Manganese intersections continue at Ira Miri
Released
Released
Announcement PDF
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103 Email info@estrellaresources.com.au
15 October 2025
Manganese Intersections Continue to
Extend Strike at Ira Miri
HIGHLIGHTS
➔ Step-out drilling targeting the Ira Miri supergene manganese continues to extend the strike length of
mineralisation, now nearly 100m and open both to the northeast and southwest
➢ EMDD040 intersected 5.9m of 90% secondary supergene manganese oxides from 11.5m
➢ EMDD039 intersected 3.9m of 90% secondary supergene manganese oxides from 10.0m
➢ EMDD038 intersected 8.0m of 40% secondary supergene manganese oxides from 4m
➢ EMDD037 intersected 1.5m of 15% primary manganese oxides from 11.5m
➢ EMDD036 intersected 1.6m of 20% primary manganese oxides from 12.3m
➢ EMDD035 intersected 3.14m of 15% primary manganese oxides from 14.26m
➔ LiDAR and DroneMag surveys at Ira Miri have been completed with an extensive MobileMTd to follow
in late-November
➔ Results from LiDAR at Werumata project received and bathymetric survey on the potential port area has
commenced
➔ The Werumata Limestone road access and pads are complete awaiting drill rig arrival
Figure 1: Primary and secondary manganese mineralisation in core from EMDD040. For visual estimates and visual
estimates disclaimer please refer to table 1.
ASX: ESR
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the success of
the next six diamond drillholes targeting the Ira Miri mineralisation at its Lautém Manganese Project, Timor-
Leste.
The mineralisation remains open both to the northwest and southeast. Step-out lines continue to extend its
length and width as the Company enhances its understanding of the finer details of the geology controlling
the location of mineralisation.
Recent intersections are presented in Table 1 below.
Table 1: Visual estimates of EMDD034 to EMDD040
Hole ID m From m To Interval Description
EMDD035
0 14.26 Colluvium / Soil / Limestone Cover
14.26 17.4 3.14 15% Primary Manganese Oxides, 85% Chert
17.4 30.4 Noni Formation Chert
EMDD036
0 12.3 Colluvium / Soil / Limestone Cover
12.3 13.9 1.6 20% Primary Manganese Oxides, 80% Chert
13.9 22.3 Noni Formation Chert
EMDD037
0 11.5 Colluvium / Soil / Limestone Cover
11.5 13 1.5 15% Primary Manganese Oxides, 85% Chert
13 13.8 Noni Formation Chert
13.8 14.2 0.4 5% Primary Manganese Oxides, 95% Chert
14.2 28.7 Noni Formation Chert
EMDD038
0 4 Colluvium / Soil / Limestone Cover
4 10 6 50% Manganese oxide, 50% clay
10 12 2 30% Manganese Oxides, 70% Chert
12 17.4 Noni Formation Chert
EMDD039
0 8.5 Colluvium / Soil / Limestone Cover
8.5 10 1.5 5% Primary Manganese Oxides, 95% Chert
10 13.9 3.9 90% Manganese oxides, 10% Clay
13.9 14.7 0.8 15% Primary Manganese Oxides, 85% Chert
14.7 15.4 Clay
15.4 17.8 2.4 10% Manganese oxides, 90% clay
17.8 22.5 Noni Formation Muds
EMDD040
0 9.95 Colluvium / Soil / Limestone Cover
9.95 10.7 0.75 5% Primary Manganese Oxides, 95% Chert
10.7 11.5 0.8 15% Primary Manganese Oxides, 85% Chert
11.5 17.4 5.9 90% Manganese oxides, 10% Clay
17.4 18.9 1.5 15% Primary Manganese Oxides, 85% Chert
18.9 24.3 Noni Formation Muds
Cautionary Statement: The Company draws attention to uncertainty in reporting visual results. Visual estimates of
mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or
grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding
impurities or deleterious physical properties relevant to valuations.
Samples of core have been taken with results expected within 6-8 weeks.
Commenting on the exploration activities, Managing Director Chris Daws said:
“These latest results continue to highlight the fantastic, unexplored opportunity which Estrella has
generated in Timor-Leste.
“Our latest visual manganese estimations extend the strike length of mineralisation to nearly 100 metres
and with more strong manganese oxides being encountered, I am increasingly confident our team is
unlocking a new manganese province.
“The exploration team have done a fantastic job to develop targets from mapping as we integrate new
drill data with recent LiDAR and drone geophysics surveys.
“With every hole we grow more confident in our ability to unlock further broad mineralised intercepts.
“Despite the significant volume of activity at Ira Miri, the team have also been able oversee the
completion of drill pad preparation at the Werumata limestone project as well as a bathymetric survey
for the port option. Drilling is now imminent as we target large-scale calcite mineralisation.
“As always, I implore investors to follow our exciting drill progress and remain engaged. Go Estrella!”
The latest intersections at Ira Miri extend both the strike length and the width of mineralisation. Total drilled
strike length is now almost 100m with mineralisation approximately 15-18m in width with the total
mineralised package up to 30m in width on some sections (Figure 2).
Figure 2: Location of the latest intersections with respect to the interpreted primary mineralisation position
Both the targeted sections in Figures 3 and 4 (the recent drillholes) are open and work is underway to
expand drilling on these sections to test the mineralisation to its limits.
Figure 3: Cross section through EMDD029 to EMDD031 and EMDD039 and EMDD040 (5m north of section) showing the
location of intersected mineralisation which is open both east and west.
Figure 4: Cross section through EMDD036 to EMDD039 showing the location of intersected mineralisation which is open to
the east. Refer to Figure 2 “Next Holes” for location.
Both the LiDAR and Drone Mag surveys at Ira Miri have been completed and the Company is awaiting
the results, particularly from the drone magnetics which will help future targeting.
Werumata Limestone Project
Results have been received for the LiDAR survey covering 1,700ha at the Werumata project, measuring
differences in surface height which is vital for drill planning1.
LiDAR analysis has been followed up with a bathymetric survey of the potential port area to assist in locating
suitable positions for port facilities and infrastructure. A tidal survey is concurrent with the other work.
This work has been done at an early stage as proximity of the ore body to a port will affect the positioning
of all other infrastructure. This will enable efficiencies to be built in to the project at an early stage and
enable community consultation on the project to continue with the best possible information.
Figure 5: Bathymetric and Tidal Surveys underway at Werumata Limestone Project utilising support from the local fishing
community
Groundwork including track and pad preparation at the Werumata Project site has been completed utilising
local contractors. The work was completed ahead of schedule and the site is ready for the imminent arrival
of drilling equipment. Two contracting companies, one from Lospalos and one from Baucau were engaged
and the results have been excellent.
1 See ASX announcement dated 28 August and 15 September 2025
Figure 6: Mobilisation day of contractors to the Werumata Limestone Project to commence drill track and pad preparation.
Figure 7: Examples of the work conducted by local contractors at Werumata Limestone Project ahead of drilling
Figure 8: Results of the LiDAR and photogrametry obtained at the Werumata Limestone Project
Eastern Target Western Target
Figure 9: Zoomed view of Figure 8
Next Steps
Diamond drilling at Ira Miri will continue in the short term. Drilling at Werumata is expected to commence
within a week. Water bores will be established to facilitate diamond drilling to lock down the stratigraphy for
rock-type delineation and calculation. Specific gravity and bulk density determinations will be made on the
core.
The Company will update shareholders as the project progresses.
This announcement has been approved by the board for release to the ASX.
ENDS
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Western
Target
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner consents
to the inclusion in the report of the matters based on their information in the form and context in which it appears.
Cautionary Statement of Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The Company draws
attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be considered
a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations.
Table 2: Collar and survey details
Hole_ID East North RL Depth Dip Azi
EMDD035 270046 9068195 121.939 30.4 -60 217
EMDD036 270041 9068197 121.942 22.3 -60 264
EMDD037 270047 9068195 121.986 28.7 -70 187
EMDD038 270046 9068188 122.596 17.4 -60 185
EMDD039 270097 9068171 130.052 22.5 -60 160
EMDD040 270095 9068176 130.443 24.3 -60 160
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Determination of mineralisation has been
based on geological logging of diamond
core and field trenching with metal
concentration confirmed by a Bruker S1
pXRF.
• Diamond core is drilled PQ3, cut in half
using a hand-grinder for competent core or
split using a chisel for sooty, less
competent core and clay.
• Core is split perpendicular to bedding
when primary mineralisation is
encountered.
• At the lab the full sample is crushed and
pulverized to 90% passing 75 um.
• A subsample undergoes fusion and XRF
analysis.
• Samples are analysed at PT Geoservices
in Jakarta, Indonesia
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Diamond drilling has been undertaken
utilising HQ and PQ triple tube.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Recoveries are calculated based upon the
depth drilled and compared to core
recovered.
• Sample recovery using the man-portable
diamond rig is below an acceptable
standard and a more suitable diamond drill
and chemical water treatment regime is in
place which has significantly lifted
recoveries.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
• Rock-chip and core samples were
geologically logged for mineral content
and photographed prior to sending for
assay or screening by pXRF.
• Drill core has also been geologically
logged.
• The trenches have been mapped and
sampled.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
• Sample sizes are appropriate to the grain
size of the mineralisation which in
manganese oxides is very fine.
• Sampling on core is performed by splitting
or cutting the core in half, perpendicular to
bedding when observed.
• The sample sizes are adequate for the
grain size of the material being sampled.
Criteria JORC Code explanation Commentary
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
• Any samples being reported are being
analysed at PT Geoservices in Jakarta
using an XRF Fusion technique for 15
elements and all samples are also being
tested for Au by fire assay a 50g sub-
sample.
• The technique is considered total.
• Lab standards and blanks are adequate at
this stage of the exploration program.
Verification
of sampling
and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No prior modern exploration has been
conducted in the area. Mineralisation has
been verified by several external parties.
• EMDD002 twinned EMDD001 with very
similar results
• No adjustments to any assay data being
reported were undertaken.
• Geological and recovery data is measured
and entered digitally into log sheets which
are then stored on the Company cloud
storage system.
• Drillhole collar and survey information is
also recorded.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
• A RTK survey system is used periodically
to pick up drill collars for final locating.
• Topographic control is accomplished
using 5m spaced satellite point data.
• Drillholes are located using a Garmin GPS
Data spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• Samples are decided upon geological
characteristics and observed dilution.
Minimum 30cm sample widths can be
taken, ranging up to 1.2m depending on
core characteristics.
• No composites have been taken.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Sampling perpendicular to bedding will
occur when bedding can be observed in
the core.
• This is not necessarily observable in
secondary enrichment zones.
• The drilling is generally at a high angle to
mineralisation.
Criteria JORC Code explanation Commentary
Sample
security
• The measures taken to ensure sample
security.
• Exported samples are in the possession of
ESR personnel from the core processing
site and through customs in Atambua in
Indonesia, where they are transferred to
ABC Express for delivery to the lab in
Jakarta.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No independent audit or review has been
undertaken on the Lab.
• Independent reviews on geological
logging and sampling techniques have
been done and all methods used are at
industry standard.
Section 2 - Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
• Exploration and Evaluation Concessions
MEL2023-CA-ZA001, MEL2023-CA-
ZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella Resources Representante
Permanente (70%) and Murak Rai Timor
(30%).
• Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
were converted to Exploration Licenses
and are awarded to Estrella Resources
Limited Representante Permanente
(100%)
• Exploration and Evaluation Concessions
MEL2024-DA-ZB001, MEL2024-DA-
ZB002 and MEL2024-DA-ZB003 are
awarded for four years to Estrella Murak
Rai, forming the joint-venture between
Estrella Resources Representante
Permanente (70%) and Murak Rai Timor
(30%).
• Estrella also operated Reconnaissance
Permits ESR-RP-01, ESR-RP-02 and
ESR-RP-03
• Estrella Resources Limited
Representante Permanente and Estrella
Murak Rai are registered in Timor-Leste
and is a wholly-owned subsidiary of
Estrella Resources Limited (Australia).
• All of the Concessions and Permits are
current and in good standing.
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
• The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
• Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
• Local geologists and companies have
sporadically explored the area however
there has been no documentation
collected nor systematic exploration to
quantify mineral occurrences.
• No minerals drilling has taken place.
• No close-spaced geophysics has taken
place.
• No systematic, modern exploration has
taken place.
• The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
Geology • Deposit type, geological setting and style of
mineralisation.
• The current Concessions and Permits
host three main forms of manganese
mineralisation.
• Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
Criteria JORC Code explanation Commentary
processes exist.
• Secondary mineralisation exists as a
supergene blanket above the cherts
where they have been exposed to
chemical weathering.
• Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels or scree deposits.
• Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
• Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectono-
stratigraphic genesis of the area.
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• No drilling has been undertaken in the
area.
• Sample locations are shown in the body of
the text.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• Exploration results with all relevant
drillhole information are reported in the
body of the text.
• No aggregation methods have been used
save for length-weighted composite grades
for significant intercepts.
• Metal equivalent values have not been
used.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
• Any relationships have been discussed
within the body of the text or depicted in
diagrams.
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Relevant diagrams have been included
within the main body of text.
Balanced
Reporting
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
• No new information has been withheld.
Criteria JORC Code explanation Commentary
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• All observations are discussed within the
body of the text.
Further work • The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
• Further work by ESR will include
trenching and drilling.
• Additional work on specific areas will be
included under the heading Next Steps in
the body of the text when appropriate to
do so.
Share your feedback
Discover