Carr Boyd Ni Cu Project
October 2017
1
Capital Structure
Current Issued Share Capital
• FPOS - 361,283,292
•
Options
- 8,250,000
- 5,000,000
- 1,375,000
2.4c exercise Mar 2020
4.4c exercise May 2018
40c exercise May 2018
Post Transactions WA Ni / CBNP
• FPOS
- 437,883,292
• Options
- 17,000,000
Major Shareholders
•
•
•
•
•
Mariner Mining P/L
11.9%
Kylie Campbell
5.9%
Douglas Daws
5.6%
Guiyun Wang
5.6%
Oceans Five Investments P/L 3.1%*
5c exercise Dec 2020
- 8,250,000
- 5,000,000
- 1,375,000
2.4c exercise Mar 2020
4.4c exercise May 2018
40c exercise May 2018
*An entity in which John Kingswood has a relevant interest. Following acquisition of Carr Boyd, Mr
Kingswood will have a relevant interest of 4.04% in ESR.
2
Carr Boyd- Introduction
•
Carr Boyd Nickel Pty Ltd, a privately owned mineral exploration company.
•
Owns 100% of the Carr Boyd Ni/Cu Project, located 80km NNE of Kalgoorlie, WA.
•
Highly differentiated layered igneous complex with breccia hosted Ni/Cu
mineralisation high up in the complex, inferred basal contact/feeder source.
•
Discovery by Great Boulder Mines Ltd and North Kalgurli JV between 1969 – 1972.
•
Acquired by and mined by WMC from 1973 to 1975.
•
Lots of “smoke” in the form of disseminated sulphides throughout the complex
(sulphur saturation).
•
Previous explorers only tested the obvious targets.
•
Basal contact Voisey Bay style, or feeder dyke style mineralisation not effectively
tested.
Carr Boyd Update, October 2017
3
Targets on Interpreted Geology
Carr Boyd Update, October 2017
4
Carr Boyd- Work Completed
•
Diamond holes re-entered at Car Boyd mine and HPEM surveyed, technique proven effective.
•
Yilgarn 1461m hole CBD022, re-logged geologically, consultation with Dr Martin Gole,
sulphur saturation and high prospectivity of CBLC confirmed.
•
Historic detailed gravity and magnetic datasets re compiled, re processed, and 3D inversion
modelled.
•
Deep coincident gravity and magnetic target identified at Tregurtha South, targeted by cofounded drillhole.
•
HPMLTEM survey completed over southern portion of CBLC, booming EM conductor detected
at Sir William Wallace (SWW), almost directly above co-funded target.
•
Detailed mapping and ground truthing completed, upgrading the SWW HPMLTEM target,
placing it inside the intrusion.
•
Geochemical datasets reprocessed, combined with all other datasets to create 3D structural
model, reaffirming SWW target.
•
Diamond Drilling rig on-site and first targeted hole NCB0001 commenced.
Carr Boyd Update, October 2017
5
Conceptual Cross Section
Carr Boyd Update, October 2017
6
HPMLTEM Target SWW Cross Section
Carr Boyd Update, October 2017
7
Co-Funded Cross Section
Carr Boyd Update, October 2017
8
Carr Boyd Mineralisation Tenor
• Pure massive sulphide typically grades 6% nickel and 2% Copper at the Carr Boyd Rocks Ni/Cu Mine
• Nickel tenor in a similar range to Nova, but the copper ratio is higher
Carr Boyd Update, October 2017
9
Carr Boyd Summary
• Confirmed fertile Mafic Layered Intrusion.
• Large Nickel & Copper target identified through HPEM.
• Target geological setting is compelling.
• Drilling commenced.
Carr Boyd Update, October 2017
10
Disclaimer & Declaration
This presentation has been prepared by Estrella Resources Limited (“ESR”) solely for investment presentations as a summary of the company’s exploration and
development activities, with particular reference to the Carr Boyd Ni/Cu Project near Kalgoorlie, WA.
No Offer of Securities
The presentation is not, and should not, be considered as an offer or invitation to subscribe for, or purchase any securities in ESR, or as an inducement to make an offer
or invitation with respect to those securities. No agreement to subscribe for securities in ESR will be entered into on the basis of this presentation.
Forward Looking Statements
This presentation contains certain forward looking statements which have not been based solely on historical facts but, rather, on ESR’s current expectations about
future events and on a number of assumptions which are subject to significant uncertainties and contingencies many of which are outside the control of ESR and its
directors, officers and advisers.
Reliance on Third Party Information
Due care and attention has been taken in the preparation of this presentation. However, the information contained in this presentation (other than as specifically
stated) has not been independently verified nor has it been audited. Accordingly, the company does not warrant or represent that the information contained in this
presentation is accurate or complete. To the fullest extent permitted by law, no liability, however arising, will be accepted by APPH or its directors, officers or advisers,
for the fairness, accuracy or completeness of the information contained in this presentation.
Competent Person Declaration
The information in this presentation that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Luke Marshall, who
is a member of The Australasian Institute of Geoscientists. Mr Marshall has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resource and Ore Reserves”. Mr Marshall consents to the inclusion in the presentation of the matters based on his information in the form
and context in which it appears.
Carr Boyd Update, October 2017
11