Quarterly Activities Report and Appendix 5B
Released
Released
Announcement PDF
QUARTERLY ACTIVITIES
REPORT
Estrella Resources Limited
Quarter ending 30 June 2020
ABN 39 151 155 207
ASX RELEASE 31 July 2020
HIGHLIGHTS
ASX Code: ESR
Board and Management
Chief Executive Officer
Christopher Daws (CEO)
Non-Executive Directors
Les Pereira
John Kingswood
Stephen Brockhurst
New nickel and gold targets identified at Carr Boyd Ni Project
Diamond drilling contract signed with Topdrive Drillers Australia
Planning commenced for further exploration of 5A Spargoville Ni
A$1.75M Munda gold divestment
New resource opportunities being investigated
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is
pleased to provide its Activities Report for the quarter ended 30 June
2020.
The focus of work during the quarter was the interpretation of assays
from an extensive soil testing program at the Carr Boyd Layered
Complex (CBLC), preparations for exploration of the T-5 nickel
discovery, Munda gold project divestment and 5A exploration planning.
Company Secretary
David McEntaggart
Address
Level 11, London House
216 St Georges Terrace Perth
WA 6000
PO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
Figure 1. Auger sampling Carr Boyd Nickel Project March 2020
CARR BOYD NICKEL PROJECT (100%)
The Carr Boyd Layered Complex (CBLC), a 75km2 layered mafic igneous complex, which hosts several
occurrences of nickel and copper sulphides (Figure 2) is the Company’s flagship asset. The most
significant occurrence discovered to date is at the Carr Boyd Rocks nickel mine, where mineralisation
is hosted by bronzitite breccias (pyroxenites) emplaced within the gabbroic sequence of the Complex.
The CBLC intrusion is emplaced within the surrounding Archaean Volcano-Sedimentary Greenstone
Belts which are host to numerous komatiite hosted nickel mines within the Kalgoorlie District.
Estrella has been actively exploring the CBNP since October 2017 and in 2019 the Company discovered
new nickel-copper sulphide mineralisation at its T5 target, 1km NNW of the Carr Boyd Mine (ASX: Nickel
Copper Discovery at Carr Boyd Rocks- 28 May 2019; and Assay Results Confirm New Sulphide Nickel
Discovery Zone at Carr Boyd Rocks- 8 July 2019).
E31/1215
CBNP Tenure Portfolio
T5
Western Sequence
CBLC
Southern
Sequences
Figure 2. Interpreted geology underlying the Carr Boyd Nickel Project. The layered intrusion which host the Carr Boyd
Rocks nickel mine and the recently discovered T5 nickel mineralisation extends into the centre of the recently granted
tenure E 31/1215. In addition the largely untested western mafic-ultramafic sequence extends through the western
portion of the tenement.
The Company has executed a diamond drilling contract with Topdrive Drillers Australia for a deep drilling
program at T-5 which will commence during the September 2020 Quarter. Drilling will concentrate on
expansion of the T-5 nickel sulphide discovery made by the Company in May 2019. Preparations for the
upcoming program have been made including upgrading of the water storage infrastructure on site, drill
pad access and sumps. The Company is also reviewing the historic work done by previous operators at
the CBLC to see whether it can apply some modern day thinking and utilise modern technology to revisit
previous target areas. One particular area of interest is a TEM anomaly targeted by a historic drill hole
in 1997 (DD97CB043 drilled by Defiance Mining) which after review of historic DHTEM data has
indicated an “off-hole” anomaly. This area was also identified by Estrella’s own ground based highpowered moving loop electromagnetic survey undertaken in late 2018 which generated a conductive
target (see ESR ASX release 26 November 2018) Due to the location, immediately west of the Carr
Boyd Nickel Mine, it warrants further follow up. There is currently a heightened level of investor interest
in nickel exploration Companies after a number of significant discoveries [Julimar (CHN), Mawson (LEG)
and Sahara (WSA)] that have been made over past months that have seen significant wealth created
from those finds. The Company believes the CBLC holds excellent potential to replicate those significant
discoveries.
The Company enlisted Gyro Australia to drill 536 shallow auger holes (plus QAQC samples) for multielement geochemical analysis using a low-impact Landcruiser mounted auger drill rig. Drilling comprised
of shallow 0.5-1.5m deep auger soil sample drill holes across the northwest tenements (M31/12,
M31/109 & E31/726) at the CBNP. Drill spoil material (Figure 1) was sieved to -2mm and a 150g-600g
sample (ave. 270g) was collected and submitted to SGS Laboratories in Perth for multi-element
geochemical analysis.
Historical samples which were collected from near surface, had limited geochemical elements tested for
and had much higher detection limits. Modern laboratories provide 49 elements and much lower
detection limits, providing a new insight into potential hidden mineralisation at depth. With this fresh
approach, drilling was designed to target the basal contact north and south of the T5 Prospect at close
spacing (on 100m x 200m grid) where RC drilling discovered Ni-Cu-Co mineralisation at depth (ASX:
Nickel Copper Discovery at Carr Boyd Rocks- 28 May 2019; and Assay Results Confirm New Sulphide
Nickel Discovery Zone at Carr Boyd Rocks- 8 July 2019).
The remainder of the program was drilled on 200m x 400m sample spacings to test along the strike of
the mafic-ultramafic contacts of the largely untested Western Sequence which contains the Colreavy
Prospect, as well as the northern contacts of the CBLC which includes the East Scotia and Schneider
Prospects.
New Nickel and Gold geochemical targets have been generated from the assay results received from
the completed auger drilling program (Figure 3). The targets were identified in the northwest portion of
the Carr Boyd Nickel Project (CBNP or the Project) tenement package.
Figure 3. Auger sample sites (blue dots) across Estrella's Carr Boyd Nickel Projects NW tenure. The generated pathfinder
Nickel (red) and Gold (yellow) vector target zones are shown over aeromagnetic image (TMI-RTP) along with previously
identified prospects.
Analysis comprised a 49 multi-element assay suite completed on the samples in order to evaluate the
geochemistry using pathfinding vectors, particularly looking for nickel and gold target zones. The
evaluation looked at the raw elemental assay results as well as combined key elemental associations
in order to produce vector target maps over the sampling area (Figures 4 and 5). Table 1 displays the
detection limits as well as the minimum and maximum key elemental assay results as displayed in this
report.
Two high priority Ni-Co-Cu targets were identified at the Central and POH Zones (Figure 3). These
target zones include previously identified smaller prospects; however, the soil sampling has extended
the target zones over a much larger area of approximately 2.5km x 1.2km (Figure 4), identifying contacts
which have had limited historical work completed on them. The geochemical maps clearly demonstrate
the fertility of the NNW trending Central Zone which includes the Scotia East Ni-Co zone and the recently
announced sulphide discovery at the Target 5 (T5) Prospect (ASX: Nickel Copper Discovery at Carr
Boyd Rocks- 28 May 2019; and Assay Results Confirm New Sulphide Nickel Discovery Zone at Carr
Boyd Rocks- 8 July 2019).
Ni-Co-Cu bearing sulphides were intersected in both drilled holes at T5 which comprised of
disseminated to matrix sulphide mineralisation:
o
o
8m @ 1.11% Ni & 0.36% Cu returned from drill hole CBP042
Includes 4m @ 1.60% Ni & 0.31% Cu from matrix sulphide zone
1m @ 0.61% Ni & 0.57% Cu returned from drill hole CBP043
It was interpreted from the drill data that the mineralisation was developing towards the north and the
results of the geochemical soil sampling supports this model, warranting further investigation along the
length of this fertile ultramafic unit and its basal contact. A strong Cu associated anomaly was generated
at the POH Zone (Figures 3 and 4) to the east of the Central Zone. Historic drilling has taken place at
this prospect, however remodelling and reinterpretation of the data is warranted given the strength of
the anomaly generated.
New secondary targets have been generated at what has been named the Eastern, Western and
Northern Zones (dashed rectangles), each showing Ni-Co and Cr association supporting fertile
ultramafic relationships (Figure 3 and 4). Of interest is the highly anomalous new Eastern Zone which
is open to the south of the auger sampling area. It is located directly over a magnetic high ultramafic
unit (Figure 3) and does not have a historical prospect located in this area.
Reassying of pulps testing for PGE elements within these target zones is now warranted. Further
historical database and field investigation is also required to validate each of these target zones and
determine the next phase of exploration works required i.e. infill/extensional auger soil sampling and/or
deeper AC/RC drilling.
Figure 4: Key elemental and pathfinder vector plots identifying Nickel associated target zones (red rectangles). Primary
targets have solid outlines and secondary targets have dashed outlines.
In addition to the Ni-Co-Cu targets, the geochemical vector analysis defined two parallel Gold pathfinder
related trends over the Western greenstone sequence (Figure 4). The Au pathfinder targets are
coincident with structural breaks in the aeromagnetics (Figure 1: yellow dashed line) supporting the
potential for structurally controlled Au mineralisation to occur in the west of the project area.
Reassying of pulps testing for Gold & PGE elements within these structural target zones is now
warranted. Further historical database and field investigations are required to validate each of these
targets.
Figure 5: Pathfinder vector plots identifying Gold associated target zones (orange ovals).
Table 1. Minimum & Maximum Key Displayed Elemental Assay Results
Minimum & Maximum Key Displayed Elemental Assay Results
Element
Detection Limit
(ppm)
2
0.1
2
10
0.05
1
1
5
Ni
Co
Cu
Cr
Ag
As
Pb
Zn
Minimum Assay
Result (ppm)
26
4.1
9
50
<0.05
<1
2
<5
Maximum Assay
Result (ppm)
2000
154
486
5940
0.8
167
41
152
Company Chief Executive Officer, Chris Daws said, “Recent market successes have spurned us
on to find the next world class nickel discovery, Carr Boyd could potentially be the next big
success story and I look forward to the upcoming round of deep drilling to see what it may
unveil.”
MUNDA GOLD PROJECT
A decision was made to divest the Munda Gold Project to allow the Company to concentrate exploration
efforts on its substantial nickel projects. An independent sale process was run by Geolithic Pty Ltd and
subsequent to the quarter’s end the Company entered into a binding agreement to sell Munda to Auric
Mining for A$1.75M (see ASX release dated 13 July 2020). Proceeds are expected to be received in
the current quarter on satisfaction of various conditions to the sale including shareholder approval.
SPARGOVILLE NICKEL PROJECT (100%)
The Company has over the June quarter continued to work up a development strategy for the highgrade nickel resource at the Spargoville 5A nickel project. The strategy involves the development of a
small open cut mine at the 5A to access the high-grade nickel oxide and transitional nickel ore for
transportation to a near-by treatment facility. Commercial discussions for the delivery and payment of
nickel ore have progressed. The Company is currently planning to explore the metallurgical
characteristics more closely by obtaining a 3,000-tonne exploration sample from within the 5A resource.
Table 2: Spargoville JORC Mineral Resource 5A Nickel Sulphide Deposit
October 2019 Mineral Resource Estimate - Min Type (0.5% Ni Cut-off)
Total Mineral Resource
Type
Tonnage
Ni
Cu
Ni
Cu
kt
%
%
t
t
Disseminated
78
0.7
0.08
520
60
Matrix/Breccia
37
2.3
0.16
840
60
Semi-massive/Massive
13
8.0
0.61
1,000
80
Total
127
1.9
0.15
2,370
190
CORPORATE
The Company continues to look for opportunities to realise or create value through the Company’s
existing assets and is actively undertaking due diligence on new domestic resource project
opportunities. The Company is currently in a trading halt pending a capital raising with further details
expected to be released Monday 3 August 2020.
The Company continues to hold exposure to future financial upside from the sale of the Mt Edwards
Lithium Project to Neometals Limited (see ESR ASX release dated 15 March 2018) via milestone
payments of A$2,000,000 and a royalty on future lithium bearing ore processed.
The Company is pleased to report the direct impacts from Covid-19 continue to be minimal at this time.
Our staff and contractors have implemented working from home protocols and are adhering to the
Government directives.
Payments to related parties and their associates
The total amount paid to related parties of Estrella and their associates, as per item 6.1 of the Appendix
5B, was $49k. Included in this amount is $26k for Directors fees and $23k paid to Mining Corporate, an
entity controlled by Stephen Brockhurst for bookkeeping, accounting and company secretarial fees.
Other ASX Requirements
ASX Listing Rule 5.3.1: Exploration and Evaluation expenditure during the Quarter was $73k primarily
focussed on the auger drilling program at the Carr Boyd Nickel Project.
ASX Listing Rule 5.3.2: There were no mining production and development activities during the Quarter.
CAPITAL
The Company’s cash balance as at 30 June 2020 was $36,000. Subsequent to 30 June 2020 the
Company announced the sale of the Munda gold project for A$1.75M and is currently undertaking a
further capital raising, both will place the Company in a much stronger financial position to conduct
robust exploration activities in the near-term.
Table 3: Estrella Capital structure as at 30 June 2020
Fully Paid Ordinary Shares
534,647,797
Listed options exercisable
$0.05 on or before the 27 June 2021 – 250,980,328
Unlisted options exercisable
$0.03 on or before 20 November 2022 – 14,000,000
$0.05 on or before 15 May 2021 – 5,500,000
Convertible Notes
Unlisted Convertible Notes (unsecured) with an aggregate face value of $450,000 and a
maturity date of 2 years from the date of issue. Convertible into fully paid ordinary shares
in the capital of the Company at a conversion price $0.01 per share. A maximum of
56,448,000 fully paid ordinary shares may be issued on conversion of the Convertible
Notes on the terms announced to ASX on 31 January 2020.
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based
on information compiled by Mr Neil Hutchison of Geolithic Geological Services, who is a consultant to Estrella
Resources and a member of The Australasian Institute of Geoscientists. Mr Hutchison has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resource and Ore Reserves”. Mr Hutchison consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
ENDS
The Board of Directors of Estrella Resources Limited authorised this announcement to be given to ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
info@estrellaresources.com.au
P: +61 (08) 9481 0389
Appendix 1 – Tenement Information as Required by Listing Rule 5.3.3.
Change in
Holding (%)
Current
Interest (%)
Country
Location Project
Tenement
Australia
WA
Carr Boyd Nickel Project
E29/1012
-
100
Australia
WA
Carr Boyd Nickel Project
E29/0982
-
100
Australia
WA
Carr Boyd Nickel Project
L24/0186
-
100
Australia
WA
Carr Boyd Nickel Project
E31/0726
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1124
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0012
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0109
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0159
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1215
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1162
-
100
Australia
WA
Munda Nickel & Gold Project
M15/87
Australia
WA
Spargoville Nickel Project
M15/395
Australia
WA
Spargoville Nickel Project
M15/703
Australia
WA
Spargoville Nickel Project
M15/1828
Australia
WA
Spargoville Nickel Project
L15/128
Australia
WA
Spargoville Nickel Project
L15/255
*Nickel rights only
**Lithium & Nickel rights held by third parties.
^Gold rights only
-
100^ **
100*
100*
100*
100*
100*
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Estrella Resources Limited
ABN
Quarter ended (“current quarter”)
39 151 155 207
30 June 2020
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(43)
(192)
(e) administration and corporate costs
(22)
(293)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
1
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(65)
(484)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(73)
(459)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
250
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(73)
(209)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
450
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
36
3.6
Repayment of borrowings
-
(36)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
450
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
174
279
Net cash from / (used in) operating
activities (item 1.9 above)
(65)
(484)
Net cash from / (used in) investing activities
(item 2.6 above)
(73)
(209)
Net cash from / (used in) financing activities
(item 3.10 above)
-
450
4.2
4.3
4.4
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
4.6
5.
Current quarter
$A’000
Year to date (12
months)
$A’000
Effect of movement in exchange rates on
cash held
-
-
Cash and cash equivalents at end of
period
36
36
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
36
174
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
36
174
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
49
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(65)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(73)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(138)
8.4
Cash and cash equivalents at quarter end (item 4.6)
8.5
Unused finance facilities available at quarter end (item 7.5)
-
8.6
Total available funding (item 8.4 + item 8.5)
-
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
36
0.3
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes, the Company expects to have negative operating cash flows for the time
being as it is in the exploration stage.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes, the Company is in the process of realising value through divesting its noncore asset, the Munda Gold Project, as announced on 13 July 2020. The Board also
have the option to raise additional funds via equity placements and expects to
announce details of a capital raising on 3 August 2020 as per the Company’s
announcement on 30 July 2020 requesting a trading halt for this purpose.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, for the reasons noted above in 8.8.2.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date: 31 July 2020
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5