T5 Extended 300 Metres South with New Intersection
HIGHLIGHTS
Southern T5 step-out diamond drillhole hits Semi-Massive Nickel-Copper Sulphides (Figure 1)
CBDD078A intersects 1.8m of semi-massive to globular sulphides from 929m downhole
within a broader 21.2m mineralised halo
This shows T5 Deposit continues south of a large Proterozoic Dyke without any significant
structural off-set
Step-out intersection occurred 300m south of previous disseminated and stringer-sulphide
intersections in CBDD067A and CBDD067B (Figure 2) which were affected by the dyke
Downhole Electromagnetics (DHEM) to commence shortly
Drill rig to move to Gossan Hill to commence maiden diamond drilling program this week
First diamond drillhole will target below disseminated sulphides intersected in RC hole CBP098
A series of step-out holes with DHEM has been planned
Broonhill Deposit (Figure 2) definition drilling awaiting DHEM surveys and seismic interpretation
Figure 1: Globular to semi-massive nickel sulphides in CBDD078A at 929m down hole.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Managing Director Chris Daws commented:
“Drilling at T5 has again provided our team success with a significant step out hole south of the latestage Proterozoic Dyke, encountering significant nickel and copper sulphides. DHEM will be a
significant advantage as we follow the extent of the T5 Deposit.
We continue to actively explore the Carr Boyd basal contact as we know that is the most likely place
to find significant accumulations of nickel and copper sulphides. It has yielded two solid discoveries
so far at T5 and Broonhill. At Gossan Hill, we are kicking off our first diamond drilling program this
week and I’m looking forward to seeing the results and updating shareholders.”
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to provide an update on the
continuing exploration activities at its 100% owned Carr Boyd nickel-copper sulphide project located 80km
northeast of the City of Kalgoorlie-Boulder with drillhole CBDD078A successfully locating the continuation
of the T5 Deposit at depth below the Carr Boyd Nickel Mine area.
CBDD078A was targeting the down-plunge continuation of the T5 Deposit 300 metres south of previous
drilling, and south of a disrupting Proterozoic Dyke.
The Company is delighted to report that the drillhole was successful in locating the continuation of the T5
Deposit below previous drilling (Figure 2). The hole intersected a 21.2-metre-long zone of disseminated to
blebby nickel-copper sulphide mineralisation, including 1.8m of semi-massive and globular nickelcopper sulphides at the bottom of the interval on the basal contact.
The lower sulphide contact occurs on an off-shoot from the Proterozoic Dyke, however the majority of
primary mineralisation appears to remain intact and has not been remobilised.
Drillholes CBDD067A and CBDD067B were wedge holes targeting a DHEM plate north of the Proterozoic
Dyke generated from their parent hole, CBDD067 (Figure 2). The wedge holes intersected remobilised
nickel-copper sulphide mineralisation. The large Proterozoic Dyke has infiltrated the basal contact in this
area and disrupted mineralisation. Further drilling is warranted to identify the location of the remobilised
sulphides and this work will be undertaken in due course once the regional program has concluded.
Figure 2: Location of CBDD078A with respect to the T5 Mineralisation and Broonhill Discovery on the Northern basal contact.
Both deposits remain open and untested at depth. The CBDD067 DHEM plate can be seen outlined in red within
the T5 Deposit.
Visual estimates of mineralisation in all recent holes can be found in Table 1 with collar and survey details
in Table 2.
Figure 3 below shows a cross-section through the T5 Deposit north of the Proterozoic Dyke. As the dyke
has intruded east-west through the Carr Boyd Complex, pockets of molten material have been forced along
the T5 Pyroxenite contact both north and south of the dyke. This has resulted in local-scale remobilisation
of basal contact sulphides away from the intrusion.
Further step-out holes south of the dyke will encounter less and less disruption, as was seen within the
main T5 Deposit identified to date.
The T5 deposit remains open at depth and to the south.
Figure 3: Cross Section 6,673,500 North showing the intrusion of the Proterozoic Dyke below the basal contact which has
caused sulphide remobilisation.
Advancing the Broonhill Deposit
The Company is awaiting the downhole electromagnetic (DHEM) team to arrive on site to conduct surveys
on the DHEM platform holes between the T5 Deposit and the Broonhill Deposit (Figure 4). Geological
observation of the DHEM platform holes noted that the silica-sulphide plume observed close to
mineralisation around T5 and Broonhill Deposits was not as strong along the basal contact between the
deposits. The Company believes that the Broonhill Mineralisation is a separate deposit from T5 as the
geological environments vary quite distinctly between the two.
The Broonhill Mineralisation occurs within a pyroxenite off-shoot between 20m to 40m below the footwall
of the main Carr Boyd Igneous Complex. The off-shoot relates to the earliest of pyroxenite flows within the
complex, the T5-Broonhill Pyroxenite, and controls on mineralisation appear different from those at T5,
mainly due to the orientation of the basal contact in the Broonhill area.
The deposit appears to be fairly flat-lying and has been defined over a 200m by 180m arial extent so far. It
is open to the south, east and north. The Company will await the DHEM results and seismic modelling
before continuing to drill, so as to make the best use of all the exploration information gathered to date.
The recent seismic survey has answered a number of fundamental questions relating to the orientation and
timing of the pyroxenites within the Complex and the Company looks forward to unlocking further
information that will assist in targeting additional mineralisation through advancing the current geological
model (Figure 5).
Figure 4: DHEM conductors from T5 to Broonhill all occur within the sulphidic halo identified by the Phase 4 RC program
Figure 5: 3D view of magnetics cut by seismic section 4 across the Carr Boyd Intrusive Complex, identifying the basal and
internal contact orientations at depth. BH = Broonhill Discovery, CB = Carr Boyd Mine, T5 = T5 Ni-Cu Deposit
Current Drilling at Gossan Hill
The Company identified Gossan Hill as a potential mirror-image to the T5-Broonhill basal contact and
mapping confirmed the prospectivity of the area mid-2021. In early 2022 four RC holes were drilled into the
Gossan Hill Contact, the first of which intersected 3m of disseminated sulphides on the basal contact.
Drilling was unable to be completed due to issues with the RC rig and the decision was taken to diamond
drill the area at a later date.
Up until now, the 3.6km long basal contact (Figure 6) had not received any historical drilling. The Company
has collared the first diamond drillhole targeting the basal contact below CBP098 and will update the market
with results as they come to hand.
Figure 6: Basal contact of the Carr Boyd Igneous Complex showing the location and scale of the Gossan Hill Prospect
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Table 1: Visual Sulphide Estimates
Hole ID
CBDD078A
CBDD067
CBDD067A
CBDD067B
Depth
From
Depth
To
Interval
Rock Type
Sulphide Texture
Visual
Sulphide
Estimation
Visual
Pentlandite
Estimation
Visual
Chalcopyrite
Estimation
909.62
911.3
1.68
Pyroxenite
Globular
2%
Trace
Trace
911.3
913.12
1.82
Pyroxenite
Highly Disseminated
10%
2%
1%
913.12
916.17
3.05
Pyroxenite
Globular
5%
2%
2%
916.17
917.16
0.99
Pyroxenite
917.16
928.61
11.45
Pyroxenite
Disseminated
4%
2%
1%
928.61
929
0.39
Pyroxenite
Stringer
4%
2%
1%
929
930.79
1.79
Pyroxenite
Semi-massive
40%
3%
1%
782.46
790.55
8.09
Pyroxenite
Disseminated
2%
Trace
Trace
790.55
792.2
1.65
Dolerite Dyke
792.2
806
13.8
Pyroxenite
Disseminated / Blebby
2%
1%
Trace
754.1
768.7
14.6
Pyroxenite
Disseminated
1%
Trace
Trace
768.7
768.92
0.22
Pyroxenite
Stringer
5%
1%
1%
735.7
753.2
17.5
Pyroxenite
Disseminated
2%
Trace
Trace
753.2
754.67
1.47
Pyroxenite
Stringer
5%
1%
1%
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide abundance should
never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine the widths
and grade of mineralisation. The Company will update the market when laboratory analytical results become available.
Table 2: Drill hole collar details
Hole ID
Final Depth
Easting
Northing
RL
Dip
Azimuth
Status
CBDD067
CBDD067A
CBDD067B
CBDD078A
946.2
918.8
801.1
1100.0
367634
367634
367634
367633
6673411
6673411
6673411
6673416
426.1
426.1
426.1
426.2
-75
-70
-68
-60
260
280
285
225
Completed
Completed
Completed
Completed
APPENDIX 1 JORC TABLE 1 – CARR BOYD EXPLORATION
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Commentary
DD core samples have been half cut with an automatic core saw.
0.25m-1.1m samples are collected from the core trays as
marked out by the supervising geologist.
A handheld XRF tool was used to verify the mineralisation with
samples reporting >0.3% Ni in disseminated zones and >1% Ni
in the matrix sulphide zones.
XRF results have not been reported and are used as a
logging/sampling verification tool only.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Core is cut and sampled to ensure the sample is representative
and no bias is introduced. Cutting of specific, banded or stringer
sulphide zoned core is done orthogonal to the banding to ensure
there is no bias.
Aspects
of
the
determination
of
mineralisation that are material to the Public
Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential
loss/gain
of
fine/coarse
material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether
logging
is
qualitative
or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
Drilling was undertaken using NQ2 sized drill core.
Holes have been collared with mud rotary from surface, HQ
rough cored to top of fresh rock then NQ2 cored to EOH.
Core recovery was recorded by the field crew and verified by the
geologist.
RQD measurements were digitally recorded to ensure recovery
details were captured.
Sample recovery in all mineralised zones is high with negligible
core loss observed.
Diamond core drilling is the highest standard and no relationship
has been established between sample recovery and reported
grade as the core is in very good condition.
Drilling
techniques
Drill sample
recovery
Logging
Determination of mineralisation has been based on geological
logging, visual sulphide estimates and confirmation using a
pXRF machine. Samples were dispatched to an accredited
laboratory for multi-element analysis.
.
Diamond core drilling was used to obtain 3m length samples
from the core barrel which are then marked in one meter
intervals, based on core block measurements.
Samples are selected based on geological logging boundaries
or on nominal meter marks.
Collected samples weigh a nominal 2-3 kg (depending on
sample length).
Samples have been dispatched to an accredited commercial
laboratory in Perth for analysis.
Samples are being analysed using a 4-acid digest, ME-ICP for
33 elements and ore zone samples are also being tested for Au
& PGE elements using ICP analysis.
Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines was
undertaken.
Core trays were photographed wet and dry prior to sampling.
Drill hole logs are recorded in Excel spread sheets and validated
in Micromine Software as the drilling progresses.
The entire length of all holes is logged.
_________________________________________________________________________________
Criteria
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling
stages
to
maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
Commentary
Core is half cut using an automatic core saw to achieve a halfcore sample for laboratory submission.
The sample preparation technique is considered industry best
standard practice.
No field duplicates have been collected in this program. Field
duplicates will be collected once initial results are returned and
resampling of the mineralised zones is warranted.
Sample sizes are appropriate to the grain size of the
mineralisation.
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Results verified internally by Company personnel
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Hole CBDD0028 is twinning hole CBP042. No other twinning is
warranted at this stage.
The data was collected and logged using Excel spreadsheets
and validated using Micromine Software. The data will be
loaded into an externally hosted and managed database.
No adjustments have been made to the assay data other than
length weighted averaging.
The holes were pegged using a hand-held GPS + 3m
The rig was setup over the nominated hole position and final
GPS pickup occurred at the completion of the hole.
Holes are progressively surveyed by DGPS on a batch basis.
Location of
data points
Data
spacing and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied
No handheld XRF results are reported however the tool was
used to verify the mineralisation with reporting >0.3% Ni in
disseminated zones and >1% Ni in the matrix sulphide zones.
DHTEM parameters are as follows;
Tx Loop size:
500 x 800 m
Transmitter:
GAP HPTX-70
Receiver:
EMIT SMARTem24
Sensor:
EMIT DigiAtlantis
Station spacing: 2m to 10m
Tx Freq:
0.5 Hz
Duty cycle:
50%
Current:
~130 Amp
Stacks:
32-64
Readings:
2-3 repeatable readings per station
MGA94_51
Topography is relatively flat and control is more than adequate
given the early stage of the project. A 3D drone orthophotographic survey had been used to create a DTM of the
project area.
Refer to Cross Sections and Plans included
Not applicable, no Mineral Resource is being stated.
No compositing has been applied. Intercepts are quoted as
length weighted intervals.
Criteria
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
JORC Code explanation
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Commentary
The drill hole orientation does not introduce a sample bias.
Samples are in the possession of Estrella’s personnel from field
collection to laboratory submission.
No audits or reviews have been conducted for this release given
the early stage of the project.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
JORC Code explanation
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as
joint
ventures,
partnerships,
overriding
royalties,
native
title
interests, historical sites, wilderness or
national park and environmental
settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Acknowledgment and appraisal of
exploration by other parties.
Commentary
Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of ESR)
holds a 100% interest in the nickel and base metal rights to the
project.
There are no known impediments to operate in the area.
Geology
Deposit type, geological setting and
style of mineralisation.
The Carr Boyd Rocks deposit was discovered by Great Boulder
Mines, in a joint venture with North Kalgurli Ltd in 1968. The
deposit was mined between 1972 and 1975, during which time
they explored for additional breccia pipe occurrences near the
mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price. The mine
had produced 210,000t at 1.44% Ni and 0.46% Cu before its
closure.
From 1968 Pacminex Pty Ltd held most of the ground over the
CBLC outside of the immediate mine area. Between 1968 and
1971 they conducted extensive exploration programs searching
for large basal contact and/or stratabound Ni-Cu deposits. It
was during this time that most of the disseminated and cloud
sulphide occurrences such as those at Tregurtha, West
Tregurtha and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from
Pacminex in 1987 and focused on exploration for PGE deposits
between 1987 and 1990. In 1990 Defiance purchased the Carr
Boyd Rocks mine from WMC and switched focus to the mine
area between 1990 and 2001, leaving many PGE targets
untested.
From 1990 Defiance dewatered the mine to conduct testwork
and feasibility studies on the remnant mineralisation.
Metallurgical testwork, Mineral Resource estimations, and
scoping studies were completed. Around 1996 the focus shifted
again to regional exploration for large tonnage basal contact
deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project and
recommenced economic evaluations of the remnant material at
Carr Boyd Rocks before embarking on another regional
exploration program focusing on the basal contact. An
aeromagnetic survey, airborne EM reprocessing, and several
programs of RAB and RC drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and
continued with some regional exploration but focused most
attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd
(Consmin). Consmin conducted IP surveys and detailed gravity
surveys but did not drill any targets before selling the project to
Salt Lake Mining (SLM) in 2013. SLM completed limited drilling
to meet expenditure commitments, before selling the project to
Apollo Phoenix Resources in 2016.
Apollo sold the project to ESR in 2018.
The Carr Boyd project lies within the Achaean Yilgarn Craton in
a 700km belt of elongate deformed and folded mafic, ultramafic
rocks and volcanic sediments intruded by granitoids which is
referred to as the Norseman-Wiluna Belt. The belt has been
divided into several geological distinct terranes, with the project
area lying at the northern end of the Gindalbie terrane (Swager,
1996).
Criteria
JORC Code explanation
Drill hole
Information
Data
aggregation
methods
Relationship
between
Commentary
The geology of the Carr Boyd area is dominated by the Carr
Boyd mafic-ultramafic intrusive complex (CBIC).
Several distinctive styles of Ni and Ni-Cu mineralisation have
been identified within the CBIC. At the Carr Boyd Rocks Nickel
Mine Ni-Cu mineralisation is hosted within several 20 - 60m
diameter brecciated pipe-like bodies that appear to be
discordant to the magmatic stratigraphy. Mineralisation is
hosted by a matrix of sulphides (pyrrhotite, pentlandite, pyrite
and chalcopyrite) within brecciated Bronzite and altered country
rock clasts.
Stratiform Ni-Cu-PGE mineralisation has been identified at
several different locations within the layered magmatic complex.
Estrella is in the process of re-mapping and reclassifying the
Carr Boyd Igneous Complex. Previous “Layered Intrusive”
models are misleading as the complex is made up of many
overprinted and juxtaposed, smaller layered and non-layered
intrusives that have progressed from Ultramafic to Mafic over
time. The complex is better described as a magma feeder zone,
where the earliest melts passing through the Morelands
Formation have assimilated graphitic sulphidic shales, reached
sulphur saturation and deposited nickel sulphides along basal
contacts.
These basal contacts are not restricted to the base of the
complex, but can form within the complex, wherever access was
gained by these earlier flows.
The complex has then been intruded and inflated over time by
progressively more mafic, barren magmas to produce what we
see today.
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
o
easting and northing of the drill
hole collar
o
elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill hole
collar
o
dip and azimuth of the hole
o
down
hole
length
and
interception depth
o
hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
All relevant drillhole information can be found in the Tables and
sections within the announcement.
No information is excluded.
In reporting Exploration Results,
weighting
averaging
techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
These relationships are particularly
important in the reporting of Exploration
Intersections are reported on a 0.5% Ni cut-off with SG and
length weighted intervals.
All intercepts are reported using SG and length weighted
intervals.
No metal equivalents have been stated
True widths have not been stated. The variable orientation of
mineralisation within magma feeders combined with a structural
Criteria
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
JORC Code explanation
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known,
its nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported. These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
Other exploration data, if meaningful
and material, should be reported
including (but not limited to): geological
observations;
geophysical
survey
results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information
is
not
commercially
sensitive.
Commentary
overprint and steep drill angles make true width calculations
highly misleading.
Maps and sections with drill hole locations are included in the
announcement.
All new drillhole information within this announcement is reported
Everything meaningful and material is disclosed in the body of the
report.
Geological observations are included in the report.
No bulk samples, metallurgical, bulk density, groundwater,
geotechnical and/or rock characteristics test were carried out.
There are no known potential deleterious or contaminating
substances.
Diamond drilling and DHTEM geophysical testing is continuing.
Share your feedback
Discover