Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
QUARTERLY ACTIVITIES REPORT
Quarter ending 31 December 2025
HIGHLIGHTS
• Exceptional manganese grades up to 58% Mn encountered at
Ira Miri project, consistent with the highest-quality stratiform
deposits globally
• Multiple high-grade intervals exceeding 50% Mn with very low
impurities (P, Al₂O₃, Fe₂O₃) with results including:
o EMDD026: 3.00m @ 35.7% Mn
▪ Including 1.5m @ 55.1% Mn
o EMDD030: 1.10m @ 52.6%Mn
▪ Including 0.4m @ 58.02%
o EMDD031: 4.00m @ 25.7% Mn
▪ Including 1.05m @ 49.6% Mn
o EMDD033: 11.97m @ 28.9% Mn
▪ Including 2.1m @ 46.8% Mn
o EMDD039: 5.20m @ 39.6% Mn
▪ Including 2.5m @ 54.0% Mn
o EMDD040: 6.20m @ 45.3% Mn
▪ Including 2.5m @ 50.8% Mn
• Potential for stacked or offset manganese horizons,
supporting continuity and upside at depth and along strike
• Post period-end extraction of up to 30kT of manganese ore for
market appraisal approved by the ANM
• High grade, low impurity Ira Miri ore expected to be distributed
to a range of potential international offtake partners
• Extraction equipment mobilised to site and operations
underway
• Maiden drill program at Werumata Limestone project (3,717m
total) completed
• Campaign confirmed substantial limestone and chalk
thicknesses and positions the company to meet its target of
an Inferred Mineral Resource of 500Mt
• Assays from Werumata pending, subject to standard
government inspection and export approvals
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is
pleased to provide its quarterly activities report for the period ending 31
December 2025 in which the company made significant progress
developing its Ira Miri manganese and Werumata Limestone projects
located in the virtually unexplored region of Timor-Leste (Figure 1).
ASX Release: 30 January 2026
Estrella Resources Limited
ABN 39 151 155 207
ASX Code: ESR
Board and Management
Managing Director
Christopher Daws
CEO
Robert Mencel
Non-Executive Directors
Les Pereira
John Kingswood
Company Secretary
Stephen Brockhurst
Benjamin Smith
Address
Level 8, London House
216 St Georges Terrace Perth
WA 6000
PO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
Commenting on activities completed during the quarter, Managing Director Chris Daws said:
“Our operations in Timor-Leste continue to progress in leaps and bounds, and I’m thrilled to see major
campaigns completed at Ira Miri as well as Werumata, where Estrella continues to spearhead the
nation’s mining activities.
At Ira Miri, the period has been defined by the delivery of multiple, high-grade manganese assays
which have the potential to place the project amongst the world’s top manganese deposits.
In a credit to the resourcefulness of our small team, Estrella was able to concurrently direct the first
major limestone diamond and RC drilling campaign at Werumata.
Assays from the campaign are pending, but the targeting of two large limestone plateaus positions
Estrella very strongly to pursue our target of defining an Inferred Mineral Resource in excess of 500Mt.
With further progress anticipated in 2026, it’s going to be another massive year. Go Estrella!
Figure 1: Location of Estrella Resources’ Timor-Leste concessions
IRA MIRI MANGANESE PROJECT
In December, Estrella announced high-grade manganese assays with multiple intervals exceeding 50%
Mn and very low impurities (P, Al₂O₃, Fe₂O₃), demonstrating strong continuity of mineralisation1.
1 Refer to ASX announcement dated 12 December 2025
Table 1: Summary of drilling intersections reported
Drill hole ID Intersection of mineralisation
EMDD022 2.9m @ 29.2% Mn from 4.80m
EMDD023 2.0m @ 13.7% Mn from 8.4m
EMDD025 1.95m @ 28.2% Mn from 1.3m
EMDD026 3m @ 35.7% Mn from 1.4m
Including: 1.5m @ 55.1% Mn from 1.4m
EMDD029 1.7m @ 31.8% Mn from 14.2m
EMDD030 1.1m @ 52.6% Mn from 17.3m
Including 0.4m @ 58.02% from 18m
EMDD031 4.0m @ 25.7% Mn from 9.2m
And 1.05m @ 49.6% Mn from 15.9m
EMDD032 1.9m @24.7% Mn from 5.1m
And 5.7m @ 21.5% Mn from 8.6m
EMDD033 11.97m @ 28.9% Mn from 5.13m
And 2.1m @ 46.78% Mn from 7.7m
EMDD034 4.2m @ 17.9% Mn from 8.8m
These exceptional results complement existing assays from Ira Miri, with Estrella previously reporting
very high-grade mineralisation from initial drilling, including: 6.45m @ 51.7% Mn (EMDD001) and 8.05m
@ 53.0% Mn (EMDD002)2. The mineralisation presents as a folded bed of manganiferous cherty
mudstone generally dipping at a shallow angle approximately towards the north, for example the zone
intersected by reported drill-holes EMDD022 and EMDD023 (Figures 3 and 4)
The mineralisation presents as a folded bed of manganiferous cherty mudstone generally dipping at a
shallow angle approximately towards the north.
The assay results confirm the composition of the manganese mineralisation at Ira Miri is typical of low-
iron, high silica stratiform manganese deposits that form in marine sedimentary rocks upon the
continental shelf in a back-arc tectonic setting.
Examples of high-silica, low-iron manganese deposits include the giant Molango Manganese deposit
(Mexico) and Groote Eylandt Manganese deposit (Australia), both laying claims to being the largest
manganese deposits in the world.
The mineralisation at Ira Miri has favourable characteristics (Table 2) similar to other high-silica low-iron
manganese deposits, highlighting the economic potential of the mineralisation.
Table 2: Summary of key components of the Ira Miri mineralisation EMDD026-EMDD036
Component of
mineralisation
Average
concentration (%)
Comment
Mn 36% (weighted) With removal of silica, will beneficiate to higher grade.
P 0.04% Maximum 0.10% - 0.25%
Al2O3 5.12% Low; common range 0.12% to 25%
Fe2O3 2.00% Very low; highly desirable for some uses
SiO2 37.08% 0.25% - 25% common range
2 Refer to ASX Announcement, “Broad Supergene Manganese Intersected Ira Miri”, dated 22
September 2025. Note: Down-hole intersection lengths; the true thickness is not yet certain, although
many of the drill-holes are interpreted to have intersected the mineralisation at a high angle, in which
case stated lengths are likely to be similar to the true thickness of the mineralisation
The drill results were followed by further manganese assays which reinforced the scale and quality of
the Ira Miri system, reported in Table 33.
Table 3: Summary of drilling intersections reported
Drill hole ID Intersection of mineralisation
EMDD037 1.5m @ 13.4% Mn from 11.5m
EMDD038 8.0m @ 17.3% Mn from 4.0m
EMDD039 5.2m @ 39.6% Mn from 9.5m
Including: 2.5m @ 54.0% Mn from 10.0m
EMDD040 6.2m @ 45.3% Mn from 11.2m
Including: 2.5m @ 50.8% Mn from 12.1m
The grades and widths of mineralisation intersected by drill-holes EMDD039 and EMDD040 are highly
encouraging and the Company will continue to assess its targets for follow-up drilling.
Modelling of these latest results may either represent a layer of manganese mineralisation overlying
mineralisation intersected by EMDD001, EMDD002, EMDD003, EMDD022 and EMDD023, or may be
the same layer, either folded or off-set by a fault.
Regardless, the general orientation and style of the mineralisation reported appears similar (see
Figure 2 and Figure 3 for the location of the cross-section3) and further exploration is warranted.
Figure 2: Cross-section CD (refer to Figure 3)
3 Refer to ASX announcement dated 18 December 2025
Figure 3: Location of drill-holes (EMDD001 – EMDD045) and cross-section CD
The mineralisation intersected in these drill-holes (EMDD037 – EMDD042) possesses favourable
characteristics, consistent with previously reported results (Table 4).
Table 4: Summary of mineralisation intersected by EMDD037 – EMDD040 at Ira Miri
Component of
mineralisation
Average
concentration (%)
Comment
Mn 31% (weighted) With removal of silica, will beneficiate to higher grade.
P 0.03% <0.005% preferred, maximum 0.10% - 0.25%
Al2O3 5.12% Low; common range 0.12% to 25%
Fe2O3 2.20% Very low; highly desirable for some uses
SiO2 41.20% 0.25% - 25% common range
These excellent assay results were supported by a significant program of surveying which incorporated
LiDAR, DroneMag, MobileMTd and Resistivity–Induced Polarisation technologies.
In November, Estrella announced results from the Resistivity–Induced Polarisation (Res-IP) survey,
which identified multiple high-chargeability zones that align with mapped manganese outcrops and
diamond drill intersection4.
The Resistivity-IP survey was executed by the highly-experienced geophysics team from Instituto de
Geosciecias de Timor-Leste Instituto Publico (IGTL) and Estrella Resources national Timorese
geological team, across a NNW – SSE trending zone of manganese surface outcrops.
4 Refer to ASX announcement dated 28 November 2025
Line 1 consisted of 48 Dipole-Dipole electrodes at 5-metre spacing.
Results from the Resistivity-IP survey produced a detailed, geologically consistent and robust model for
mapping manganese enrichment and associated structural features, with interpretation work strongly
indicating the presence of supergene manganese enrichment controlled by weathering processes and
structural pathways.
Processing of the data enabled subsequent creation of a cross-section displaying zones of low-
resistivity, which show many low-resistivity anomalies, some of which correlate with known manganese
mineralisation, but other anomalies may relate to conductive zones of the weathered clay, possibly
caused by high water content. However, a cross-section displaying IP inversion results revealed three
key manganese-bearing zones, each associated with elevated chargeability values.
Comparing the resistivity and IP images (upper and lower cross-sections respectively of Figure 4), it is
clear that the IP anomalies correlate well with manganese drill holes, known manganese outcrops and
expected supergene enrichment patterns.
Figure 4: Comparison of Resistivity (upper cross-section) and IP (lower cross-section
It is clear that the IP anomalies correlate well with manganese mineralisation, which implies that the
strong IP anomalies between EMDD004 and EMDD019 are also likely to represent manganese
mineralisation, and therefore are priority drill targets (Figure 5).
Figure 5: Drill-targets between EMDD004 and EMDD019
Post period-end, Estrella advised that the Company had executed an agreement with the Autoridade
Nacional dos Minerais, I.P. (ANM) of Timor-Leste authorising the extraction of up to 30,000 tonnes
(30kT) of high-grade manganese oxide from the Ira Miri Manganese Project for market appraisal
purposes5.
This agreement represents an important milestone in the advancement of the Ira Miri Project and
provides a clear regulatory framework under which the Company may conduct sample extraction,
prepare material for sale, and remit applicable government fees equivalent to standard mining royalties
(manganese ore attracts an 8% GSR royalty similar to Western Australia).
The sample is anticipated to be Timor-Leste’s first-ever economic mineral bulk extraction under its
modern Mining Code and will provide material for sale, export and testing with potential future long-term
offtake partners. The sample extraction program will be undertaken and supervised by Estrella’s Timor-
Leste exploration and mine operations teams, which have recently been expanded with strategic
appointments to strengthen on-ground technical capacity.
The Company intends to extract the high-grade manganese oxide from a well-defined pit anticipated to
have a maximum depth of approximately 15m with total excavation of approximately 85,000 cubic
metres.
The topsoil will be stored separately for rehabilitation, and the overburden will be stored in benched
external stockpile (See Figure 6)
Figure 6: Ira Miri proposed manganese bulk sample extraction location and pit design overlayed
with drill assay results
The program will transport the stockpiled material approximately 17 km from the Stage 1 pit head
stockpile to the former Lautem airstrip and decommissioned fish-processing facility, which hosts an
existing barge landing site: the LCT port site.
Material will be loaded onto a barge and shipped offshore to be on-loaded into a bulk carrier, avoiding
lengthy road transport. Transporting bulk material by barge to offshore bulk carriers is a well-established
and commonly used practice across the archipelago region.
The approved sampling initiative will enable Estrella to undertake detailed metallurgical, quality and
commercial assessments of the Ira Miri manganese ore with a range of prospective buyers in the
international seaborne manganese market.
Extraction equipment has been mobilised to site, including a digger and haulage vehicles, with
operations underway (Figure 7), and entirely utilizing local contractors. This is consistent with Estrella’s
5 Refer to ASX announcement dated 8 January 2025
prioritisation of providing employment opportunities to local communities in the areas in which the
company operates.
Figure 7: Mining vehicle mobilised to the Ira Miri manganese extraction site
WERUMATA LIMESTONE PROJECT
Throughout the period, Estrella significantly progressed operations at its Werumata limestone project,
with the Company targeting the development of a 500Mt Inferred Mineral Resource.
In October, the Company received results for a LiDAR survey covering 1,700ha at the project, measuring
differences in surface height which is vital for drill planning6.
LiDAR analysis was followed up with a bathymetric survey of the potential port area to assist in locating
suitable positions for port facilities and infrastructure.
Groundwork including track and pad preparation at the Werumata Project site was also completed
utilising local contractors. The work was completed ahead of schedule ensuring the site was ready for
the arrival of drilling equipment. Two contracting companies, one from Lospalos and one from Baucau
were engaged with excellent results (Figures 8 & 9).
6 Refer to ASX announcement dated 15 October 2025
Figure 8: Mobilisation day of contractors to the Werumata Limestone Project to commence drill
track and pad preparation.
Figure 9: Results of the LiDAR and photogrametry obtained at the Werumata Limestone Project
Drilling commenced later in the month, following community education and consultation processes held
over many weeks, concluding with cultural ceremonies by the communities and their leader (Figure 10)7.
The site was also prepared with the establishment of water resources for the drilling program and dust
suppression. Two water bores were installed and water was sourced utilising local water trucks.
Mobilisation of the Diamond Drill rig from Ira Miri, and the Reverse-Circulation Rig and support
equipment from Dili was completed without incident. Estrella opted to use the Ira Miri Diamond Drill rig
as a fast-track option to commence immediate drilling of the limestone.
All access tracks and drill pads for the program were constructed by local excavator teams ahead of
schedule and below budget estimates.
7 Refer to ASX announcement dated 28 October 2025
Figure 10: Collaring of the first diamond drillhole WLD001 at the Werumata Limestone
Project with Estrella’s exploration team and Coresearch drill team.7
In November, the Company announced more than 70% of initial drilling was complete, with initial results
providing strong encouragement (Figure 11)8.
Drilling revealed the targeted limestone units (Baucau Limestone Formation and the Batu Puthi
Formation) vary in thickness across different parts of the Werumata Limestone deposit; Baucau
Limestone Formation ranges from 11m – 87m thick and Batu Puthi Formation (chalk) ranges from 0.6m
– 38m thick.
The combined thickness of the Baucau and Batu Puthi formations ranges from 32m – 87m, with an
average thickness of 55m.
Drilling also unexpectedly revealed that the rocks underlying the targeted known limestone formations
are also calcite-enriched and in some cases to EOH, confirmed by testing the effect of acid upon these
rocks. These calcite-enriched rocks are interpreted as weathered marl units and may represent the
hitherto unrecognised basal unit of the Batu Puthi Formation. These calcite-enriched rocks appear to
have potential as an additional source of acid-neutralisation material, complementing the overlying
limestone and chalk the drilling is targeting.
8 Refer to ASX announcement dated 24 November 2025
Figure 11: WLD003 drill-core from surface to approximately 15m, comprised of units of the
Baucau Limestone (estimated 60%-80% calcite)8
– refer to ASX announcement 24 November 2025 for
further information regarding drill collars for visual estimates
Cautionary Statement: The Company draws attention to uncertainty in reporting visual results. Visual estimates
of mineral abundance should never be considered a proxy or substitute for laboratory analyses where
concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no
information regarding impurities or deleterious physical properties relevant to valuations.
Drilling was concluded in December9, with Estrella completing 33 RC drill-holes for a total of 2,804m,
and 9 diamond core drill-holes for a total of 913.10m, bringing the combined total to 3,717.10m drilled.
While assaying and interpretation activities are ongoing, completion of the drilling programme has
revealed the following about the known exposed calcium carbonate rocks:
• Range of thickness of Baucau Limestone is 0m (eroded) to 87m
• Range of thickness of Batu Putih chalk is 0m (absent) to 38m
• Range of combined thickness of Baucau & Batu Putih = 29m to 112m
• Average thickness of combined limestone + chalk = 57m
Assays from Werumata are pending, subject to standard government inspection and export approvals.
CORPORATE
Post period-end, Estrella announced Robert Mencel has agreed to join Estrella as Chief Executive
Officer with a structured transition to Managing Director by 30 June 2026. Current Managing Director
Mr Chris Daws is expected to remain within the Estrella Group as Business Development Officer10.
9 Refer to ASX Announcement dated 18 December 2025
10 Refer to ASX announcement dated 5 January 2026
Robert is a qualified Mining Engineer and highly credentialed executive with more than 25 years’
operational and corporate experience across Australia and the Indo-Pacific. He also possesses
significant Board-level experience, serving as CEO / Managing Director for ASX-listed companies
including Centrex Limited, Valence Industries and Ironclad Mining.
CAPITAL
The Company’s cash balance as at 31 December 2025 was $918k.
Throughout the Quarter, the Company received proceeds of $144k from the exercise of options,
including $105k which was received from Non-Executive Chairman Les Pereira, for the exercise of
3,500,000 unlisted options at $0.03.
Total amount paid to related parties of Estrella and their associates, as per item 6.1 of the Appendix 5B,
was $78k for Directors fees, salaries and superannuation and the total amount paid to related parties of
Estrella and their associates, as per item 6.2 of the Appendix 5B, was $51k for Director’s salaries.
The Company continues to take steps to protect its legal rights and interests in the Mt Edwards Lithium
Royalty. The Board will protect these important assets of the Company and will be providing further
updates as material developments occur in accordance with the ASX Listing Rules and the Company’s
continuous disclosure obligations. Refer to ASX announcement dated 6 September 2024.
Table 4: Estrella Capital structure as at 31 December 2025
Fully Paid Ordinary Shares 2,204,391,574
Listed options exercisable 562,238,774
Unlisted options exercisable 505,000,000
Share Performance Rights 154,250,000
EXPLORATION
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure during the Quarter was $3.098M.
ASX Listing Rule 5.3.2: There were no mining production and development activities during the Quarter.
ASX Listing Rule 5.3.3: Refer to Appendix 1 for Estrella Tenement Information. No changes to
tenements throughout the period.
ENDS
The Board of Directors of Estrella Resources Limited authorised this announcement to be given to ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
info@estrellaresources.com.au
P: +61 (08) 9481 0389
Media Contact:
David Tasker
Chapter One Advisors
Email: dtasker@chapteroneadvisors.com.au
Tel: 0433 112 936
Compliance Statement
With reference to previously reported Exploration Results and Mineral Resources, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the original market
announcement and, in the case of estimates of Mineral Resources, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcement.
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical
facts but, rather, on ESR’s current expectations about future events and on a number of assumptions which are
subject to significant uncertainties and contingencies many of which are outside the control of ESR and its directors,
officers and advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Peter
Spitalny, who is the Exploration Manager, Timor Leste of Estrella Resources, and a Fellow of The Australasian
Institute of Mining and Metallurgy. Mr Spitalny has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration, and to the activity they are undertaking to qualify as Competent Persons as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and
Ore Reserves”. Mr Spitalny consents to the inclusion in the report of the matters based on their information in the
form and context in which it appears.
Cautionary Statement:
The Company draws attention to uncertainty in reporting visual results. Visual estimates of mineral abundance
should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the
factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities
or deleterious physical properties relevant to valuations.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Estrella Resources Limited
ABN Quarter ended (“current quarter”)
39 151 155 207 31 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (78) (154)
(e) administration and corporate costs (437) (905)
1.3 Dividends received (see note 3) - -
1.4 Interest received 19 29
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(496) (1,030)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment * - -
(d) exploration & evaluation (3,098) (4,742)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material)
R&D expenditure refund - -
2.6 Net cash from / (used in) investing
activities
(3,098) (4,742)
3. Cash flows from financing activities
- -
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options 144 154
3.4 Transaction costs related to issues of equity
securities or convertible debt securities (1) (22)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material)
Proceeds received in advance for Option
exercise
(39) -
3.10 Net cash from / (used in) financing
activities
104 132
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period 4,408 6,558
4.2 Net cash from / (used in) operating
activities (item 1.9 above) (496) (1,030)
4.3 Net cash from / (used in) investing activities
(item 2.6 above) (3,098) (4,742)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above) 104 132
4.5 Effect of movement in exchange rates on
cash held - -
4.6 Cash and cash equivalents at end of
period 918 918
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 918 2,908
5.2 Call deposits - 1,500
5.3 Bank overdrafts - -
5.4 Other (cash held on trust subject to
shareholder approval at 15 August 2025
meeting)
- -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above) - 4,408
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
(78)
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
(51)
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify)
R & D financing facility - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (496)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(3,098)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (3,594)
8.4 Cash and cash equivalents at quarter end (item 4.6) 918
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 918
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.26
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: The Company will continue to spend funds on its Timor-Leste project, with a
continued focus on exploration at its Werumata Limestone project, and development
of its Manganese project including its sample extraction.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes, the Company will be required to raise further cash to fund its operations. The
Company has always been well supported in its capital raising initiatives and will raise
to fund its current and future operations.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, refer to answers 8.8.1 and 8.8.2
Note: where item 8.
Share your feedback