Timor-Leste Tenement Upgrades Granted
Released
Released
Announcement PDF
ASX: ESR
14 May 2025
Estrella Converts Reconnaissance Permits
to Exploration & Evaluation Licenses on the
Back of Strong Exploration Results
HIGHLIGHTS
➔ Four Reconnaissance Permits converted to Exploration and Evaluation Licenses (Figure 1)
➢ Initial Reconnaissance completed with manganese & limestone prospectivity considered very high
➢ Exploration License holding in Lautém Municipality increases from 121.5 km 2 to 268.7 km2
➢ Conversion enables areas to be explored using ground-disturbing techniques such as drilling and
trenching
➢ Limestone mineralisation added to converted Exploration and Evaluation Licenses
Figure 1: Reconnaissance Permits RP01, RP02, RP03 and RP04 converted to Exploration and Evaluation Licenses
MEL2025-DA-ZA001, MEL2025-DA-ZA002, MEL2025-DA-ZA003 and MEL2025-DA-ZA004
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the successful
conversion of four Reconnaissance Permits to Exploration and Evaluation Licenses, the first such action
by any company under Timor-Leste’s new mining laws. These new exploration concessions will
automatically be part of the joint venture concessions with the state-owned mining company Murak Rai
Timor, E.P. on free carry term, until completion of a feasibility study.
The Reconnaissance Permits allowed the holder to perform mapping and limited sampling activities within
the Permit Area. The conversion to an Exploration and Evaluation Licence requires successful exploration
results from the initial reconnaissance activity and allows the holder to pursue much more intensive
exploration such as road development, trenching and drilling.
The Licenses are granted for 4 years and can be extended up to another 6 years if required. During that
time, the holder is encumbered to explore for and economically evaluate mineralisation within the License
area, culminating in resource definition and an economic pre-feasibility study if warranted. A certain degree
of community engagement and development is expected, and Estrella will begin the community
consultation and ceremonial process now that the Licenses have been awarded.
Commenting on the new License areas Estrella Managing Director Chris Daws said:
“The successful conversion of three Reconnaissance Permits into Exploration and Evaluation Licenses is a
significant milestone as it makes Estrella the first company to achieve this under Timor-Leste’s new mining
laws. The positive results from early-stage exploration work on these permits allowed Estrella to demonstrate
the viability of more advanced exploration activities, allowing us to move from mapping and sampling to more
advanced exploration including trenching and drilling over a 4-year license term with a 6-year extension
option. We are committed to responsible exploration and will begin the community consultation and
ceremonial process as required. We look forward to advancing exploration on these licenses and updating
shareholders on our progress.”
Exploration and Evaluation Licenses MEL2025-DA-ZA001 (ex RP-01) & MEL2025-DA-ZA002 (ex RP-02)
host the northern and western extensions to the Sica-Lalena trend of the Noni Formation, the rock unit
responsible for the development of the secondary and tertiary manganese that Estrella is evaluating on
MEL2023-CA-ZA001. Figure 2 below shows the northern extension of the trend onto MEL2025-DA-ZA001
where significant tertiary manganese was located. Estrella continues to search for secondary supergene
manganese such as that recently discovered at Sica and at Ira Miri. The Exploration and Evaluation Licence
will extend the Company’s exploration toolbox in these areas by enabling the use of IP geophysics,
trenching and drilling.
Figure 2: Sica and Lalena Prospects straddle the border between MEL2025-DA-ZA001 and MEL2023-CA-ZA001 with Noni
Formation highlighed (in green) and assays from ASX Announcement dated 11 October 2024.
The Company has requested and been granted the addition of Limestone to all four newly-converted
Exploration and Evaluation Licenses. During reconnaissance, the Company took notice of the abundance
of clean, fossil-rich limestones that have been deposited in the sequences above the Noni Formation.
All four of the new Exploration and Evaluation Licenses have significant amounts of clean limestone
material, as shown in Figure 3. The Exploration and Evaluation License provides the Company with an
opportunity to evaluate the geochemistry and abundance of these clean limestone sources at depth.
N
Figure 3: Location of suitable limestone resources near to the coast in Estrella’s tenure.
Figure 4 below is an example of one of the limestone formations found in all three licenses. The proximity
to the coast where deep water is available not far from shore, brings potential economic significance should
an export market be developed.
Figure 4: Proximity of significant depths of suitable Limestone to the coast in MEL2025-DA-ZA003
An additional note is that the Batu Putih (White Rock) and Baucau Limestones that outcrop over MEL2025DA-ZA002 and MEL2025-DA-ZA003 are stratigraphically above the Noni Formation. Any future drill testing
of the manganese potential of the Noni Formation will necessitate the drilling of the limestones, and vice
versa. This is a win-win for optimising exploration expenditure.
The stratigraphy responsible for this clean lime forms part of the Baucau Formation and in places is several
hundred metres thick (source: Institute of Geology, Timor-Leste and Estrella’s stratigraphic mapping). Ten
samples from fresh sources within MEL2025-DA-ZA003 were imported to Australia and assayed for their
chemical and acid neutralisation content. The rock type is known for its pure coral content which is reflected
in the assays received in Table 1.
The limestone is predominantly calcite with a small but varying silica content. Small amounts of dolomite
(calcium magnesium carbonate) and siderite (iron carbonate) are present. The Neutralisation Value is a
calculation derived from acid-testing the samples and expressing the result as percent calcite (calcium
carbonate).
The very high lime content, lack of impurities and neutralisation potential makes the rock amenable to many
industrial and environmental processes where lime is necessary, and Estrella will explore these
opportunities across various Asian markets.
Table 1: Results from limestone sampling in MEL2025-DA-ZA003
Al2O3
CaO
Fe2O3
K2O
MgO
P2O5
SO3
SiO2
CaCO3
Sample ID
%
%
%
%
%
%
%
%
%
Net Neutralisation
Potential
tCaCO3/1Kt
CBR114697
0.28
51.51
0.33
0.08
0.41
0.02
0.37
1.73
91.9
914
CBR114698
0.45
49.83
0.36
0.11
0.79
0.02
0.48
2.23
88.9
872
CBR114699
0.48
49.75
0.43
0.12
0.91
0.04
0.54
2.39
88.8
902
CBR114700
0.81
47.42
0.52
0.21
0.91
0.03
0.72
4.4
84.6
856
CBR114703
0.79
48.35
0.55
0.2
0.8
0.03
0.66
4.49
86.3
865
CBR114704
1.09
45.52
0.77
0.24
1.07
0.03
0.45
5.21
81.2
814
CBR114705
1.92
41.76
1.05
0.45
1.82
0.06
0.36
11.12
74.5
783
CBR114706
0.59
49.44
0.86
0.15
1.06
0.03
0.34
2.81
88.2
904
CBR114707
0.3
52.34
0.23
0.07
0.72
0.03
0.34
1.32
93.4
944
Next Steps
The end of the wet season in May should coincide with the arrival of full RC and Diamond Drill capability in
Timor-Leste. The company has just completed environmental surveys on a series of planned drill positions
at Ira Miri, Sica and Lalena and awarded the drilling contract to CoreSearch Exploration and Mining
Services LDA, a division of H2O Pump and Power LDA (See ASX release dated 4 April 2025).
Drilling programs and environmental clearances will now be planned for the four new Exploration and
Evaluation Licenses and the environmental applications submitted to allow for immediate drill testing. Whilst
this undergoes evaluation by the authorities, the team will continue mapping in the area and begin sampling
the limestones ahead of market appraisal work as well as conduct drilling within Exploration and Evaluation
License MEL2023-CA-ZA001.
The company will update shareholders as the approvals process and continued exploration unfolds.
Tenement Changes
With the expiration of term of the 8 Reconnaissance Licenses during the quarter, Estrella has made the
following changes:
• Reconnaissance Permits ESR-RP-01 to ESR-RP-04 were converted to 4-year Exploration and
Evaluation Licenses MEL2025-DA-ZA001 to MEL2025-DA-ZA004
• Reconnaissance Permits ESR-RP-05, ESR-RP-07 and ESR-RP-08 have been extended for a
further 6 months to complete exploration and mapping activities
• Reconnaissance Permit ESR-RP-06 was allowed to expire
Figure 5: Map showing the current tenement status of Estrella's landholding in Timor-Leste
The Board has authorised for this announcement to be released to the ASX.
ENDS
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner consents
to the inclusion in the report of the matters based on the information in the form and context in which it appears.
Table 2: Sample Coordinates
Sample
CBR114697
East MGA94 Z52
246867
North MGA94 Z53
9068086
CBR114698
246910
9068063
CBR114699
246906
9068065
CBR114700
246900
9068067
CBR114703
246896
9068070
CBR114704
246885
9068067
CBR114705
246865
9068067
CBR114706
246868
9068077
CBR114707
242376
9066475
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological mapping, visual
mineral estimates and confirmation of
metallic and carbonate content via ALS in
Malaga.
•
Samples are initially brought back to Dili
and pulverized to 100% passing 1mm
•
A sub-sample of 300g is then dispatched
through customs and quarantine in
Australia to ALS in Malaga for multielement analysis.
•
Exported samples are analysed using a 4acid digest with ME-XRF26s, C-CAL15
and OA-VOL07
•
No drilling has been undertaken to date.
•
•
•
No drilling has been undertaken to date.
The installation of pulverising sample prep
facilities in Timor-Leste ensures sample
representivity when presented to the PXRF
and when obtaining the 300g split to send
to Australia.
•
Rock-chip samples were geologically
logged
for
mineral
content
and
photographed prior to sending for assay or
screening by pXRF.
•
Sample sizes are appropriate to the grain
size of the mineralisation
The exploration program is in its very early
stages and initial sample sizes are kept
small due to freight and customs /
quarantine restrictions. They are not
considered representative of the bulk of
mineralisation.
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling
stages
to
maximise
•
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
•
•
No prior modern exploration has been
conducted in the area.
•
No adjustments to assay data were
undertaken
•
CaO is converted to Ca multiplying by
0.71469
•
Ca is converted to CaCO3 multiplying by
2.4973
•
These
modifiers
are
stochiometric conversions
•
Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
Topographic control is accomplished
using 30m spaced satellite point data.
No systematic sampling has been
conducted at this early stage.
•
•
•
Location of
data points
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
•
Sample
security
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
•
•
•
•
Samples are being analysed at ALS in
Malaga using a 4-acid digest, ME-XRF26s,
C-CAL15 and OA-VOL07
Laboratory standards are considered
adequate at this early stage
standard
•
No orientation-based sampling bias has
been identified.
•
Exported samples are in the possession of
ESR personnel from field collection to
customs
submission
in
Darwin.
Possession
then
passes
to
the
Department of Agriculture, Forestry and
fisheries where Northline Couriers pick up
Criteria
JORC Code explanation
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
Commentary
the samples and take them by road to ALS
in Malaga.
•
Non-exported samples remain with ESR
personnel past Darwin Airport Customs.
•
No independent audit or review has been
undertaken at this stage.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
ESR-RP-05, ESR-RP-06, ESR-RP-07
and ESR-RP-08 are awarded to Estrella
Resources
Limited
Representante
Permanente (100%)
•
Exploration and Evaluation Concessions
MEL2024-DA-ZB001,
MEL2024-DAZB002 and MEL2024-DA-ZB003 are
awarded for four years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Estrella
Resources
Limited
Representante Permanente and Estrella
Murak Rai are registered in Timor-Leste
and is a wholly-owned subsidiary of
Estrella Resources Limited (Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Local geologists and companies have
sporadically explored the area however
there has been no documentation
collected nor systematic exploration to
quantify mineral occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Concessions and Permits
host three main forms of manganese
mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
processes exist.
•
Secondary mineralisation exists as a
supergene blanket above the cherts
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
Commentary
where they have been exposed to
chemical weathering.
•
Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels or scree deposits.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
•
The limestone potential is still being
investigated however the stratigraphy and
unit thicknesses are well known in the
literature. The units under assessment
are corraline in nature or large chalk beds
with very low silica and other impurities.
They are fresh and devoid of alteration.
• No drilling has been undertaken in the
area.
• Sample locations are shown in the body of
the text or appended in subsequent tables.
•
•
•
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used.
Metal equivalent values have not been
used.
CaO is converted to Ca multiplying by
0.71469
Ca is converted to CaCO3 multiplying by
2.4973
These modifiers are standard stochiometric
conversions
•
Any relationships have been discussed
within the body of the text.
•
Relevant diagrams have been included
within the main body of text.
Criteria
Balanced
Reporting
Other
substantive
exploration
data
Further work
JORC Code explanation
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
No new information has been withheld.
•
No other substantive data exists as the
program is in its early stages.
All observations are discussed within the
body of the text.
•
•
•
•
Further work by ESR will include
systematic mapping and sampling along
with
stratigraphic
and
structural
classification.
Additional work on specific areas will be
included under the heading Next Steps in
the body of the text when appropriate to
do so.
Drilling of the manganese is in the
approvals stage
Share your feedback
Discover