Investor Webinar Presentation
Released
Released
Announcement PDF
30 October 2020
ASX ANNOUNCEMENT
INVESTOR WEBINAR PRESENTATION
Estrella Resources (ASX: ESR) (“Estrella” or the “Company”) is pleased to announce its participation in the Share
Cafe Webinar - Micro/Small Cap "Hidden Gems" Webinar to be held today (Friday 30 October 2020) from 12:30pm
AEDT / 9:30am AWST.
CEO Chris Daws will provide an overview of the Company’s recent volcanic massive sulphide discovery at the T5
prospect at its Carr Boyd project, located approximately 80km from Kalgoorlie.
Using Down-Hole Transient Electro-Magnetic (DHTEM) surveying Estrella Resources has recently defined a large
conductive body which is associated with its confirmed nickel sulphide mineralisation – which is unconstrained at
depth and may be open in all directions.
The Company is conducting the final diamond core hole (CBDD031) of Stage 1 drilling with planning well
underway to rapidly expand future exploration at Carr Boyd.
This webinar is able to be viewed live via Zoom over the internet and will provide viewers the opportunity to hear
from, and engage with, a range of ASX-listed leading micro/mid cap companies.
To access further details of the event and to register (at no cost), please paste the following link into your internet
browser:
https://us02web.zoom.us/webinar/register/WN_A_Kc4zQiTLa-tPXfDUK-Tg
A recorded copy of the webinar will be made available following the event and a copy of the investor presentation
to be delivered during the webinar is attached.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
UNLOCKING CARR BOYD’S MASSIVE NICKEL SULPHIDE POTENTIAL
INVESTOR PRESENTATION I OCTOBER 2020 I ASX:ESR
Disclaimer & Declaration
This presentation has been prepared by Estrella Resources Limited (“ESR”) as a summary of the company’s exploration and development activities, with
particular reference to the Carr Boyd Ni/Cu Project near Kalgoorlie, WA.
No Offer of Securities
The presentation is not, and should not, be considered as an offer or invitation to subscribe for, or purchase any securities in ESR, or as an inducement to
make an offer or invitation with respect to those securities. No agreement to subscribe for securities in ESR will be entered into on the basis of this
presentation.
Forward Looking Statements
This presentation contains certain forward looking statements which have not been based solely on historical facts but, rather, on ESR’s current expectations
about future events and on a number of assumptions which are subject to significant uncertainties and contingencies many of which are outside the control
of ESR and its directors, officers and advisers.
Reliance on Third Party Information
Due care and attention has been taken in the preparation of this presentation. However, the information contained in this presentation (other than as
specifically stated) has not been independently verified nor has it been audited. Accordingly, the company does not warrant or represent that the
information contained in this presentation is accurate or complete. To the fullest extent permitted by law, no liability, however arising, will be accepted by
ESR or its directors, officers or advisers, for the fairness, accuracy or completeness of the information contained in this presentation.
Competent Person Declaration
The information in this announcement relating to Exploration Results is based on information compiled by Neil Hutchison of Geolithic Geological Services,
who is a consultant to Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr Hutchison has sufficient experience relevant to
the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Hutchison consents to the inclusion in
the report of the matters based on his information in the form and context in which it appears.
2
Investment Opportunity
Diverse WA-based company focused on
exploration & development of nickel projects in a
Tier-1 mining jurisdiction
100% owned Carr Boyd project – close to major
infrastructure and only 80km NNE of Kalgoorlie
T5 prospect – initial drilling programs have
discovered Massive Nickel Sulphide
Significant exploration program underway to
unlock nickel sulphide potential and build
shareholder value
Highly experienced board and management in
exploration with innovative approach to mining
and development of metal deposits
3
Capital Structure
FPOS
Options
Convertible Notes
(as at 20 October 2020)
- 787,747,798
- 14,000,000 3c exercise Nov 2022
- 5,500,000 5c exercise May 2021
- 246,880,327 5c exercise June 2021 (ASX:ESRO)
- 351,000,000 2c exercise July 2023 (ASX:ESROA)
- $400,000 1c conversion, expiry Feb 2022
12%PA
Major Shareholders
• Apollo Resources Pty Ltd 6%
• Sunset Capital Pty Ltd
5%
• Directors / Management 4%
CASH
~ A$2.2M^
^ As at 30th September 2020 with ~A$20.1M worth of options “in-the-money”
4
Source: ASX
Carr Boyd - Overview
• 100% owned Ni/Cu Project
• Continuous tenure covering 259 sq.km
• Close to infrastructure & only 80km NNE of
Kalgoorlie
• Project comprises 3 Mining Licences, 6
Exploration Licences & 1 Miscellaneous Licence
• Covers Carr Boyd Layered Complex – a 75 sq.km
mafic igneous complex hosting several nickel
and copper sulphide occurrences – most
significant being the Carr Boyd Rocks mine
5
Carr Boyd - History
GBM and NK
acquired by WMC,
mined from 19731977
1970
Discovered by Great
Boulder Mines Ltd
North Kalgurli JV
1972)
Placed into new ASX
float Defiance Mining
(1987) additional
areas consolidated
1980
WMC concentrated
on its Kambalda and
Leinster operations
Titan JV to Yilgarn
Mining (2006)
1990
2000
Defiance transitions
to biotechnology and
sells asset to Titan
Resources (2001)
Pallinghurst sell
WA assets to Salt
Lake Mining
(2013)
2010
Yilgarn (now
Brockman)
withdraw from JV
(2009)
Titan retain 100%
but now owned by
Pallinghurst
Apollo sell Carr
Boyd to Estrella
Resources (2017)
2020
SLM sell Carr
Boyd to
Apollo
Phoenix
(private)
(2015)
6
Carr Boyd – Mine Source?
Mined from 1973 to 1977 by WMC
•
Total production: 202,100t at 1.43% Ni and 0.46% Cu producing a 9.7% Ni concentrate
•
High tenor nickel mineralisation is confined to coarse grained, bronzite pyroxene rich rocks with sulphide minerals forming a
matrix around brecciated xenoliths of unmineralised country rocks
•
Four ore pipes occur containing a central zone of brecciated and stringer sulphides surrounded by broader zones of strongly
disseminated sulphide mineralisation
•
Development was completed on 3 levels with partial stoping completed on all levels, including a glory hole through to the
surface
•
Where did all this high-grade massive nickel sulphide come from?
7
Carr Boyd Layered Complex
•
Strike extents at Carr Boyd have been under-explored
due to historically fractured ownership and unique geology
•
The Carr Boyd Layered Complex was the first magmatic
hosted nickel sulphide deposit discovered and mined in
WA
•
Historically the region has been renowned for komatiite
flow nickel sulphides with komatiite nickel discoveries
throughout the Kambalda-Kalgoorlie-Leinster-Laverton
goldfields region
•
Estrella is applying modern systematic exploration at Carr
Boyd to better understand the magmatic geology
•
Magmatic nickel is of increasing focus following a number
of significant discoveries in WA, including:
•
IGO’s (ASX:IGO) Nova-Bollinger Mine
•
Legend Mining’s (ASX:LEG) Rockford Project
•
Chalice Gold Mines’ (ASX:CHN) Julimar Projects
•
Panoramic Resources (ASX:PAN) Savanah8 North
Deposit
Carr Boyd – New Targets
• Previous explorers only tested the
obvious targets at shallow depths
• Modern exploration techniques
have been employed looking for
deeper targets
• High Powered Moving Loop
Transient Electro-Magnetic
surveying and extensive
geochemical auger drilling is
defining areas of interest
• Among the targets, Target 5 (T5)
prospect has emerged as a highpriority area
Auger sample sites (blue dots) across Estrella's Carr Boyd Nickel Projects NW tenure. The generated pathfinder Nickel (red) and
Gold (yellow) vector target zones are shown over aeromagnetic image (TMI-RTP) along with previously identified prospects.
9
Carr Boyd – Target 5 (T5)
• HPMLTEM survey completed in 2018-2019 identified the T5 anomaly
• RC drilling program (2 holes for 414m) was completed to test T5
• DHTEM completed on both holes confirming in-hole source of the
intersected nickel sulphides
• FLTEM completed over T5 area and along the contact to the north to
forward model further drill targets
• Modelling of all the data is supportive of mineralisation open along
the length of the basal contact to the north, at depth to the north &
south of T5 discovery zone below the current and historic drilling
• Deep diamond core drilling is targeting a zone 300m to the north
and south of the current drilling as well as directly below T5 at a
vertical target depth of 400-500m below surface
• Drilling to test the basal contact over a greater strike length of ~700800m, providing a platform for deep DHTEM geophysical testing as
well as returning critical geological and geochemical vectoring data
for Ni-Cu sulphides
10
T5 – RC Drilling
RC Drilling consisted of 2 holes for 414m (2019)
• Intersected 1st nickel mineralisation at T5
• 8m @ 1.11% Ni & 0.36% Cu from drill hole CBP042
• includes 4m @ 1.60% Ni & 0.31% Cu from matrix
sulphide zone
• 1m @ 0.61% Ni & 0.57% Cu from drill hole CBP043
• Mineralisation extends over 400m strike and open north, south
and developing at depth
• First significant results outside the known Carr Boyd nickel mine
area
• Intersected sulphides are located on a stratigraphic primary basal
contact position
• DHTEM modelling confirms drilling has intersected the T5 MLEM
conductor
• Carr Boyd has the potential to host multiple fertile positions
11
T5 – Diamond Drilling
Diamond Drilling consists of 4 holes (2020)
• Conducted at T5 for first time at depth and along strike
• CBDD028 tested the Carr Boyd layered mafic-ultramafic
intrusions contact zone ~25m down dip of CBP042
• Drilled to depth of 251m and successfully intersected the
contact at 165.2m downhole depth
• 3.8m @ 0.48% Ni & 0.31% Cu from 165.2m including 0.4m
@ 1.12% Ni & 1.07% Cu from 165.2m
• 0.4m @ 0.33 Ni & 0.28% Cu from 173.6m
• CBDD029 - a deep high-powered DHTEM platform hole - tested
the length of the intrusions contact for the presence of sulphide
mineralisation
12
T5 Massive Nickel Discovery
• CBDD030 tested the intrusions contact 300m to the southern end
of the T5 Prospect between recent drilling and anomalous historical
drilling.
• Significant drill intersection of massive Ni-Cu (+ PGE) bearing
sulphides were returned
• 2.9m intersected from 435.9m to 438.8m depth
• Massive sulphide zone surrounded by a broader ~15m wide zone of
vein, stringer, matrix and disseminated Ni-Cu sulphide
mineralisation from 430.55m, with additional minor blebs and
disseminated sulphides further downhole
• CBDD030 intersected the contact at a depth of 368m, was
completely blind and is open in all directions providing a massive
opportunity to drill out and expand this zone of mineralization
• CBDD031 is currently testing the basal contact 600m north of
CBDD030 and 300m north of the 2019 RC drill holes
13
Large Conductive Body
Defined at T5
• Down-Hole Transient Electro-Magnetic
(DHTEM) surveyed CBDD030 to define the
extent of the massive nickel sulphide
mineralisation
• DHTEM data defined a clear massive
sulphide signature/conductor associated
with the nickel mineralisation
• Conductor is unconstrained at depth and
may be open in all directions
Cross Section showing CBDD030 and modelled DHTEM plates
14
Work Programme
• T5 - Area surrounding CBDD030 requires immediate follow
up drilling
• Stage 2 drilling will comprise 8-10 holes for ~5,000m of
RC/DD drilling on 40 x 40m pattern
• Surrounding CBDD030
• A hole below CBDD028, and
• Untested contact near CBDD029
• Topdrive Drillers (TDA) diamond drill rig has been retained
• Local station owner assisting upgrade of site support
infrastructure
• Number of drilling rigs, personnel and support will be
increased so Estrella can quickly determine extent of the
discovery
15
Investment Opportunity
Active nickel explorer in a tier-1 mining jurisdiction
Target 5 massive nickel sulphide discovery – a gamechanger!
Focused on drilling to unlock T5 potential and build
shareholder value
Experienced board and management in exploration
with innovative approach to mining and development
of metal deposits
Well funded to progress drilling campaigns
Highly leveraged to success
16
Contact:
Chris Daws, CEO
P: +61 8 9481 0389
E: info@estrellaresources.com.au
Share your feedback
Discover