Annual Report to shareholders
Released
Released
Announcement PDF
1
Annual Report 2026
2026 ANNUAL REPORT
2
Annual Report 2026
Annual Report 2026
CONTENTS
DIRECTORS’ REPORT 3
AUDITORS’ INDEPENDENCE DECLARATION 23
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME 24
CONSOLIDATED STATEMENT OF FINANCIAL POSITION 25
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY 26
CONSOLIDATED STATEMENT OF CASH FLOWS 27
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 28
CONSOLIDATED ENTITY DISCLOSURE STATEMENT 50
DIRECTORS’ DECLARATION 51
INDEPENDENT AUDITORS’ REPORT 52
SHAREHOLDER INFORMATION 56
CORPORATE DIRECTORY 59
SCHEDULE OF EXPLORATION TENEMENTS 60
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
3
Annual Report 2026
DIRECTORS’ REPORT
Your directors present the following report on Estrella Resources Limited (“the Company”) and its wholly
owned subsidiaries (together referred to hereafter as “the Group” or “consolidated entity”) for the financial
year ended 30 June 2026.
Directors
The names of directors in office at any time during or since the end of the period are:
Robert Mencel Managing Director/CEO (appointed CEO 5 January 2026, appointed Managing Director
22 May 2026)
Leslie Pereira Non-Executive Chairman
Christopher Daws Non-Executive Director (Managing Director until 21 May 2026)
John Kingswood Non-Executive Director
Unless noted above, all directors have been in office since the start of the financial year to the date of this
report.
Principal activities
The principal activities of the Group during the reporting period were to explore the manganese project in
Timor-Leste.
Operating and Financial Review
The net loss of the Group for the financial year ended 30 June 2026 amounted to $23,978,726 (2025: loss
$2,079,754). The current year loss was incurred in the ordinary course of the business. The net assets of the
Group for the financial year ended 30 June 2026 amount to $15,205,999 (2025: net assets $24,157,426).
Risk Management
The Group aims to identify material risks and manage these effectively. The Board aims to manage these risks
by carefully planning its activities and implementing risk control measures. Some of the risks are, however,
unpredictable and the extent to which the Board can effectively manage them is limited.
The following section is a non-exhaustive list of risks faced by the Group and investors, are not in order of
importance or significance and actual events may differ from those described.
Exploration and Development
The future value of the Group will depend on its ability to find and develop resources that are economically
recoverable. Mineral exploration and development is a speculative undertaking that may be impeded by
circumstances and factors beyond the control of the Group. Success in this process involves, among other
things; discovery and proving-up an economically recoverable resource or reserve, access to adequate capital
throughout the project development phases, securing and maintaining title to mineral exploration projects,
obtaining required development consents and approvals and accessing the necessary experienced operational
staff, financial management, skilled contractors, consultants and employees.
The Group is entirely dependent upon its projects, which are the sole potential source of future revenue, and
any adverse development affecting these projects would have a material adverse effect on the Group, its
business, prospects, results of operations and financial condition.
Economic Conditions
Factors such as (but not limited to) political movements, stock market fluctuations, interest rates, inflation
levels, commodity prices, foreign exchange rates, industrial disruption, taxation changes and legislative or
regulatory changes, may all have an adverse impact on operating costs, the value of the Group’s projects, the
profit margins from any potential development and the Company’s share price.
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
4
Annual Report 2026
Reliance on key personnel
The Group’s success is to a large extent dependent upon the retention of key personnel and the competencies
of its directors, senior management, and personnel. The loss of one or more of the directors or senior
management could have an adverse effect on the Group’s performance. There is no assurance that
engagement contracts for members of the senior management team personnel will not be terminated or will
be renewed on their expiry. If such contracts were terminated, or if members of the senior management team
were otherwise no longer able to continue in their role, the Group would need to replace them which may not
be possible if suitable candidates are not available.
Future funding risk
Continued exploration and evaluation is dependent on the Company being able to secure future funding from
equity markets. The successful development of a mining project will depend on the capacity to raise funds
from equity and debt markets. The Company will need to undertake equity/debt raisings for continued
exploration and evaluation. There can be no assurance that such funding will be available on satisfactory terms
or at all at the relevant time. Any inability to obtain sufficient financing for the Group’s activities and future
projects may result in the delay or cancellation of certain activities or projects, which would likely adversely
affect the potential growth of the Group.
Unforeseen expenditure risk
Exploration and evaluation expenditures and development expenditures may increase significantly above
existing projected costs. Although the Group is not currently aware of any such additional expenditure
requirements, if such expenditure is subsequently incurred, this may adversely affect the expenditure
proposals of the Group and its proposed business plans.
Environmental, weather and climate change
The highest priority climate related-risks include reduced water availability, extreme weather events, changes
to legislation and regulation, reputational risk, and technological and market changes. Mining and exploration
activities have inherent risks and liabilities associated with safety and damage to the environment, including
the disposal of waste products occurring as a result of mineral exploration and production, giving rise to
potentially substantial costs for environmental rehabilitation, damage control and losses. Delays in obtaining
approvals of additional remediation costs could affect profitable development of resources.
Tenure and Access risk
While the Group does not anticipate there to be any issues with the grant or renewals of its tenements, there
can be no assurance that the application (or future applications) will be granted. Mining and exploration
tenements are subject to periodic renewal. The renewal of the term of granted tenure is subject to the
discretion of the relevant authorities. Renewal conditions may include increased expenditure or obligations on
the Group or compulsory relinquishment of areas of the tenements. The imposition of new conditions or the
inability to meet those conditions may adversely affect the operations, financial position and/or performance
of the Group.
The Group’s tenements may overlap third party interests or private property that may limit the Group’s ability
to conduct exploration and mining activities. Where the Project overlaps private land, exploration and mining
activity on the project may require authorisation or consent from owners of the land. Restrictions or inability
to access the Group’s tenements adversely affect the operations, financial position and/or performance of the
Group.
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
5
Annual Report 2026
Review of Operations
Estrella Resources Limited (ASX: ESR) (Estrella or Company) is pleased to provide its Review of Operations for
the full year ended 30 June 2026.
1. Overview
The 2026 financial year was transformational for Estrella Resources Limited (“Estrella” or “the Company”). In
twelve months the Company took its Ira Miri Manganese Project from first assay results through to the
completion of Timor-Leste’s first hard-rock minerals extraction under the country’s modern Mining Code,
delivering a surveyed 27,371 tonne manganese stockpile inventory available for sale. Over the same period
the Company designed, permitted, executed and reported a maiden drilling programme at the Werumata
Limestone Deposit, culminating in the declaration of a maiden JORC (2012) Inferred Mineral Resource of 621
million tonnes of limestone. The year also completed the Company’s planned leadership transition, with Mr
Robert Mencel appointed Managing Director in May 2026.
Estrella’s Timor-Leste concessions cover the Lautem and Baucau municipalities. The Company records its
appreciation of the support of the Government of Timor-Leste, the Autoridade Nacional dos Minerais, I.P.
(“ANM”), joint venture participant Murak Rai Timor, the Instituto de Geociências de Timor-Leste, the
Universidade Nacional Timor Lorosa’e and the communities of Lautem. Both the Ira Miri extraction campaign
and the Werumata drilling programme were delivered using predominantly local labour and local contractors.
FY2026 highlights
• Maiden Ira Miri assays confirmed high-grade supergene manganese, including 6.45m @ 51.7% Mn
(EMDD001) and 8.05m @ 53.0% Mn (EMDD002); a second suite reported in December 2025 returned
multiple intervals above 50% Mn with very low impurities, including 1.5m @ 55.1% Mn, 0.4m @ 58.02%
Mn, 2.5m @ 54.0% Mn and 2.5m @ 50.8% Mn.
• Execution in January 2026 of an agreement with the ANM authorising extraction of up to 30,000 tonnes
of high-grade manganese oxide for market appraisal — Timor-Leste’s first economic mineral bulk
extraction under its modern Mining Code.
• Completion of the Category B extraction, delivering a surveyed Stage 1 stockpile inventory of 27,371
tonnes at 28.64% Mn including 4,984 tonnes at 49.38% Mn, with in-situ pit sampling confirming grades
up to 60.22% Mn, and with zero lost-time injuries.
• Completion of the maiden Werumata drilling programme — 33 reverse circulation and nine diamond holes
— with all assays received by March 2026, returning average grades of 83% CaCO₃ (Baucau Limestone)
and 77.5% CaCO₃ (Batu Putih Chalk).
• Declaration on 14 May 2026 of a maiden JORC (2012) Inferred Mineral Resource of 621 million tonnes
(central estimate) at Werumata, comprising three direct shipping ore products requiring only crushing and
screening.
• Completion of a staged geophysical programme incorporating LiDAR, drone magnetics, Resistivity–
Induced Polarisation and an advanced MobileMTd UAV passive electromagnetic survey over the Ira Miri
pit and a five-kilometre corridor along strike.
• Nine parties expressed interest in purchasing all or part of the trial manganese parcel, and two
underwriting agreements over the Company’s quoted options were completed, with all underwritten funds
received by 30 June 2026.
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
6
Annual Report 2026
2. Ira Miri Manganese Project (Timor-Leste)
2.1 Exploration drilling and assay results
Drilling continued through the first half of the year as part of the first modern hard-rock exploration campaign
in Timor-Leste’s history. In September 2025 the Company reported its first assays. Maiden hole EMDD001 was
drilled vertically into outcropping manganese and ended in mineralisation due to technical difficulties; it was
twinned by EMDD002 to improve recovery of the friable manganese oxides. Both intersected primary
manganese with a thick zone of secondary enrichment above 50% Mn.
Hole ID From
(m)
To (m) Interval
(m)
Mn (%) Al₂O₃
(%)
Fe₂O₃
(%)
P (%) Si (%)
EMDD001 1.35 7.80 6.45 51.7 0.6 0.1 0.1 7.1
EMDD002 0.25 8.30 8.05 53.0 1.0 0.3 0.0 3.8
EMDD003 8.30 9.80 1.50 35.8 4.2 1.7 0.0 14.7
Table 1: First assay results, Ira Miri. Refer ASX announcement dated 4 September 2025.
Trenching in August 2025 identified in-situ primary manganese bedding within the Noni Formation which,
where exposed by weathering and erosion, had undergone significant secondary enrichment. Up to three
parallel primary hypogene beds were mapped, dipping 40 to 70 degrees north, together with substantial
detrital material. Angled holes EMDD022 and EMDD023 were the first to target the primary horizons directly.
Further assays reported in December 2025 confirmed the scale and quality of the system.
Hole ID Intersection Hole ID Intersection
EMDD022 2.9m @ 29.2% Mn from 4.80m EMDD032 1.9m @ 24.7% Mn from 5.1m; and 5.7m @
21.5% Mn from 8.6m
EMDD023 2.0m @ 13.7% Mn from 8.4m EMDD033 11.97m @ 28.9% Mn from 5.13m; and 2.1m
@ 46.78% Mn from 7.7m
EMDD025 1.95m @ 28.2% Mn from 1.3m EMDD034 4.2m @ 17.9% Mn from 8.8m
EMDD026 3.0m @ 35.7% Mn from 1.4m, incl. 1.5m @
55.1% Mn
EMDD037 1.5m @ 13.4% Mn from 11.5m
EMDD029 1.7m @ 31.8% Mn from 14.2m EMDD038 8.0m @ 17.3% Mn from 4.0m
EMDD030 1.1m @ 52.6% Mn from 17.3m, incl. 0.4m @
58.02% Mn
EMDD039 5.2m @ 39.6% Mn from 9.5m, incl. 2.5m @
54.0% Mn
EMDD031 4.0m @ 25.7% Mn from 9.2m; and 1.05m @
49.6% Mn from 15.9m
EMDD040 6.2m @ 45.3% Mn from 11.2m, incl. 2.5m @
50.8% Mn
Table 2: Ira Miri assay intersections. Refer ASX announcements dated 12 December 2025 (EMDD022–EMDD034) and 18 December
2025 (EMDD037–EMDD040). Down-hole intersection lengths; true thickness is not yet certain, although many drill-holes are interpreted
to have intersected the mineralisation at a high angle, in which case stated lengths are likely to be similar to true thickness.
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
7
Annual Report 2026
The chemistry is favourable. Across EMDD026 to EMDD036 the weighted average grade was 36% Mn with
phosphorus of 0.04%, alumina of 5.12%, ferric oxide of 2.00% and silica of 37.08%; across EMDD037 to
EMDD040, 31% Mn with phosphorus of 0.03%, alumina of 5.12%, ferric oxide of 2.20% and silica of 41.20%.
These characteristics are typical of low-iron, high-silica stratiform manganese deposits formed in marine
sedimentary rocks on the continental shelf in a back-arc setting — the same style as the Molango deposit in
Mexico and Groote Eylandt in Australia. The low iron content is highly desirable for certain end uses and the
silica content is amenable to beneficiation.
2.2 Geophysics and target generation
The Company completed a staged geophysical programme designed so that each method built on the last.
LiDAR was flown first at Werumata over 1,700 hectares on 100-metre spaced lines, and subsequently over
1,500 hectares at Ira Miri, overseen by TimorRai Exploration Services Lda with Enmintech; at Ira Miri the
objective was to detect both present-day topographic lows and evidence of historical structures, improving
predictive modelling for secondary supergene manganese accumulations. A drone magnetics campaign
followed, exploiting the magnetic contrast between Noni Formation manganese and the typically non-magnetic
overlying limestones. In November 2025 a Resistivity–Induced Polarisation survey, executed by the Instituto
de Geociências de Timor-Leste with Estrella’s national Timorese geological team, revealed three key
manganese-bearing zones associated with elevated chargeability and identified priority drill targets between
EMDD004 and EMDD019.
In the June 2026 quarter the Company commenced and completed an advanced MobileMTd UAV passive
electromagnetic survey using technology developed by Expert Geophysics. Conventional ground-based
methods had been depth-limited in assessing the geometry, continuity and scale of deeper anomalies beneath
and adjacent to the pit. The survey covered the pit area together with a corridor extending approximately five
kilometres along strike. Data was undergoing quality assurance in Canada at year end, with results intended
to rank deeper drill targets, refine the geological and structural model, and support the Company’s intended
Category A Mining Licence application.
2.3 Category B market appraisal extraction
In January 2026 the Company executed an agreement with the ANM authorising extraction of up to 30,000
tonnes of high-grade manganese oxide for market appraisal purposes, providing a clear regulatory framework
under which the Company could conduct sample extraction, prepare material for sale and remit government
fees equivalent to standard mining royalties, manganese ore attracting an 8% gross sales royalty.
Extraction commenced immediately, undertaken by a local contractor operating three production excavators
and bulldozers, a loader, a backhoe and an ancillary excavator, supported by twelve local community dump
trucks fitted with mud chains for wet-season operations, and supervised by Estrella’s geological and
engineering teams. The pit was designed to a maximum depth of approximately 15 metres and a total
excavation of approximately 85,000 cubic metres, with topsoil stored separately for rehabilitation and
overburden placed in a benched external stockpile. By February 2026 the mineralised horizon had been
intercepted in the pit, validating the exploration model. The campaign was completed with zero lost-time
injuries and strong community support.
2.4 Stockpile inventory and product characterisation
In May 2026 the Company announced completion of the Category B sample, delivering a surveyed Stage 1
stockpile inventory of approximately 27,371 tonnes of ore at a weighted average 28.64% Mn, including
approximately 4,984 tonnes grading 49.38% Mn, with a further 6,291 tonnes of mineralised waste recorded
separately. In-situ pit sampling confirmed ultra-high-grade mineralisation up to 60.22% Mn.
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
8
Annual Report 2026
Stockpile Survey
vol.
Bulk
density
Tonnes Mn (%) Al₂O₃ SiO₂ Fe₂O₃ P S
High-Grade 1,618.1 3.08 4,984 49.38 2.05 14.38 0.47 0.049 0.16
Med-Grade 2,201.7 2.75 6,065 35.87 4.02 31.03 1.44 0.031 0.06
Med-Low Grade 1,846.4 2.53 4,675 23.87 6.16 46.10 2.79 0.030 0.01
Low-Grade 5,044.6 2.31 11,647 20.57 6.57 49.65 3.00 0.029 0.02
Total Ore 10,710.8 2.56 27,371 28.64 5.29 39.88 2.26 0.033 0.04
Mineralised
Waste
3,445.2 1.83 6,291 20.78 6.74 48.07 2.82 0.038 0.04
Table 3: Ira Miri surveyed stockpile inventory and weighted grade summary. Measured LCM bulk density. Values marked in the original
announcement as elemental or oxide values calculated from laboratory XRF results using stoichiometric conversion factors. Refer ASX
announcement dated 11 May 2026.
Direct pit exposure materially improved the Company’s understanding of the deposit, confirming a structurally
complex Noni Formation host sequence. Mineralisation remains open beyond the current pit, including into the
pit walls and below the pit floor, and multiple high-priority IP anomalies at depth remain untested. Product
options were identified across the high-grade, medium-grade and low-grade stockpiles, subject to final
screening, blending, customer specification and pre-shipment quality control.
2.5 Logistics, marketing and export
The ANM approved the Company’s port stockpile location during the March 2026 quarter. The export
programme contemplates local contractors moving stockpiled manganese approximately 17 kilometres from
the Stage 1 pit head stockpile to the existing barge landing site at the former Lautem airstrip and
decommissioned fish-processing facility — the LCT port site — from which material is to be barged and on-
loaded into a bulk carrier offshore, avoiding lengthy road transport. Barging and trans-shipment into offshore
bulk carriers is standard practice across the archipelago region.
Sale of the trial parcel progressed well. As at 30 June 2026, nine separate parties had expressed interest in
purchasing all or some of the parcel. No binding sales agreement had been executed as at 30 June 2026.
3. Werumata Limestone Project (Timor-Leste)
3.1 Approvals, site preparation and drilling
At the end of September 2025 the ANM approved the Company’s Environmental Impact Statement and
Environmental Management Plan for drilling at Werumata, and all community consultation works were
completed. LiDAR results covering 1,700 hectares were received in October 2025 and followed by a
bathymetric survey of the potential port area. Track and pad preparation was completed ahead of schedule
and below budget by local contractors from Lospalos and Baucau, two water bores were installed, and
community education and consultation processes concluded with cultural ceremonies led by the communities
and their leaders.
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
9
Annual Report 2026
Drilling commenced in late October 2025, with the Ira Miri diamond rig mobilised as a fast-track option
alongside a reverse circulation rig from Dili, and concluded in December 2025. The Company reported
completion of 33 reverse circulation holes for 2,804 metres and nine diamond core holes for 913.10 metres, a
combined 3,717.10 metres. The Mineral Resource announced in May 2026 was reported as estimated from 33
reverse circulation holes for 2,852 metres and nine diamond holes for 913 metres, a combined 3,765 metres.
On completion of the programme the Baucau Limestone was recorded as ranging from zero, where eroded,
to 87 metres, and the Batu Putih Chalk from zero, where absent, to 38 metres, with a combined thickness of
29 to 112 metres averaging 57 metres. Drilling also revealed that the rocks underlying the targeted formations
are calcite-enriched, in some cases to end of hole. These are interpreted as weathered marl units and may
represent a hitherto unrecognised basal unit of the Batu Putih Formation, with potential as an additional source
of acid-neutralisation material. Their recognition is a significant contribution to the understanding of the
geology of Timor-Leste.
3.2 Assay results
Initial assays for holes WLR001 to WLR011 were received in February 2026 following sample inspection by
Timor-Leste government agencies and dispatch to PT Geoservices in Jakarta, with the remaining assays
received in March 2026 under the same protocol. Baucau Limestone intersections of up to 87 metres were
returned, averaging 30 metres, and Batu Putih Chalk intersections of up to 59 metres, also averaging 30
metres. These are down-hole lengths but are likely to be very close to true thickness. The low magnesium,
alumina and ferric oxide contents of the Baucau Limestone indicate strong potential for large-scale industrial
acid-neutralisation applications.
Formation Average
CaCO₃
Average SiO₂ Average MgO Average Al₂O₃ Average Fe₂O₃
Baucau Limestone 83% 8.34% 2.05% 1.83% 0.96%
Batu Putih Chalk 77.5% 12.68% 1.11% 3.82% 1.74%
Table 4: Average composition of the Werumata host formations. Refer ASX announcements dated 11 February 2026 and 16 March 2026.
3.3 Maiden Mineral Resource Estimate
Bulk density determinations required to complete the estimate were undertaken in collaboration with the
Universidade Nacional Timor Lorosa’e. On 14 May 2026 the Company declared a maiden JORC (2012) Inferred
Mineral Resource of 621 million tonnes (central estimate), independently estimated by ASEAMCO Pty Ltd with
Mr Robert de Jongh FAusIMM acting as Competent Person.
Category Product 1 (Mt) Acid
neutralisation
Product 2 (Mt)
Industrial uses
Product 3 (Mt)
Road base & fill
Total limestone
(Mt)
Lower estimate 442 30 85 557
Central estimate 493 33 95 621
Upper estimate 545 37 104 686
Table 5: Inferred Limestone Mineral Resource Statement as at 14 May 2026. Reported in accordance with the JORC Code (2012 Edition);
all products classified as Inferred. A resource recovery factor of 97% has been applied to account for voids. Average estimated bulk
densities applied: Product 1 (BCUH 1.88 t/bcm, BPUH 1.64 t/bcm); Product 2 (BCUL 1.58 t/bcm, LCL 1.54 t/bcm, BPUL 1.56 t/bcm);
Product 3 (BPUX 1.53 t/bcm, CL 1.30 t/bcm). Lower and upper estimates reflect ±10.4% variation on central tonnage estimates, being
the weighted average coefficient of variation of the bulk density dataset. A larger density sampling programme would support upgrade
to Indicated and Measured classification. Rounding may cause apparent discrepancies in totals. Refer ASX announcement dated 14 May
2026, “Maiden Resource – Werumata Limestone Project”.
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
10
Annual Report 2026
The Resource comprises three direct shipping ore products, each requiring only crushing and screening with
no further metallurgical processing: Product 1, high-grade limestone suitable for sale as an acid neutralisation
agent, of 493 million tonnes at an average acid neutralisation capacity of 83.2%; Product 2, lower-grade
limestone suitable for industrial uses including autoclaved aerated concrete blocks, masonry mortar and
cement, of 33 million tonnes at an average acid neutralisation capacity of 35.6%; and Product 3, high-silica
material suitable for road paving, construction aggregate, road base and rock fill, of 95 million tonnes with an
average silicon dioxide content of 58%.
The two host formations are sub-horizontal and broadly tabular with no faulting identified within the
concession, and open cut mining was determined to be the only economically feasible extraction method. The
Werumata concession covers approximately 4,990 hectares in Lautem Municipality and drilling to date has
tested only a small portion near the western boundary; the host formations extend more than six kilometres
eastward across the concession, an area largely untested by drilling and representing significant resource
growth potential.
3.4 Commercial arrangements
The Company has a Master Agreement with the Indonesian mining services company PT Raka Energi Mandiri,
which on satisfaction of a number of conditions and timeframes would facilitate entry into a definitive offtake
agreement conferring exclusive marketing and offtake rights. In August 2025 the parties agreed a variation
extending several milestone timelines, requiring Estrella to obtain all material licences, permits and approvals
for the mining and export of limestone by 31 March 2026; to announce a JORC-compliant resource of at least
500 million dry metric tonnes by 30 November 2025; to announce a positive Scoping Study by 30 January
2026; and to obtain all permits and approvals for port export infrastructure by 30 June 2026. All other terms
were unaffected. The agreement remains on foot and is expected to be updated shortly to reflect revised
timelines.
Next steps identified at year end were engagement with prospective customers to negotiate commercial sales
agreements, negotiation of a port land access agreement with the Government of Timor-Leste, and community
consultation in support of a new round of drilling targeting very high-grade limestone.
4. Regional Exploration
Estrella’s concession package in Lautem and Baucau covers a substantial and largely unexplored tenure
position, and reconnaissance mapping and sampling advanced across a number of prospects during the year,
including Lalena, Sica, Soru, Dasidara, Afa-Buti, Luro and Samalari.
The most significant regional development arose immediately after year end. In July 2026 the Company
reported high-grade manganese rock chip results from the Leuro and Sica prospects, assaying up to 57.8%
Mn and 55.7% Mn respectively. At Leuro a manganiferous bed of the Noni Formation is exposed in the eroded
bank of a stream at several locations, suggesting a laterally continuous orientation; given the grades and
potential strike length, Leuro is a significant target for ground geophysics. Sica is identified by an extensive
area of detrital manganese eroded from previously unidentified sources upslope, with traverses leading to
recognition of a highly eroded primary source and manganese occurring at several further locations, potentially
derived from one or two laterally extensive manganiferous beds. Together these results support the
interpretation that the manganese-bearing Noni Formation is considerably more widespread than initially
realised. Resistivity–Induced Polarisation surveying recommenced at Ira Miri in the second half of July 2026
and will be followed by surveying at Leuro and Sica.
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
11
Annual Report 2026
5. Western Australian Projects and Mt Edwards Lithium Royalty
Estrella retains its Carr Boyd Nickel Project and its interest in the Spargoville Nickel Project in Western Australia,
set out in the tenement schedule at the end of this report. There were no changes to the Company’s tenement
holdings during the year, and consistent with the strategic focus on Timor-Leste, activity in Western Australia
was limited to tenement management and statutory compliance.
The Company continued to take steps to protect its legal rights and interests in the Mt Edwards Lithium
Royalty. On 13 March 2026 the Company advised that it had commenced proceedings in the Supreme Court
of Western Australia against WIN Metals Limited (ASX: WIN), Auric Mining Limited (ASX: AWJ) and Neometals
Limited (ASX: NMT), and their respective wholly owned subsidiaries, concerning its royalty rights in respect of
lithium bearing ore. Pleadings were filed and mediation was held on 29 April 2026. As at 30 June 2026 the
matter remained ongoing. The Company does not expect the litigation to impact its current operations.
6. People, Community and Safety
Local employment and local contracting were central to how the Company operated in Timor-Leste. The Ira
Miri extraction campaign was carried out by a local contractor supported by twelve community-owned dump
trucks; access tracks and drill pads at Werumata were constructed by local excavator teams from Lospalos
and Baucau ahead of schedule and below budget; and the Timor-Leste exploration and mine operations teams
were expanded with strategic appointments to strengthen on-ground technical capacity. The Company worked
with national institutions throughout, including the Instituto de Geociências de Timor-Leste on geophysical
surveying and the Universidade Nacional Timor Lorosa’e on bulk density work and the establishment of a
sample preparation lab