Sulphides Intersected at Carr Boyd Project
Released
Released
Announcement PDF
8 September 2020
ASX ANNOUNCEMENT
Sulphides Intersected at Carr Boyd Rocks Ni/Cu Project
HIGHLIGHTS
Ni-Cu sulphides intersected in diamond core drilling at T5 Prospect
Two diamond holes completed to date
Drilling has confirmed the T5 mineralisation intersected in RC hole CBP042 in 2019
A deep high-powered DHTEM platform hole has been completed to test the length of the
intrusions contact for the presence of sulphide mineralisation
A third deep hole has commenced to test the intrusions contact 300m to the south, between
the recent drilling and anomalous historical drilling further southwards
Geophysical crews will be mobilised to conduct high-powered DHTEM on the 2 completed
holes as well as an historic hole at Target A to the southwest
Core has been cut and submitted to ALS Laboratories, assays are pending
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce that recent
diamond core drilling at the Company’s flagship Carr Boyd Project has intersected Ni-Cu mineralisation
(Figure 1) at the recently discovered Target 5 (T5) zone which is located 1.1km NE of the historic Carr
Boyd mine (Figure 3) which produced 202Kt at 1.43% Ni and 0.46% Cu between 1973-1977.
Figure 1. Drilling water turns black as Ni-Cu sulphides (pyrrhotite-pentlandite-chalcopyrite) are intersected in diamond drill
hole CBDD0028 at the T5 Ni-Cu discovery zone (165m-165.5m shown).
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Chris Daws, CEO said “It is certainly an exciting time for all those involved with Estrella and the Carr Boyd
Rocks Ni/Cu Project. We continue to further our exploration strategy at the Carr Boyd layered intrusion and
with every new hole we are gaining more valuable knowledge as to where the source of the high grade
nickel/copper sulphides at the Carr Boyd mine is located.”
Diamond drill hole CBDD028 was designed to
test the Carr Boyd layered mafic-ultramafic
intrusions contact zone ~25m down dip of the
original RC hole CBP042 (Figure 2) which
intersected 8m @ 1.11% Ni & 0.36% Cu,
including 4m @ 1.60% Ni & 0.31% Cu from
the matrix sulphide zone*.
The core hole was drilled to a depth of 251m
and successful intersected the contact at
165.2m downhole depth. Semi-massive &
stringer Ni sulphides (pyrrhotite-pentlandite)
was intersected at a depth of 165.31m165.37m downhole (Figures 1, 2 & 4).
Remobilised Cu sulphides (chalcopyrite)
occur above, within and below this zone. Ni
bearing matrix to disseminated style sulphides
immediately followed and were intersected
from 165.37m-166.81m downhole depth
(Figure 2). A broader disseminated sulphide
zone was also encountered from 169.52m173.92m with several narrow zones identified
further down hole (Figure 4).
Core has been cut and submitted to ALS
Laboratories in Perth with assays pending in
the coming weeks.
Figure 2. Semimassive and matrix style Ni sulphides (bronze colour)
with stringer Cu sulphides (golden colour) in drill core (165m165.5m shown).
The second diamond core hole CBDD029 was completed to a depth of 603.8m and was designed to provide
a deep DownHole Transient Electro-Magnetic (DHTEM) platform hole which parallels the intrusions contact
(Figure 4). The hole was drilled within the underlying volcano-clastic rocks, into which the intrusion was
emplaced (Figure 4). Stringer and blebby Cu-Fe sulphides (chalcopyrite-pyrrhotite) mineralisation was
intersected from 565m down hole indicating the sulphides may have been remobilised from the intrusion
into the host country rock. These sulphides should be detected by the planned DHTEM and sourced back
to the intrusion contact zone.
A geophysical crew is being mobilized to the project to complete high-powered DHTEM on these two holes
which when combined, will test the layered mafic-ultramafic intrusions contact zone for both in-hole and offhole sulphide mineralisation along the length of the contact. This DHTEM survey will cover an area of over
400m down dip from the original RC drill hole intersection providing a more cost-effective method than a
drilling program design to continuously intersect the contact zone at a regular drill spacing.
* Assay Results Confirm New Sulphide Nickel Discovery Zone at Carr Boyd Rocks- 8 July 2019
In addition, the geophysical crew will re-enter historic hole DD97CB043 located 2km to the southwest at
Target A (Figure 3). The original drill hole targeted a SIROTEM anomaly which remained unresolved.
Recent surface High Powered Electro-Magnetic surveys (MPEM) defined and large anomaly to the south
of this drill hole which appears to have missed the target zone. Estrella will re-enter the drill hole whilst the
DHTEM crew are on site and use the modern high-powered equipment to survey the hole to better resolve
this anomaly before drill testing the target zone.
Figure 3. Carr Boyd Complex and Estrellas tenure package. Target 5 and Traget A EM anomalies are shown in red to the
NNW and E of the Carr Boyd Mine and are the current focus of exploration activities.
Table 1: Drill hole collar details
Hole ID
Final Depth
CBDD0028
251.0m
CBDD0029
603.8m
CBDD0030
~600m
DD97CB043
207.3m
Easting
367045
367000
367025
365408
Northing
6673940
6673940
6673640
6673098
Dip
-60
-70
-65
-60
Azimuth
Status
090
Completed
090
Completed
090
Commenced
090
Historic Hole
Carr Boyd Layered Intrusion
DHTEM Platform
Target Zone
Figure 4. Cross Section 6673940mN showing interpreted geology from RC hole CBP042 and recently completed diamond
drill holes CBDD0028 & CBDD0029. These holes provide a deep platform to test the mineralised contact over a down
dip length of 400m.
ABOUT THE PROJECT AND THE CBLC
The Carr Boyd Nickel Project (CBNP) is a magmatic
hosted sulphide system which comprises the Carr
Boyd Layered Complex (CBLC or the Complex). The
CBLC is in a Tier 1 jurisdiction approximately 80km
north north-east of Kalgoorlie Western Australia. An
all-weather haul road accessible by Estrella under a
granted miscellaneous license connects the Project
to the Goldfields Highway via Scotia. Estrella holds
259km2 of contiguous tenure over the entire
magmatic mafic-ultramafic layered complex
The CBLC hosts the historic Carr Boyd Rocks nickel
mine which was the first magmatic hosted style of
nickel deposit discovered and mined in WA. It was
discovered an the late 1960’s and produced 202,110t
of ore at an average grade of 1.43% Ni and 0.46% Cu
between 1973-1977.
Figure 5. Location of Carr Boyd Project
Komatiites flows have been the main source of developed nickel sulphide mines in WA and have been
explored extensively since the late 1960’s. Due to their well understood geochemistry, formation, and highgrade sulphide enrichment process within defined channels, most of the studies and exploration programs
in WA have focused on discovering this style of mineralisation. The Kambalda-Kalgoorlie-Leinster-Laverton
Goldfields Region has been the main focus for komatiite exploration, with limited potential existing outside
this region. Greenfields discoveries of komatiite nickel have all bar dried up in the Goldfields Region and
its only deep brownfields exploration that is delivering new nickel deposits.
Elsewhere around the world, large scale magmatic nickel deposits are the norm, producing world-class
deposits with long productive mine lives. In WA, magmatic nickel deposits occur scattered throughout the
state, however, they have had a long and slow history of discovery, development and understanding. Its
only in recent years, since the discovery of the Nova-Bollinger deposit (2012) in the Fraser Range (which
had been historically explored for over 40yrs), that a string of magmatic nickel deposit have suddenly been
discovered. As komatiite sources dry up, focus and understanding around magmatic nickel deposits is
starting to gain momentum, resulting in exploration companies looking at various mafic-ultramafic bodies
which have had limited to no exploration completed over them to date. This is resulting in a new level of
understanding in WA on the formation/deposition of nickel-copper sulphides within magmatic rocks, leading
to a wave of new discoveries.
Interest in magmatic nickel-copper deposits have had a resurgence with the recent discoveries of magmatic
hosted sulphide mineralisation at Legend Mining’s (ASX:LEG) Rockford Project and Chalice Gold Mines
(ASX:CHN) Julimar Projects. A “Voisey Bay” magmatic style model has not been adequately explored
within the CBLC. This represents a compelling exploration target opportunity which the Company will
continue to aggressively pursue.
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Neil Hutchison, who is a consultant to Estrella Resources, and a member of The Australasian
Institute of Geoscientists. Mr. Hutchison has sufficient experience relevant to the style of mineralisation and type of
deposit under consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr.
Hutchison consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut DD core samples have been half cut with automatic core
techniques
channels, random chips, or specific
saw
specialised
industry
standard 0.3m-1.1m samples are collected from the core trays as
measurement tools appropriate to the
marked out by the supervising geologist
minerals under investigation, such as A handheld XRF tool was used to verify the mineralisation
down hole gamma sondes or handheld
with samples reporting >0.3% Ni in disseminated zones
XRF
instruments,
etc.).
These
and >1% Ni in the matrix sulphide zones.
examples should not be taken as XRF results have not been reported and are used as a
limiting the broad meaning of sampling.
logging/sampling verification tool only.
No other measurement tools other than directional survey
tools have been used in the holes.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Core is continuously cut on the same side of the
orientation line and the same side is sampled to ensure
the sample is representative and no bias is introduced.
Determination of mineralisation has been based on
geological logging and confirmation using a pXRF
machine. Samples were dispatched for laboratory
analysis.
.
Diamond Core drilling was used to obtain 3-6m length
samples from the barrel which are then marked in one
meter intervals based on the drillers core block
measurement.
Assay samples are selected based on geological logging
boundaries or on the nominal meter marks.
Collect samples weigh a nominal 2-3 kg (depending on
sample recovery) was sent to lab and pulverised.
Samples have been dispatched to a commercial
laboratory in Perth for analysis
Samples are being analysed using a 4 acid digest for MEICP for 33 elements and ore zone samples are also being
tested for PGM-ICP testing for PGE elements
Drilling was undertaken using NQ2 sized drill core.
Hole was collar with mud rotary from surface, HQ rough
cored to top of fresh rock then NQ2 cored to EOH.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
JORC Code explanation
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Core recovery was recorded by the drill crew and verified
by the geologist.
RQD measurements were digitally recorded to ensure
recovery details were captured.
Sample recovery in both holes was high with negligible
loss of recovery observed.
Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very good
condition.
The
verification
of
significant
intersections by either independent or
alternative company personnel.
NA at this stage. Assays pending
Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines
was undertaken
Core trays were photographed wet and dry prior to
sampling.
Drill hole logs are recorded in Xcel spread sheets and
validated in Micromine Software as the drilling
progressed.
The entire length of both holes was logged.
Core is half cut using an automatic core saw to achieve a
nominal 2-3kg split sample for laboratory submission
The sample preparation technique is considered industry
best standard practice
No field duplicates have been collected in this program.
Field duplicates will be collected once initial results are
return and resampling of the mineralised zones is
warranted.
Sample sizes are appropriate to the grain size of the
mineralisation.
No results from geophysical tools are being reported.
No handheld XRF results are reported however the tool
was used to verify the mineralisation with reporting >0.3%
Ni in disseminated zones and >1% Ni in the matrix
sulphide zones.
Criteria
and
assaying
Location of
data points
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
JORC Code explanation
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Commentary
Hole CBDD0028 is twinning hole CBP042
The data was collected and logged using Excel
spreadsheets and validated using Micromine Software.
The data will be loaded into an externally hosted and
managed database and loaded by an independent
consultant, before being validated and checked, then
exported and send back to ESR for analysis.
No adjustments have been made to the assay data.
The holes were pegged by Geolithic Geological Services
using a hand held GPS + 3m
The rig was setup over the nominated hole position and
final GPS pickup occurred at the completion of the hole.
MGA94_51
More than adequate given the early stage of the project
Refer to Cross Section and Plan at Figure 4
Not applicable, no Mineral Resource is being stated.
No compositing has been applied. Intercepts will be
quoted as length weighted intervals.
The drill line and drill hole orientation are oriented as
close as possible to normal the interpreted MLEM target.
Samples are in the possession of Geolithic personnel
from field collection to laboratory submission.
No audits or reviews have been conducted for this release
given the very small size of the dataset.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
Type, reference name/number,
Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of
tenement and
location and ownership including
ESR) holds a 100% interest in the nickel and base metal
land tenure
agreements or material issues with
rights to the project.
status
third parties such as joint ventures,
There are no known impediments to operate in the area.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Exploration
Acknowledgment and appraisal of
The Carr Boyd Rocks deposit was discovered by Great
done by other
exploration by other parties.
Boulder Mines, in a joint venture with North Kalgurli Ltd
parties
in 1968. The deposit was mined between 1972 and
1975, during which time they explored for additional
breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni and 0.46%
Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground
over the CBLC outside of the immediate mine area.
Between 1968 and 1971 they conducted extensive
exploration programs searching for large basal contact
and/or stratabound Ni-Cu deposits. It was during this
time that most of the disseminated and cloud sulphide
occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from
Pacminex in 1987 and focused on exploration for PGE
deposits between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from WMC and
switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
From 1990 Defiance dewatered the mine to conduct
testwork and feasibility studies on the remnant
mineralisation. Metallurgical testwork, Mineral Resource
estimations, and scoping studies were completed.
Around 1996 the focus shifted again to regional
exploration for large tonnage basal contact deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project
and recommenced economic evaluations of the remnant
material at Carr Boyd Rocks before embarking on
another regional exploration program focusing on the
basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC
drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and
continued with some regional exploration, but focused
most attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd
(Consmin). Consmin conducted IP surveys and detailed
gravity surveys, but did not drill any targets before selling
the project to Salt Lake Mining (SLM) in 2013. SLM
completed limited drilling to meet expenditure
Criteria
JORC Code explanation
Geology
Deposit type, geological setting and
style of mineralisation.
Drill hole
Information
A summary of all information
material to the understanding of the
exploration results including a
tabulation
of
the
following
information for all Material drill
holes:
o
easting and northing of the
drill hole collar
o
elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and
interception depth
Commentary
commitments, before selling the project to Apollo
Phoenix Resources in 2016.
Apollo sold the project to ESR in 2018.
The Carr Boyd project lies within the Achaean Yilgarn
Craton in a 700km belt of elongate deformed and folded
mafic, ultramafic rocks and volcanic sediments intruded
by granitoids which is referred to as the NorsemanWiluna Belt. The belt has been divided into several
geological distinct terranes, with the project area lying at
the northern end of the Gindalbie terrane (Swager, 1996).
The geology of the Carr Boyd area is dominated by the
Carr Boyd layered mafic-ultramafic intrusive complex
(CBLC). This layered intrusive covers an area of 17 km
by 7km and has intruded into an Achaean
Greenstone/Granite succession. The CBLC is comprised
of a basal sequence of dunites, which are overlain by
peridotites / pyroxenites and above that by gabbros. The
intrusion has been interpreted to have been tilted to the
east with the geometry of the intrusive further
complicated by regional deformation and folding. The
sequence has been metamorphosed to upper
greenschist to lower amphibolite facies.
Several distinctive styles of Ni and Ni-Cu mineralisation
have been identified within the CBLC. At the Carr Boyd
Rocks Nickel Mine Ni-Cu mineralisation is hosted within
several 20 - 60m diameter brecciated pipe-like bodies
that appear to be discordant to the magmatic
stratigraphy. Mineralisation is hosted by a matrix of
sulphides
(pyrrhotite,
pentlandite,
pyrite
and
chalcopyrite) within brecciated Bronzite and altered
country rock clasts.
Stratiform Ni-Cu-PGE mineralisation has been identified
at several different stratigraphic levels within the layered
magmatic complex. Low grade stratiform disseminated
Ni-Cu-PGE sulphides have been identified at several
locations within the basal parts of the complex and at
shallower stratigraphic levels of the complex. The
presence of Ni-Cu-PGE mineralisation within multiple
stratigraphic positions and of several unique styles of
mineralisation highlights the potential of the CBLC for
hosting a substantial Ni-Cu deposit.
The Company is not aware of any significant cobalt
exploration being completed in the area.
All relevant drillhole information can be found in Table 1
of the announcement.
Criteria
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
JORC Code explanation
o
hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Where
aggregate
intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be
reported.
If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (e.g. ‘down hole length, true
width not known’).
Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported. These should include, but
not be limited to a plan view of drill
hole collar locations and appropriate
sectional views.
Where comprehensive reporting of
all Exploration Results is not
practicable, representative reporting
of both low and high grades and/or
widths should be practiced to avoid
misleading reporting of Exploration
Results.
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological
observations;
geophysical
survey
results;
Commentary
No information is excluded.
Intersections will be reported on a nominal 0.4% Ni or
0.1% Cu cut-off with length weighted intervals.
Aggregation is irrelevant as all samples are 1m in length
within the reported mineralised zone.
No metal equivalents are used in this announcement.
The drill line and drill hole orientation in relation to
mineralisation orientation is perpendicular to the MLEM
plate and the geological contact targeted.
True width cannot be determined at this stage as the dip of
the contact is yet to be accurately determined.
Appropriate maps, sections and tables are included in the
body of the Report.
All new drillholes within this announcement are reported in
Table 1
Everything meaningful and material is disclosed in the
body of the report.
Geological observations are included in the report.
No bulk samples, metallurgical, bulk density, groundwater,
geotechnical and/or rock characteristics test were carried
Criteria
Further work
JORC Code explanation
geochemical survey results; bulk
samples – size and method of
treatment; metallurgical test results;
bulk
density,
groundwater,
geotechnical
and
rock
characteristics; potential deleterious
or contaminating substances.
The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
Commentary
out.
There are no known potential deleterious or contaminating
substances.
Continued deep diamond drilling is underway and
DHTEM geophysical testing of the drill holes will
commence soon.
Surface HPEM to the NE are the project is currently being
planned.
Share your feedback
Discover