Samalari Exploration Update
Released
Released
Announcement PDF
ASX:ESR
16 October 2024
Samalari Exploration Update
HIGHLIGHTS
➔ Estrella continues to explore the newly granted and highly prospective Baucau Licenses in
Timor-Leste:
➢ A significant new supergene Manganese exposure has been located 500m south of Samalari
prospect from ongoing reconnaissance mapping (See Figure 1 and Figure 3)
➢ Outcropping manganese oxides have been traced over 1.7km strike at Samalari and between
2m to 6m in width.
➢ Community engagement and education programs are ongoing.
Figure 1: Estrella Geologist Kharol Varela mapping and sampling chert bedding below supergene development in
an exposed outcrop 500m south-west of the Samalari discovery area within concession MEL2024-DA-ZB-001.
Visual estimates of the mineral abundances present within the exposure is not possible for safety reasons. The
scree from this exposure exhibited >70% manganese-iron-oxide minerals and results are presented in Table 1.
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce an exploration
update covering the newly awarded Baucau project (Figure 2).
Figure 2: Location of the Samalari Prospect within the four granted Exploration and Evaluation Licenses
Commenting on the new discovery Estrella Managing Director Chris Daws said:
"The more time our exploration teams spend in the field the more manganese they keep finding. This most
recent discovery of outcropping supergene manganese south of the Samalari manganese prospect is one of
the most spectacular that we have located to date in Timor-Leste.
With our partners Murak Rai Timor the Company has been able to secure the largest exploration ground
holding in Timor-Leste which gives us a very strong opportunity for many more mineral discoveries to be
made.
Our pivot to Timor-Leste has been the right move and we are starting to see reward for our efforts. I’m very
excited to see what our next stage of development looks like as we continue our mapping and sampling work
while also preparing for surveying and ground-disturbing activities which will allow us to explore for
manganese mineralisation below surface.”
The Samalari Prospect is located just 5km from Baucau, the third largest city in Timor-Leste. Existing roads
connect the prospect to a major national highway to the north. Grid power is readily available within the
Exploration License. Mineralisation occurs in an area with very low population and little farmland.
Figure 3 below shows the location of an extensive manganese outcrop captured in Figure 1,500m to the
south of the main outcrop at Samalari. Surface mapping is ongoing with mineralisation at Samalari open to
both the north-east and south-west. The mineralisation in the pictured outcrop has not yet been sampled
given difficult access to the location and with the outcrop exposed around 8m up a steep gully face.
Figure 3: Location Plan of the Samalari Prospect (5km from Baucau and 7.5km by road from a national highway)
Table 1 below presents spot rock-chip pXRF results that were taken during mapping of the area. None of
this material was collected for assay at the time. Proper sampling of the outcrop will be conducted in due
course.
Table 1: Portable XRF results from spot rock-chip samples just down stream from the exposure in Figures 1 and 3
Description
Manganese float material in creek
Manganese float material in creek
Supergene sub-crop side of creek
Mineralogy
>95% Manganese oxides
45% Fe-Mn oxides
>95% Manganese oxides
Latitude
Longitude
-8.51473
-8.51485
-8.51532
126.474
126.474
126.475
pXRF
Mn%
56.2
17.1
45.8
Cautionary Statement of pXRF - pXRF results that are announced in this report are from uncrushed, rock-chip
samples. The use of the PXRF is an indication only of the order of magnitude of expected manganese content. None
of the samples that are reported will be submitted for laboratory assay in Australia.
Next Steps
Estrella has expanded its in-country technical team with additional experienced Timor-Leste geological and
geophysical personnel to expedite its exploration programs.
Estrella is looking to develop a specific Induced Polarisation (IP) tool to be available in-country, which it can
deploy to areas where mapping shows the greatest potential of supergene manganese development.
IP is an excellent geophysical method for manganese exploration. Manganese oxides often exhibit distinct
electrical properties compared to the surrounding materials. IP can help identify these differences, making
it easier to locate manganese deposits in 3D and at depth.
Whilst the IP capabilities are being assembled, Estrella is embarking on its Community Liaison and Public
Education Programs and planning Cultural Ceremonies with the local villages within the Baucau License
areas.
The Company will update shareholders as more information comes to hand.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Cautionary Statement of pXRF
pXRF results that are announced in this report are from uncrushed, rock-chip samples. The use of the PXRF is an
indication only of the order of magnitude of expected manganese content. None of the samples that are reported will
be submitted for laboratory assay in Australia.
Cautionary Statement
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where
concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no
information regarding impurities or deleterious physical properties relevant to valuations.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists, and based on information compiled by Beau Nicholls, who is a Director of Sahara Natural Resources and
is the Exploration Manager for Estrella Timor-Leste, and a fellow of The Australasian Institute of Geoscientists. Mr
Warriner and Mr Nicholls have sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner and Mr
Nicholls consent to the inclusion in the report of the matters based on their information in the form and context in which
it appears.
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological mapping, visual
mineral estimates and confirmation of
metallic concentration using a Bruker S1
Titan Portable XRF instrument.
•
Initial rock-chip samples were taken and
pXRF determinations on uncrushed
samples made in the field.
•
Samples are then brought back to Dili and
pulverized to 100% passing 1mm before
the powder is again subjected to PXRF
•
A sub-sample of 150g is then dispatched
through customs and quarantine in
Australia to ALS in Malaga for multielement analysis.
•
Exported samples are analysed using a 4acid digest, ME-XRF26s, ME-MS61L at
ALS in Malaga
•
No drilling has been undertaken to date.
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
•
No drilling has been undertaken to date.
The installation of pulverising sample prep
facilities in Timor-Leste ensures sample
representivity when presented to the
PXRF.
•
Rock-chip samples were geologically
logged
for
mineral
content
and
photographed prior to sending for assay or
screening by pXRF.
•
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
•
Sample sizes are appropriate to the grain
size of the mineralisation which in
manganese oxides is very fine.
The exploration program is in its very early
stages and initial sample sizes are kept
small due to freight and customs /
quarantine restrictions. They are not
considered representative of the bulk of
mineralisation.
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
sub-sampling
stages
to
maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
•
•
•
•
•
•
Verification
of sampling
and
assaying
Location of
data points
•
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
•
Three sample types are quoted:
1 – Uncrushed Field PXRF (a fresh mineral
face is chipped from samples prior to the
XRF determination in the field)
2 – Crushed PXRF (samples from above
are taken back to Dili, 1-3kg of material,
and crushed/pulverised to 100% passing
1mm in the company’s dedicated sample
preparation facility, and 15g of powder is
then taken for PXRF analysis. Crushed
PXRF
determinations
have
been
subjected to repeat samples, standards
and confirmation of accuracy by laboratory
analysis.
3 – Assay, where 150g of material is
exported to ALS in Malaga via quarantine
in Darwin. Standards and blanks have not
been included in samples sent to Australia.
The company relies on the internal
standards and blanks used by ALS.
Samples are being analysed at ALS in
Malaga using a 4-acid digest, ME-ICP for
61 elements and all samples are also
being tested for Pt, Pd and Au by fire assay
and ICP-MS finish on a 50g sub-sample.
Currently, uncrushed field samples are
being analysed by PXRF on location. The
Cautionary statement is included when
assessing pXRF.
No prior modern exploration has been
conducted in the area.
•
No adjustments to assay data were
undertaken save where the ME-XRF26s
method reports MnO%.
•
Mn% is derived by dividing MnO by 1.2912
•
Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
Topographic control is accomplished
using 30m spaced satellite point data.
No systematic sampling has been
conducted at this early stage.
•
•
•
No orientation-based sampling bias has
been identified.
Criteria
Sample
security
JORC Code explanation
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure sample
security.
Commentary
•
•
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
•
•
•
Exported samples are in the possession of
ESR personnel from field collection to
customs
submission
in
Darwin.
Possession
then
passes
to
the
Department of Agriculture, Forestry and
fisheries where Northline Couriers pick up
the samples and take them by road to ALS
in Malaga.
Non-exported samples remain with ESR
personnel past Darwin Airport Customs.
No independent audit or review has been
undertaken.
Internal QAQC involves frequent standard
checks on the PXRF instrument to
determine any drift of accuracy.
Additional checks involve analysis of any
assayed samples in comparison to the
crushed and uncrushed in-country PXRF
determinations so as to provide
confidence in in-country analysis.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
ESR-RP-05, ESR-RP-06, ESR-RP-07
and ESR-RP-08 are awarded to Estrella
Resources
Limited
Representante
Permanente (100%)
•
Exploration and Evaluation Concessions
ESR-BA-01, ESR-BA-02 and ESR-BA-03
are awarded for four years to Estrella
Murak Rai, forming the joint-venture
between
Estrella
Resources
Representante Permanente (70%) and
Murak Rai Timor (30%).
•
Estrella
Resources
Limited
Representante Permanente is registered
in Timor-Leste and is a wholly-owned
subsidiary of Estrella Resources Limited
(Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Local geologists and companies have
sporadically explored the area however
there has been no documentation
collected nor systematic exploration to
quantify mineral occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Concessions and Permits
host three main forms of manganese
mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
processes exist.
•
Secondary mineralisation exists as a
supergene blanket above the cherts
where they have been exposed to
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
Commentary
chemical weathering.
•
Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
• No drilling has been undertaken in the
area.
• Sample locations are shown in the body of
the text.
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used.
Metal equivalent values have not been
used.
•
Any relationships have been discussed
within the body of the text.
•
Relevant diagrams have been included
within the main body of text.
•
No new information has been withheld.
Criteria
Other
substantive
exploration
data
Further work
JORC Code explanation
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
•
•
•
No other substantive data exists as the
program is in its early stages.
All observations are discussed within the
body of the text.
Further work by ESR will include
systematic mapping and sampling along
with
stratigraphic
and
structural
classification.
Additional work on specific areas will be
included under the heading Next Steps in
the body of the text when appropriate to
do so.
Share your feedback
Discover