
Northing
RL
Dip
Azimuth
Status
367246
367729
6673649
6674933
435.7
444.0
-63
-70
269.4
270
Completed
Completed
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut RC samples have been collected via a cone splitter fed
techniques
channels, random chips, or specific
from the RC sample system. The splitter enables a bulk
specialised
industry
standard
and lab sample to be obtained simultaneously.
measurement tools appropriate to the DD core samples have been half cut with an automatic
minerals under investigation, such as
core saw.
down hole gamma sondes or handheld 0.25m-1.1m samples are collected from the core trays as
XRF
instruments,
etc.).
These
marked out by the supervising geologist.
examples should not be taken as A handheld XRF tool was used to verify the mineralisation
limiting the broad meaning of sampling.
with samples reporting >0.3% Ni in disseminated zones
and >1% Ni in the matrix sulphide zones.
XRF results have not been reported and are used as a
logging/sampling verification tool only.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
RC samples are monitored for recovery and water
content. Wet samples may lose a small percentage of
sulphides due to water action however testing has not
quantified this, nor is this expected to be significant for
nickel exploration drilling.
Core is cut and sampled to ensure the sample is
representative and no bias is introduced. Cutting of
specific, banded or stringer sulphide zoned core is done
orthogonal to the banding to ensure there is no bias.
Aspects of the determination of
mineralisation that are material to the
Public Report.
Determination of mineralisation has been based on
geological logging, visual sulphide estimates and
confirmation using a pXRF machine. Samples were
dispatched to an accredited laboratory for multi-element
analysis.
.
RC samples are collected every 1m down hole and logged
and sampled on that basis.
Diamond core drilling was used to obtain 3m length
samples from the core barrel which are then marked in
one meter intervals, based on core block measurements.
Samples are selected based on geological logging
boundaries or on nominal meter marks.
Collected samples weigh a nominal 2-3 kg (depending on
sample length).
Samples have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed using a 4-acid digest, MEICP for 33 elements and ore zone samples are also being
tested for Au & PGE elements using ICP analysis.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
RC drilling utilised a multi-purpose RC / Diamond rig
(Hydco), using a 5.5 inch hammer and bit.
Drilling was undertaken using NQ2 sized drill core.
Holes have been collared with mud rotary from surface,
HQ rough cored to top of fresh rock then NQ2 cored to
EOH.
_________________________________________________________________________________
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
JORC Code explanation
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Core recovery was recorded by the field crew and verified
by the geologist.
RQD measurements were digitally recorded to ensure
recovery details were captured.
Sample recovery in all mineralised zones is high with
negligible core loss observed.
Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very good
condition.
Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines
was undertaken.
Core trays were photographed wet and dry prior to
sampling.
RC and Diamond Drill hole logs are recorded in Excel
spread sheets and validated in Micromine Software as the
drilling progresses.
The entire length of all holes is logged.
RC samples are split through a cone splitter at the drill rig
with a lab sample being collected in a sealed calico bag
every 1m.
Core is half cut using an automatic core saw to achieve a
half-core sample for laboratory submission.
The sample preparation technique is considered industry
best standard practice.
No field duplicates have been collected in this program.
Field duplicates will be collected once initial results are
returned and resampling of the mineralised zones is
warranted.
Sample sizes in both diamond and RC drilling are
appropriate to the grain size of the mineralisation.
No handheld XRF results are reported however the tool
was used to verify the mineralisation with reporting >0.3%
Ni in disseminated zones and >1% Ni in the matrix
sulphide zones.
DHTEM parameters are as follows;
Tx Loop size:
500 x 800 m
Transmitter:
GAP HPTX-70
Receiver:
EMIT SMARTem24
Sensor:
EMIT DigiAtlantis
Station spacing: 2m to 10m
Tx Freq:
0.5 Hz
Duty cycle:
50%
Current:
~130 Amp
Stacks:
32-64
Readings:
2-3 repeatable readings per
station
Criteria
Verification
of sampling
and
assaying
JORC Code explanation
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data
spacing
and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Commentary
Results verified internally by Company personnel
Hole CBDD0028 is twinning hole CBP042. No other
twinning is warranted at this stage.
Close spaced wedge holes have been utilised to look at
mineralisation continuity at small scales. The results are
favourable and good replication of mineralisation has
been found.
The data was collected and logged using Excel
spreadsheets and validated using Micromine Software.
The data will be loaded into an externally hosted and
managed database.
No adjustments have been made to the assay data other
than length weighted averaging.
The holes were pegged using a hand-held GPS + 3m
The rig was setup over the nominated hole position and
final GPS pickup occurred at the completion of the hole.
Holes are progressively surveyed by DGPS during
drilling.
MGA94_51
Topography is relatively flat and control is more than
adequate given the early stage of the project. A 3D drone
ortho-photographic survey had been used to create a
DTM of the project area.
Refer to Cross Sections and Plans included
Not applicable, no Mineral Resource is being stated.
No compositing has been applied. Intercepts are quoted
as length weighted intervals.
The drill hole orientation does not introduce a sample
bias.
Samples are in the possession of Estrella’s personnel
from field collection to laboratory submission.
No audits or reviews have been conducted for this release
given the early stage of the project.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
Type, reference name/number,
Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of
tenement and
location and ownership including
ESR) holds a 100% interest in the nickel and base metal
land tenure
agreements or material issues with
rights to the project.
status
third parties such as joint ventures,
There are no known impediments to operate in the area.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Exploration
Acknowledgment and appraisal of
The Carr Boyd Rocks deposit was discovered by Great
done by other
exploration by other parties.
Boulder Mines, in a joint venture with North Kalgurli Ltd
parties
in 1968. The deposit was mined between 1972 and
1975, during which time they explored for additional
breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni and 0.46%
Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground
over the CBLC outside of the immediate mine area.
Between 1968 and 1971 they conducted extensive
exploration programs searching for large basal contact
and/or stratabound Ni-Cu deposits. It was during this
time that most of the disseminated and cloud sulphide
occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from
Pacminex in 1987 and focused on exploration for PGE
deposits between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from WMC and
switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
From 1990 Defiance dewatered the mine to conduct
testwork and feasibility studies on the remnant
mineralisation. Metallurgical testwork, Mineral Resource
estimations, and scoping studies were completed.
Around 1996 the focus shifted again to regional
exploration for large tonnage basal contact deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project
and recommenced economic evaluations of the remnant
material at Carr Boyd Rocks before embarking on
another regional exploration program focusing on the
basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC
drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and
continued with some regional exploration, but focused
most attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd
(Consmin). Consmin conducted IP surveys and detailed
gravity surveys, but did not drill any targets before selling
the project to Salt Lake Mining (SLM) in 2013. SLM
completed limited drilling to meet expenditure
Criteria
JORC Code explanation
Commentary
commitments, before selling the project to Apollo
Phoenix Resources in 2016.
Apollo sold the project to ESR in 2018.
Geology
Deposit type, geological setting and
style of mineralisation.
The Carr Boyd project lies within the Achaean Yilgarn
Craton in a 700km belt of elongate deformed and folded
mafic, ultramafic rocks and volcanic sediments intruded
by granitoids which is referred to as the NorsemanWiluna Belt. The belt has been divided into several
geological distinct terranes, with the project area lying at
the northern end of the Gindalbie terrane (Swager, 1996).
The geology of the Carr Boyd area is dominated by the
Carr Boyd mafic-ultramafic intrusive complex (CBIC).
Several distinctive styles of Ni and Ni-Cu mineralisation
have been identified within the CBIC. At the Carr Boyd
Rocks Nickel Mine Ni-Cu mineralisation is hosted within
several 20 - 60m diameter brecciated pipe-like bodies
that appear to be discordant to the magmatic
stratigraphy. Mineralisation is hosted by a matrix of
sulphides
(pyrrhotite,
pentlandite,
pyrite
and
chalcopyrite) within brecciated Bronzite and altered
country rock clasts.
Stratiform Ni-Cu-PGE mineralisation has been identified
at several different locations within the layered magmatic
complex.
Estrella is in the process of re-mapping and reclassifying
the Carr Boyd Igneous Complex. Previous “Layered
Intrusive” models are misleading as the complex is made
up of many overprinted and juxtaposed, smaller layered
and non-layered intrusives that have progressed from
Ultramafic to Mafic over time. The complex is better
described as a magma feeder zone, where the earliest
melts passing through the Morelands Formation have
assimilated graphitic sulphidic shales, reached sulphur
saturation and deposited nickel sulphides along basal
contacts.
These basal contacts are not restricted to the base of the
complex, but can form within the complex, wherever
access was gained by these earlier flows.
The complex has then been intruded and inflated over
time by progressively more mafic, barren magmas to
produce what we see today.
Drill hole
Information
A summary of all information
material to the understanding of the
exploration results including a
tabulation
of
the
following
information for all Material drill
holes:
o
easting and northing of the
drill hole collar
o
elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and
interception depth
o
hole length.
All relevant drillhole information can be found in the
Tables and sections within the announcement.
Criteria
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
JORC Code explanation
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Where
aggregate
intercepts
incorporate short lengths of highgrade results and longer lengths of
low-grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be
reported.
If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (e.g. ‘down hole length, true
width not known’).
Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported. These should include, but
not be limited to a plan view of drill
hole collar locations and appropriate
sectional views.
Where comprehensive reporting of
all Exploration Results is not
practicable, representative reporting
of both low and high grades and/or
widths should be practiced to avoid
misleading reporting of Exploration
Results.
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological
observations;
geophysical
survey
results;
geochemical survey results; bulk
Commentary
No information is excluded.
Intersections are reported on a 0.5% Ni cut-off with SG
and length weighted intervals where appropriate.
All diamond intercepts are reported using SG and length
weighted intervals.
RC intercepts are length weighted intervals.
No metal equivalents have been stated
True widths have not been stated. The variable orientation
of mineralisation within magma feeders combined with a
structural overprint and steep drill angles make true width
calculations highly misleading at Carr Boyd.
Maps and sections with drill hole locations are included in
the announcement.
All new drillhole information within this announcement is
reported
Everything meaningful and material is disclosed in the
body of the report.
Geological observations are included in the report.
No bulk samples, metallurgical, bulk density, groundwater,
geotechnical and/or rock characteristics test were carried
out.
Criteria
Further work
JORC Code explanation
samples – size and method of
treatment; metallurgical test results;
bulk
density,
groundwater,
geotechnical
and
rock
characteristics; potential deleterious
or contaminating substances.
The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
Commentary
There are no known potential deleterious or contaminating
substances.
RC and Diamond drilling and DHTEM geophysical testing
is continuing.
Share your feedback
Discover