Carr Boyd Project Update
Released
Released
Announcement PDF
16 November 2020
ASX ANNOUNCEMENT
Carr Boyd Project Update
HIGHLIGHTS
Two diamond core rigs on site drilling surrounding area of high-grade nickel sulphide
mineralisation recently intersected at the T5 Prospect located 1.1km from the Carr Boyd Mine
New DHTEM anomaly defined at Anomaly A 1.8km to the SW of T5 Target Zone
Access road, exploration camp, site office, core logging facility and onsite communications
upgrades are underway
Bulk water and fuel storage facilities being installed to cope with multiple drill rigs and
exploration personnel
Airstrip re-established for RFDS and personnel movements
Detailed drone aerial photography and 3D DTM surveying completed over the key areas of
operation for planning and targeting purposes
Rock chip assays confirm high grade Cu-Ni-Au-Ag at POH and Ni-Cr-Ti-V at Tektite Hill
Phase IV HPMLTEM survey completed over NE portion of the project area
To Drill &
Coreyard
Site Access
Roads
Camp Area
Site Office
Carr Boyd Mine
Bulk Drilling
Water
Figure 1. 3D aerial drone survey of the Carr Boyd Mine area showing planned site layout which is currently being established.
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to update the market of
progress at the Carr Boyd Nickel Project post the nickel sulphide discovery at the T5 Prospect which is
located 1.1km NE of the historic Carr Boyd mine.
Site upgrades are well underway with the old haul road access now being graded and improved to facilitate
the transport of exploration camp and office block buildings to site as the Company gears up for expanded
drilling efforts focusing on the T5 Target area. The core yard facility upgrades and site office installations
are in progress, with bulk water and diesel fuel storage also being established on top of the old waste
dumps to allow for multiple diamond core rigs to operate without stretching resources (Figure 1). An old
airstrip located 4km east of the Carr Boyd Mine has also been re-established by the local station owner for
RFDS and charter flight site visits of Company personnel.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Two diamond core rigs are now drilling 24/7 on site to initially test the high grade nickel sulphide zone and
DHTEM plate above and below discovery hole CBDD030, as well as defining the intrusions basal contact
300m to the north, at the original T5 Prospect below CBP042 and CBDD028 (Figure 2). Additional holes
are scheduled 40m to the north and south of holes CBDD033 & CBDD035. These holes will be finalised
once hole deviations within this area are understood to ensure the rig position is setup correctly so that we
can intersect the planned target zone positions without the need for navigational drilling.
Targeted
Contact
Zone
Untested Zone
Initial Target Zone
Figure 2. Drone aerial photo of the T5 drill area showing the colour contrast of the targeted ultramafic contact zone between
the darker footwall zone (west) and the red iron-rich intrusion (east). The completed drill holes are on the western side of
contact and were drilled from the footwall side of the intrusion, the current drill holes are now drilling from the eastern side
through the intrusion and back towards the contact zone. Historical holes can still be seen and did not locate this blind
nickel sulphide mineralsation as they were drilled to shallow.
Chris Daws, CEO comments “It is great to see the rapid developments taking place on site as we
move from an exploration bush-camp with limited facilities, to ramping things up to provide a well
serviced and far more comfortable work environment for the on-site workers as we settle in for a
comprehensive exploration effort. Once the site upgrades are complete, we will be in a better
position to increase the number of drill rigs and personnel onsite as Estrella forges ahead to unlock
the full potential of the Carr Boyd Nickel Project. Whilst Carr Boyd is only 1 ½ hours from
Kalgoorlie, it’s too far to commute daily. By providing quality site living and working conditions, it
will be more efficient to service the camp regularly from Kalgoorlie and provide the required local
support to allow the field crew and drillers to focus on drilling holes.”
“We are not just focusing all our efforts towards the T5 Zone, we have also been busy undertaking
regional exploration activities away from T5 by completing DHTEM in an historic hole at Target A,
completing rock chip sampling over the previously defined auger soil anomaly areas, as well as
extending the HPMLTEM survey over the northern portion of the project covering new targets POH
and Tektite Hills. It is an exciting time for Estrella and our shareholders as we rapidly advance our
efforts at Carr Boyd.”
CARR BOYD
MINE
Figure 3. DD97CB043 Drill Hole Location / DHTEM-MLTEM Conductor Models over RTP Aeromagnetic Imagery – T5
Location/Conductor AND Carr Boyd Mine are also defined.
Estrella recently completed a Down-Hole Transient Electro-Magnetic (DHTEM) survey down historical drill
hole DD97CB043 at Target A, which is located 2.25km west of the Carr Boyd Mine and 1.8km SW of the
T5 Prospect (Figure 3).
Historic hole DD97CB043 was drilled in 1997 as an attempt to test an earlier defined SIROTEM ground EM
target, however this hole failed to explain the bedrock conductor source and subsequent low powered
DHTEM surveying of this hole with non-optimal loop design was completed in 1997.
In 2018/19 Estrella completed a High-Powered Moving Loop Transient EM survey (HPMLTEM) over the
western region of the project which generated an anomaly over the “Target A” area. The modern higherpowered geophysical survey produced a well-defined target which coincided with the broader historical
SIROTEM anomaly.
Re-processing, interpretation and modelling of the 1997 DHTEM dataset by Southern Geoscience
highlighted that DD97CB043 drill hole had not intersected the main local bedrock conductors as they clearly
manifest as off-hole anomalies (Figure 4). A discrete off-hole anomaly was defined at ~110-150m downhole
depth and a second broader off-hole anomaly is believed to be located just beyond the current EOH depth
(Table 1).
Estrella contracted GAP Geophysics to resurvey DD97CB043 (which was found to be PVC cased and
open) using modern High-powered DHTEM equipment with multiple loop/coupling scenarios to more
accurately constrain the position/geometry and conductance of the local bedrock conductors priority to
potential drill testing.
Table 1: Drill hole collar details
Hole ID
DD97CB043
Final Depth
207m
Easting
365408
Northing
6673098
Dip
-58
Azimuth
Status
090
Historic Hole
Figure 4. Re-modelling of historical survey data in drill hole DD97CB043 highlighted two local off-hole conductors (blue
plates) of moderate conductance and a strong background response that warranted further investigation. Red & purple
plates are the original 1997 DHEM models, green is the MLTEM model.
Modelling of the new data was completed by Southern Geoscience Consultants, defining the presence of
three bedrock conductors that demonstrate spatially but different correlation with the earlier MLTEM target
model scenarios (Figure 5). These currently remain untested given the considerable differences/contrasts
in geometry and presence of the conductive bodies shown at Figure 5, instead of just a single conductive
source as modelled via the earlier MLTEM survey (green plate, Figure 4).
Details of the new anomalies are detailed below:
DD97CB043 DHTEM Conductors (Figure 5):
Upper conductor (purple plate) – relatively localised ~15-20m width x ~40-50m depth extent,
~2000-5000S moderate to high conductance, immediately above/SE of hole position, ~70-80deg
E/ESE dip/geometry
Central conductor (green plate) - relatively localised ~20-30m width x ~60-80m depth extent, ~5001000S moderate conductance, immediately E/SE of hole position – appears to be below the upper
conductor, ~70-80deg ESE/SE dip/geometry
Lower conductor (red and blue plates)– relatively large areal size, not constrained as hole/data is
not deep enough/covering the full anomaly wavelength, >200x200m areal size, ~400-800S
moderate conductance, immediately NE of the hole at depth/continuing below hole trace, ~7080deg E dip/geometry but less well constrained. May be related to the upper two conductor. This
source could potentially strengthen with depth.
Russell Mortimer of Southern Geoscience comments “Target A represents a compelling untested
bedrock conductor of moderate to high conductance situated on/adjacent to the western contact of
the Carr Boyd intrusive complex. Multiple conductive bodies and 3D geometrical complexities are
commonly observed within such mineralised systems.”
Figure 5. Modelling of new HP DHTEM survey data from resurveying down historical hole DD97CB043 shows different and
broader anomalies than the historical survey data shown at Figure 4.
Field investigation of auger drill soil samples completed in April 2020* identified several areas in the
northeast of the Carr Boyd project area that warranted field investigation. Estrella’s field crew from Geolithic
Geological Services completed field visits to the sites and completed rockchip sampling over the identified
anomalous zones, collecting several significant samples with contained highly anomalous assay results
with combinations of either Ni, Cu, Au, Ag, or Ni, Cr, Ti and V (Table 2 and Figure 6).
Table 2: Rock Chip Sample Details
Sample ID
Prospect
Easting
Northing
Type
Ni
%
Cu
%
Au
ppm
Ag
ppm
Co
ppm
Cr
ppm
Ti
ppm
V
ppm
CBRX0002
POH
368944
6674007
Rock chip
0.884
18.600
2.08
25.4
407
96
0.04
127
CBRX0003
Watertank
369702
6674052
Rock chip
0.690
0.733
0.082
0.6
256
409
0.12
91
CBRX0004
Watertank
369697
6674074
Soil
0.092
0.116
0.084
0.8
66
262
0.26
112
CBRX0005
Watertank
369704
6674069
Rock chip
0.251
3.040
0.139
0.7
120
79
0.23
114
CBRX0006
Watertank
369702
6674092
Soil
0.068
0.141
0.066
1.2
58
312
0.44
236
CBRX0007
Watertank
369826
6673935
Rock chip
0.026
0.018
0.014
<0.5
41
280
0.11
74
CBRX0008
Watertank
369702
6674052
Rock chip
0.540
0.442
0.059
0.9
221
319
0.24
147
CBRX0001
Tektite Hill
370429
6674944
Rock chip
0.063
0.024
<0.001
<0.5
203
13000
6.33
1165
CBRX0009
Tektite Hill
370539
6674970
Drill Chips
0.023
0.015
0.009
<0.5
10
41
0.14
12
CBRX0011
Tektite Hill
370688
6674964
Drill Chips
0.008
0.001
0.002
<0.5
27
82
0.46
123
CBRX0012
Tektite Hill
370588
6674965
Drill Chips
0.120
0.002
0.007
<0.5
72
1740
0.1
54
CBRX0013
Tektite Hill
370637
6674960
Drill Chips
0.091
0.001
<0.001
<0.5
58
1720
0.07
42
CBRX0014
Tektite Hill
370490
6674970
Drill Chips
0.004
0.000
0.014
<0.5
3
43
0.03
5
Figure 6: Highly anomalous rock chip sample CBRX0002 from the POH prospect returned Cu (18.6%), Ni (0.9%), Au
(2.08g/t), and Ag (25.4g/t) assays from the base of a shallow historical scraped pit.
* ASX:ESR 24/04/2020 - New Nickel & Gold Geochem Targets Identified
Subsequent to the field investigation and rock chip sampling, the Company commissioned a High-Powered
Moving Loop Transient EM survey (HPMLTEM) extending eastward from the 2018/2019 survey area and
covering the newly defined target zones (Figure 7). The HPMLTEM survey was recently completed, and
the data is currently being processed, merged and modelled across both survey areas to allow for targeting
and future drill testing.
Tektite Hill
Target 5
POH
Watertank
Carr Boyd Mine
Figure 7. Existing HPMLTEM stations on RTP Aeromagnetic Imagery. T5 and Carr Boyd Mine are located in the west of the
area with key regional prospects POH, Watertank and Tekitite Hill located to the northeast. The box shows the area of the
recent extensional HPMLTEM survey.
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Neil Hutchison, who is a consultant to Estrella Resources, and a member of The Australasian
Institute of Geoscientists. Mr. Hutchison has sufficient experience relevant to the style of mineralisation and type of
deposit under consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr.
Hutchison consents to the inclusion in the report of the matters based on his information in the form and context in which
it appears.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
ABOUT THE PROJECT AND THE CBLC
The Carr Boyd Nickel Project (CBNP) is a magmatic
hosted sulphide system which comprises the Carr Boyd
Layered Complex (CBLC or the Complex). The CBLC is
in a Tier 1 jurisdiction approximately 80km north northeast of Kalgoorlie Western Australia. An all-weather haul
road accessible by Estrella under a granted
miscellaneous license connects the Project to the
Goldfields Highway via Scotia. Estrella holds 259km 2 of
contiguous tenure over the entire magmatic maficultramafic layered complex
The CBLC hosts the historic Carr Boyd Rocks nickel
mine which was the first magmatic hosted style of nickel
deposit discovered and mined in WA. It was discovered
an the late 1960’s and produced 202,110t of ore at an
average grade of 1.43% Ni and 0.46% Cu between
1973-1977.
Location of Carr Boyd Project
Komatiites flows have been the main source of developed nickel sulphide mines in WA and have been explored
extensively since the late 1960’s. Due to their well understood geochemistry, formation, and high-grade
sulphide enrichment process within defined channels, most of the studies and exploration programs in WA
have focused on discovering this style of mineralisation. The Kambalda-Kalgoorlie-Leinster-Laverton
Goldfields Region has been the main focus for komatiite exploration, with limited potential existing outside this
region. Greenfields discoveries of komatiite nickel have all bar dried up in the Goldfields Region and its only
deep brownfields exploration that is delivering new nickel deposits.
Elsewhere around the world, large scale magmatic nickel deposits are the norm, producing world-class
deposits with long productive mine lives. In WA, magmatic nickel deposits occur scattered throughout the
state, however, they have had a long and slow history of discovery, development and understanding. Its only
in recent years, since the discovery of the Nova-Bollinger deposit (2012) in the Fraser Range (which had been
historically explored for over 40yrs), that a string of magmatic nickel deposit have suddenly been discovered.
As komatiite sources dry up, focus and understanding around magmatic nickel deposits is starting to gain
momentum, resulting in exploration companies looking at various mafic-ultramafic bodies which have had
limited to no exploration completed over them to date. This is resulting in a new level of understanding in WA
on the formation/deposition of nickel-copper sulphides within magmatic rocks, leading to a wave of new
discoveries.
Interest in magmatic nickel-copper deposits have had a resurgence with the recent discoveries of magmatic
hosted sulphide mineralisation at Legend Mining’s (ASX:LEG) Rockford Project and Chalice Gold Mines
(ASX:CHN) Julimar Projects. A “Voisey Bay” magmatic style model has not been adequately explored within
the CBLC. This represents a compelling exploration target opportunity which the Company will continue to
aggressively pursue.
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut Rock chip samples were collected from outcropping, near
techniques
channels, random chips, or specific
surface or the floor of shallow dug pit as random samples
specialised
industry
standard
representing to targeted rock /mineralisation type.
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes or handheld
XRF
instruments,
etc.).
These
examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to Not applicable for rock chip samples or geophysical
ensure sample representivity and the
surveys
appropriate
calibration
of
any
measurement tools or systems used.
Aspects of the determination of Not applicable for rock chip samples or geophysical
mineralisation that are material to the
surveys
Public Report.
In cases where ‘industry standard’ work Not applicable for rock chip samples or geophysical
has been done this would be relatively
surveys
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
Drill type (e.g. core, reverse circulation, Not applicable for rock chip samples or geophysical
techniques
open-hole hammer, rotary air blast,
surveys
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Drill sample Method of recording and assessing Sample location were recorded using a hand held GPS
recovery
core and chip sample recoveries and Details of location, rock type, and observation were
results assessed.
recorded in an Excel Spread sheet
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
JORC Code explanation
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Not applicable for rock chip samples or geophysical
surveys
Not applicable for rock chip samples or geophysical
surveys
No handheld XRF results are reported however the tool
was used to verify the mineralisation before submitting for
laboratory analysis.
DHTEM parameters are as follows;
Verification
of sampling
and
assaying
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Transmitter System: Gap GeoPak High Power
EMTX / DC10LV or HPTX series.
Transmit frequency to be used: 0.5 Hz
Current is anticipated to be: > 100 A
Loop size: 500 x 800 m
Receiver System: DigiAtlantis 24-bit B-field 3
component Probe
Winch: DGRT 2000m or Auslog 2000m.
Results verified by Company CEO
Not applicable for rock chip samples or geophysical
surveys
The data was collected and logged using Excel
spreadsheets and validated using Micromine Software.
The data will be loaded into an externally hosted and
managed database and loaded by an independent
consultant, before being validated and checked, then
exported and send back to ESR for analysis.
No adjustments have been made to the assay data
Criteria
Location of
data points
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
JORC Code explanation
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Commentary
The samples were located by Geolithic Geological
Services using a handheld GPS + 3m
MGA94_51
Topography is relatively flat and is more than adequate
given the early stage of the project. A drone orthophotographic survey of the drill areas has been completed
and an accurate GPS controlled DTM of the project area
has been created.
Refer to geophysical Cross Sections and Plans included
Not applicable, no Mineral Resource is being stated.
Not applicable for rock chip samples or geophysical
surveys
Not applicable for rock chip samples or geophysical
surveys
Samples are in the possession of Geolithic personnel
from field collection to laboratory submission.
No audits or reviews have been conducted for this release
given the very small size of the dataset.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
Type, reference name/number,
Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of
tenement and
location and ownership including
ESR) holds a 100% interest in the nickel and base metal
land tenure
agreements or material issues with
rights to the project.
status
third parties such as joint ventures,
There are no known impediments to operate in the area.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Exploration
Acknowledgment and appraisal of
The Carr Boyd Rocks deposit was discovered by Great
done by other
exploration by other parties.
Boulder Mines, in a joint venture with North Kalgurli Ltd
parties
in 1968. The deposit was mined between 1972 and
1975, during which time they explored for additional
breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni and 0.46%
Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground
over the CBLC outside of the immediate mine area.
Between 1968 and 1971 they conducted extensive
exploration programs searching for large basal contact
and/or stratabound Ni-Cu deposits. It was during this
time that most of the disseminated and cloud sulphide
occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from
Pacminex in 1987 and focused on exploration for PGE
deposits between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from WMC and
switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
From 1990 Defiance dewatered the mine to conduct
testwork and feasibility studies on the remnant
mineralisation. Metallurgical testwork, Mineral Resource
estimations, and scoping studies were completed.
Around 1996 the focus shifted again to regional
exploration for large tonnage basal contact deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project
and recommenced economic evaluations of the remnant
material at Carr Boyd Rocks before embarking on
another regional exploration program focusing on the
basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC
drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and
continued with some regional exploration, but focused
most attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd
(Consmin). Consmin conducted IP surveys and detailed
gravity surveys, but did not drill any targets before selling
the project to Salt Lake Mining (SLM) in 2013. SLM
completed limited drilling to meet expenditure
Criteria
JORC Code explanation
Geology
Deposit type, geological setting and
style of mineralisation.
Drill hole
Information
A summary of all information
material to the understanding of the
exploration results including a
tabulation
of
the
following
information for all Material drill
holes:
o
easting and northing of the
drill hole collar
o
elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and
interception depth
Commentary
commitments, before selling the project to Apollo
Phoenix Resources in 2016.
Apollo sold the project to ESR in 2018.
The Carr Boyd project lies within the Achaean Yilgarn
Craton in a 700km belt of elongate deformed and folded
mafic, ultramafic rocks and volcanic sediments intruded
by granitoids which is referred to as the NorsemanWiluna Belt. The belt has been divided into several
geological distinct terranes, with the project area lying at
the northern end of the Gindalbie terrane (Swager, 1996).
The geology of the Carr Boyd area is dominated by the
Carr Boyd layered mafic-ultramafic intrusive complex
(CBLC). This layered intrusive covers an area of 17 km
by 7km and has intruded into an Achaean
Greenstone/Granite succession. The CBLC is comprised
of a basal sequence of dunites, which are overlain by
peridotites / pyroxenites and above that by gabbros. The
intrusion has been interpreted to have been tilted to the
east with the geometry of the intrusive further
complicated by regional deformation and folding. The
sequence has been metamorphosed to upper
greenschist to lower amphibolite facies.
Several distinctive styles of Ni and Ni-Cu mineralisation
have been identified within the CBLC. At the Carr Boyd
Rocks Nickel Mine Ni-Cu mineralisation is hosted within
several 20 - 60m diameter brecciated pipe-like bodies
that appear to be discordant to the magmatic
stratigraphy. Mineralisation is hosted by a matrix of
sulphides
(pyrrhotite,
pentlandite,
pyrite
and
chalcopyrite) within brecciated Bronzite and altered
country rock clasts.
Stratiform Ni-Cu-PGE mineralisation has been identified
at several different stratigraphic levels within the layered
magmatic complex. Low grade stratiform disseminated
Ni-Cu-PGE sulphides have been identified at several
locations within the basal parts of the complex and at
shallower stratigraphic levels of the complex. The
presence of Ni-Cu-PGE mineralisation within multiple
stratigraphic positions and of several unique styles of
mineralisation highlights the potential of the CBLC for
hosting a substantial Ni-Cu deposit.
The Company is not aware of any significant cobalt
exploration being completed in the area.
All relevant drillhole information can be found in Tables 1
and Table 2 of the announcement.
Criteria
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
JORC Code explanation
o
hole length.
If the exclusion of this information is
justified on the basis
Share your feedback
Discover