QUARTERLY ACTIVITIES
REPORT
Estrella Resources Limited
Quarter ending 30 June 2017
ABN 39 151 155 207
ASX RELEASE 28 JULY 2017
HIGHLIGHTS
ASX Code: ESR
Board and Management
Chief Executive Officer
Christopher Daws (CEO)
Non-Executive Directors
John Kingswood
Ray Shorrocks
Stephen Brockhurst
Company Secretary
Stephen Brockhurst
Address
Level 11, London House
216 St Georges Terrace Perth
WA 6000
PO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrella.resources.com.au
www.estrellaresources.com.au
Follow-up rock chip sampling at Bravo Cluster and Charlie
Pegmatites, Atomic Three Prospect has returned the highest-grade
results thus far, up to 3.36% Li2O at surface
Historic drill core recently relocated to the historic 132N nickel mine,
approximately 1.5km south of Alpha Pegmatite relogged for lithium
pathfinder minerals
Systematic rock chip and soil sampling programs completed at
Atomic Three
POW approval granted for the drilling of high priority targets at
Atomic Three and Inco Boundary
Corporate activities continuing
Estrella Resources Limited (ASX: ESR) (Estrella or Company) is pleased to
provide its Activities Report for the quarter ended 30 June 2017.
ATOMIC THREE PROGRESS
Detailed mapping and rock chip sampling programs have resulted in the
discovery of several closely related high grade lithium bearing pegmatite bodies,
and the highest-grade results to date on the MELP. These have been named
Bravo Cluster and Charlie Pegmatite. Follow-up drilling will be conducted as
soon as practicable in the Bravo and Charlie areas to determine if the new
interpretations of larger pegmatite bodies are correct, to determine if the
pegmatites are related to each other, or are connected, and to generate a
JORC2012 mineral resource estimate.
A soil sampling program was completed over the Atomic Three prospect area
during the quarter, which included the Bravo Cluster and Charlie Pegmatite. 458
samples were collected on a 200m by 50m grid pattern. The aim of the soil
sampling program was to determine if soil sampling could be an effective
technique for identifying blind lithium bearing pegmatites with no visible surface
expression, and if so, determine if there are any such pegmatites in the Atomic
Three area. Samples from the program have been transported to Kalgoorlie and
are in storage while the Company awaits the arrival of a new handheld XRF unit.
When the XRF unit arrives, the soil samples will be analysed as soon as
practicable.
__________________________________________________________________________________
Estrella Resources Limited ABN 39 155 151 207 Level 11, London House, 216 St Georges Terrace, Perth
WA 6000 T +61 8 9481 0389 F + 61 8 9463 6103 E info@estrellaresources.com.au
Page 1 of 7
Figure 1. Map of the Atomic Three prospect showing all the rock chips sampled to date, labelled with % Li2O for
anomalous results above 0.1% Li2O. The more recent follow-up sampling results are labelled in a white highlight. * †
*Refer to announcement “Mt Edwards Lithium Project Exploration Update”, 23 June 2017
† Refer to announcement “Highest Grade Lithium to Date - Atomic Three”, 18 July 2017
__________________________________________________________________________________
Estrella Resources Limited ABN 39 155 151 207 Level 11, London House, 216 St Georges Terrace, Perth
WA 6000 T +61 8 9481 0389 F + 61 8 9463 6103 E info@estrellaresources.com.au
Page 2 of 7
BRAVO CLUSTER
The Bravo Cluster is located approximately 600m NNW of the 132N nickel mine, or 250m SW of the
Alpha Pegmatite targeted by the first phase of drilling on the MELP. Six rock chip samples were
collected at Bravo Cluster during the quarter, half of which returned over 1.5% Li2O, with a peak value
of 1.68% Li2O. *
Detailed mapping has now been completed on the prospect. This has shown that Bravo could be a
single pegmatite, rather than a cluster of smaller bodies, and the pegmatite could be significantly larger
than previously interpreted. The numerous small rubbly outcrops at the prospect are now interpreted
to represent a single pegmatite body in a deeply weathered and poorly exposed environment.
CHARLIE PEGMATITE
The Charlie Pegmatite is located approximately 200m east of the Bravo Cluster. It is less than 200m
from the broad historic pegmatite intersection in holes WD4133 and WD5301, which will be targeted by
twin holes in an upcoming drill program, after historic diamond core was unable to be located within
core storage locations.
Detailed mapping and two phases of rock chip sampling have been completed on the prospect. The
size of the pegmatite is now interpreted to be larger than previously thought, and it may possibly be
connected to or be of the same pegmatite as the Bravo Cluster.
The most recent phase of rock chip sampling at the Charlie Pegmatite included the following very highgrade lithium results.†
Sample ID
Zone
Easting
Northing
RL
Li2O %
AP00450
51J
360921
6519461
369
2.50
AP00451
51J
360918
6519473
368
3.36
AP00452
51J
360924
6519437
369
2.33
AP00454
51J
360966
6519423
371
3.29
AP00457
51J
360996
6519382
373
1.41
AP00458
51J
361021
6519371
375
3.14
AP00459
51J
361061
6519356
378
1.23
*Refer to announcement “Mt Edwards Lithium Project Exploration Update”, 23 June 2017
† Refer to announcement “Highest Grade Lithium to Date - Atomic Three”, 18 July 2017
INCO BOUNDARY
Earlier in the year, RC drilling identified a highly anomalous pegmatite body at Inco Boundary.
The highly anomalous near surface drill intercept in MERC0005 will be tested by step-out drilling. This
will determine the grade distribution within the pegmatite and its geometry in 3D space. The current
interpretation is that the pegmatite is flat dipping and at least 7m thick, which would be a favourable
geometry for mining if economic concentrations of lithium were discovered. *
*Refer to announcement “Quarterly Activities and Cashflow Report”, 27 April 2017
__________________________________________________________________________________
Estrella Resources Limited ABN 39 155 151 207 Level 11, London House, 216 St Georges Terrace, Perth
WA 6000 T +61 8 9481 0389 F + 61 8 9463 6103 E info@estrellaresources.com.au
Page 3 of 7
Figure 2. Cross section of Inco Boundary showing interpreted pegmatites, significant intercepts and planned drilling
OTHER WORK PROGRAMS
The Company identified several pegmatite intersections over 10m wide in historic drilling in the Atomic
Three area during the last quarter. These include diamond holes WD4133, which intersected 78.8m of
pegmatite from 56.7m downhole and WD5301, which intersected 37.7m of pegmatite from 132.6m
downhole.* Both holes were drilled at the 132N nickel deposit targeting nickel, within 200m of Charlie
Pegmatite. The core for these holes was unable to be to be located, therefore the Company intends to
twin these intersections with new drillholes, to determine if the pegmatites are lithium bearing.
Numerous pegmatite intersections less than 10m wide were also identified in the area. Most of these
are historic percussion holes. The Company systematically worked through these intersections during
the quarter to determine if any core or drill cuttings from them has been preserved, and is able to be
sampled. Only a small number of narrow barren pegmatite intersections could be sighted in drill core.
The Company may consider drilling twin holes of other pegmatite intersections over 10m in with if they
are interpreted to be associated with high priority lithium zones during other work at Atomic Three.
Table 1. Location of pegmatite drillhole intersections over 10m thick in the Atomic Three area.*
Hole_ID
WD4133
WD5301
WID1364
WID1527
WID1628
WID1629
Hole_Type
DDH
DDH
RC
DDH
RC
RC
mFrom
56.7
132.6
4.0
333.6
15.0
18.0
mTo
135.5
170.3
16.0
348.2
25.5
33.0
MGA_East MGA_North DTM_RL Width
361192
6519096
291
78.8
361165
6519055
242
37.7
360633
6518985
350
12.0
361088
6517994
59
14.6
360902
6520213
336
10.5
360894
6520213
332
15.0
*Refer to announcement “Quarterly Activities and Cashflow Report”, 27 April 2017
__________________________________________________________________________________
Estrella Resources Limited ABN 39 155 151 207 Level 11, London House, 216 St Georges Terrace, Perth
WA 6000 T +61 8 9481 0389 F + 61 8 9463 6103 E info@estrellaresources.com.au
Page 4 of 7
CHILE COPPER PROJECT
There has been no activities undertaken on the Chilean mineral assets over the quarter.
CORPORATE
The Company continues to review mineral acquisitions that will complement the current
exploration activities in the Kalgoorlie/Kambalda mining districts.
CAPITAL
The Company’s cash balance as at 30 June 2017 was A$904,000. The Company issued
200,000 fully paid ordinary shares at A$0.05 per share during the quarter settling a consulting
fee.
Fully Paid Ordinary Shares
361,283,292
Unlisted options exercisable $0.024 on or before 31 March 2020 – 8,250,000
$0.044 on or before 31 May 2018 – 5,000,000
$0.40 on or before 13 November 2019 – 1,375,000
$0.80 on or before 3 October 2018 – 118,750
$1.40 on or before 21 November 2019 – 750,000
ABOUT ESTRELLA RESOURCES.
Estrella Resources is a metals exploration company based in Perth, Western Australia. The Company
holds Lithium exploration and mining rights agreements with Apollo Phoenix Resources which cover
129km2 of mineral tenements in an emerging world Class LCT pegmatite province. The Company’s
major project, the Mt Edwards Lithium Project (MELP), is situated 40km south of the Mt Marion Lithium
mine which is currently in production (Ganfeng, Mineral Resources and Neometals). The Company is
actively looking to increase its asset base and activities.
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based
on information compiled by Luke Marshall, who is a consultant to Apollo Phoenix Resources and Mt Edwards
Lithium, and a member of The Australasian Institute of Geoscientists. Mr Marshall has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resource and Ore Reserves”. Mr Marshall consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
info@estrella.com.au
__________________________________________________________________________________
Estrella Resources Limited ABN 39 155 151 207 Level 11, London House, 216 St Georges Terrace, Perth
WA 6000 T +61 8 9481 0389 F + 61 8 9463 6103 E info@estrellaresources.com.au
Page 5 of 7
Appendix 1 – Estrella Resources Limited – Tenement Information as Required by
Listing Rule 5.3.3.
Country
Location
Project
Tenement
Change in
Holding
(%)
Current
Interest
(%)
Australia
WA
Mt Edwards Lithium Project
M15/698
75
75
Australia
WA
Mt Edwards Lithium Project
M15/75
75
75
Australia
WA
Mt Edwards Lithium Project
M15/699
75
75
Australia
WA
Mt Edwards Lithium Project
M15/87
75
75
Australia
WA
Mt Edwards Lithium Project
M15/74
75
75
Australia
WA
Mt Edwards Lithium Project
M15/101
75
75
Australia
WA
Mt Edwards Lithium Project
M15/99
75
75
Australia
WA
Mt Edwards Lithium Project
M15/653
75
75
Australia
WA
Mt Edwards Lithium Project
M15/97
75
75
Australia
WA
Mt Edwards Lithium Project
M15/96
75
75
Australia
WA
Mt Edwards Lithium Project
M15/102
75
75
Australia
WA
Mt Edwards Lithium Project
M15/100
75
75
Australia
WA
Mt Edwards Lithium Project
M15/1271
75
75
Australia
WA
Mt Edwards Lithium Project
E15/1505
75
75
Australia
WA
Mt Edwards Lithium Project
E15/1507
N/A
Application
Australia
WA
Mt Edwards Lithium Project
E15/1562
N/A
Application
Chile
Mercurio
-
100
Chile
Saturno
-
100
Note – Estrella Resources Limited owns 75% in the lithium rights of the tenements noted Mt
Edwards Lithium Project. All tenements are held by Apollo Phoenix Resources Pty Ltd and
are in Western Australia.
__________________________________________________________________________________
Estrella Resources Limited ABN 39 155 151 207 Level 11, London House, 216 St Georges Terrace, Perth
WA 6000 T +61 8 9481 0389 F + 61 8 9463 6103 E info@estrellaresources.com.au
Page 6 of 7
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Estrella Resources Limited
ABN
Quarter ended (“current quarter”)
39 151 155 207
30 June 2017
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date (12
months)
$A’000
-
-
(116)
(657)
(b) development
-
-
(c) production
-
-
(d) staff costs
-
-
(126)
(587)
(a) exploration & evaluation
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
4
21
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Research and development refunds
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(238)
(1,223)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
-
-
(b) tenements (see item 10)
-
-
(c) investments
-
-
(d) other non-current assets
-
-
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) property, plant and equipment
-
-
(b) tenements (see item 10)
-
-
(c) investments
-
-
(d) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – Cash acquired on acquisition of
subsidiary
-
2
2.6
Net cash from / (used in) investing
activities
-
2
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
-
760
3.2
Proceeds from issue of convertible notes
-
-
3.3
Proceeds from exercise of share options
-
402
3.4
Transaction costs related to issues of
shares, convertible notes or options
(2)
(39)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(2)
1,123
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,144
1,002
Net cash from / (used in) operating
activities (item 1.9 above)
(238)
(1,223)
4.2
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
2
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(2)
1,123
+ See chapter 19 for defined terms
1 September 2016
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (12
months)
$A’000
904
Current quarter
$A’000
904
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
904
1,144
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
904
1,144
6.
Payments to directors of the entity and their associates
6.1
Aggregate amount of payments to these parties included in item 1.2
70
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
-
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
Directors including non-executive and executive director’s fees and superannuation for the quarter.
Current quarter
$A'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
-
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
-
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
-
-
8.2
Credit standby arrangements
-
-
8.3
Other (please specify)
-
-
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
9.
Estimated cash outflows for next quarter
9.1
Exploration and evaluation
9.2
Development
-
9.3
Production
-
9.4
Staff costs
-
9.5
Administration and corporate costs
9.6
Other (provide details if material)
-
9.7
Total estimated cash outflows
(400)
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and
location
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
N/A
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
N/A
$A’000
(250)
(150)
Nature of interest
Interest at
beginning
of quarter
Interest
at end of
quarter
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Sign here: .....................
(Director/Company Secretary)
Date: ..........28/07/2017.....
Print name: Stephen Brockhurst
+ See chapter 19 for defined terms
1 September 2016
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Notes
1.
The quarterly report provides a basis for informing the market how the entity’s activities have
been financed for the past quarter and the effect on its cash position. An entity that wishes to
disclose additional information is encouraged to do so, in a note or notes included in or attached
to this report.
2.
If this quarterly report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral
Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to
Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows
from investing activities, depending on the accounting policy of the entity.
+ See chapter 19 for defined terms
1 September 2016
Page 5
Share your feedback
Discover