New Supergene Manganese Discovery and Exceptional Assays
Released
Released
Announcement PDF
ASX:ESR
1 August 2024
New Supergene Manganese Discovery and
Exceptional Assays Received
HIGHLIGHTS
➔ Sica Prospect discovered with supergene manganese mineralisation exposed on surface (Figure 1)
➢ pXRF determinations in the field range between 59% - 26% Mn
➔ Lalena Prospect extension towards Sica with pXRF values ranging between 64% - 34% Mn (Figure 2)
➔ Assays between 57% - 26% Mn received from Perth laboratory from the Lautém Project
➢ Excellent correlation between in-country pXRF determinations and laboratory assays
➔ Step change in Estrella’s understanding of the regional controls on manganese mineralisation
Figure 1: Layer of concentrated high-grade manganese supergene rubble at the Sica Prospect with Estrella MD Chris Daws
and Exploration Manager Steve Warriner standing above part of the prospect area.
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce an update to
exploration activities in the Lautém Municipality of Timor-Leste and the discovery of the new supergene
manganese Sica Prospect.
Commenting on the discovery, Estrella Managing Director Chris Daws said:
“Our exploration team is gaining a very good understanding of the controls and distribution of manganese
within the Lautem Manganese Project. This has resulted in another fantastic manganese discovery – one of
the best to date – at our Sica Prospect within concession MEL2023-CA-ZA001. The new discovery location
is less than 5km from the major northern coastal highway, providing excellent logistics for any potential future
exploration and mining at the prospect. Our move into Timor-Leste is delivering very positive results.
I look forward in updating shareholders further as we progress our exploration efforts in Timor-Leste.”
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Figure 2: Lautem project with Noni Formation highlighed (in green) with manganese prospects defined to date. The
red dashed line indicates extensions to the Noni Formation mapped outside previous known extents
The Sica Prospect was discovered by mapping the prospective geology of the Lalena Prospect towards the
northeast. The outcropping Noni Formation is the host sequence to primary manganese mineralisation
associated with cherts towards the top of the sequence. These have subsequently undergone supergene
enrichment.
Mineralisation at Sica consists of surface concentrations of manganese-rich cobblestones that are derived
from weathering of the Noni Formation and erosion of the resulting supergene enrichment. The remnant
supergene material can be found over a distance of several hundred metres and has been derived from insitu material that is now mostly covered in scree from the overlying limestones.
Detailed mapping is continuing in an effort to locate the in-situ supergene boundaries which will be the
focus of trenching activities. Surface samples have been collected for assay in Dili and also will be exported
to Australia for laboratory assay analysis.
Table 1 and Figure 3 below presents recent field pXRF analysis of samples collected for further assay. The
results are in line with other analyses made of the Lautém manganese mineralisation.
Table 1: Field pXRF results for the Lalena and Sica Prospects
Prospect
Sica
Lalena
Sample
Longitude
Lattitude
Mn%
Fe%
Al%
CBR114526
126.880015
-8.406731
59.0
0.0
0.9
CBR114525
126.883926
-8.405463
51.9
0.0
2.4
CBR114527
126.879837
-8.406968
41.7
0.0
0.5
CBR114524
126.883925
-8.402765
26.0
0.0
2.0
CRB114518
126.850376
-8.424906
64.4
0.0
1.2
CRB114520
126.851415
-8.422912
47.1
0.0
0.7
CBR114517
126.850155
-8.425900
41.1
1.2
0.9
CBR114521
126.861337
-8.415855
39.0
0.0
0.1
CBR114522
126.862170
-8.415634
36.7
0.0
0.3
CBR114523
126.836649
-8.413279
35.7
7.0
2.1
CBR114519
126.850425
-8.424433
33.8
0.0
0.3
Figure 3: Zoomed map of the Lalena and Sica Prospects with rock chip pXRF determinations shown.
Figure 4: Surficial supergene manganese at the Sica Prospect, photo taken looking north from Sica Prospect symbol location
in Figure 3.
ALS Laboratory Assay Results
Estrella Resources has also received further confirmatory assay results from ALS Laboratory in Perth,
evaluating grab samples collected by the Company which were initially assessed using only a portable XRF
(pXRF) machine (Table 2).
The assays confirm broadly high-grade manganese results across the Company’s prospects with a top
result of 56.93% Mn reported from a sample collected at the Lalena prospect.
The Company is pleased to note the correlation between the two methods is very high, which means the
Estrella’s geological team can be more confident in grade determinations made in the field, expediting
exploration efforts.
Estrella Resources also notes that in May 2024 the Company established a sample preparation facility in
Dili to facilitate the more accurate in-country pXRF analysis, as well as to prepare samples for export to
Australian laboratories1.
Table 2: ALS Laboratory results for rock samples collected from the Lautem Project, compared to Estrella's
in-country crushed sample determination by pXRF
ALS Laboratory Assay
Fe%
Al%
Prospect
Longitude
Lattitude
Sample
Lalena
126.83182
-8.43254
LRG-032
56.93
0.07
Lalena
126.83171
-8.43114
CBR114502
54.62
Lalena
126.82699
-8.43991
LRG-026
50.20
Dasidara
126.75514
-8.49232
LRG-041
Sica
126.88548
-8.39737
CBR114506
Soru Prospect
126.90798
-8.52687
LRG-071
1 Refer to ASX Announcement dated 31 May 2024
Mn%
In-Country
Mn:Fe
pXRF
0.15
813
56.1
0.18
0.09
303
54.4
0.79
0.54
64
53.1
56.29
0.42
0.74
134
59.1
26.86
25.40
0.47
1
23.5
26.12
14.30
0.77
2
17.5
Figure 5: Crusher / Pulverisor and pXRF analysis system set up at Estrella's office in Dili with samples ready.
Sharewise Webinar – Estrella Resources Limited Managing Director Chris Daws
Friday 11am 2nd August 2024. Presentation plus Q&A registration link to participate.
https://zoom.us/webinar/register/6917223190937/WN_9sTGTmkCSXCXarjOpwQGrA
The Board has authorised for this announcement to be released to the ASX.
ENDS
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Cautionary Statement of pXRF
PXRF results that are announced in this report are preliminary only. The use of the PXRF is an indication only of the
order of magnitude of expected final assay results. The samples that are the subject of this report will be submitted for
laboratory assay and some variation from the results presented herein should be expected.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Beau Nicholls,
who is the Exploration Manager for Estrella Timor-Leste, and a fellow of The Australasian Institute of Geoscientists, and
Mr Steve Warriner, who is the Group Exploration Manager for Estrella Resources and a member of the Australian Institute
of Geoscientists. Mr. Nicholls and Mr. Warriner have sufficient experience relevant to the style of mineralisation and type
of deposit under consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr
Nicholls and Mr Warriner consent to the inclusion in the report of the matters based on their information in the form and
context in which it appears.
Table 3: ALS analysis of samples; note Mn % = MnO divided by 1.2912
MEGRA05
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
MEXRF26s
LOI
Al2O3
BaO
CaO
Cr2O3
Fe2O3
K2O
MgO
MnO
Na2O
P2O5
SO3
SiO2
TiO2
Sample
%
%
%
%
%
%
%
%
%
%
%
%
%
%
CBR114502
12.46
0.15
0.43
2.05
<0.01
0.43
0.04
0.2
70.52
0.02
0.27
0.04
8.57
0.01
CBR114506
13.19
0.92
0.09
3.15
<0.01
38.77
0.42
1.19
34.68
0.85
1.23
0.09
3.6
0.05
LRG-026
12.8
0.98
2.2
3.06
<0.01
1.32
0.16
0.29
64.82
0.1
0.15
0.7
7.7
0.05
LRG-032
14.1
0.26
0.98
4.06
<0.01
0.49
0.05
0.29
73.51
0.03
0.03
0.15
0.55
0.03
LRG-041
12.17
1.37
1.77
0.71
<0.01
0.92
0.22
0.19
72.68
0.03
0.14
0.52
3.61
0.08
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological mapping, visual
mineral estimates and confirmation of
metallic concentration using a Bruker S1
Titan Portable XRF instrument.
•
Initial rock-chip samples were taken and
dispatched
through
customs
and
quarantine to ALS in Malaga for multielement analysis.
•
Samples were analysed using a 4-acid
digest, ME-MS for 61 elements and MEXRF for over-grade manganese on a 50g
sub-sample.
•
No drilling has been undertaken to date.
•
•
No drilling has been undertaken to date.
•
Rock-chip samples were geologically
logged for mineral content prior to sending
for assay or screening by pXRF.
•
Sample sizes are appropriate to the grain
size of the mineralisation.
The exploration program is in its very early
stages and initial sample sizes were kept
small due to freight and customs /
quarantine restrictions. They are not
considered representative of the bulk of
mineralisation.
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
•
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
JORC Code explanation
sub-sampling
stages
to
maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
•
•
No prior modern exploration has been
conducted in the area.
•
No adjustments to assay data were
undertaken.
•
GPS equipment using MGA94, Zone 52
coordinate system with an accuracy of +/5m.
Topographic control using 30m spaced
satellite point data.
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
•
Sample
security
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
•
•
•
•
•
•
No systematic sampling has
conducted at this early stage.
•
No orientation-based sampling bias has
been identified.
•
Exported samples are in the possession of
ESR personnel from field collection to
customs submission in Dili.
Non-exported samples remain with ESR
personnel.
No independent audit or review has been
undertaken.
•
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
Samples are selected based on geological
logging. Samples
have
been
dispatched to an accredited commercial
laboratory in Perth for analysis.
Preliminary samples are being analysed at
ALS in Malaga using a 4-acid digest, MEICP for 61 elements and all samples are
also being tested for Pt, Pd and Au by fire
assay and ICP-MS finish on a 50g subsample.
Standards and blanks have not been
included in this early phase of the program.
Current field samples are being analysed
by pXRF. The Cautionary statement is
included when assessing pXRF.
•
been
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded to Estrella Murak Rai, forming
the joint-venture between Estrella
Resources Representante Permanente
(70%) and Murak Rai Timor (30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
ESR-RP-05, ESR-RP-06, ESR-RP-07
and ESR-RP-08 are awarded to Estrella
Resources
Limited
Representante
Permanente (100%)
•
Estrella
Resources
Limited
Representante Permanente is registered
in Timor-Leste and is a wholly-owned
subsidiary of Estrella Resources Limited
(Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Other local geologists and companies
have sporadically explored the area
however
there
has
been
no
documentation collected nor systematic
exploration
to
quantify
mineral
occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Permits host three main forms
of manganese mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
processes exist.
•
Additional primary mineralisation exists
as pisolithic concretions and direct
precipitates within deep-sea limestones.
•
Secondary mineralisation exists in the
form of small to extremely large clasts of
manganese mineralisation associated
with the Bobonaro Formation, a melange
that is a lithotectonic unit composed
mostly of broken, clay-rich layers that are
mixed to varying degrees with structurally
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
Commentary
and stratigraphically overlying units. This
unit represents an under-sea collapse
zone containing multiple manganese
clasts over a very large area.
•
Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
• No drilling has been undertaken in the
area.
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used.
Metal equivalent values have not been
used.
•
Any relationships have been discussed
within the body of the text.
•
Relevant diagrams have been included
within the main body of text.
•
No new information has been withheld.
Criteria
Other
substantive
exploration
data
Further work
JORC Code explanation
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
•
•
No other substantive data exists as the
program is in its early stages.
All observations are discussed within the
body of the text.
Further work by ESR will include
systematic mapping and sampling along
with
stratigraphic
and
structural
classification.
Share your feedback
Discover