Sauro Manganese Discovery
Released
Released
Announcement PDF
ASX:ESR
19 April 2024
New Sauro manganese prospect discovered and
magnetic survey data secured
HIGHLIGHTS
➔ New Sauro Mn prospect defined during last week’s reconnaissance mapping and sampling program.
This Mn occurrence is ~ 12km southeast of the Lalena Mn prospect and has returned 27.9% Mn
from pXRF.
➔ Countrywide airborne Magnetics and Radiometric survey flown on 400m lines has been secured
by Estrella team and is currently being reviewed. The magnetics is seen as potentially an excellent
targeting tool for Mn under surficial cover, as mineralisation noted to date in the field has iron
associated with the Mn mineralisation.
➔ Preliminary geological reconnaissance work within the newly granted 503.7km2 tenure (ASX release
on 27th March 2024) is ongoing and has defined prospectivity for Manganese (Mn) and Copper-Gold
(Cu-Au).
Figure 1: Lautem project with Noni Formation highlighed (in pink) and the three prospects defined to date
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce an update to
exploration activities in the Lautém Municipality of Timor-Leste and the discovery of the new Sauro
manganese prospect.
Commenting on the ongoing work program, Estrella Managing Director Chris Daws said:
It is exceptionally pleasing to encounter yet another manganese prospect at our emerging Lautem project in
the virtually unexplored nation of Timor-Leste. Encouraging samples discovered through reconnaissance
work greatly assist us in interpreting the most prospective areas within the geological setting and also hint at
the possibility of further discoveries to come within our large exploration tenure.
The identification of the Sauro prospect is significant as it sits a great distance away from the manganese
identified at Lalena and the source of this mineralisation is yet to be discovered. These prospects continue
to affirm our belief the Timor-Leste is geologically fertile and that a first-mover advantage offers significant
opportunities for further exploration success.
I would also like to note the Sauro discovery was made by local Timorese geologists with the aid and
engagement of local Timorese people. We are continuing to work closely with government as well as the
local community who are very supportive of our activities.
With new discoveries emerging as well as the recent acquisition of magnetic and radiometric data, I look
forward to providing further updates as we continue to progress our exploration campaigns across our tenure.
Sauro Mn prospect
The Sauro Mn prospect is defined by Mn float material that has not had the in-situ source located at this
stage. There is prospective Noni Formation identified in historical maps of the region and the Estrella field
team will return to undertake more detailed mapping once initial reconnaissance is completed. The following
table is a summary of all samples with a trigger value reported >1% Mn since the prior release.
Sample ID
LRG_035
Prospect
Sauro Mn
Description
Mn float
Lat (WGS84)
126.8965
Long
(WGS84)
Ti (ppm)
V
(ppm)
Mn %
Fe %
Co
(ppm)
-8.5184
2328
65
27.9
5.6
792
Table 1: Results of samples taken with pXRF. Please see cautionary note on pXRF analysis below.
The Company is mobilising crushing and other laboratory equipment to Timor-Leste to test and report multielement pXRF results from within the country, including the use of a portable parts-per-billion (ppb) gold
detection system. Select samples will be returned to Australia for laboratory analysis as standard reference
checks. This will alleviate sample bottlenecking and vastly improve analysis times to accelerate exploration
progress.
Airborne Magnetics and Radiometrics
A helicopter-borne high resolution magnetic and radiometric survey was completed over the Timor-Leste
mainland, the island of Atauro and the enclave of Oceussi. The work was completed by Airborne Petroleum
Geophysics (APG) from Canada in 2019 under contract to Autoridade Nacional do Petroleo e Minerais
(ANPM)
A total of 45,298 line-km of data were acquired over the commission area. The survey was flown at a
nominal mean terrain clearance of 80 metres for both the magnetometer and the gamma-ray spectrometer,
primary flight lines were flown at 400m separation and tie lines at 4000m of line separation.
Estrella have undertaken preliminary review of the available data and have identified the magnetics data to
be a useful tool for defining potential ferro manganese mineralisation below surficial cover. There is a late
flat lying limestone unit that has been identified in the field and overlays the prospective Mn bearing Noni
Formation.
Estrella is looking at increasing the line density (currently 400m) to refine the anomalies and the team is
currently assessing options to undertake this infill work. High-definition magnetic anomalies combined with
Mn bearing Noni Formation will present highly prospective drill targets for Estrella.
The figure below shows the Magnetic image with First Vertical Derivative, and shows clear features
associated with the defined Mn prospects.
Figure 2: Lautem Airborne Magnetics (1st Vertical Derivative 1VD)
Geology
The Island of Timor is part of the Outer Non-Volcanic Banda Arc that was formed from the collision between
the Volcanic Banda Arc and the Australian Continental Crust, which occurred in Late Miocene.
Consequently, the Island of Timor has a complex geological setting.
The geology of the island is grouped into three distinct units:
• Allochthon/Banda Terrane (pre-collision Banda Forearc/Asian affinity);
• Para-autochthones (Gondwana Megasequence and Australian Margin Megasequence); and
• Autochthon (Syn-Orogenic Megasequence).
Estrella’s in country team is undergoing systematic geological mapping and sampling and has identified
the Noni Formation as the host to the extensive manganese mineralisation identified across the project.
The Noni Formation occurs as part of the Banda Terrane and has been mapped across Estrella’s project
for over 27km (Figure 1). It is described as a Middle Jurassic to Cretaceous bedded unit of over 100m
thickness comprising arenites and chert beds within there has been found massive manganese and ferro
manganese bands and nodules.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Cautionary Statement of pXRF
PXRF results that are announced in this report are preliminary only. The use of the PXRF is an indication only of the
order of magnitude of expected final assay results. The samples that are the subject of this report will be submitted for
laboratory assay and some variation from the results presented herein should be expected.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Beau Nicholls,
who is the Exploration Manager for Estrella Timor-Leste, and a fellow of The Australasian Institute of Geoscientists. Mr.
Nicholls has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Nicholls consents to the inclusion in the
report of the matters based on their information in the form and context in which it appears.
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological mapping, visual
mineral estimates and confirmation of
metallic concentration using a Bruker S1
Titan Portable XRF instrument.
•
Initial rock-chip samples were taken and
dispatched
through
customs
and
quarantine to ALS in Malaga for multielement analysis.
•
Samples were analysed using a 4-acid
digest, ME-MS for 61 elements and Pt, Pd
and Au by fire assay and ICP-MS finish on
a 50g sub-sample.
•
No drilling has been undertaken to date.
•
•
No drilling has been undertaken to date.
•
Rock-chip samples were geologically
logged for mineral content prior to sending
for assay or screening by pXRF.
•
Sample sizes are appropriate to the grain
size of the mineralisation.
The exploration program is in its very early
stages and initial sample sizes were kept
small due to freight and customs /
quarantine restrictions. They are not
considered representative of the bulk of
mineralisation.
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
•
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
JORC Code explanation
sub-sampling
stages
to
maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
•
•
No prior modern exploration has been
conducted in the area.
•
No adjustments to assay data were
undertaken.
•
GPS equipment using MGA94, Zone 52
coordinate system with an accuracy of +/5m.
Topographic control using 30m spaced
satellite point data.
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
•
Sample
security
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
•
•
•
•
•
•
No systematic sampling has
conducted at this early stage.
•
No orientation-based sampling bias has
been identified.
•
Exported samples are in the possession of
ESR personnel from field collection to
customs submission in Dili.
Non-exported samples remain with ESR
personnel.
No independent audit or review has been
undertaken.
•
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
Samples are selected based on geological
logging. Samples
have
been
dispatched to an accredited commercial
laboratory in Perth for analysis.
Preliminary samples are being analysed at
ALS in Malaga using a 4-acid digest, MEICP for 61 elements and all samples are
also being tested for Pt, Pd and Au by fire
assay and ICP-MS finish on a 50g subsample.
Standards and blanks have not been
included in this early phase of the program.
Current field samples are being analysed
by pXRF. The Cautionary statement is
included when assessing pXRF.
•
been
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded to Estrella Murak Rai, forming
the joint-venture between Estrella
Resources Representante Permanente
(70%) and Murak Rai Timor (30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
ESR-RP-05, ESR-RP-06, ESR-RP-07
and ESR-RP-08 are awarded to Estrella
Resources
Limited
Representante
Permanente (100%)
•
Estrella
Resources
Limited
Representante Permanente is registered
in Timor-Leste and is a wholly-owned
subsidiary of Estrella Resources Limited
(Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Other local geologists and companies
have sporadically explored the area
however
there
has
been
no
documentation collected nor systematic
exploration
to
quantify
mineral
occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Permits host three main forms
of manganese mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
processes exist.
•
Additional primary mineralisation exists
as pisolithic concretions and direct
precipitates within deep-sea limestones.
•
Secondary mineralisation exists in the
form of small to extremely large clasts of
manganese mineralisation associated
with the Bobonaro Formation, a melange
that is a lithotectonic unit composed
mostly of broken, clay-rich layers that are
mixed to varying degrees with structurally
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
Commentary
and stratigraphically overlying units. This
unit represents an under-sea collapse
zone containing multiple manganese
clasts over a very large area.
•
Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
• No drilling has been undertaken in the
area.
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used.
Metal equivalent values have not been
used.
•
Any relationships have been discussed
within the body of the text.
•
Relevant diagrams have been included
within the main body of text.
•
No new information has been withheld.
Criteria
Other
substantive
exploration
data
Further work
JORC Code explanation
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
•
•
No other substantive data exists as the
program is in its early stages.
All observations are discussed within the
body of the text.
Further work by ESR will include
systematic mapping and sampling along
with
stratigraphic
and
structural
classification.
Share your feedback
Discover