Significant Massive Nickel Sulphide Discovery at Carr Boyd
Released
Released
Announcement PDF
8 October 2020
ASX ANNOUNCEMENT
Significant Massive Nickel Sulphide Discovery at Carr Boyd
HIGHLIGHTS
2.9m of massive nickel-copper sulphide mineralisation (~true width) has been intersected at the
southern end of the T5 Prospect in diamond core hole CBDD030 from 435.9m to 438.8m depth
Massive sulphide zone is surrounded by a broader ~15m wide zone of vein, stringer, matrix and
disseminated Ni-Cu sulphide mineralisation from 430.55m, with additional minor blebs and
disseminated sulphides further downhole
The presence of high-grade Ni and Cu mineralisation has been verified by site geologists using
a pXRF gun and is by far the most extensive intersection away from the historic Carr Boyd Mine
CBDD030 intersected the contact at a depth of 368m, was completely blind and is open in all
directions providing a massive opportunity to drill out and expand this zone of mineralisation
This is a significant breakthrough in the development of the T5 Prospect which has been
discovered after almost five years of work by our team
DHTEM is scheduled as soon as possible to survey this hole and further define the extent of this
massive sulphide system
Initial assay results for CBDD028 (159-204m) have been received for Ni-Cu-PGE sulphides
intersected at T5 Prospect
Figure 1. Massive Ni-Cu bearing sulphides surrounded by a ~15m wide zone of vein, matrix, stringer and
disseminated mineralisation in CBDD030 at the T5 Prospect, Carr Boyd Rocks Project (431.95m -441.3m shown).
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is excited to inform the market that a
significant drill intersection of massive Ni-Cu (+ PGE) bearing sulphides has been returned from CBDD030
which was drilled 300m south of the original T5 discovery zone at the Company’s flagship Carr Boyd
Project. The T5 Prospect is located 1.1km NE of the historic Carr Boyd mine and was identified in 2019
following RC drilling of a HP FLTEM anomaly*.
Figure 2. Ni-Cu bearing massive sulphide zone in diamond drill hole CBDD030 drilled 300m south of the T5 Ni-Cu discovery
zone (436.7m-437.6m shown).
Chris Daws, CEO said “It is certainly an unprecedent time for all those involved with Estrella and the Carr
Boyd Rocks Ni-Cu Project. Modern science, technology, belief, and persistence has led to this highly
significant discovery which is now beginning to unlock the true potential of T5.
“The Board of Estrella recently focused all of our shareholder funds and efforts into supporting the
Company’s Flagship Carr Boyd Project. The exploration team comprising Geolithic Geological Services,
Southern Geoscience and Topdrive Drillers have been instrumental in this discovery, spending the last 7
weeks on the ground setting up and drilling at T5. Previous geological input from respected individuals
including Luke Marshall, Matt Painter, Dr. Martin Gole, Peter Hayden and others have given us the
confidence to commit shareholder’s funds into this venture. All the hard work has now delivered this
outstanding result which confirms the confidence that the Company has had in the Carr Boyd Project.
“It was a bold move to drill deep holes well below the existing near surface drilling. Our work has resulted
in this thick intersection of primary magmatic nickel sulphides, and Carr Boyd can now join an elite list of
recent Western Australian nickel discoveries including the Golden Swan, Julimar and Mawson discoveries.
The Company is still drilling our planned holes in the current program and our Phase IV HPMLTEM survey
is also underway. I look forward to seeing what we next uncover.”
* Assay Results Confirm New Sulphide Nickel Discovery Zone at Carr Boyd Rocks - 8 July 2019
Diamond core hole CBDD030 was collared 300m south of the T5 zone (Figure 4), testing the Carr Boyd
Layered Intrusions contact at depth, below and south of the previously identified mineralisation. The hole
successfully intersected the basal contact of the layered mafic/ultramafic intrusion, returning a significant
~15m wide zone of sulphide mineralisation (Table 1) starting from 430.55m downhole, which contains a
2.9m thick core zone (~true width) of massive Ni-Cu sulphide mineralisation from 435.9m depth (Figures 1
& 2).
The sulphide zone forms unique magmatic nickel sulphide textures comprising pyrrhotite, pentlandite and
chalcopyrite (Figure 3), with pXRF testing by site geologists confirming the high-grade nature of the Ni-Cu
sulphides. Au+PGE elements are expected, as demonstrated by recent assay results from hole CBDD028
(Table 3).
Detailed logging of the core is currently in progress with cutting and sampling scheduled post showcasing
the intersection in Kalgoorlie during the Diggers and Dealers Conference next week (12-14th October).
Figure 3. Unique magmatic sulphide texures showing breccia rip up clasts within the massive sulphide, interstitual
sulphide/crystal intergrowth at the margin, and chalcopyrite segregation within the crystallised host gabbro. Coarse blebs
of matrix sulphide are observed between the crystallising host rock (436.7m-441.1m shown).
CBDD0030
Table 1: Sulphide Intersection Summary
Hole ID
mFrom
mTo
Width
Type
Sulphides
S%
430.55
431.60
Dissem
po,py,cpy
2-5%
1.05
431.60
431.70
Vein
po,py
70%
0.10
431.70
432.15
Blebby
po,py,pe
50%
0.45
432.15
432.35
Massive
po,pe
70%
0.20
432.35
435.90
Dissem
po,py,cpy
5-15%
3.57
435.90
438.80
Massive
po,pe,
cpy
80%
2.88
438.80
440.00
Matrix
po,pe,cpy
10%
1.20
440.00
445.50
Dissem
po,py,cpy
5%
5.50
*po=pyrrhotite, py=pyrite, cpy=chalcopyrite, pe=pentlandite
Comment
Weak sulphides
Remobilised
Coarse blebs
Breccia Vein
Interstitial/dissem
Primary Massive
Crystal intergrowths
Dissem to blebby
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide
and oxide material abundance should never be considered a proxy or substitute for laboratory
analysis. Laboratory assay results are required to determine the widths and grade of the visible
mineralisation reported in preliminary geological logging. The Company will update the market when
laboratory analytical results become available.
The Company has completed 3 diamond core holes to date (Table 2) with the final hole (CBDD031) of the
planned deep drill program now in progress. CBDD031 is collared 300m north of the T5 zone giving deep
coverage over a 600m wide window along the intrusions basal contact.
Historical hole GD124 was drilled 140m south of CBDD030 (Figure 4), returning 1.83m @ 1.17% Ni at a
vertical depth of 86m, providing the initial interest in this position of the basal contact. Hole GD140 was
drilled above the position of CBDD030, also intersecting the intrusions contact near surface at a vertical
depth of 100m (Figures 4 & 5). This hole returned an anomalous grade of 2.29m @ 0.8% Ni but was not
followed up by previous explorers as follow up work was centered around GD124 to the south.
In contrast, CBDD030 intersected the contact at a depth of 368m, was completely blind and is open
in all directions (Figure 5). This provides massive opportunity to drill out and expand this zone of
mineralisation.
DHTEM geophysical surveying is scheduled to be completed in this hole as soon as a crew is available and
will further define the extent of this massive sulphide system. DHTEM has already been completed on the
first two diamond holes CBDD028 & CBDD029, and with the pending completion of the final planned hole
CBDD031, the results will assist Estrella in vectoring into the extents and source of this primary magmatic
Ni-Cu sulphide mineralisation.
This is a significant breakthrough in the development of the T5 Prospect that was initially investigated in
mid-2019 through drill testing of a High-Powered Fixed Loop TEM survey target located to the north of the
historical intersections around GD124. Our current work is now beginning to unlock the real potential of the
Carr Boyd Project.
Planning is now underway to rapidly expand the exploration program at Carr Boyd following this significant
development which will include upgrading support infrastructure, increasing number of drilling rigs,
personnel and support so that we can quickly determine the extent of this discovery.
Table 2: Drill hole collar details
Hole ID
CBDD0028
CBDD0029
CBDD0030
CBDD0031
Final Depth
251.0m
603.8m
495.7m
~600m
Easting
367045
367000
367025
366925
Northing
6673940
6673940
6673640
6674240
Dip
-60
-70
-65
-65
Azimuth
090
090
090
090
Status
Completed
Completed
Completed
In Progress
Historical
Shallow
Intersections
Final Planned
Drill Hole
Discovery
Intersection
Historical
Intersection
GD140
CBDD030
Intersection
Position
Width x Grade
Historical
Intersection
GD124
Figure 4. Drill hole plan showing ESR’s recent RC and DD drill holes (blue trace) and historical holes >150m depth (grey
trace). Nickel intersections are shown by the squares which are coloured by Width x Grade calculation.
2.29m @ 0.8% Ni
~15m Wide
Sulphide Zone
Assays Pending
Figure 5. Cross Section 6673640mN showing CBDD030 and shallow historical hole with interpreted geology and mineralised
basal contact. Mineralisation is open in all directions with DHTEM planned to geophysically test the potential of this zone.
Assay results have been returned from the initial batch of samples taken from the first shallow diamond
core hole CBDD028 which was drilled under the RC hole CBP042 (Figure 7). The core was sampled
through the remobilised and disseminated sulphide zone as shown at Figure 6 and as previously reported†.
† Sulphides Intersected at Carr Boyd Rocks Ni/Cu Project - 8 September 2020
Table 3 below highlights the mineralised intersections and associated anomalous elements within
CBDD028 and Table 4 shows full list of assays for the relevant economic elements.
Table 3: Significant Intersection Results above 0.3% Ni cut-off grade.
Hole ID
From
CBDD028 165.2m
Incl l 165.2m
CBDD028 173.6m
To
Width
Ni
Cu
Co
Ag
%
%
ppm
ppm
169.0m
3.8m
0.48
0.31
255
2.60
165.6m
0.4m
1.12
1.07
579
6.80
174.0m
0.4m
0.33
0.28
208
1.3
*Downhole widths reported, true widths not fully establish.
Au+Pt+Pd
ppm
0.634
0.930
0.144
Figure 6. Anomalous Ni-Cu-PGE bearing sulphides in diamond drill hole CBDD028 at the T5 Ni-Cu discovery zone (161m-169m
shown).
Diamond drill hole CBDD028 was designed to test the Carr Boyd layered mafic-ultramafic intrusions contact
zone ~25-30m down dip of the original RC hole CBP042 which intersected 8m @ 1.11% Ni & 0.36% Cu,
including 4m @ 1.60% Ni & 0.31% Cu from the matrix sulphide zone‡.
The core hole was drilled to a depth of 251m and successful intersected the contact at 165.2m downhole
depth. Semi-massive & stringer Ni sulphides (pyrrhotite-pentlandite) was intersected at a depth of 165.31m165.37m downhole (Figures 6 & 7). Remobilised Cu sulphides (chalcopyrite) occur above, within and below
this zone. Ni bearing matrix to disseminated style sulphides immediately followed and were intersected from
165.37m-166.81m downhole. This is a significant lead in understanding the nature of the basal contact and
how it appears to be thinner and lower grade near surface (masking earlier discovery efforts), then thickening
and being higher grade at depth. This provides wide open opportunities along the entire length of the basal
contact at depth, below the historical near surface drilling.
‡ Assay Results Confirm New Sulphide Nickel Discovery Zone at Carr Boyd Rocks - 8 July 2019
3.8m @ 0.48% Ni
0.31% Cu
255ppm Co
630ppm Au+PGEs
Carr Boyd Layered Intrusion
DHTEM Platform
Target Zone
Figure 7. Cross Section 6673940mN showing interpreted geology from RC hole CBP042 and recently completed diamond
drill holes CBDD0028 & CBDD0029. These holes provided a deep platform to test the mineralised contact over a down dip
length of 400m.
DownHole Transient Electro-Magnetic (DHTEM) was recently completed on holes CBDD0028 & CBDD029
by GEM Geophysics and modelled by Southern Geoscience. Modelling of the data from hole CBDD028
shows a clear mid to late channel inhole/offhole anomaly which is defined at ~160-170m downhole with the
source being centered above and south of this hole (Figure 8). This conductor is clearly related to the known
T5 conductor as tested by the earlier RC hole and by the reported sulphide intersection within this diamond
hole.
The second diamond core hole CBDD029 was completed to a depth of 603.8m and was designed to provide
a deep DHTEM platform hole which parallels the intrusions contact (Figure 8). A clear mid to late channel
anomaly is defined between ~100-200m downhole with the source being sub-parallel to the hole with the
lower edge being at ~200m downhole depth within this hole. This conductor is clearly related to the known
upper T5 conductor as already tested. A localised moderate strength anomaly (~750-1250S) is apparent at
~365-425m downhole and is modelled to be sub-parallel. It has a size of ~10-15m with reasonable strike
extent of >50m, positioned just west of hole and strongly north of the hole (Figure 8).
This may be the deeper northern extents of the mineralisation intersected in CBDD030 and will be further
tested with the final planned hole CBDD031 which is now in progress. Further modelling is required once
the DHTEM survey of the highly successful hole CBDD030 is completed which will combined with the results
of the northern most hole CBDD031 to assist in vectoring towards the extent and source of the magmatic
sulphides.
CBDD031
CBDD030
Figure 8. DHTEM results showing position of anomaly in CBDD029 (Light blue zone).
In addition, a geophysical crew has been mobilized to the project this week to complete High-Powered
Moving Loop Transient Electro-Magnetic (HP MLTEM) at the north eastern part of the project covering POH,
Watertank and Tektite Hill prospects (Figure 9). Field investigation of these prospects return encouraging
finding and nickel-copper bearing gossanous rocks at surface with the geologists collecting rock chip samples
from these sites and submitting them to ALS laboratories for assaying. Results are pending and will be
reported along with the results of the HP MLTEM survey results.
The Company will continue to update shareholders as assay and DHTEM results are received and
interpreted.
HPEM Survey
Extension Area
Figure 9. Previous HPEM stations on aeromagnetics covering the Central Zone and Target 5 area which is the current focus
of drilling. The central box defines the new target area for the HPEM extension survey which covers the POH Zone and
Tektite Hill Zone.
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Neil Hutchison, who is a consultant to Estrella Resources, and a member of The Australasian
Institute of Geoscientists. Mr. Hutchison has sufficient experience relevant to the style of mineralisation and type of
deposit under consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr.
Hutchison consents to the inclusion in the report of the matters based on his information in the form and context in which
it appears.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
ABOUT THE PROJECT AND THE CBLC
The Carr Boyd Nickel Project (CBNP) is a magmatic
hosted sulphide system which comprises the Carr Boyd
Layered Complex (CBLC or the Complex). The CBLC is
in a Tier 1 jurisdiction approximately 80km north northeast of Kalgoorlie Western Australia. An all-weather haul
road accessible by Estrella under a granted
miscellaneous license connects the Project to the
Goldfields Highway via Scotia. Estrella holds 259km 2 of
contiguous tenure over the entire magmatic maficultramafic layered complex
The CBLC hosts the historic Carr Boyd Rocks nickel
mine which was the first magmatic hosted style of nickel
deposit discovered and mined in WA. It was discovered
an the late 1960’s and produced 202,110t of ore at an
average grade of 1.43% Ni and 0.46% Cu between
1973-1977.
Location of Carr Boyd Project
Komatiites flows have been the main source of developed nickel sulphide mines in WA and have been explored
extensively since the late 1960’s. Due to their well understood geochemistry, formation, and high-grade
sulphide enrichment process within defined channels, most of the studies and exploration programs in WA
have focused on discovering this style of mineralisation. The Kambalda-Kalgoorlie-Leinster-Laverton
Goldfields Region has been the main focus for komatiite exploration, with limited potential existing outside this
region. Greenfields discoveries of komatiite nickel have all bar dried up in the Goldfields Region and its only
deep brownfields exploration that is delivering new nickel deposits.
Elsewhere around the world, large scale magmatic nickel deposits are the norm, producing world-class
deposits with long productive mine lives. In WA, magmatic nickel deposits occur scattered throughout the
state, however, they have had a long and slow history of discovery, development and understanding. Its only
in recent years, since the discovery of the Nova-Bollinger deposit (2012) in the Fraser Range (which had been
historically explored for over 40yrs), that a string of magmatic nickel deposit have suddenly been discovered.
As komatiite sources dry up, focus and understanding around magmatic nickel deposits is starting to gain
momentum, resulting in exploration companies looking at various mafic-ultramafic bodies which have had
limited to no exploration completed over them to date. This is resulting in a new level of understanding in WA
on the formation/deposition of nickel-copper sulphides within magmatic rocks, leading to a wave of new
discoveries.
Interest in magmatic nickel-copper deposits have had a resurgence with the recent discoveries of magmatic
hosted sulphide mineralisation at Legend Mining’s (ASX:LEG) Rockford Project and Chalice Gold Mines
(ASX:CHN) Julimar Projects. A “Voisey Bay” magmatic style model has not been adequately explored within
the CBLC. This represents a compelling exploration target opportunity which the Company will continue to
aggressively pursue.
Table 4. List of assay results from CBDD028 with selected relevant elements
Hole_ID
SampleID
mFrom
mTo
Interval
Ag
Co
Cu
Ni
S
Au
Pt
Pd
Au+Pt+Pd
ppm
ppm
ppm
CBDD028
ECB10001
159
160
1
<0.5
55
84
ppm
%
ppm
ppm
ppm
ppm
180
0.08
0.003
0.016
0.015
0.034
CBDD028
ECB10002
160
161
1
<0.5
55
CBDD028
ECB10003
161
162
1
<0.5
16
106
139
0.09
0.003
0.013
0.017
0.033
83
24
0.27
0.001
<0.005
0.003
0.004
CBDD028
ECB10004
162
163
1
<0.5
10
80
0.33
0.002
<0.005
0.001
0.003
CBDD028
ECB10005
163
164
1
<0.5
14
414
17
0.73
0.02
<0.005
0.003
0.023
CBDD028
ECB10006
164
164.6
0.6
<0.5
33
CBDD028
ECB10007
164.6
165.2
0.6
<0.5
72
64
57
0.07
0.012
0.009
0.01
0.031
802
458
0.34
0.003
0.019
0.026
0.048
CBDD028
ECB10008
165.2
165.6
0.4
6.8
579
10700
11200
9.52
0.023
0.268
0.639
0.93
CBDD028
ECB10009
165.6
166.2
0.6
<0.5
CBDD028
ECB10010
166.2
167
0.8
0.5
383
752
7330
6.31
0.007
0.211
0.351
0.569
286
1605
5190
4.39
0.011
0.306
0.287
0.604
CBDD028
ECB10011
167
168
1
2.1
118
2030
2140
1.1
0.236
0.213
0.113
0.562
CBDD028
ECB10012
168
169
CBDD028
ECB10013
169
170
1
4.5
161
3630
3000
1.77
0.315
0.202
0.133
0.65
1
<0.5
85
160
1175
0.25
0.004
0.027
0.022
0.053
CBDD028
ECB10014
170
171
1
<0.5
83
93
1080
0.16
0.002
0.021
0.024
0.047
CBDD028
ECB10015
CBDD028
ECB10016
171
172
1
<0.5
84
301
1365
0.26
0.013
0.068
0.036
0.117
172
173
1
<0.5
80
248
1395
0.28
0.015
0.032
0.036
0.083
CBDD028
ECB10017
173
173.6
0.6
<0.5
131
705
2580
1.22
0.062
0.033
0.036
0.131
CBDD028
ECB10018
173.6
174
0.4
1.3
208
2780
3340
3.81
0.042
0.069
0.033
0.144
CBDD028
ECB10019
174
175
1
<0.5
41
112
352
0.17
0.001
0.007
0.008
0.016
CBDD028
ECB10020
175
176
1
<0.5
58
94
540
0.1
0.004
0.013
0.009
0.026
CBDD028
ECB10021
176
177
1
<0.5
62
104
606
0.1
0.007
0.014
0.011
0.032
CBDD028
ECB10022
177
178
1
<0.5
65
115
609
0.12
0.005
0.01
0.012
0.027
CBDD028
ECB10023
178
179
1
<0.5
65
79
599
0.09
0.004
0.013
0.011
0.028
CBDD028
ECB10024
179
180
1
<0.5
68
97
640
0.09
0.025
0.012
0.012
0.049
CBDD028
ECB10025
180
181
1
<0.5
63
114
604
0.1
0.006
0.013
0.012
0.031
CBDD028
ECB10026
181
182
1
<0.5
71
154
713
0.12
0.007
0.014
0.012
0.033
CBDD028
ECB10027
182
183
1
<0.5
68
104
660
0.05
0.006
0.014
0.011
0.031
CBDD028
ECB10028
183
184
1
<0.5
68
55
606
0.02
0.003
0.016
0.013
0.032
CBDD028
ECB10029
184
185
1
<0.5
69
89
693
0.02
0.009
0.025
0.019
0.053
CBDD028
ECB10030
185
186
1
<0.5
69
41
572
0.02
0.007
0.022
0.017
0.046
CBDD028
ECB10031
186
187
1
<0.5
72
97
725
0.02
0.009
0.022
0.02
0.051
CBDD028
ECB10032
187
188
1
<0.5
78
67
1035
0.02
0.012
0.041
0.033
0.086
CBDD028
ECB10033
188
189
1
<0.5
103
288
1365
0.43
0.008
0.037
0.033
0.078
CBDD028
ECB10034
189
190
1
<0.5
96
264
1145
0.47
0.005
0.03
0.027
0.062
CBDD028
ECB10035
190
190.5
0.5
<0.5
110
236
1250
0.39
0.003
0.04
0.037
0.08
CBDD028
ECB10036
190.5
191
0.5
<0.5
186
901
2670
1.12
0.016
0.045
0.044
0.105
CBDD028
ECB10037
191
192
1
<0.5
106
175
1495
0.36
0.001
0.033
0.026
0.06
CBDD028
ECB10038
192
193
1
<0.5
105
231
1545
0.45
0.004
0.039
0.034
0.077
CBDD028
ECB10039
193
194
1
<0.5
91
226
1290
0.39
0.004
0.03
0.026
0.06
CBDD028
ECB10040
194
195
1
<0.5
86
134
1045
0.13
0.009
0.023
0.023
0.055
CBDD028
ECB10041
195
196
1
<0.5
69
62
794
0.04
0.007
0.015
0.014
0.036
CBDD028
ECB10042
196
197
1
<0.5
82
285
1250
0.13
0.031
0.028
0.021
0.08
CBDD028
ECB10043
197
198
1
0.7
91
613
1005
0.27
0.011
0.02
0.017
0.048
CBDD028
ECB10044
198
199
1
<0.5
97
299
1435
0.8
0.006
0.06
0.029
0.095
CBDD028
ECB10045
199
199.5
0.5
<0.5
88
300
1050
0.81
0.005
0.038
0.027
0.07
<1
Hole_ID
SampleID
mFrom
mTo
Interval
Ag
Co
Cu
Ni
S
Au
Pt
Pd
Au+Pt+Pd
ppm
ppm
ppm
ppm
%
ppm
ppm
ppm
ppm
CBDD028
ECB10046
199.5
200
0.5
<0.5
130
872
1300
1.7
0.004
0.03
0.026
0.06
CBDD028
ECB10047
200
201
1
<0.5
98
370
1175
0.85
0.002
0.028
0.028
0.058
CBDD028
ECB10048
201
202
1
<0.5
94
84
1005
0.2
0.006
0.02
0.019
0.045
CBDD028
ECB10049
202
203
1
<0.5
81
20
874
0.03
0.006
0.015
0.014
0.035
CBDD028
ECB10050
203
204
1
<0.5
76
61
762
0.03
0.007
0.028
0.017
0.052
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut DD core samples have been half cut with automatic core
techniques
channels, random chips, or specific
saw
specialised
industry
standard 0.3m-1.1m samples are collected from the core trays as
measurement tools appropriate to the
marked out by the supervising geologist
minerals under investigation, such as A handheld XRF tool was used to verify the mineralisation
down hole gamma sondes or handheld
with samples reporting >0.3% Ni in disseminated zones
XRF
instruments,
etc.).
These
and >1% Ni in the matrix sulphide zones.
examples should not be taken as XRF results have not been reported and are used as a
limiting the broad meaning of sampling.
logging/sampling verification tool only.
No other measurement tools other than directional survey
tools have been used in the holes.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Core is continuously cut on the same side of the
orientation line and the same side is sampled to ensure
the sample is representative and no bias is introduced.
Determination of mineralisation has been based on
geological logging and confirmation using a pXRF
machine. Samples were dispatched for laboratory ultielement analysis.
.
Diamond Core drilling was used to obtain 3-6m length
samples from the barrel which are then marked in one
meter intervals based on the drillers core block
measurement.
Assay samples are selected based on geological logging
boundaries or on the nominal meter marks.
Collect samples weigh a nominal 2-3 kg (depending on
sample recovery) was sent to lab and pulverised.
Samples have been dispatched to a commercial
laboratory in Perth for analysis
Samples are being analysed using a 4 acid digest for MEICP for 33 elements and ore zone samples are also being
tested for PGM-ICP testing for Au & PGE elements
Drilling was undertaken using NQ2 sized drill core.
Hole was collar with mud rotary from surface, HQ rough
cored to top of fresh rock then NQ2 cored to EOH.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
JORC Code explanation
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Core recovery was recorded by the drill crew and verified
by the geologist.
RQD measurements were digitally recorded to ensure
recovery details were captured.
Sample recovery in both holes was high with negligible
loss of recovery observed.
Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very good
condition.
The
verification
of
significant
intersections by either independent or
alternative company personnel.
Results verified by Company CEO
Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines
was undertaken
Core trays were photographed wet and dry prior to
sampling.
Drill hole logs are recorded in Excel spread sheets and
validated in Micromine Software as the drilling
progressed.
The entire length of both holes was logged.
Core is half cut using an automatic core saw to achieve a
nominal 2-3kg split sample for laboratory submission
The sample preparation technique is considered industry
best standard practice
No field duplicates have been collected in this program.
Fi
Share your feedback
Discover