High Grade Ira Miri Mn Assays
Released
Released
Announcement PDF
18 December 2025
High-Grade Ira Miri Manganese Results
Continue, Werumata Drilling Completed
HIGHLIGHTS
Ira Miri Manganese Prospect
➔ Further high-grade manganese mineralisation confirmed at Ira Miri, reinforcing the scale and
quality of the system
➔ Latest standout intersections include:
• EMDD039: 5.20m @ 39.6% Mn
o Including 2.5m @ 54.0% Mn
• EMDD040: 6.20m @ 45.3% Mn
o Including 2.5m @ 50.8% Mn
➔ Recent drilling suggests potential for stacked or offset manganese horizons, supporting
continuity and upside at depth and along strike
➔ 45 diamond drill holes completed for 1,532.5m, with 16 holes intersecting significant
manganese mineralisation within the Noni Formation
➔ Mineralisation displays favourable metallurgical characteristics, including low iron (~2%
Fe₂O₃) and low phosphorus (~0.04% P), enhancing beneficiation potential
Werumata Limestone Project
➔ Drilling completed at the Werumata Limestone Deposit (3,717m total), confirming
substantial limestone and chalk thicknesses
➔ Identification of a previously unrecognised marl unit with potential economic significance and
inclusion in future resource estimates
➔ Assays from Werumata pending, subject to standard government inspection and export
approvals
Figure 1: Drill-core from EMDD039, interval 10.70m – 11.70m, showing high-grade Mn mineralisation. Assay results
summarised in Table 1 and detailed in Appendix 2.
Estrella Resources Limited (ASX: ESR), (“Estrella”, the “Company”) is pleased to announce further
standout assay results from drilling at the Ira Miri Manganese Prospect (Figure 1) and completion
of RC and diamond drilling at the Werumata Limestone Deposit in Timor-Leste.
Commenting on the broad and high-grade assay results, Managing Director Chris Daws said:
“The consistency of high-grade manganese intersected at Ira Miri continues to underline the quality
and potential scale of this system, particularly given its favourable metallurgical characteristics.
In parallel, the company has completed drilling at Werumata and identified a potentially economic marl
unit materially enhances the strategic value of the limestone project.
Together, these outcomes position Estrella well as we move into the next phase of evaluation and
development across our Timor-Leste portfolio.
With multiple prospects and an expanding dataset, Estrella is well positioned to identify opportunities
for significant discoveries in Timor-Leste. Go Estrella!”
Figure 2: Estrella Resources manganese prospects and tenure in Timor-Leste
Ira Miri Update
Estrella has successfully completed 45 diamond drill-holes at Ira Miri, for a total of 1,532.50m. Of
these, 29 passed through the manganese-bearing horizon of the Noni Formation, with 16 drill-holes
intersecting significant mineralisation.
The latest results are summarised in Table 1, with Collar Table provided as Appendix 1 and full
results provided in Appendix 2.
Table 1: Summary of drilling intersections reported1
These exceptional results complement existing assays, with Estrella reporting very high-grade
mineralisation in initial drill holes, including: 6.45m @ 51.7% Mn (EMDD001) and 8.05m @ 53.0%
Mn (EMDD002).2
These results were followed-up with further high-grade discoveries, including:
0.4m @ 58.02% Mn from 18m (EMDD030) and 1.5m @ 55.1% Mn from 1.4m (EMDD026)3
.
The grades and widths of mineralisation intersected by drill-holes EMDD039 and EMDD040 are
highly encouraging and the Company will continue to assess its targets for follow-up drilling.
Modelling of these latest results may either represent a layer of manganese mineralisation
overlying mineralisation intersected by EMDD001, EMDD002, EMDD003, EMDD022 and
EMDD023, or may be the same layer, either folded or off-set by a fault.
Regardless, the general orientation and style of the mineralisation reported appears similar (see
Figure 3 and Figure 4 for the location of the cross-section) and further exploration is warranted.
Figure 3: Cross-section CD (refer to Figure 4)
1
Assay results are attached as Appendix 2.
2
Refer to ASX Announcement, “Broad Supergene Manganese Intersected Ira Miri”, dated 22 September 2025. Note: Down-hole
intersection lengths; the true thickness is not yet certain, although many of the drill-holes are interpreted to have intersected the
mineralisation at a high angle, in which case stated lengths are likely to be similar to the true thickness of the mineralisation.
3
Refer to ASX Announcement, “Outstanding High-Grade Manganese Results at Ira Miri”, dated 12 December 2025
Drill-hole ID Intersection of mineralisation
EMDD037 From 11.50m to 13.00m,1.50m @ 13.4% Mn
EMDD038 From 4.00m to 12.00m, 8.00m @17.3% Mn
EMDD039 From 9.50m to 14.70m, 5.20m @39.6% Mn
including from 10.00m - 12.50m, 2.5m @ 54.0% Mn
EMDD040 From 11.20m to 17.40m, 6.20m @ 45.3% Mn
including from 12.10m to 14.60m, 2.5m @ 50.8% Mn
EMDD041 no significant intersection
EMDD042 no significant intersection
Figure 4: Location of drill-holes (EMDD001 – EMDD045) and cross-section CD (refer to Figure 3)
The mineralisation intersected in the latest Ira Miri drill-holes (EMDD037 – EMDD042) possesses
favourable characteristics, typical of low-iron, high silica stratiform manganese deposits (Table 2).
These results highlight the economic potential of the mineralisation and are consistent with
previously reported results (Table 3).
Table 2: Summary of mineralisation intersected by EMDD037 – EMDD040 at Ira Miri
Table 3: Summary of mineralisation intersected by EMDD026 – EMDD036 at Ira Miri (reported previously)
Component of
mineralisation
Average
concentration (%)
Comment
Mn 36% (weighted) With removal of silica, will beneficiate to higher grade.
P 0.04% Maximum 0.10% - 0.25%
Al2O3 5.12% Low; common range 0.12% to 25%
Fe2O3 2.00% Very low; highly desirable for some uses
SiO2 37.08% 0.25% - 25% common range
component of
mineralisation
average
concentration (%)
Comment
Mn 31% (weighted) with removal of silica, will beneficiate to higher grade
P 0.03% <0.005% preferred, maximum 0.10% - 0.25%
Al2O3 5.12% Low; common range 0.12% to 25%
Fe2O3 2.20% Very low; highly desrible for someuses
SiO2 41.20% 0.25% - 25% common range
Werumata Update
Drilling has concluded at the Werumata Limestone Deposit, with the completion of 33 RC drill-holes
(Figures 5 and 6) for a total of 2,804m, and 9 diamond core drill-holes for a total of 913.10m,
bringing the combined total to 3,717.10m drilled.
Figure 5: Estrella geologist Bebeto Abelia during a pause of drilling WLR004A
The campaign targeted two large limestone plateaus with a target of defining an Inferred Mineral
Resource, compliant with the JORC Code (2012), in excess of 500Mt of limestone.
While assaying and interpretation activities are ongoing, completion of the drilling programme has
revealed the following about the known exposed calcium carbonate rocks:
• Range of thickness of Baucau Limestone is 0m (eroded) to 87m
• Range of thickness of Batu Putih chalk is 0m (absent) to 38m
• Range of combined thickness of Baucau & Batu Putih = 29m to 112m
• Average thickness of combined limestone + chalk = 57m
In addition, a “limey clay” unit and a glauconitic unit have been intersected underlying the chalk
and are likely to be the previously unknown basal component of the Batu Putih formation. The
“limey clay” is a highly weathered marl, which is a rock comprised of a varying mixture of calcium
carbonate (and possibly other carbonates) and clay or silt.
Importantly, marl can have a high calcite content and potentially can be used for acid-
neutralisation in the same way as limestone or chalk. Consequently, the marl unit may be
economically significant and be incorporated into the Mineral Resource Estimate for the
Werumata Limestone Deposit.
Figure 6: WLR015 in-progress.
In some parts of the deposit, there are layers of coarse gravel and conglomerate in between the
Baucau Formation and the Batu Putih Formation and sometimes occurs as thin lenses in the base
of the Baucau Formation. These layers are probably part of the Ainaro Gravel formation.
There are also layers of brown or grey “limey gritty clay” beneath the limestone of the Baucau
Formation (Figure 7), of which they may be an unknown basal unit.
Figure 7: RC drill-cuttings from drill-hole WLR025 laid out in sequence.
Note; the cream-coloured piles on left side are Baucau Limestone; brown and dark grey piles are weathered
calcium carbonate-rich rocks that are a previously unknown basal unit of the Baucau Limestone. The pale grey
piles are cuttings of the Batu Putih Formation, mostly chalk. The total thickness of calcium carbonate rocks
intersected by in this drill-hole is 83m.
Next Steps
All the samples of limestone to be assayed are in Dili and although a large batch of samples have
progressed for export, the majority of samples await inspection by government agencies. This
approval process will continue, however the Company advises that timing is anticipated to be
affected by government holidays during the Christmas-New Year holiday period.
The Board has authorised for this announcement to be released to the ASX.
Engage with this announcement on our interactive Investor Hub
ENDS
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Peter Spitalny,
who is the Exploration Manager, Timor Leste of Estrella Resources, and a Fellow of The Australasian Institute of Mining
and Metallurgy. Mr Spitalny has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Spitalny consents
to the inclusion in the report of the matters based on their information in the form and context in which it appears.
Compliance Statement
With reference to previously reported Exploration Results, the Company confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement which continue
to apply and have not materially changed. The company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
APPENDIX 1: COLLAR TABLE OF DRILLING BEING REPORTED
Drill-hole ID Easting(mE) Northing(mN)
MSL Height (m)
EGM2008
azimuth declination EOH (m)
EMDD037 270047 9068195 124 187 -70 28.70
EMDD038 270046 9068188 124 185 -60 17.40
EMDD039 270097 9068171 132 160 -60 22.50
EMDD040 270095 9068176 132 160 -70 24.30
EMDD041 270074 9068207 130 210 -60 24.30
EMDD042 270075 9068208 130 N/A -90 20.60
EMDD043 270062 9068201 126 N/A -90 21.50
EMDD044 269997 9068178 122 210 -60 33.30
EMDD045 270008 9068188 121 210 -60 8.20
APPENDIX 2: ASSAY RESULTS
Hole_ID mFrom mTo Interval SampleID Mn (%) Al2O3 (%) SiO2 (%) Fe2O3 (%) P (%)
EMDD037 8.50 9.00 0.50 ESR000324 <0.01 13.17 67.01 8.80 0.03
EMDD037 9.00 9.50 0.50 ESR000325 <0.01 11.34 69.94 7.87 0.03
EMDD037 9.50 10.00 0.50 ESR000326 <0.01 12.41 69.74 6.40 0.02
EMDD037 10.00 10.50 0.50 ESR000327 <0.01 11.74 70.13 7.58 0.03
EMDD037 10.50 11.00 0.50 ESR000328 <0.01 11.87 70.27 6.62 0.03
EMDD037 11.00 11.50 0.50 ESR000329 2.41 9.65 71.60 5.92 0.03
EMDD037 11.50 12.00 0.50 ESR000330 7.34 8.49 68.41 3.74 0.02
EMDD037 12.00 12.50 0.50 ESR000331 30.03 4.16 41.37 2.64 0.03
EMDD037 12.50 13.00 0.50 ESR000332 6.66 7.47 70.13 4.79 0.02
EMDD037 13.00 13.40 0.40 ESR000333 0.50 10.02 69.95 9.49 0.03
EMDD037 13.40 13.80 0.40 ESR000334 0.91 12.25 66.48 9.31 0.03
EMDD037 13.80 14.20 0.40 ESR000335 2.55 8.90 69.75 8.70 0.03
EMDD037 14.20 14.7 0.50 ESR000336 <0.01 12.87 72.37 5.04 0.03
EMDD037 14.70 15.2 0.50 ESR000337 <0.01 9.80 77.73 3.98 0.03
EMDD037 15.20 15.7 0.50 ESR000338 <0.01 9.40 78.98 3.90 0.03
EMDD037 15.70 16.2 0.50 ESR000339 <0.01 9.08 79.90 3.84 0.02
EMDD037 16.20 16.7 0.50 ESR000340 <0.01 8.97 78.73 3.46 0.02
EMDD037 16.70 17.2 0.50 ESR000341 <0.01 9.88 76.97 4.24 0.02
EMDD038 1.00 1.50 0.50 ESR000342 <0.01 0.66 1.82 0.09 0.04
EMDD038 1.50 2.00 0.50 ESR000343 <0.01 0.71 2.13 0.10 0.04
EMDD038 2.00 2.50 0.50 ESR000344 <0.01 0.77 2.17 0.11 0.04
EMDD038 2.50 3.00 0.50 ESR000345 <0.01 0.95 2.98 0.16 0.03
EMDD038 3.00 3.50 0.50 ESR000346 <0.01 0.63 1.63 0.07 0.04
EMDD038 3.50 4.00 0.50 ESR000347 <0.01 1.15 3.71 0.24 0.03
EMDD038 4.00 4.50 0.50 ESR000348 10.39 8.63 62.60 3.43 0.03
EMDD038 4.50 5.00 0.50 ESR000349 22.02 7.75 47.57 2.76 0.03
EMDD038 5.00 5.40 0.40 ESR000350 23.64 4.87 50.33 1.77 0.02
EMDD038 5.40 5.90 0.50 ESR000351 4.11 7.85 74.54 3.11 0.01
EMDD038 5.90 6.30 0.40 ESR000352 10.44 8.51 63.48 2.70 0.02
EMDD038 6.30 6.90 0.60 ESR000353 27.56 4.54 44.90 1.51 0.02
EMDD038 6.90 7.4 0.50 ESR000354 31.24 4.18 41.05 1.30 0.02
EMDD038 7.40 7.9 0.50 ESR000355 20.80 5.33 50.35 2.00 0.01
EMDD038 7.90 8.40 0.50 ESR000356 9.57 7.26 67.01 2.88 0.02
EMDD038 8.40 8.90 0.50 ESR000357 14.22 6.59 62.06 2.49 0.02
EMDD038 8.90 9.3 0.40 ESR000358 14.24 7.26 61.20 2.56 0.01
EMDD038 9.30 9.6 0.30 ESR000359 24.59 5.30 48.83 1.87 0.02
EMDD038 9.60 10.00 0.40 ESR000360 31.27 5.54 35.17 1.86 0.02
EMDD038 10.00 10.50 0.50 ESR000361 14.38 6.10 61.30 2.62 0.01
EMDD038 10.50 11 0.50 ESR000362 2.95 9.68 71.50 4.18 0.02
EMDD038 11.00 11.4 0.40 ESR000363 20.36 6.73 51.00 3.18 0.02
EMDD038 11.40 12 0.60 ESR000364 16.56 6.01 58.89 2.51 0.03
EMDD038 12.00 12.5 0.50 ESR000365 5.01 6.98 75.43 2.94 0.02
EMDD038 12.50 13 0.50 ESR000366 3.31 8.72 67.34 11.63 0.03
EMDD038 13.00 13.5 0.50 ESR000367 0.09 8.15 63.66 20.18 0.02
EMDD038 13.50 14 0.50 ESR000368 6.68 11.30 64.35 4.59 0.03
EMDD038 14.00 14.5 0.50 ESR000369 8.62 9.48 63.68 4.23 0.03
EMDD038 14.50 15 0.50 ESR000370 1.29 9.19 75.90 4.51 0.07
EMDD039 5.50 6.00 0.50 ESR000371 <0.01 10.08 77.50 2.73 <0.01
EMDD039 6.00 6.50 0.50 ESR000372 <0.01 10.11 77.15 3.53 0.01
APPENDIX 2: ASSAY RESULTS (CONTINUED)
Hole_ID mFrom mTo Interval SampleID Mn (%) Al2O3 (%) SiO2 (%) Fe2O3 (%) P (%)
EMDD039 6.50 7.10 0.60 ESR000373 <0.01 9.02 79.20 2.45 0.02
EMDD039 7.10 7.60 0.50 ESR000374 0.04 6.62 80.06 4.57 0.03
EMDD039 7.60 8.10 0.50 ESR000375 0.34 7.64 78.17 5.42 0.05
EMDD039 8.10 8.50 0.40 ESR000376 0.53 10.06 73.59 4.12 0.04
EMDD039 8.50 9.00 0.50 ESR000377 4.60 9.74 67.15 4.06 0.03
EMDD039 9.00 9.50 0.50 ESR000378 0.14 11.11 72.55 4.60 0.04
EMDD039 9.50 10.00 0.50 ESR000379 10.05 10.92 56.65 3.84 0.03
EMDD039 10.00 10.50 0.50 ESR000380 56.63 1.07 4.90 <0.01 0.05
EMDD039 10.50 11.00 0.50 ESR000381 49.30 0.31 19.61 <0.01 0.05
EMDD039 11.00 11.50 0.50 ESR000382 58.37 0.46 3.31 <0.01 0.07
EMDD039 11.50 12 0.50 ESR000383 46.88 4.21 16.37 1.57 0.06
EMDD039 12.00 12.5 0.50 ESR000384 57.51 0.57 4.69 <0.01 0.05
EMDD039 12.50 13.00 0.50 ESR000385 40.94 0.14 32.84 <0.01 0.03
EMDD039 13.00 13.50 0.50 ESR000386 32.49 0.11 47.65 <0.01 0.03
EMDD039 13.50 13.90 0.40 ESR000387 29.24 0.11 52.30 0.04 0.03
EMDD039 13.90 14.20 0.30 ESR000388 40.14 3.06 27.90 1.02 0.04
EMDD039 14.20 14.7 0.50 ESR000389 11.86 6.80 64.93 2.91 0.03
EMDD039 14.70 15.2 0.50 ESR000390 0.17 9.37 69.43 10.40 0.03
EMDD039 15.20 15.70 0.50 ESR000391 7.06 8.32 67.14 4.50 0.03
EMDD039 15.70 16.20 0.50 ESR000392 3.69 8.46 72.96 3.84 0.03
EMDD039 16.20 16.70 0.50 ESR000393 4.62 9.24 70.81 3.79 0.03
EMDD039 16.70 17.20 0.50 ESR000394 0.45 10.35 74.20 4.46 0.02
EMDD039 17.20 17.8 0.60 ESR000395 16.20 9.04 53.32 2.98 0.03
EMDD039 17.80 18.3 0.50 ESR000396 5.13 12.54 62.10 6.72 0.03
EMDD039 18.30 18.80 0.50 ESR000397 <0.01 18.29 66.92 2.30 0.01
EMDD039 18.80 19.30 0.50 ESR000398 <0.01 18.53 67.71 1.92 0.01
EMDD039 19.30 19.80 0.50 ESR000399 0.12 11.69 75.00 4.00 0.02
EMDD039 19.80 20.30 0.50 ESR000400 <0.01 10.01 76.71 4.42 0.03
EMDD039 20.30 20.80 0.50 ESR000401 <0.01 10.14 76.21 4.45 0.02
EMDD040 7.70 8.20 0.50 ESR000402 0.16 8.66 63.03 4.22 0.04
EMDD040 8.20 8.70 0.50 ESR000403 0.22 7.54 62.14 3.36 0.06
EMDD040 8.70 9.20 0.50 ESR000404 0.03 10.34 69.44 5.19 0.04
EMDD040 9.20 9.70 0.50 ESR000405 0.08 8.77 74.08 4.38 0.06
EMDD040 9.70 10.20 0.50 ESR000406 0.45 9.34 72.87 5.00 0.05
EMDD040 10.20 10.70 0.50 ESR000407 2.87 9.71 71.29 4.02 0.05
EMDD040 10.70 11.20 0.50 ESR000408 10.39 10.36 57.79 4.13 0.03
EMDD040 11.20 11.70 0.50 ESR000409 40.47 2.98 28.84 0.93 0.05
EMDD040 11.70 12.10 0.40 ESR000410 34.21 3.79 34.52 1.29 0.05
EMDD040 12.10 12.60 0.50 ESR000411 56.42 1.12 6.19 <0.01 0.05
EMDD040 12.60 13.10 0.50 ESR000412 42.00 4.04 21.48 1.27 0.06
EMDD040 13.10 13.60 0.50 ESR000413 57.34 0.75 6.21 <0.01 0.07
EMDD040 13.60 14.1 0.50 ESR000414 47.12 2.55 16.34 0.87 0.05
EMDD040 14.10 14.6 0.50 ESR000415 51.18 1.80 12.39 0.38 0.04
EMDD040 14.60 15.1 0.50 ESR000416 39.71 4.16 19.17 1.29 0.04
EMDD040 15.10 15.7 0.60 ESR000417 42.03 4.47 19.50 1.20 0.04
EMDD040 15.70 16.2 0.50 ESR000418 44.35 3.55 18.51 1.11 0.04
EMDD040 16.20 16.7 0.50 ESR000419 41.79 4.00 22.57 1.40 0.04
EMDD040 16.70 17.2 0.50 ESR000420 46.34 3.07 16.59 0.83 0.04
EMDD040 17.20 17.4 0.20 ESR000421 44.42 3.73 20.85 1.11 0.03
EMDD040 17.40 17.9 0.50 ESR000422 6.42 11.90 61.64 4.49 0.03
EMDD040 17.90 18.4 0.50 ESR000423 1.39 8.12 77.34 3.69 0.03
APPENDIX 2: ASSAY RESULTS (CONTINUED)
Hole_ID mFrom mTo Interval SampleID Mn (%) Al2O3 (%) SiO2 (%) Fe2O3 (%) P (%)
EMDD040 18.40 18.9 0.50 ESR000424 18.70 7.11 52.91 2.85 0.03
EMDD040 18.90 19.4 0.50 ESR000425 3.04 11.34 66.61 6.16 0.03
EMDD040 19.40 19.9 0.50 ESR000426 0.90 15.81 62.43 6.73 0.02
EMDD040 19.90 20.4 0.50 ESR000427 1.75 18.04 63.75 3.31 0.02
EMDD040 20.40 20.9 0.50 ESR000428 <0.01 9.45 78.34 4.10 0.03
EMDD040 20.90 21.4 0.50 ESR000429 <0.01 10.08 77.23 4.26 0.03
EMDD040 21.40 21.9 0.50 ESR000430 <0.01 11.35 73.88 4.74 0.02
EMDD041 13.00 13.50 0.50 ESR000431 0.55 9.73 75.37 3.90 0.02
EMDD041 13.50 14.00 0.50 ESR000432 1.78 8.23 77.32 3.55 0.03
EMDD041 14.00 14.50 0.50 ESR000433 3.18 8.06 74.94 3.36 0.03
EMDD041 14.50 15.00 0.50 ESR000434 8.49 8.09 67.68 3.46 0.03
EMDD041 15.00 15.50 0.50 ESR000435 9.00 7.20 67.89 3.19 0.07
EMDD041 15.50 16.00 0.50 ESR000436 6.78 6.86 73.05 2.89 0.05
EMDD041 16.00 16.60 0.60 ESR000437 7.91 5.89 71.63 2.57 0.26
EMDD041 16.60 17.10 0.50 ESR000438 <0.01 14.87 63.57 8.45 0.03
EMDD041 17.10 17.60 0.50 ESR000439 4.36 12.12 61.63 7.53 0.04
EMDD041 17.60 18.00 0.40 ESR000440 <0.01 12.64 71.42 6.03 0.03
EMDD042 8.30 8.80 0.50 ESR000441 <0.01 10.16 77.90 2.86 0.01
EMDD042 8.80 9.30 0.50 ESR000442 <0.01 9.18 79.48 2.84 0.02
EMDD042 9.30 9.80 0.50 ESR000443 <0.01 8.05 81.30 3.04 0.01
EMDD042 9.80 10.30 0.50 ESR000444 <0.01 7.67 81.46 3.03 0.01
EMDD042 10.30 10.80 0.50 ESR000445 <0.01 7.09 82.41 3.04 <0.01
EMDD042 10.80 11.30 0.50 ESR000446 <0.01 7.85 81.54 2.82 <0.01
EMDD042 11.30 11.80 0.50 ESR000447 4.16 7.70 71.32 6.07 0.02
EMDD042 11.80 12.30 0.50 ESR000448 7.20 7.91 68.75 3.51 0.03
EMDD042 12.30 12.80 0.50 ESR000449 2.98 8.01 75.55 3.25 0.03
EMDD042 12.80 13.30 0.50 ESR000450 6.80 6.51 72.39 2.81 0.04
EMDD042 13.30 13.80 0.50 ESR000451 8.10 7.62 67.94 3.37 0.03
EMDD042 13.80 14.50 0.70 ESR000452 5.20 7.63 72.73 3.52 0.02
EMDD042 14.50 15.00 0.50 ESR000453 0.06 9.79 68.66 11.76 0.03
EMDD042 15.00 15.50 0.50 ESR000454 <0.01 11.73 71.13 6.62 0.03
EMDD042 15.50 16.00 0.50 ESR000455 <0.01 11.30 72.46 6.17 0.03
EMDD042 16.00 16.70 0.70 ESR000456 <0.01 10.60 65.49 14.56 0.03
EMDD042 16.70 17.00 0.30 ESR000457 <0.01 18.68 66.73 3.83 0.02
EMDD042 17.00 17.50 0.50 ESR000458 <0.01 18.90 64.52 4.85 0.01
APPENDIX 3 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Determination of mineralisation has been
based on geological logging of diamond
core and field trenching with metal
concentration confirmed by a Bruker S1
pXRF.
• Diamond core is drilled PQ3, cut in half
using a hand-grinder for competent core or
split using a chisel for sooty, less
competent core and clay.
• Core is split perpendicular to bedding when
primary mineralisation is encountered.
• Samples are exported from Timor Leste to
Indonesia and analysed at PT Geoservices
in Jakarta, Indonesia
• At the lab the full sample is crushed and
pulverized to 90% passing 75 um.
• A subsample undergoes fusion and XRF
analysis for Mn and a suite of elements.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Diamond drilling has been undertaken
utilising HQ and PQ triple tube.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature of
the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Recoveries are calculated based upon the
depth drilled and compared to core
recovered.
• Sample recovery is generally high, although
some extremely weathered friable material
is sometimes lost due to the effects of the
down-hole water circulation required to
enable diamond (core) drilling. Core-loss in
the mineralised zone is uncommon and
minor but if it has occurred, it is accounted
for in calculating mineralised intervals.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
• Rock-chip and core samples were
geologically logged for mineral content and
photographed prior to sending for assay (or
screening by pXRF).
• Drill core has also been geologically
logged.
• The trenches have been mapped and
sampled.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
• Sample sizes are appropriate to the grain
size of the mineralisation which in
manganese oxides is very fine.
• Sampling on core is performed by splitting
or cutting the core in half, perpendicular to
bedding when observed.
• The sample sizes are adequate for the
Criteria JORC Code explanation Commentary
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
• Samples are analysed at PT Geoservices
in Jakarta using an XRF Fusion technique
for 15 elements.
• The technique is considered total.
• Lab standards and blanks are adequate at
this stage of the exploration program.
Verification
of sampling
and assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No prior modern exploration has been
conducted in the area. Mineralisation has
been verified by several external parties.
• EMDD002 twinned EMDD001 with very
similar results
• No adjustments to assay data were
undertaken.
• Geological and recovery data is measured
and entered digitally into log sheets which
are then stored on the Company cloud
storage system.
• Drillhole collar and survey information is
also recorded.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
• Topographic control is accomplished using
5m spaced satellite point data.
• Drillholes are initially located using a
Garmin GPS but precise locations are
determined by precision RTK GPS survey
providing an accuracy of +/- 0.1m.
Data spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• Samples are decided upon geological
characteristics and observed dilution.
Minimum 30cm sample widths can be
taken, ranging up to 1.2m depending on
core characteristics.
• No composites have been taken.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling
• Sampling perpendicular to bedding will
occur when bedding can be observed in the
core.
• This is not necessarily observable in
secondary enrichment zones.
Criteria JORC Code explanation Commentary
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• The drilling is generally at a high angle to
mineralisation.
Sample
security
• The measures taken to ensure sample
security.
• Exported samples are in the possession of
ESR personnel from the core processing
site through completion of mandatory
governmental inspections prior to delivery
to a courier for delivery to the lab in Jakarta.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No independent audit or review has been
undertaken on the Lab.
• Independent reviews on geological logging
and sampling techniques have been done
and all methods used are at industry
standard.
Section 2 - Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a license to operate in the area.
• Exploration and Evaluation Concessions
MEL2023-CA-ZA001, MEL2023-CA-
ZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella Resources Representante
Permanente (70%) and Murak Rai Timor
(30%).
• Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
were converted to Exploration Licenses
and are awarded to Estrella Resources
Limited Representante Permanente
(100%)
• Exploration and Evaluation Concessions
MEL2024-DA-ZB001, MEL2024-DA-
ZB002 and MEL2024-DA-ZB003 are
awarded for four years to Estrella Murak
Rai, form
Share your feedback
Discover