Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
QUARTERLY ACTIVITIES
REPORT
Estrella Resources Limited
Quarter ended 30 September 2017
ABN 39 151 155 207
ASX RELEASE 27 October 2017
HIGHLIGHTS
ASX Code: ESR
Board and Management
Chief Executive Officer
Christopher Daws
Non-Executive Directors
John Kingswood
Ray Shorrocks
Stephen Brockhurst
Company Secretary
Stephen Brockhurst
Address
Level 11, London House
216 St Georges Terrace Perth
WA 6000
Postal Address
GPO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
New gold and nickel sulphide project acquisition at Munda, Spargos
Reward, and Spargoville
Lithium rights ownership over M15/87 now 100%
Detailed mapping at Bravo Cluster and Charlie Pegmatite (Bravo
Charlie) identified a zone of large spodumene crystals in outcrop and
further refined the geological map of the area
Rock chip samples returned high grade Li2O, confirming the Bravo
Charlie spodumene occurrence and providing an indication of grade
potential
Soil sample collection phase was successfully completed on a 200m
by 50m grid pattern and HXRF analyses undertaken at Atomic Three
Corporate activities continuing
Estrella Resources Limited (ASX: ESR) (Estrella or Company) is pleased to
provide its Activities Report for the quarter ended 30 September 2017.
ACQUISITIONS
The most significant development during the quarter was the acquisition of WA
Nickel Pty Ltd (WAN).
Under the terms of the acquisition, WAN was acquired by ESR. WAN held a
100% interest in nickel rights at the Spargoville Project, 100% of the gold and
nickel rights at the Munda Project (M15/87), and 25% of the lithium rights at the
Munda Project. The transaction gave ESR 100% ownership of all metals on
M15/87.
As well as diversifying the portfolio with the addition of gold assets, this
transaction strengthens ESR’s position in the emerging electric vehicle (EV)
sector, as nickel forms a key role in the production of lithium ion batteries; in fact,
more nickel than lithium is used in these batteries.
The new projects were added to the Mount Edwards Lithium Project (MELP), with
the consolidated project now referred to as the Widgiemooltha Energy Metals
Project (WEMP).
1
Figure 1. Map of ESR’s landholding in the Widgiemootha area outlined in dark red and the tenements subject to the new
acquisition outlined in blue. Call out labels show major nickel, lithium, and gold prospects, and new drill ready nickel
targets.
2
MUNDA GOLD
The Munda project hosts a JORC Code 2012 reported Inferred gold Mineral Resource estimate of
511,000t at 2.82g/t Au (Table 2)*. Within this Mineral Resource, several very high-grade zones occur,
which are interpreted to be formed where sub vertical NNW trending structures intersect a sheared basal
contact between an ultramafic hangingwall and metabasaltic footwall.
This is interpreted to result in very high-grade plunging shoots within a lower grade envelope of gold
mineralisation. These high-grade shoots will be targeted by drilling, and if the interpretation is confirmed,
they will be evaluated, beginning with a Scoping Study to determine if they can be economically
extracted.
An open pit mining operation was commenced in 1999 by Resolute Mining Limited, but was shut in 2000
due to a dramatic fall in the gold price at the time to sub A$400/oz. With gold now holding above
A$1,500/oz, there is considerable scope to complete the mining of the remaining Mineral Resource.
Figure 2. Munda gold cross section at 360460mE, looking east.
A POW was submitted and approved for the drilling of two holes targeting the high-grade gold zone
intersected by MND1406. The Company intends to drill these holes as soon as possible.
*
Refer to ESR announcement “ESR to Acquire Munda Gold and Spargoville Nickel Projects”, 04 September 2017
3
Table 1. Munda Gold Mineral Resource Estimate*
Resources
Category
Metal Grade
Contained Metal
Cut off
Tonnage
Gold
Gold
(Au g/t)
(Kt)
(g/t)
(oz)
Inferred
1
511
2.82
46,337
Total
1
511
2.82
46,337
Table 2. Summary of the significant gold intercepts immediately north and beneath the Munda open pit. These will be
targeted by drilling and economic evaluations starting with confirmatory drillholes around MND1406 and MND1407.*
Hole_ID
mFrom
mTo
Width (m)
Au_g/t
MND1406
53.0
60.0
7.0
41.23
Including
58.0
59.0
1.0
195.00
MND1407
70.0
74.0
4.0
40.10
MND1508
98.0
114.0
16.0
10.13
MND1724
94.1
97.1
3.1
23.17
MND1405
76.0
83.0
7.0
25.38
Including
76.0
78.0
2
82.5
MND1660
140.0
142.5
2.5
22.89
MND1417
111.0
128.0
17
10.34
MIRC009
46.0
50.0
4.0
38.80
MIRC006
20.0
23.0
3.0
16.31
(Note: the full tabulation of intersections is provided in Table 5)
MUNDA NICKEL
Closely associated with, but separated from the gold mineralisation at Munda, is a significant deposit of
nickel sulphide. A JORC Code 2012 reported Inferred Mineral resource of 240,000t at 2.36% Ni has
been estimated for the deposit.*
The nickel mineralisation is interpreted to be a “Kambalda Style” nickel sulphide occurrence, located at
the basal contact between a high MgO komatiitic ultramafic unit and a footwall basalt. Mineralisation is
concentrated in thermal and structural embayment’s in the basal contact, and in “footwall carrots” in the
basalt.
4
Table 3. Munda Nickel Mineral Resource Estimate*
Resources
Category
Metal Grade
Contained Metal
Cut off
Tonnage
Nickel
Nickel
(Ni%)
(Kt)
(%)
(t)
Inferred
1
240
2.36
5676
Total
1
240
2.36
5676
Significant potential exists for further nickel sulphide mineralisation down plunge of the Munda Mineral
Resource. Several DHTEM conductors were identified down plunge to the nickel mineralisation by Titan
Resources during exploration programs conducted up to 2007, but these are yet to be followed up by
drilling. The project was abandoned at the time due to a fall in the nickel price.
There are also two greenfields EM conductor targets, M15/87-C1 and M1587-C4, located north west of
Munda within M15/87 (refer to Figure 1). These conductors were identified by Consolidated Minerals
during MLTEM surveys completed in 2010. During the quarter, a follow-up soil sampling program was
completed over this area.
Figure 3. Long section of the Munda nickel mineralisation, outlined by Titan Resources, showing the EM anomaly
down plunge and the location of the high-grade gold cross section.
5
SPARGOVILLE NICKEL
The Spargoville area hosts several nickel mines which have been exploited to varying degrees in the
past, including 1A (nickel), 5A (nickel), 5B (nickel and gold), and 5D (nickel). Global and remnant
Mineral Resources have been published by previous operators for each of these occurrences, but they
are not up-dated to JORC Code 2012 reporting compliance so cannot be quoted at this stage. It is
envisaged that only a small amount of new data will need to be collected, if any, to advance these
projects to JORC Code 2012 reporting standard. The Company intends to add them to the Mineral
Resource inventory, and conduct economic evaluations.
1A
The 1A project was mined by between 1990 and 1992. It produced 112,800t @ 3.8% Ni (4,286t Ni
metal) before its closure in 1992. Three 25m spaced underground levels were mined to a vertical depth
of 175m below surface.
Breakaway Resources (BRW) conducted drilling programs through 2007 and 2008, confirming depth
continuation of high grade nickel sulphide mineralisation, including intercepts of 5.60m at 4.27% Ni,
7.29m at 6.94% Ni, 8.35m at 3.49% Ni, 1.84m at 4.95% Ni.* This extended the mineralisation up to 200
metres down-plunge of the mine workings on three separate surfaces.
Optiro completed a fully depleted Inferred Mineral Resource estimate on the project in 2009. This
Mineral Resource estimate was completed to JORC 2004 reporting standard, and terminating at 280m
below surface. There is significant potential to upgrade this to JORC Code 2012 Mineral Resource
reporting standard and to extend it further down plunge.
Down plunge extensions could be achieved using targeted drilling programs guided by modern high
power DHTEM surveying. The DHTEM technology available today was not available to previous
operators.
* Refer to ESR announcement “ESR to Acquire Munda Gold and Spargoville Nickel Projects”, 04 September 2017
6
Figure 4. Cross section of the 1A project care of Minotaur Exploration showing mineralisation domains, mine workings
and interpreted down plunge potential. *
5A
Thick high-grade nickel intercepts have been returned from drilling by previous operators beneath an
historic oxide gold open pit at 5A. These intercepts represent a compelling target for generating a JORC
Code 2012 Mineral Resource estimation and economic evaluations.
The high-grade nickel mineralisation appears to be open at depth.
exploration upside at the project.
This represents significant
Scoping Studies completed by previous operators have determined that high metallurgical recoveries
are achievable on the mineralisation. This would be advantageous should an economic mining
operation be possible on the project.
A strong downhole EM conductor has been identified within and below currently defined mineralisation.
This conductor represents a compelling drill target for ESR.
7
Figure 5. Long section of the 5A project care of Minotaur Exploration showing mineralisation domains, a selection of
significant drill intercepts, drill targets, and the strong DHTEM conductor at depth. *
5D (Andrews)
The 5D project was mined via the Andrews Shaft. The mine was active between 1975 and 1979 when
it was developed to 250m below surface. There are no production figures available on open file for the
project.
A fully depleted remnant Mineral Resource was estimated by Geostat in 2004 to JORC Code 1999
reporting standard. This Mineral Resource estimate only included material between levels 2 and 11 of
the mine, excluding lateral and depth extensions. Drilling completed by BRW in 2007 and 2008
confirmed the mineralisation extends at depth beyond the 11 level, with DHTEM modelling indicating
that the mineralisation extends further to the north.
8
Figure 6. Nickel sulphides in drill core from Spargoville.
Figure 7. Long section of the 5D (Andrews) project from Minotaur Exploration showing the mine workings, drill intercepts
and DHTEM conductor models. *
9
5B
The 5B project was mined between 1975 and 1982 and again between 1992 and 1993 via an open pit.
Approximately 14,000t of nickel was produced between the two mining campaigns.
A decline was established post mining to allow drilling of the nickel and gold mineralisation from
underground. The details of this operation are not available on open file.
A drilling program completed by Minotaur in 2014 drill confirmed historic nickel intercepts. Results
included:
15m @ 1.41% Ni in hole SPRC001*
16m @ 0.98% Ni in hole SPRC002*
16m @ 1.82% Ni (including 6m @ 3.60% Ni) in hole SPRC003*
24m @ 1.53% Ni (including 6m @ 3.08% Ni) in hole SPRC005*
Mineral Resource estimates were completed on 5B by previous operators, but they were not completed
to JORC Code 2012 reporting standards and therefore cannot be stated. ESR believes there is strong
potential to upgrade the project to a JORC Code 2012 Mineral Resource and extend mineralisation with
further drilling down plunge.
Figure 8. Long section of the 5A project from Minotaur Exploration, modified from BRW, showing the 5 %Ni x m nickel
envelope, significant drill intercepts, and mine workings.
These existing mineralised occurrences are located on a significant landholding of exploration tenure,
providing potential exploration upside to ESR, particularly given the recent advances in electrical
geophysical technology and power levels since previous operators were active on the projects.
ESR has already identified four electromagnetic conductors in the historic data. One of which, M15/96C1 straddles the boundary between ESRs existing tenement M15/96 and the newly acquired tenement
M15/395. The conductor is located between 5A and 5D and appears to be located on the same basal
contact as them. It has a conductance of 6000 siemens and has good support from aeromagnetic data.
This target will be assessed against geological and geochemical datasets before a decision to drill.
* Refer to ESR announcement “ESR to Acquire Munda Gold and Spargoville Nickel Projects”, 04 September 2017
10
LITHIUM PROGRAMS
Several programs of rock chip sampling and detailed mapping were completed at Bravo Cluster and
Charlie Pegmatite (Bravo Charlie), in the Atomic Three prospect area during the quarter. The mapping
expanded on the highly prospective pegmatite occurrences and identified the largest spodumene
crystals seen to date. This upgraded and further refined the drill targets in the area.
24 rock chip samples have been collected from Bravo Charlie. All but 6 samples returned over 0.2%
Li2O, and seven returned over 2% Li2O. The anomalous area now extends over at least 200m of strike.
However, Bravo Charlie is now interpreted to be the strike continuation of Alpha Pegmatite, meaning
the overall strike length exceeds 600m. The pegmatites appear to be at their thickest and highest grade
at Bravo Charlie, but drilling is required to better determine this. †
Figure 9. Photo of the AP00461 sample site, which returned 3.40% Li2O. The orange brown tarnished crystals above the
hammer are spodumene.†
Follow-up drilling will be conducted to determine if the new interpretations are correct, to determine if
the pegmatites are related to each other, or are connected by a common feeder, and to generate a
JORC2012 mineral resource estimate.
Approximately 12 – 15 holes are proposed, with planned depths between 60m and 72m. Holes will be
drilled at -60 towards 80 in a “top to tail” formation, roughly perpendicular to the stratigraphy. This will
ensure the entire stratigraphic width of the pegmatites is sampled. Drilling will target directly beneath
the highest-grade rock chip results, and the where pegmatites have the widest surface expressions.
POW approvals remain in place for the follow-up drilling programs at Atomic Three and Inco Boundary.
Although these programs were not executed during the quarter as initially intended, the Company
intends to complete them in the first half of 2018.
†
Refer to ESR announcement “Mt Edwards Lithium Project Exploration Update”, 09 August 2017
11
Figure 10. Photo of the AP00460 sample site, which returned 1.89% Li2O. The greenish hewed material on the right hand
80% of this sample contains abundant spodumene. This specimen was taken from an historic costean. ‡
A soil sampling program was completed over the Atomic Three prospect area during the quarter, which
includes Bravo Charlie. 458 samples were collected on a 200m by 50m grid pattern. The aim of the
soil sampling program was to determine if soil sampling could be an effective technique for identifying
blind lithium bearing pegmatites with no visible surface expression, and if so, determine if there are any
such pegmatites in the Atomic Three area. Samples from the program have been analysed by HXRF
and the results are currently being processed and interpreted.
‡
Refer to ESR announcement “Mt Edwards Lithium Project Exploration Update”, 09 August 2017
12
Figure 11. Map of Bravo Charlie prospect showing all the rock chips sampled to date, labelled with % Li2O for anomalous
results above 0.1% Li2O. The better of the more recent sampling results are labelled in a white highlight.§
§
Refer to ESR announcement “Mt Edwards Lithium Project Exploration Update”, 09 August 2017
13
CHILE COPPER PROJECT
There have been no activities undertaken on the Chilean mineral assets over the quarter.
CORPORATE
CAPITAL
The Company’s cash balance as at 31 September 2017 was A$606,961, with A$1,360,000
raised (before fees) post quarter end through the issue of 34,000,000 fully paid ordinary shares
to sophisticated investors.
Capital Structure
Fully Paid Ordinary Shares
Unlisted Options
361,283,292
5,000,000 exercisable at $0.044 on or before 31 May 2018
118,750 exercisable at $0.80 on or before 3 October 2018
750,000 exercisable at $1.40 on or before 21 November 2018
1,375,000 exercisable at $0.40 on or before 13 November 2019
8,250,000 exercisable at $0.024 on or before 31 March 2020
ABOUT ESTRELLA RESOURCES
Estrella Resources is a metals exploration company based in Perth, Western Australia. The Company
holds a combination of lithium, nickel, and gold rights over exploration and mining tenements which
cover over 127km2 of an emerging world class LCT pegmatite province. The Company’s major project,
the Widgiemooltha Energy Metals Project (WEMP), is situated 40km south of the Mt Marion Lithium
mine which is currently in production (Ganfeng, Mineral Resources and Neometals). The Company is
actively looking to increase its asset base and activities in energy metals.
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based
on information compiled by Luke Marshall, who is a consultant to Apollo Phoenix Resources and Mt Edwards
Lithium, and a member of The Australasian Institute of Geoscientists. Mr Marshall has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resource and Ore Reserves”. Mr Marshall consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
info@estrellaresources.com.au
14
Appendix 1 – Tenement Information as Required by Listing Rule 5.3.3.
Country
Location
Project
Tenement
Change in
Holding
(%)
Current
Interest
(%)
Australia
WA
Mt Edwards Lithium Project
M15/698
75
75
Australia
WA
Mt Edwards Lithium Project
M15/75
75
75
Australia
WA
Mt Edwards Lithium Project
M15/699
75
75
Australia
WA
Mt Edwards Lithium Project
M15/87
75
75
Australia
WA
Mt Edwards Lithium Project
M15/74
75
75
Australia
WA
Mt Edwards Lithium Project
M15/101
75
75
Australia
WA
Mt Edwards Lithium Project
M15/99
75
75
Australia
WA
Mt Edwards Lithium Project
M15/653
75
75
Australia
WA
Mt Edwards Lithium Project
M15/97
75
75
Australia
WA
Mt Edwards Lithium Project
M15/96
75
75
Australia
WA
Mt Edwards Lithium Project
M15/102
75
75
Australia
WA
Mt Edwards Lithium Project
M15/100
75
75
Australia
WA
Mt Edwards Lithium Project
M15/1271
75
75
Australia
WA
Mt Edwards Lithium Project
E15/1505
75
75
Australia
WA
Mt Edwards Lithium Project
E15/1507
N/A
Application
Australia
WA
Mt Edwards Lithium Project
E15/1562
N/A
Application
Chile
Mercurio
-
100
Chile
Saturno
-
100
Note – Estrella Resources Limited owns 75% in the lithium rights of the tenements noted Mt Edwards Lithium
Project. All tenements are held by Apollo Phoenix Resources Pty Ltd and are in Western Australia.
15
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Estrella Resources Limited
ABN
Quarter ended (“current quarter”)
39 151 155 207
30 September 2017
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date (3
months)
$A’000
-
-
(174)
(174)
(b) development
-
-
(c) production
-
-
(d) staff costs
-
-
(125)
(125)
(a) exploration & evaluation
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
2
2
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Research and development refunds
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(297)
(297)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
-
-
(b) tenements (see item 10)
-
-
(c) investments
-
-
(d) other non-current assets
-
-
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
Proceeds from the disposal of:
(a) property, plant and equipment
-
-
(b) tenements (see item 10)
-
-
(c) investments
-
-
(d) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – Cash acquired on acquisition of
subsidiary
-
-
2.6
Net cash from / (used in) investing
activities
-
-
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
-
-
3.2
Proceeds from issue of convertible notes
-
-
3.3
Proceeds from exercise of share options
-
-
3.4
Transaction costs related to issues of
shares, convertible notes or options
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
904
904
Net cash from / (used in) operating
activities (item 1.9 above)
(297)
(297)
4.2
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
-
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
+ See chapter 19 for defined terms
1 September 2016
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (3
months)
$A’000
607
Current quarter
$A’000
607
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
607
904
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
607
904
6.
Payments to directors of the entity and their associates
6.1
Aggregate amount of payments to these parties included in item 1.2
80
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
-
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
Directors including non-executive, executive director’s fees, chief executive officer’s fees and
superannuation for the quarter.
Current quarter
$A'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
-
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
-
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
-
-
8.2
Credit standby arrangements
-
-
8.3
Other (please specify)
-
-
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
9.
Estimated cash outflows for next quarter
9.1
Exploration and evaluation
9.2
Development
-
9.3
Production
-
9.4
Staff costs
-
9.5
Administration and corporate costs
9.6
Other (provide details if material)
-
9.7
Total estimated cash outflows
(460)
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and
location
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
N/A
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
N/A
$A’000
(280)
(180)
Nature of interest
Interest at
beginning
of quarter
Interest
at end of
quarter
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Sign here: .....................
(Director/Company Secretary)
Date: ..........27/09/2017.....
Print name: Stephen Brockhurst
+ See chapter 19 for defined terms
1 September 2016
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Notes
1.
The quarterly report provides a basis for informing the market how the entity’s activities have
been financed for the past quarter and the effect on its cash position. An entity that wishes to
disclose additional information is encouraged to do so, in a note or notes included in or attached
to this report.
2.
If this quarterly report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral
Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to
Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows
from investing activities, depending on the accounting policy of the entity.
+ See chapter 19 for defined terms
1 September 2016
Page 5
Share your feedback