IP Survey identifies additional drill targets at Ira Miri
Released
Released
Announcement PDF
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103 Email info@estrellaresources.com.au
28 November 2025
IP Survey Identifies additional drill targets at
Ira Miri Manganese Project
HIGHLIGHTS
➔ Resistivity–Induced Polarisation survey identifies multiple, highly chargeable subsurface
anomalies at Ira Miri manganese project
➔ Three primary anomalous zones identified, including high-priority target interpreted as a northern
continuation and likely thickening of mineralisation identified in EMDD032-EMDD0341:
➢ EMDD033 intersected 12.87m of 80% manganese oxides from 5.13m
➢ EMDD032 intersected 11.65m including 8.3m of 60% manganese oxides from 5.1m
➢ EMDD034 intersected 8.5m of 30% Primary Manganese Oxides in Chert from 8.3m
➔ Target positions, orientation and intensities strongly match with manganese drill observations,
known manganese outcrops and expected supergene enrichment patterns
➔ Further drill planning to follow receipt of manganese assays, anticipated within the next 1-3 weeks,
and priority targets to be tested following immediate commencement of 2026 field season
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce results from a
Resistivity–Induced Polarisation (Res-IP) survey completed across the Ira Miri manganese prospect in
Timor-Leste (Figure 1).
The survey identified multiple high-chargeability zones that align with mapped manganese outcrops and
diamond drill intersections, providing clear targets for the next phase of work.
Commenting on survey activity, Managing Director Chris Daws said:
“Estrella continues to make major strides in the virtually untested region of Timor-Leste and the
completion of this Res-IP survey brings further advanced technology to define highly prospective
targets.
The survey involved the placement of sensitive electrodes across Ira Miri with assessments conducted
for resistance to electrical current flow, as well as temporary storage of electrical charge, with a
combination of low resistivity and high chargeability being an indication of the potential presence of
manganese oxide mineralisation, among other mineralisation styles.
IP inversion results have identified three subsurface targets which are very exciting. The modelled
anomalies occur at shallow depths, broadly 5–25 metres, and locally 10–15 metres thick, consistent with
supergene accumulation within weathered horizons and structural pathways.
Our highest-charge anomaly is particularly encouraging and is interpreted to represent a potential
northern extension and likely thickening of manganese mineralisation from holes EMDD032-EMDD034.
This target will be immediately prioritised for drilling when operations resume next year, and further
assessments will be conducted as further assays and data come to hand.
With a large number of prospects and an emerging dataset, Estrella continues to identify exceptional
opportunities for discovery in Timor-Leste. Go Estrella!
1
See ASX Announcement dated: 22 September 2025
ASX: ESR
Figure 1: Estrella Resources prospects and tenure in Timor-Leste
The Resistivity-IP survey was executed
by the highly-experienced geophysics
team from Instituto de Geosciecias de
Timor-Leste Instituto Publico (IGTL) and
Estrella Resources national Timorese
geological team, across a NNW – SSE
trending zone of manganese surface
outcrops.
Line 1 consisted of 48 Dipole-Dipole
electrodes at 5-metre spacing (Figure
2).
Results from the Resistivity-IP survey
produced a detailed, geologically
consistent and robust model for
mapping manganese enrichment and
associated structural features, with
interpretation work strongly indicating
the presence of supergene manganese
enrichment controlled by weathering
processes and structural pathways.
Figure 2: Deployment of Res-IP electrodes at Ira Miri
_____________________________________________________________________________________________________________Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA
6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103 Email info@estrellaresources.com.au
Processing of the data enabled subsequent creation of a cross-section displaying zones of low-resistivity, which show many low-resistivity anomalies, some of which
correlate with known manganese mineralisation, but other anomalies may relate to conductive zones of the weathered clay, possibly caused by high water content.
However, a cross-section displaying IP inversion results revealed three key manganese-bearing zones, each associated with elevated chargeability values.
Comparing the resistivity and IP images (upper and lower cross-sections respectively of Figure 3), it is clear that the IP anomalies correlate well with manganese drill
holes, known manganese outcrops and expected supergene enrichment patterns.
Figure 3: comparison of Resistivity (upper cross-section) and IP (lower cross-section)
It is clear that the IP anomalies correlate well with manganese mineralisation, which implies that the strong IP anomalies between EMDD004 and EMDD019 are also
likely to represent manganese mineralisation, and therefore are priority drill targets (Figure 4).
Figure 4: drill-targets between EMDD004 and EMDD019
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103 Email info@estrellaresources.com.au
The three IP anomalies, displayed in Figures 3 and 4, are highly prospective, with IGTL Geophysics
providing the following assessment of each of the targets:
1. High Chargeability Zone; Electrodes 19–21
• One of the most significant anomalies, with high chargeability values and distinct geometry.
• Extends between 5–25 m depth and 10 to 15 m thick.
• Confirms a major manganese accumulation directly beneath surface exposures.
• The lens-like geometry suggests supergene infill of fractures or weathering-controlled
concentration.
• Represents the western part of the mineralised system.
2. High Chargeability Zone: Electrodes 27–35
• Moderate to strong anomaly, situated at shallower depths and overlies 4m to 6m thick for Hole
EMDD039 and EMDD040.
• Spatially correlated with surface manganese findings.
• Likely an eastward continuation of the western mineralised body.
• The geometry supports the presence of thin manganese lenses developed along structural breaks.
3. Highest Chargeability Zone; Electrodes 35–40
• The strongest anomaly on the entire profile, located between EMDD004 and EMDD019
• Indicates the potential thickest or most manganese-rich concentration along the line.
• Possibly a structural trap or feeder zone, where manganese accumulated preferentially.
• Represents the most promising exploration target for follow-up drilling or trenching.
The location of the highest chargeability target at Electrode 38 (E38) is particularly promising, with the size
of the IP anomaly suggesting the presence of a substantial chargeable body, like or perhaps larger than
the thick intersection achieved by EMDD033 of 12.87m of 80% manganese oxides from 5.13m (Figure 5)2.
The intensity and geometry of this anomaly are typical of manganese-rich zones, where Mn oxides such
as pyrolusite and would produce strong polarization effects.
Figure 5: Manganese oxides in core from EMDD033, For visual estimates and visual estimates disclaimer please refer to
table 1
2 See ASX Announcement dated: 22 September 2025
Table 1: Visual estimates of EMDD032 to EMDD034
Hole ID m From m To Interval Description
EMDD032
0 5.1 Colluvium / Soil / Limestone Cover
5.1 11 5.9 50% Manganese oxide, 50% clay
11 13.4 2.4 90% Manganese oxides, 10% Clay
13.4 16.75 3.35 15% Manganese oxide, 85% clay
16.75 27.9 Noni Formation Chert
EMDD033
0 5.13 Colluvium / Soil / Limestone Cover
5.13 18 12.87 80% Manganese oxides, 30% clay
18 28.3 Noni Formation Chert
EMDD034
0 8.3 Colluvium / Soil / Limestone Cover
8.3 16.8 8.5 30% Primary Manganese oxides, 70% Chert
16.8 26.2 Noni Formation Chert
Cautionary Statement: The Company draws attention to uncertainty in reporting visual results. Visual
estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses
where concentrations or grades are the factor of principal economic interest. Visual estimates also
potentially provide no information regarding impurities or deleterious physical properties relevant to
valuations.
Corporate Update
Mr Peter Spitalny has been appointed as Estrella Timor Leste Exploration Manager, replacing Mr Steve
Warriner, who has given notice of resignation and will depart the company on 12 December 2025. Mr
Spitalny is an exploration geologist having expertise in Manganese mineralisation, among other
commodities (primarily but not limited to gold, copper and lithium). His 30+ years of exploration experience
includes extended periods operating in foreign jurisdictions and has established and managed exploration
projects in Angola, Canada, the Democratic Republic of the Congo and shorter periods in many other
countries.
Next Steps
The excellent alignment of drilling, trenching, surface outcrops, electrode positions, and IP responses
strongly support E38 as a priority target for follow-up drilling, as it represents the next major subsurface Mn
concentration along the mineralised trend.
The Company has prioritised the area for immediate follow-up following the commencement of the 2026
field season. The Company may also consider additional IP survey lines across the Electrode 38, as well
as additional RES-IP surveying.
Estrella will also continue to assess its targets and geological data with respect to further assay results.
Manganese samples have been airfreighted from Dili to a credited Jakarta lab, expediting assay return.
The Company anticipates the next series or results within 1-3 weeks. The Company’s initial batch of
limestone samples will be airfreighted to Jakarta early next week with assays expected in 3-4 weeks. This
past week has included the Werumata Limestone JORC resource author’s site visit, planning for the
expansion of the drilling area at Werumata to increase the size of prospective project well beyond 500Mt.
Preparation of all-weather access tracks, required to enable extraction and transport of the market sample
to port stockpile area, will commence after the imminent Timor Leste Independence Day national holiday
and will continue until the festive season, enabling extraction of the Market Appraisal bulk sample of
manganese mineralisation early in the New Year, subject to statutory approvals being obtained.
The Company will keep shareholders informed of the progress. The Board has authorised for this
announcement to be released to the ASX.
ENDS
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner consents
to the inclusion in the report of the matters based on their information in the form and context in which it appears.
Cautionary Statement of Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The Company draws
attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be considered
a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations.
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Determination of mineralisation has been
based on geological logging of diamond
core and field trenching with metal
concentration confirmed by a Bruker S1
pXRF.
• Diamond core is drilled PQ3, cut in half
using a hand-grinder for competent core or
split using a chisel for sooty, less
competent core and clay.
• Core is split perpendicular to bedding
when primary mineralisation is
encountered.
• Samples are exported from Timor Leste to
Indonesia and analysed at PT
Geoservices in Jakarta, Indonesia
• At the lab the full sample is crushed and
pulverized to 90% passing 75 um.
• A subsample undergoes fusion and XRF
analysis for Mn and a suite of elements.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Diamond drilling has been undertaken
utilising HQ and PQ triple tube.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Recoveries are calculated based upon the
depth drilled and compared to core
recovered.
• Sample recovery is generally high,
although some extremely weathered friable
material is sometimes lost due to the effects
of the down-hole water circulation required
to enable diamond (core) drilling. Core-loss
in the mineralised zone is uncommon and
minor but if it has occurred, it is accounted
for in calculating mineralised intervals.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
• Rock-chip and core samples were
geologically logged for mineral content
and photographed prior to sending for
assay (or screening by pXRF).
• Drill core has also been geologically
logged.
• The trenches have been mapped and
sampled.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
• Sample sizes are appropriate to the grain
size of the mineralisation which in
manganese oxides is very fine.
• Sampling on core is performed by splitting
or cutting the core in half, perpendicular to
bedding when observed.
• The sample sizes are adequate for the
grain size of the material being sampled.
Criteria JORC Code explanation Commentary
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
• Samples are being analysed at PT
Geoservices in Jakarta using an XRF
Fusion technique for 15 elements and all
samples are also being tested for Au by
fire assay a 50g sub-sample.
• The technique is considered total.
• Lab standards and blanks are adequate at
this stage of the exploration program.
Verification
of sampling
and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No prior modern exploration has been
conducted in the area. Mineralisation has
been verified by several external parties.
• EMDD002 twinned EMDD001 with very
similar results
• No adjustments to assay data were
undertaken.
• Geological and recovery data is measured
and entered digitally into log sheets which
are then stored on the Company cloud
storage system.
• Drillhole collar and survey information is
also recorded.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
• Topographic control is accomplished
using 5m spaced satellite point data.
• Drillholes are located using a Garmin GPS
Data spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• Samples are decided upon geological
characteristics and observed dilution.
Minimum 30cm sample widths can be
taken, ranging up to 1.2m depending on
core characteristics.
• No composites have been taken.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Sampling perpendicular to bedding will
occur when bedding can be observed in
the core.
• This is not necessarily observable in
secondary enrichment zones.
• The drilling is generally at a high angle to
mineralisation.
Sample
security
• The measures taken to ensure sample
security.
• Exported samples are in the possession of
ESR personnel from the core processing
Criteria JORC Code explanation Commentary
site and through customs in Atambua in
Indonesia, where they are transferred to
ABC Express for delivery to the lab in
Jakarta.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No independent audit or review has been
undertaken on the Lab.
• Independent reviews on geological
logging and sampling techniques have
been done and all methods used are at
industry standard.
Section 2 - Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
• Exploration and Evaluation Concessions
MEL2023-CA-ZA001, MEL2023-CA-
ZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella Resources Representante
Permanente (70%) and Murak Rai Timor
(30%).
• Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
were converted to Exploration Licenses
and are awarded to Estrella Resources
Limited Representante Permanente
(100%)
• Exploration and Evaluation Concessions
MEL2024-DA-ZB001, MEL2024-DA-
ZB002 and MEL2024-DA-ZB003 are
awarded for four years to Estrella Murak
Rai, forming the joint-venture between
Estrella Resources Representante
Permanente (70%) and Murak Rai Timor
(30%).
• Estrella also operated Reconnaissance
Permits ESR-RP-01, ESR-RP-02 and
ESR-RP-03
• Estrella Resources Limited
Representante Permanente and Estrella
Murak Rai are registered in Timor-Leste
and is a wholly-owned subsidiary of
Estrella Resources Limited (Australia).
• All of the Concessions and Permits are
current and in good standing.
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
• The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
• Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
• Local geologists and companies have
sporadically explored the area however
there has been no documentation
collected nor systematic exploration to
quantify mineral occurrences.
• No minerals drilling has taken place.
• No close-spaced geophysics has taken
place.
• No systematic, modern exploration has
taken place.
• The Geological Institute of Timor-Leste
Criteria JORC Code explanation Commentary
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
Geology • Deposit type, geological setting and style of
mineralisation.
• The current Concessions and Permits
host three main forms of manganese
mineralisation.
• Primary mineralisation Is found in
stratigraphic banded cherts and
associated mudstones and formed
through direct precipitation of manganese
onto the sea floor. Evidence for both
microbial and inorganic processes exist.
• Secondary mineralisation exists as a
supergene blanket above the cherts
where they have been exposed to
chemical weathering. There has also
been secondary enrichment of primary
mineralisation.
• Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels or scree deposits.
• Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
• Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectono-
stratigraphic genesis of the area.
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• Estrella has completed the only drilling
that has occurred in the area, and the
drilling has been thoroughly reported.
• Sample locations are shown in the body of
the text.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• Exploration results with all relevant
drillhole information are reported in the
body of the text.
• No aggregation methods have been used
save for length-weighted composite grades
for significant intercepts.
• Metal equivalent values have not been
used.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• Any relationships have been discussed
within the body of the text or depicted in
diagrams.
Criteria JORC Code explanation Commentary
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Relevant diagrams have been included
within the main body of text.
Balanced
Reporting
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• No new information has been withheld.
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• Estrella has completed an initial
Resistivity/IP survey, comprised of a
single survey line at the Ira Miri
manganese prospect.
• The survey was completed using the IRIS
Syscal Pro multi-electrode imaging
system. The following configuration and
acquisition parameters were applied
during the survey:
Instrument: IRIS Syscal Pro (Res-IP
configuration)
Number of electrodes: 48
Array: Dipole-Dipole
Electrode spacing: 5 meters
Total survey line length: Approximately
222.23 meters
Measurement mode used: n76
• Data was acquired successfully using the
Arithmetic Mode, which produced stable
and high-quality data.
• Data Processing: All datasets were
processed using the standard IRIS
software workflow followed by inversion
and modelling in Res2DInv, applying
noise filtering, error analysis, and smooth-
model inversion to generate reliable
subsurface resistivity and chargeability
sections.
• Results are discussed within the body of
the text.
Further work • The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlightin
Share your feedback
Discover