Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Release: 28 October 2022
QUARTERLY ACTIVITIES REPORT
Quarter ending 30 September 2022
HIGHLIGHTS
Estrella Resources Limited
ABN 39 151 155 207
ASX Code: ESR
Board and Management
Managing Director
Christopher Daws
Non-Executive Directors
Les Pereira
John Kingswood
Company Secretary
Stephen Brockhurst
High Grade nickel results returned from 5A Spargoville
o SPDD002 3.40m* @ 8.2% Ni incl. 2.66m @ 10.34% Ni
o SPDD009 3.45m* @ 5.46% Ni incl. 1.2m @ 10.85% Ni
o SPDD020 8.03m* @ 3.17% Ni incl. 2.63m @ 9.23% Ni
o SPDD006 11.12m* @ 1.68% Ni incl. 0.7m @ 13.05% Ni
o SPDD018 6.80m* @ 4.40% Ni incl. 1.76m @ 10.21% Ni
JORC Exploration Target of +100,000 Ni tonnes at Carr Boyd
o 5Mt to 7Mt at 0.7% to 1.5% Nickel and 0.3% to 0.5% Copper
o Between 35,000 to 105,000 Nickel tonnes and 15,000 to
35,000 Copper tonnes
o Carr Boyd boasts 16km of basal contact (Figure 5) to be
targeted by drilling and geophysics
Maiden T5 Inferred Mineral Resource Estimate released
o 5,700 Ni tonnes and 3,600 Cu tonnes defined within T5
High grade lithium discovered by Widgie Nickel Limited
within Estrella’s Mt Edwards royalty area
o New Faraday prospect located with spodumene identified in
rock chip samples
o Numerous high grade lithium assays returned over 3% Li2O
Successful Placements during the September Quarter
raised $4,018,717 before costs
o New mandate executed with CPS Capital
o Shareholder Q&A sessions to be held in Sydney, Melbourne
and Perth (further details on page 14)
* Down hole widths quoted. For true widths refer to Table 1
Address
Level 8, London House
216 St Georges Terrace Perth
WA 6000
GPO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (“Estrella” or “the Company”)
is pleased to report its activities for the quarter ended 30th September
2022 in which the Company advanced exploration and development
activities at its Carr Boyd and Spargoville nickel sulphide projects.
Estrella Managing Director Chris Daws commented:
“I am proud of the team’s efforts during what has been a very busy
quarter for Estrella. At Spargoville, we continued to progress towards
kicking off full scale mining at the 5A nickel resource, subject to a
positive Definitive Feasibility Study. The DFS which assesses mining
below the existing open pit is well advanced, as are pre-mining site
works.
“At Carr Boyd, the release of the initial MRE for T5 was a significant
milestone and a major step towards quantifying a sizeable Exploration
Target estimate for the Carr Boyd basal contact.
“On the corporate front, successful placements raising over $4 million
during the quarter provided us with funds to complete the 5A nickel
mine DFS and continue diamond drilling activities at Carr Boyd. The
December Quarter is proving to be just as busy a quarter for Estrella
and I look forward to updating you on our progress at both projects.”
Figure 1: Clean-up of the Spargoville 5A Open Pit with mineralisation highlighted (red)
SPARGOVILLE NICKEL PROJECT
5A Nickel Deposit
The Company has progressed its DFS for the 5A Nickel Mine at Spargoville, located approximately
20km Southwest of Kambalda, Western Australia during the September quarter. The Company is
seeking to transition the Spargoville nickel sulphide project into a producing asset, starting with a
remnant high grade nickel resource below the 5A Nickel Mine open pit.
The Spargoville nickel sulphide project was acquired by Estrella via the purchase of WA Nickel Pty Ltd
(see ASX release 4 September 2017). Nickel sulphides were first discovered in the area by Selcast
Exploration in the late 1960s. Since then, the 1A, 5A, 5B, and 5D deposits were discovered and partially
developed on two of the three mining leases for which the Nickel Rights were purchased. All these
mines have remnant nickel sulphide mineralisation and extensive exploration potential at depth.
The Company’s initial focus is on the remaining resource at the 5A Nickel Deposit. The mineralisation
at 5A consists of a 30m deep Oxide Zone, which was mined in an open pit by Amalg Resources NL in
1996-1997. Beneath this, and which is the focus of the DFS, remains a 20-50m thick Transitional
Zone (dominated by the nickel mineral violarite), underlain by Fresh Sulphides (dominated by
pentlandite) as can be seen in Figure 2.
Figure 2: Long-section looking west through the 5A Nickel Resource showing abundance of Oxide, Transitional and
Fresh Metallurgical Zones as well as an outline of the optimised pit shell from the 2020 Scoping Study.
Diamond drilling below the open pit has been completed, with numerous diamond drillholes intersecting
very high-grade nickel mineralisation below the open pit (see Figure 3). Assays received from the
laboratory confirmed visual estimate expectations with some of the better results listed below (see ASX
releases dated 30 June, 1 August, 4 August, 23 August, and 30 August 2022). The full results are
summarised in Table 1.
Figure 3: Core from the Transitional Massive Sulphide zone in drillhole SPDD002 at 65.64m to 68.32m
Diamond drilling highlights at the 5A nickel mine:
SPDD002 returned: 3.4m @ 8.2% Ni from 65.16m down hole
Including 2.66m @ 10.34% Ni from 65.64m down hole
SPDD006 returned 11.12m* @ 1.68% Ni
* Including 0.7m @ 13.05% Ni
SPDD009 returned 3.45m* @ 5.46% Ni
* Including 1.2m @ 10.85% Ni within 3.45m*
SPDD019 returned 4.34m* @ 3.58% Ni
* Including 1.40m @ 7.79% Ni
SPDD020 returned 8.03m* @ 3.17% Ni
* Including 2.63m @ 9.23% Ni
* Down hole widths quoted. For true widths refer to Table 1
Table 1: Estrella 5A Significant Intercepts to Date
Metallurgical
Length
From (m) To (m)
Type
(m)
Hole ID
SPDD001
47.00
52.00
5.00
3.10
65.16
68.55
3.39
2.46
65.64
68.30
2.66
90.95
92.50
1.55
90.95
91.55
0.60
OXIDE
70.85
73.00
2.15
Including
TRANSITIONAL
72.40
73.00
0.60
Lower
NSA - Dolerite dyke on contact
Total
Including
SPDD003
SPDD004
SPDD005
Total
Including
Total
OXIDE
TRANSITIONAL
TRANSITIONAL
Total
SPDD006
SPDD007
SPDD008
SPDD009
Ni %
Cu % Co ppm Pt g/t Pd g/t
S%
Fe %
MgO% As ppm
SG
1.50
0.01
239
0.02
0.04
0.0
9.0
21.1
181
2.7
Core loss in massive sulphide - redrill with SPDD020
Total
SPDD002
T.W.
(m)
0.94
1.49
0.63
1756
0.34
0.18
21.5
28.1
4.5
460
3.1
0.79
2195
0.42
0.22
27.1
30.2
2.8
448
3.1
5.06
0.21
1102
0.29
0.30
12.6
21.0
2.1
1176
2.9
11.00
0.44
2280
0.58
0.31
28.5
33.9
0.5
672
3.2
2.35
0.06
711
0.06
1.30
4.5
11.3
18.2
2613
2.8
6.54
0.19
2290
0.15
4.65
15.7
22.2
3.1
6380
2.7
1.68
0.07
372
0.09
0.15
2.8
9.0
24.5
410
2.9
1.85
0.07
269
0.08
0.18
1.3
7.8
18.1
180
2.7
59.48
70.60
11.12
Including
OXIDE
61.38
62.87
1.49
And
TRANSITIONAL
69.12
70.60
1.78
6.93
0.27
1493
0.41
0.57
15.8
24.1
7.0
2186
2.9
Including
TRANSITIONAL
70.20
70.60
0.70
13.05
0.61
2350
0.99
0.60
36.5
28.9
0.4
1990
2.7
74.35
77.05
2.70
2.47
0.21
420
0.07
0.20
5.8
20.3
9.5
1594
3.0
76.00
77.05
1.05
4.90
0.45
787
0.13
0.44
12.4
22.0
4.6
3849
2.9
5.46
0.21
1689
0.11
0.43
13.5
22.8
2.2
1334
3.1
Total
including
TRANSITIONAL
Lower
NSA - Sheared out base
Total
69.85
73.30
3.45
7.48
8.22
10.34
1.54
2.33
Including
OXIDE
69.85
72.10
2.25
2.37
0.02
365
0.02
0.03
0.3
20.4
3.2
402
3.0
And
TRANSITIONAL
72.10
73.30
1.20
10.85
0.55
4000
0.27
1.12
36.6
27.1
0.5
2960
3.2
SPDD010
Lower
NSA - Sheared out base
SPDD011
Lower
NSA - Did not intersect footwall
Total
SPDD012
56.30
63.75
7.45
1.32
0.02
326
0.06
0.13
0.6
11.7
13.5
1153
2.8
Including
OXIDE
60.58
62.37
1.79
1.80
0.01
295
0.02
0.04
0.1
15.5
9.6
1702
2.7
And
TRANSITIONAL
62.37
62.80
0.43
4.67
0.02
1945
0.45
1.20
6.9
15.9
2.5
4120
3.2
63.7
73.65
9.95
1.25
0.07
217
0.03
0.03
1.0
9.1
7.3
273
2.7
Total
SPDD013
5.34
5.78
Including
OXIDE
67.6
70.25
2.65
1.63
0.02
181
0.02
0.01
0.2
9.7
4.0
113
2.7
And
TRANSITIONAL
72.1
73.65
1.55
2.54
0.32
613
0.12
0.04
5.5
11.9
2.7
445
2.7
SPDD014
Lower
NSA - Dolerite dyke on contact
36.00
55.00
19.00
0.74
0.01
147
0.01
0.03
0.0
8.6
11.3
178
2.8
SPDD015
including
OXIDE
39.20
40.02
0.82
1.15
0.01
195
0.02
0.05
0.0
10.5
14.8
163
2.7
and
OXIDE
50.00
53.30
3.30
1.09
0.02
140
0.02
0.02
0.0
8.7
3.5
225
2.9
23.30
26.30
3.00
1.15
0
228
0.06
0.2
0.0
10.2
22
13.6
2.62
24.30
26.30
2.00
1.23
0
226
0.06
0.2
0.0
9.9
23
13.5
2.61
0.55
0.01
129
0.00
0.01
0.2
7.3
28.0
391
2.8
1.74
0.01
302
0.01
0.01
0.1
11.9
25.0
800
2.8
3.05
0.18
695
0.14
0.23
8.5
19.5
4.1
790
3.2
7.28
0.45
1636
0.29
0.45
20.7
29.9
3.2
1392
3.5
1.37
0.00
169
0.00
0.01
0.0
8.7
20.3
1057
2.7
4.40
0.31
946
0.18
0.51
12.0
19.8
10.4
953
3.3
10.21
0.69
2140
0.24
0.94
29.4
30.1
1.5
2007
3.6
Total
Total
SPDD016
SPDD017
SPDD018
Including
OXIDE
Lower
TRANSITIONAL NSA - Sheared out base
Total
56.56
59.46
2.90
including
59.16
59.46
0.30
Total
76.95
81.00
4.05
11.15
1.85
1.70
2.40
including
TRANSITIONAL
79.72
81.00
1.28
Total
OXIDE
57.53
59.80
2.27
1.71
Total
TRANSITIONAL
66.20
73.00
6.80
4.50
70.86
72.62
1.76
Including
SPDD019
Visual 2.65m Massive and Matrix Sulphides - Awaiting Assays *
SPDD020
Visual 2.63m Massive and Semi-Massive Sulphides - Awaiting Assays *
An additional oxide zone located within the hosting komatiite was identified to the east of the main basal
contact. This zone occurs as a result of a subsequent, mineralised komatiite flow which lies on top of
the main basal flow. The Company will sample this additional horizon in all drillholes. If this oxide
material meets a reasonable grade threshold it may be included in the 5A Resource, as it will satisfy all
JORC2012 requirements and specifically the reasonable prospect of eventual economic extraction.
Assay results returned very high grades of nickel mineralisation from the northern and central portions
of the deposit. With receipt of these assays, work on a new Resource Estimate for 5A was finalised and
an updated MRE was released to the ASX post the September quarter on 18 October 2022.
Figure 4: Spargoville 5A Open Pit digital model with recent diamond drilling
The removal of drill water from the base of the open pit was completed and cleaning up of the ramp and
pit floor has been undertaken in readiness for the removal of a bulk sample for third party processing.
This sample of Transitional material will be tested at an alternative treatment facility to the Kambalda
Concentrator and will be extending on successful bench-scale tests conducted in 2019.
Inclement weather and a shortage of suitable machinery and contractors in the Goldfields has seen a
slight delay of the extraction of the bulk sample. The Company expects the sample to be mined in the
current quarter with pre-mining site works already commenced with ramp access, pit floor preparation
and ore mark-up underway. A short drill-blast program followed by extraction of the first ore bench will
be undertaken by local contractors under the supervision of Company representatives and consultant
mining specialists. High grade nickel ore will be placed onto the 5B ROM pad where it will be
crushed/screened to required size before being transported by road train to the desired treatment facility
for processing and recovery of the nickel metal.
CARR BOYD NICKEL PROJECT
The Company continued to aggressively explore the Carr Boyd intrusion system for further evidence of
high-grade massive nickel and copper sulphides during the September 2022 quarter. A total of 6,133
metres of diamond drilling was completed in 9 holes across the project area.
The Company announced its maiden T5 JORC 2012-compliant Mineral Resource Estimate (MRE)
which underpins an Exploration Target of 5-7 million tonnes for the basal contact at the 100%owned Carr Boyd Nickel Project located 80km northeast of Kalgoorlie (see ASX released dated 20
September 2022).
Figure 5: Location of the T5 MRE in red with respect to the 16km prospective basal contact informing the Exploration
Target
The Inferred T5 MRE is based upon 43 diamond holes and 3 reverse circulation holes drilled by Estrella
Resources at T5, covering a strike length of 500 metres and running from near surface to 720m depth.
The MRE is entirely north of the Proterozoic Dyke which Estrella has interpreted to split the T5
mineralisation (Figure 5). The JORC 2012 Mineral Resource Estimate was compiled by Ashmore
Advisory Pty Ltd and is presented in Table 2.
Table 2: T5 September 2022 Inferred Mineral Resource Estimate (0.5% Ni + Cu Cut-off Grade)
Inferred Mineral Resource
Tns
Ni+C
u
Ni
Cu
Co
Pt
Pd
Ag
Ni
Cu
Co
Pt
Pd
Ag
kt
%
%
%
%
g/t
g/t
g/t
t
t
t
oz
oz
oz
Transitional
10
0.70
0.45
0.24
0.04
0.02
0.08
1.10
30
10
10
210
Fresh
850
1.08
0.66
0.42
0.03
0.22
0.22
1.99
5,700
3,600
300
6,200
6,100
54,600
Total
860
1.08
0.66
0.42
0.03
0.22
0.22
1.98
5,700
3,600
300
6,200
6,100
54,800
Type
Note: All Mineral Resources figures reported in the table above represent estimates as at September 2022. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape and
continuity of the occurrence and on the available sampling results. The totals contained in the above table have been rounded to
reflect the relative uncertainty of the estimate. Rounding may cause some computational discrepancies. Mineral Resources are
reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(The Joint Ore Reserves Committee Code – JORC 2012 Edition).
In addition to the nickel and copper, the T5 MRE contains over 12,000 ounces of platinum and palladium
and almost 55,000 ounces of silver which are associated with the sulphide mineralisation. The nickelcopper-PGE sulphide resource is free of Arsenic and is low in MgO.
The T5 Mineral Resource Estimate, with an additional 34 regional diamond holes and 56 reverse
circulation holes, has been used to estimate an Exploration Target for the 16km of the prospective Carr
Boyd Basal Contact of between 5Mt and 7Mt at a nickel grade between 0.7% and 1.5% as presented
in Table 3.
Additional work on the existing Carr Boyd remnant resource will also be carried out. The resource is
currently not JORC 2012 compliant and so cannot be quoted here. Estrella has intersected remnant
massive nickel-copper sulphides below the historical workings. The results of CBDD064 were released
to the market 8th March 2022 with the drillhole intersecting 16.2m* @ 3.12% Ni and 0.60% Cu from
192.35m and a further 12.97m* @ 1.07% Ni and 0.25% Cu from 256.0m downhole.
The Exploration Target is based on the results of exploration activities undertaken to date and
references an extensive dataset of historical drilling, geological and geophysical information, which
includes recent exploration data obtained by Estrella. The T5 Mineral Resource Estimate forms the
basis for grade ranges and tonnage factors for the Exploration Target.
Estrella plans to continue to systematically test the approximately 16km of basal contact strike within
the Project’s tenure, as well as testing for possible sulphide occurrences off the basal contact, such as
those forming at the Carr Boyd Nickel Mine.
* Down hole widths quoted. For true widths refer to Table 4
Table 3: Carr Boyd Nickel Project September 2022 Exploration Target
Range
Tonnage (Mt)
Nickel Grade (%)
Copper Grade (%)
Lower
5.0
0.7
0.3
Upper
7.0
1.5
0.5
Note: The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration
to estimate a Mineral Resource for all target areas reported. It is uncertain if further exploration will result in the estimation of a
Mineral Resource. The Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC
Code.
T5 Extensions
CBDD078A was collared across the Proterozoic Dyke to assess its true thickness (approximately 120m)
and into the basal contact at depth below the Carr Boyd Nickel Mine (Figure 6). The drillhole intersected
a mixed suite of T5 Pyroxenite along with cross-cutting sills from the Proterozoic Dyke. A number of
zones of disseminated sulphides in pyroxenite and remobilised sulphides within the Proterozoic Dyke
were logged, including a zone of 1.8m downhole length of semi-massive sulphides (see ASX
announcement 21 July 2022).
Interpretation of the drill core reveals that the area is similar to that intersected north of the dyke and
just south of the T5 resource. These areas have been modified by the intrusion of the Proterozoic Dyke
along the Carr Boyd basal contact, and sulphides have been partially assimilated by the dyke and
remobilised along the contact. Infill drilling in these areas is required and can be undertaken at a later
date.
Figure 6: Long Section of the T5 MRE with respect to the Carr Boyd Mine (left) and the Broonhill Discovery
Broonhill Exploration Update
Results have been received for CBDD076 which intersected nickel-copper mineralisation at Broonhill
(Figure 6). Assays from the drillhole averaged 6.23m (True Width) @ 0.6% Ni & 0.7% Cu including
1.2m @ 1.2% Cu and another 0.6m @ 1.81% Cu.
The Broonhill mineralisation is associated with a thick sub-intrusion just below the main Carr Boyd
Complex. This area is interpreted as where the initial stage of the Carr Boyd Complex was intruding the
Morelands Formation by splitting it apart with numerous dyke-like fingers which thickened over time and
assimilated sulphidic material from the country rock. Figure 7 depicts the drill area in cross-section.
Figure 7: Cross section through the first Broonhill drill line where mineralisation was discovered in a thickened dyke
just below the base of the main Carr Boyd Complex.
Table 4: Carr Boyd Nickel Project - Assay Results from Diamond Drillhole CBDD076
Gossan Hill
To date, Estrella has drilled four reverse circulation holes and five diamond holes at Gossan Hill (Figure
8). The initial hole CBP098 intersected 3m down hole length @ 0.6% Ni & 0.3% Cu, 0.8g/t 3PGE’s at
114m, confirming the Company’s prospectivity analysis of the Gossan Hill Pyroxenite.
A downhole electromagnetic (DHEM) program has commenced at Gossan Hill to systematically test the
4km strike length of the basal contact. Three out of 16 DHTEM platform drill holes have been drilled and
tested to date. Hole CBDD082 intersected 5.5m of cloud to disseminated nickel-copper sulphides at
531m down hole however no DHEM anomaly was detected. The mineralisation is part of a much broader
sulphide assimilation zone associated with sulphidic sediments in the footwall.
The environment is conducive to nickel-copper sulphide formation as evidenced by CBP098 and
CBDD082. Drilling plus DHEM testing of the contact will continue.
Figure 8: The Gossan Hill and Southern Mossgiel Basal Contacts remain mostly untested and will be systematically
covered with diamond drilling and downhole geophysics
Tregurtha and Sir William Wallace
The Tregurtha and Sir William Wallace prospects lie along the basal contact between Gossan Hill and
Mossgiel (Figure 8). Little drilling has occurred here in the past two years. However, historical exploration
by Apollo-Phoenix and others have intersected nickel-copper sulphides within these prospects.
With additional information gathered by Estrella from the seismic program, the Company now better
understands the orientation of the basal contact and why it may have been missed in historic drilling. The
contact is now interpreted to undercut to the south, as shown in the cross-section in Figure 9. At Tregurtha,
the vast majority of drilling intersecting sulphides ran parallel to the basal contact. The basal contact has
thus never been tested.
This untested basal contact will be targeted either late this year or early next year as it presents the
Company with further significant opportunities to unlock further discoveries at Carr Boyd. With the
additional help from the seismic program, the Company can target and hit this contact at depth with much
more confidence.
Figure 9: Cross section through the Tregurtha basal contact showing the parallel nature of the historical drilling with
the basal contact orientation as determined through seismic interpretation.
Carr Boyd T5 Nickel-Copper Sulphide Deposit
September 2022 Mineral Resource Estimate (0.5% Ni+Cu Cut-off)
Type Tonnes Ni+Cu
kt
%
Trans.
10
0.70
Fresh
850
1.08
Total
860
1.08
Ni
%
0.45
0.66
0.66
Cu
%
0.24
0.42
0.42
Co
%
0.04
0.03
0.03
Inferred Mineral Resource
Pt
Pd
Ag
Ni
Cu
g/t
g/t
g/t
t
t
0.02
0.08 1.10
30
10
0.22
0.22 1.99 5,700 3,600
0.22
0.22 1.98 5,700 3,600
Co
t
300
300
Pt
oz
Pd
Ag
oz
oz
10
210
6,200 6,100 54,600
6,200 6,100 54,800
Note: All Mineral Resources figures reported in the table above represent estimates as at September 2022. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape and
continuity of the occurrence and on the available sampling results. The totals contained in the above table have been rounded to
reflect the relative uncertainty of the estimate. Rounding may cause some computational discrepancies. Mineral Resources are
reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(The Joint Ore Reserves Committee Code – JORC 2012 Edition).
2.5
64,000
2.0
48,000
1.5
32,000
1.0
16,000
0.5
0
0.0
Grade (%)
Tonnage (t)
Carr Boyd T5 Deposit - Total 0.5% Ni + Cu Cut-off
80,000
-300
-280
-260
-240
-220
-200
-180
-160
-140
-120
-100
-80
-60
-40
-20
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
Bench Top RL (m)
Fresh
Transitional
Ni %
Cu %
Ni+Cu %
Figure 10: Carr Boyd tonnes and grade with elevation. The area between the 220 RL and 140 RL is the Flat Fault blank
area.
Tonnes/Vm
-300
-280
-260
-240
-220
-200
-180
-160
-140
-120
-80
-100
-60
-40
0
-20
20
40
60
80
100
120
140
160
180
200
0
220
0
240
6
260
800
280
12
300
1,600
320
18
340
2,400
360
24
380
3,200
400
30
420
Tonnage/Vm
Carr Boyd T5 Deposit - Tonnes Per Vertical Metre
4,000
Bench Top RL (m)
TVM
Ni t
Cu t
Figure 11: Carr Boyd tonnes per vertical metre
Grade
Range
Ni+Cu
0.1 -> 0.2
0.2 -> 0.3
0.3 -> 0.4
0.4 -> 0.5
0.5 -> 0.6
0.6 -> 0.7
0.7 -> 0.8
0.8 -> 0.9
0.9 -> 1.0
1.0 -> 1.1
1.1 -> 1.2
1.2 -> 1.5
1.5 -> 2.0
2.0 -> 2.5
2.5 -> 3.0
3.0 -> 5.0
Total
Tonnes
t
77
791
45,131
81,320
187,303
147,920
130,481
57,090
33,508
17,878
18,714
51,213
109,081
79,939
17,220
9,375
987,041
Ni+Cu
%
0.20
0.27
0.37
0.47
0.55
0.65
0.74
0.85
0.93
1.03
1.13
1.36
1.70
2.22
2.67
3.79
1.00
Ni
%
0.13
0.19
0.24
0.29
0.33
0.38
0.45
0.54
0.63
0.70
0.72
0.85
1.08
1.34
1.62
1.98
0.61
Incremental Estimate
Cu
Co
%
%
0.06
0.02
0.09
0.01
0.13
0.01
0.17
0.02
0.22
0.02
0.28
0.02
0.30
0.02
0.30
0.03
0.31
0.03
0.33
0.03
0.41
0.03
0.51
0.04
0.61
0.05
0.88
0.06
1.05
0.07
1.81
0.08
0.38
0.03
Figure 12: Carr Boyd tonnes and grade per incremental cut-off
Pt
g/t
0.06
0.08
0.03
0.11
0.11
0.14
0.20
0.25
0.20
0.26
0.16
0.24
0.35
0.41
0.40
0.57
0.20
Pd
g/t
0.09
0.10
0.05
0.11
0.11
0.14
0.18
0.21
0.23
0.24
0.23
0.27
0.35
0.39
0.43
0.59
0.20
Ag
g/t
0.95
0.52
0.73
0.83
1.19
1.44
1.54
1.72
2.04
1.61
1.61
2.11
2.53
3.90
4.43
7.48
1.83
Cut-off Grade Ni_Cu %
Ni+Cu %
Ni %
3.00
2.50
0.60
Tonnes
2.00
Cu %
Figure 13: Carr Boyd tonnes Grade Curve for the T5 MRE
STAGE 2 R&D SEISMIC PROGRAM SUCCESSFULLY COMPLETED
The Company has successfully completed Stage 2 of a multiple stage seismic survey program over the
greater Carr Boyd intrusion. Data collated from the program will be integrated into the Company’s data
files and will be further utilised in assisting with the continued exploration of the intrusion for nickel,
copper, cobalt and PGE’s.
The Company is finalising its R&D tax rebate for the 2021-2022 FY and expects to receive a significant
cash return in the current quarter.
MT EDWARDS LITHIUM ROYALTY
The Company continues to hold exposure to future financial upside via the Mt Edwards Lithium Royalty,
which Estrella retained post the sale of its subsidiary Mt Edwards Lithium Pty Ltd to Neometals Limited
(see ASX release dated 15 March 2018) and Neometals’ subsequent divestment to Widgie Nickel
Limited (WIN).
Significant exploration results released by Widgie Nickel Limited subsequent to the September quarter
end (refer to ASX release dated 3 October 2022 (ASX: WIN)) included the discovery of high grade Li2O
with the dominant mineral being spodumene at a new prospect which has been named “Faraday”.
Significant rock chip results included;
S10013 – 2.61% Li2O
S10014 – 3.70% Li2O
S10015 – 2.86% Li2O
S10017 – 3.60% Li2O
S10019 – 2.91% Li2O
S10021 – 3.04% Li2O
S10025 – 2.73% Li2O
The high-grade lithium bearing pegmatites at Faraday have been identified over a 600m by 25m surface
expression and potential exists to extend the strike to the north undercover according to Widgie Nickel
Limited. Drilling was to commence immediately, and the Company looks forward to progression of the
Li2O potential of Faraday and the greater Mt Edwards lithium Project area by Widgie Nickel Limited.
CORPORATE
The Company has ended its mandate with LoftusLane Capital and executed a mandate with CPS
Capital Pty Ltd during the quarter to assist with future capital initiatives. CPS will also provide ongoing
corporate advice as/when required. The Company is currently seeking to expand its opportunities via
acquisitions in the resource sector, in particular nickel and battery metals opportunities.
Grade %
0.0
1.50
0
1.20
0.8
1.10
200,000
1.00
1.6
0.90
400,000
0.80
2.4
0.70
600,000
0.50
3.2
0.40
800,000
0.30
4.0
0.20
1,000,000
0.10
Tonnage
Carr Boyd T5 Deposit - Grade Tonnage Curve - Ni+Cu, Ni, Cu
Additionally, the Company is pleased to advise it has been preparing its baseline ESG report which it
aims to release in the current December quarter.
Estrella Resources’ registered principal place of business was also changed during the quarter to Level
8, 216 St Georges Terrace, Perth WA 6000.
The total amount paid to related parties of Estrella and their associates, as per item 6.1 of the Appendix
5B, was $67k for Directors fees, salaries and superannuation and the total amount paid to related parties
of Estrella and their associates, as per item 6.2 of the Appendix 5B, was $28k for Director’s salaries.
Post period-end Estrella has committed to host shareholder Q&A sessions with Managing Director Chris
Daws in Sydney (6:30pm Wednesday 2nd November), Melbourne (6.30pm Thursday 3rd November) and
Perth (7:00pm Wednesday 9th November). For further details and to RSVP, the Company requests
shareholders contact the Company via email: admin@estrellaresources.com.au
CAPITAL
The Company’s cash balance as of 30 September 2022 was $1.7M. The Company completed two
Placements during the quarter raising a total of $4,018,717 (before costs) through the issue of 276.8M
ordinary shares, including the issue of $200k of shares to the Company’s drilling contractor in lieu of
fees owing. The placement shares come with 1 free attaching option for every 2 shares subscribed
(subject to shareholder approval being sought at the Company’s AGM to be held 28 November 2022).
Table 5: Estrella Capital structure as at 30 September 2022
Fully Paid Ordinary Shares
1,477,465,393
Listed options exercisable
$0.02 on or before the 31 July 2023 – 239,363,575
Unlisted options exercisable
$0.03 on or before 20 November 2022 – 11,500,000
$0.20 on or before 17 November 2023 - 16,600,000
$0.06 on or before 21 January 2025 – 25,750,000
$0.06 on or before 13 April 2025 – 20,000,000
Compliance Statement
With reference to previously reported Exploration Results and Mineral Resources, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the original market
announcement and, in the case of estimates of Mineral Resources, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcement.
ENDS
The Board of Directors of Estrella Resources Limited authorised this announcement to be given to ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
info@estrellaresources.com.au
P: +61 (08) 9481 0389
Media Contact:
David Tasker
Chapter One Advisors
Email: dtasker@chapteroneadvisors.com.au
Tel: 0433 112 936
Appendix 1 – Tenement Information as Required by Listing Rule 5.3.3
Change in
Holding (%)
Current
Interest (%)
Country
Location Project
Tenement
Australia
WA
Carr Boyd Nickel Project
E29/1012
-
100
Australia
WA
Carr Boyd Nickel Project
E29/0982
-
100
Australia
WA
Carr Boyd Nickel Project
L24/0186
-
100
Australia
WA
Carr Boyd Nickel Project
E31/0726
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1124
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0012
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0109
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0159
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1215
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1162
-
100
Australia
WA
Spargoville Nickel Project
M15
Share your feedback