Maiden Nickel Resource 5A Project
Released
Released
Announcement PDF
18 October 2019
ASX ANNOUNCEMENT
MAIDEN NICKEL SULPHIDE RESOURCE 5A SPARGOVILLE
HIGHLIGHTS
Maiden nickel sulphide Resource of 127,000 tonnes @ 1.9% Ni, 0.15% Cu
o Including 13,000 tonnes @ 8% Ni
2,370 contained Ni tonnes
Over 65% of Ni tonnes in the Indicated category
Majority of resource located within 100m of surface
Deposit open at depth below high grade drill results
Nickel market outlook positive
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to report to shareholders
its maiden 5A nickel sulphide Mineral Resource at the Spargoville Nickel Project, located approximately
30km south-west of Kambalda, Western Australia. The maiden Mineral Resource stands at 127,000
tonnes at 1.9% Ni and 0.15% Cu for a contained nickel metal inventory of 2,370 tonnes and is reported
in compliance with the JORC Code (2012). The Mineral Resource is shallow with the majority of nickel
within 100m of surface and amendable to open pit mining. The maiden Mineral Resource follows a
detailed assessment of historic drilling and the inclusion of significant high grade nickel sulphide drilling
results achieved by the Company (see ASX release 18 December 2018) which included;
15m at 10.45% Ni, 0.78% Cu, 0.20% Co, 0.87g/t Pb, and 1.15g/t Pt from 20m
5m at 11.32% Ni, 0.54% Cu, 0.21% Co, 0.42g/t Pd, and 0.22g/t Pt from 61m
3m at 12.90% Ni, 1.37% Cu, 0.29% Co, 1.86g/t Pd, and 0.67g/t Pt from 69m
Over 65% of the contained nickel tonnes in the 5A maiden Mineral Resource have been classified as
Indicated with there being sufficient drill density and understanding of the mineralisation to satisfy this
classification. The deposit is open at depth below the high grade nickel sulphide drill intercepts which
allows potential for an increase in the current resource with further drilling.
In light of the current strength in the nickel market and the positive outlook, the Company will undertake
steps towards commercialisation of the 5A nickel sulphide Mineral Resource.
The 5A nickel sulphide deposit is one of a number of significant nickel sulphide occurrences that make
up the Company’s 100% owned Spargoville Nickel Project which was purchased at a time when nickel
projects were not in favour and nickel prices were much lower. In A$ terms the nickel price has risen over
50% this calendar year and currently worth over A$24,000 per tonne.
Company CEO Mr. Chris Daws said “It is pleasing to be able to report to shareholders our maiden nickel
sulphide Mineral Resource at 5A and comes on the back of previous exceptional nickel sulphide assays.
We are keen to capitalise on this near-surface resource especially now the nickel market is strengthening,
and the outlook for the metal continues to be positive. Recent news that the Indonesian Government plan
to bring forward its ban on its nickel exports by two years is clearly having an impact, as evident by the
recent dramatic drawdowns of nickel stocks from the London Metal Exchange by the world’s biggest end
users.”
5A Nickel Sulphide Deposit
October 2019 Mineral Resource Estimate - Min Type (0.5% Ni Cut-off)
Type
Disseminated
Matrix/Breccia
Semi-massive/Massive
Total
Type
Disseminated
Matrix/Breccia
Semi-massive/Massive
Total
Type
Disseminated
Matrix/Breccia
Semi-massive/Massive
Total
Tonnage
kt
37
20
12
69
Indicated Mineral Resource
Ni
Cu
Ni
%
%
t
0.7
0.05
250
2.1
0.17
430
8.1
0.63
950
2.4
0.19
1,630
Tonnage
kt
41
17
1
58
Ni
%
0.7
2.5
7.6
1.3
Inferred Mineral Resource
Cu
Ni
%
t
0.10
270
0.13
410
0.35
60
0.11
730
Ni
%
0.7
2.3
8.0
1.9
Total Mineral Resource
Cu
%
0.08
0.16
0.61
0.15
Tonnage
kt
78
37
13
127
Ni
t
520
840
1,000
2,370
Cu
t
20
30
70
130
Cu
t
40
20
70
Cu
t
60
60
80
190
Competent Person Statement
The information in this announcement relating to Mineral Resources is based on information compiled by Mr Shaun Searle who
is a consultant to Estrella Resources, and a member of The Australian Institute of Geoscientists. Mr Searle has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resource and Ore Reserves”. Mr Searle consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
info@estrellaresources.com.au
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning the Company’s planned exploration program and other statements that are not historical
facts. When used in this document, the words such as "could," "plan," "expect," "intend," "may”, "potential,"
"should,", “further” and similar expressions are forward-looking statements. Although the Company believes that its
expectations reflected in these forward-looking statements are reasonable, such statements involve risks and
uncertainties and no assurance can be given that further exploration will result in Mineral Resources.
Geology and Geological Interpretation
The Spargoville Project area lies within the Coolgardie Domain, the western most domain of the
Kalgoorlie Greenstone Terrain, which stretches northwards from Norseman to Menzies. The Project is
situated within a dominantly north-south striking belt of Archaean greenstone rocks that extend north
from the Widgiemooltha Dome. The 5A deposit is characterised as a Kambalda style (komatiite hosted)
nickel sulphide deposit.
Nickel mineralised bodies at Spargoville commonly form as lenses of massive sulphide up to several
metres thick within ultramafic rocks at or near the ultramafic / meta-basalt contact. A halo of disseminated,
lower-grade, mineralisation often extends up to 20m width into the ultramafics and rare veins of sulphide
may be found in the underlying meta-basalt. The major ore bodies are all lensoidal with limited extent
down dip and along strike, suggesting structural control in the form of embayment structures or
depressions in the meta-basalt.
Sampling and Sub-sampling Techniques
Most of the drilling, sampling and assaying was completed by Selcast Exploration and Amalg Resources.
Core was sampled at 1m intervals or to geological contacts and RC samples were collected at 1m
intervals from the rig mounted splitter.
For ESR drilling, RC drill holes were sampled by 1m cone split composites through mineralisation and
4m spear samples in unmineralised material, producing a nominal 3kg to 5kg representative sample. RC
drilling was 5 ¼ inch in diameter.
Drilling Techniques
The 5A deposit has been drilled with diamond core, carried out with NQ2 and HQ2 sized equipment,
using standard tube. RC holes were 5 ¼ inch in diameter.
Mineral Resource Classification Criteria
The 5A Mineral Resource was classified as Indicated and Inferred Mineral Resource based on data
quality, sample spacing, and lode continuity. The Indicated Mineral Resource was defined within areas
of close spaced RC and DD drilling of less than 20m by 20m, and where the continuity and predictability
of the lode positions was good. The Inferred Mineral Resource was assigned to areas where drill hole
spacing was greater than 20m by 20m, where small isolated pods of mineralisation occur outside the
main mineralised zones, and to geologically complex zones.
Sample Analysis Method
Sample analysis was undertaken at Intertek laboratory in Kalgoorlie. Nickel and multielement analysis
were performed by 4 acid digest and a combination of ICP-MS and ICP-OES analysis techniques. Gold
and PGEs were determined by a 25g fire assay fusion, followed by aqua regia digest and ICP-MS finish.
Estimation Methodology
The mineralisation was constrained by wireframes prepared using a variety of cut-offs for the various
sulphide mineralisation types. Disseminated sulphide was domained using a nominal 0.4% nickel cut-off,
plus geological logging, matrix sulphide was domained using a nominal 1.0% nickel cut-off, plus
geological logging; and semi-massive to massive sulphide mineralisation was domained using a 4.0%
nickel cut-off, plus geological logging. Following a review of the population histograms and log probability
plots and noting the low coefficient of variation statistics, it was determined that the application of high
grade cuts was not warranted.
The block model parent block dimensions used were 10m NS by 5m EW by 5m vertical with sub-cells of
0.625m by 0.625m by 0.625m. The parent block size dimension was selected on the results obtained
from KNA that suggested this was the optimal block size for the 5A dataset. The Mineral Resource block
model was created and estimated in Surpac using Ordinary Kriging (“OK”) grade interpolation. An
orientated ‘ellipsoid’ search was used to select data and adjusted to account for the variations in lode
orientations, however all other parameters were taken from the variography. Up to three passes were
used for each domain. First pass had a range of 35m, with a minimum of 6 samples. For the second
pass, the range was extended to 60m, with a minimum of 4 samples. For the third pass, the range was
extended to 100m, with a minimum of 2 samples. A maximum of 16 samples was used for all passes,
with a maximum of 4 samples per hole.
Bulk densities ranging between 2.0t/m3 and 2.95t/m3 were assigned in the block model for the saprolite
and saprock material, dependent on mineralisation and weathering. Regression equations were utilised
to estimate bulk density for the saprock and fresh matrix and massive sulphide domains. These densities
were applied based on adjusted pycnometer measurements obtained from RC chips.
Cut-off Grade
The Statement of Mineral Resources has been constrained by the mineralisation solids and reported
above a cut-off grade of 0.5% nickel.
Mining and Metallurgical Methods and Parameters
It is assumed that the 5A deposit can be mined using open pit techniques. A high level optimisation
analysis shows that this can be achieved at current nickel prices and assuming the 5A material is treated
at a suitable third party processing plant within trucking distance of the Project.
Metallurgical testing has been conducted on samples obtained from the 5A deposit. Testing indicates
that the 5A material shows more than 90% recovery at the suitable third party processing plant.
JORC Table 1
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which
3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may
be required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented
and if so, by what method, etc.).
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Commentary
The Spargoville landholding has been drilled by
DD (surface and underground, 504 holes), RC
(204 holes), RAB and Percussion (1,514 holes)
and air core (33), drilling both for nickel and gold.
Drilling data exists for 4,742 drill holes for
169,420 metres in the tenement area. A total of
1,070 holes had one or more intercepts over 1%
Ni. All the holes apart from KWC0001 to
KWC0006 were drilled by previous operators
prior to ESR taking over the prospect in 2018.
DD and RC sampling techniques conducted
prior to this drilling program are not known but
are assumed to be industry standard at the time
of collection. Pre-this program, data was
compared to historic data and the two datasets
generally correlated well.
From KWC series holes reported in this
announcement, RC drill holes were sampled by
1m cone split composites through mineralisation
and 4m spear samples in unmineralised
material. RC drilling was 5 ¼ inch in diameter.
For ESR RC holes, sampling was cone split from
1m composite bulk samples, producing a
nominal 3kg to 5kg representative sample.
RC samples ranged from 4m in waste material
and 1m in or near mineralisation.
Nickel mineralisation consists of contact
massive sulphides (violarite, pyrite, pyrrhotite,
pentlandite, chalcopyrite) typically 1.5m to 4m
thick, overlain by matrix sulphides and
disseminated sulphides. At 5A the sulphides
have been weathered to produce supergene
sulphides of pyrite and violarite and secondary
oxide material.
Most of the drilling, sampling and assaying was
completed by Selcast Exploration and Amalg
Resources. It is unknown how samples were
collected, but it is assumed to be industry
standard at the time. The data from this drilling
program compared well with drilling conducted
by previous explorers. For this drilling program,
representative samples from RC drilling were
collected and sent to Intertek laboratory in
Kalgoorlie for analysis. Intertek crushed and
pulverised the samples in entirety and took a 50g
pulp for analysis.
For ESR drilling, nickel and multielement
analysis was performed by 4 acid digest and a
combination of ICP-MS and ICP-OES analysis
techniques. Gold and PGEs were determined by
a 25g fire assay fusion, followed by aqua regia
digest and ICP-MS finish.
Minor copper, cobalt, and significant arsenic
occur in the nickel mineralisation.
The database is comprised of DD samples
(7,823), RC samples (10,766), RAB/AC drilling
samples (5,241) and unspecified samples
(25,665). DD drilling included NQ, HQ and BQ
diameter core.
RC sample recoveries were inferred from sample
weights reported by the laboratory for this
program.
No sample weight information is
available for historic drilling.
Criteria
Logging
Sub-sampling
techniques
and sample
preparation
JORC Code explanation
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant
intersections logged.
Commentary
No relationship exists between sample recovery
and grade.
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data and
laboratory
tests
Verification of
sampling and
assaying
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have
been established.
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Detailed drill hole logs are available for 97.4% of
the historic drilling and 100% of the new drilling.
Prior to the ESR drilling, it is unknown whether
duplicates, standards and blanks taken for
QA/QC purposes were taken. Hard copy sample
logging sheets were kept.
This includes
samples numbers for duplicates, standards and
blanks taken for QA/QC purposes. All data are
available for the work conducted from the current
program.
The logging is of a detailed nature and of
sufficient detail to support the current reporting
of a Mineral Resource.
DD sampling techniques are unconfirmed for
historic drilling.
For the ESR drilling, samples were collected by
a rig mounted cyclone and cone splitter.
For the ESR drilling, sample condition fields to
record moisture and sample recovery is included
in the sampling log sheet and populates the
assay table of the database.
For the ESR drilling, sample preparation is
appropriate for RC drilling as per industry
standard practices for managing RC samples.
Prior to the current program it is unknown
whether quality control procedures have been
used.
For the ESR drilling, quality control procedures
included the inclusion of field duplicates,
standard samples and blank samples into the
sampling stream for laboratory analysis.
Standards were placed every 30 samples with a
combination of blank, low-grade and high-grade
standards. Dependent on the geology, a suitable
standard was selected.
Blank standards
(OREAS22C) were generally placed after a
mineralised zone and routinely every 25
samples. Duplicate sampling was undertaken for
the RC drilling every 20 samples.
Host rock for nickel mineralisation is mainly a
serpentinite lens at the base of an ultramafic
sequence. It is assumed that prior to the current
program sampling would have been appropriate
for the style of mineralisation; and from the
current program, it is appropriate.
For the ESR drilling, quality control procedures
included the inclusion of field duplicates,
standard samples and blank samples into the
sampling stream for laboratory analysis. One
standard, blank and field duplicate were inserted
into the sample stream every 30 and 20 samples
respectively. These were offset through the
sampling stream and placed in areas of interest
i.e. high-grade standards and blanks in the
mineralised zone where possible. The QAQC
results have been assessed and are acceptable.
No geophysical methods or hand-held XRF units
have been used for determination of grades in
the Mineral Resource.
Significant intersections were visually field
verified by company geologists and Shaun
Searle of Ashmore during the 2019 site visit.
Multiple intersections reported have been
checked back to original logs and assay data.
No twin holes have been drilled.
Drill hole data were sourced from digital sources
and original hard-copy sampling and assay
Criteria
JORC Code explanation
Location of
data points
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource
and
Ore
Reserve
estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
Sample
security
The measures taken to ensure sample security.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
Commentary
records and imported into a central electronic
database. Datashed software was used to
validate and manage the data.
No adjustments have been made to the assay
data.
Surface topography is derived from drill hole
collars and the historical survey control of the
Spargoville open pit. The new holes were set
out and picked up by Cardno Surveys and
downhole surveyed by ABIMS Solutions.
Prior to the current program it is assumed that
the majority of the drill holes were down hole
surveyed by a single shot tool and by collar
measurement with a clinometer and compass.
This was rarely recorded in the database. From
the current program of holes were down hole
surveyed by a gyro.
Prior to ESR drilling, original surveying was
undertaken in Kambalda Nickel Operations Grid
(KNO) and from the current program in GDA94
grid.
The 5A area has been drilled on a regular
pattern and spacing by various previous
operators. The average spacing is estimated to
be approximately 20m by 20m within the 5A
mine area.
The drill data spacing, and sampling is adequate
to establish the geological and grade continuity
required for the current announcement.
Samples were composited to 1m intervals prior
to estimation.
The drill line and drill hole orientation are
oriented as close as practicable to perpendicular
to the orientation of the general mineralised
orientation.
Most of the drilling intersects the mineralisation
at close to 90 degrees ensuring intersections are
representative of true widths. KWC0004 and
KWC0005 are the exception; these holes were
purposefully drilled at a low angle to
mineralisation for the purpose of collecting bulk
sample for metallurgical test work.
No orientation based sampling bias has been
identified in the data.
Sample security measures are unknown for
previous drilling. For the ESR drilling, sample
security measures adopted include the daily
movement of samples to the Kalgoorlie
laboratory, where samples were securely stored
before processing.
For the ESR drilling, RC split samples were
transported from site daily and delivered to the
accredited laboratory depot in Kalgoorlie for
preparation and analysis.
Industry standard sample security standards
were followed for ESR drilling. Reports and
original log files indicate that a thorough process
of logging, recording, sample storage and
dispatch to labs was followed at the time of
drilling.
Shaun Searle of Ashmore reviewed drilling and
sampling procedures during the 2019 site visit
and found that all procedures and practices
conform to industry standards.
For the ESR drilling, sample data reviews have
included an inspection and investigation of all
available paper and digital geological logs to
ensure correct entry into the drill hole database
Visualisation of drilling data was completed in
three-dimensional software (Micromine and
Surpac), and QA/QC sampling review using
Maxwell Geoservices QAQCR Software was
Criteria
JORC Code explanation
Commentary
undertaken. Although these reviews are not
definitive, they provide confidence in the general
reliability of the data.
Section 2 Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
JORC Code explanation
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
Acknowledgment and appraisal of exploration by
other parties.
Commentary
ESR has entered into agreements to hold a
100% interest in all base metal rights to the
project. The area is held under M15/395.
The tenement is in good standing with no known
impediments.
Between 1966 and 1971 Australian Selection
Pty Limited (later Selcast Exploration)
conducted regional exploration throughout the
Spargoville area (“WS5” series holes). During
this period, numerous prospective targets were
identified including the 5A, 5B and 5D deposits.
During 1974, Selcast commenced underground
mining at the 5D deposit which was renamed
Andrews. Prior to the cessation of mining at
Andrews in 1979, a decline was developed into
the footwall of the 5B ore body, however
elevated arsenic levels in the ore and falling
nickel prices prevented production from the mine
at this time. Despite substantial deep diamond
drilling at 5A the tonnage of the nickel sulphide
ore body defined did not warrant mining at the
time.
In the early 1980s, BP Minerals Australia
acquired Selcast and continued exploration in
the Spargoville area, to determine the potential
for economic gold mineralization. BP Minerals
re-assayed existing holes drilled by Selcast that
reported gold intersections. BP completed a
series of percussion holes across the lease.
BP failed to identify a significant gold resource
and in 1990 and sold the lease to Spargoville
Nickel Pty Ltd. Spargoville Nickel Pty. Ltd.
drilled three metallurgical holes at the 5B deposit
and nine near-surface, RC drill holes at the 5A
deposit (“P” series holes).
In 1993 the lease was vendored to Amalg
Resources NL (“Amalg’). Amalg commenced
open pit mining of the 5B deposit in 1995,
targeting a small oxide gold resource previously
identified by BP. A total of 9,700 tonnes of ore
was mined from the 35m deep pit at a sampled
grade of 2.77g/t Au.
Amalg also completed 15 underground diamond
holes from the 5B decline during 1997 and re
estimated a mineral resource for this deposit of.
Amalg also completed eight diamond (5AM-1 to
5AM-8) and 10 RC (5ARC09 to 5ARC18) holes
at the 5A deposit between 1993 and 1997 aimed
at defining an oxide nickel resource.
Between July and October 1997 Amalg mined a
30m deep pit at the 5A deposit. A total of 34,560
tonnes of oxide nickel ore was mined and
stockpiled at a sampled grade of 2.36% Ni.
In December 1999 Amalg conducted a 10 hole
vertical RC drilling program (298m) at the 5A pit
(5ARC19 to 5ARC28) to generate sufficient
quantities of nickel sulphide mineralization for
metallurgical work on the transitional ore. From
this work a new Mineral Resource Ni was
Criteria
JORC Code explanation
Geology
Deposit type, geological setting and style of
mineralisation.
Commentary
estimated.
In 2001 regional multi-client Norseman-Wiluna
400m line spaced aeromagnetic data and digital
aerial images covering tenement M15/395 were
purchased to identify regional lithological and
structural trends to assist with targeting and
planning of exploration programs.
A 200m by 100m moving loop survey was
completed across the tenement to test for
massive nickel sulphide mineralization along
unexplored areas of the basal contacts. The
surface TEM program consisted of moving loop,
in-loop and slingram surveys.
Fixed loop
surveys were used over selected moving loop
TEM targets and the known nickel deposits (5A,
5B, and 5D). This work indicated the surface EM
failed to give any significant anomaly over the
known deposits.
Accurate surveys were completed of the 5A and
5B pits and mullock dumps and 5B decline that
could be converted to AMG coordinates.
Approximately 20,000t of stockpiled nickel
gossan from the 5A open cut grading
approximately 2.6% Ni was sold to OMG Cawse
for treatment through the acid pressure leach
(“PAL”) plant at Cawse.
The existing nickel resources at 5A, 5B and
Andrews were reassessed. Resource reverse
circulation (RC) and Diamond drilling were
completed at 5A and 5B and metallurgical
geotechnical and mine design studies
completed on the 5A deposit. In addition,
heritage, flora and fauna studies were
completed for feasibility study to open cut mine
the 5A deposit to remove the transitional and
sulphide mineralisation to a depth an
approximately 70 m below surface. The
feasibility study showed that the transitional ores
at 5A or 5B were not suitable for either PAL or
conventional leach circuits and that the Activox
process was the most likely process option.
The Spargoville Project is located on the north
end of the Widgiemooltha Dome within a
sequence of intercalated mafic and ultramafic
rocks.
Nickel mineralisation is located along the contact
of basalt and ultramafic rocks. High grade nickel
mineralisation is in the form of poddy contact
shoots, with a broad disseminated component.
The basalt-ultramafic contact dips sub vertically,
striking north-south. The contact itself is quite
disturbed as the area has been
Share your feedback
Discover