Ira Miri Mn Discovery Drilling
Released
Released
Announcement PDF
ASX: ESR
3 June 2025
Spectacular Manganese Intersection in
Maiden Timor-Leste Exploration Drillhole
HIGHLIGHTS
➔ EMDD001 intersects 6.45m of Massive Manganese Oxides from 1.5m down hole (Figure 1) with
the hole ending in mineralisation
➔ Drillhole positioned 3m behind the main Ira Miri discovery outcrop where rock-chip laboratory assays
in February 2025 returned between 40.0% Mn and 58.6% Mn1
➔ Trenching 8m to the southeast encounters non-outcropping massive Manganese Oxides 0.7m
below surface (Figure 2)
➔ Drilling represents Timor-Leste’s first ever modern minerals exploration, with a large number of highly
prospective targets to be tested across the underexplored region
➔ The drill program consists of an initial 3,000m diamond and 10,000m RC drilling. A secondary round
is expected to consist of a further 10,000m RC drilling to be conducted after geological review
➔ Only 6 months taken from the initial discovery in November 2024 to successful drilling in May 2025,
including full mobilisation of exploration diamond and RC drill packages by CoreSearch from Darwin.
Figure 1: LEFT: EMDD001 core from 1.35 to 3.7m (Tray 1) RIGHT: Exploration Manager Steve Warriner at trench EMT01
Both the core and the trench contained 95% manganese oxides and 5% silicious manganese oxides
1 See ASX Announcement dated 18 November 2024 and 19 February 2025
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the intersection
of 6.45m of massive manganese oxides in the Company’s maiden drill hole, which represents the first
modern metallic minerals exploration in Timor-Leste’s history.
Drill hole EMDD001, which is located at the Ira Miri Prospect in Lautém (Figure 2) encountered
mineralisation 1.35m down hole, with the drillhole ending in manganese oxides at 7.8m depth. The drillhole
was collared 3m from outcropping mineralisation.
Commenting on the intersection Estrella Managing Director Chris Daws said:
“What a fantastic discovery for Estrella and our loyal shareholders! While these are early results from just
our first hole and trench in Timor-Leste, the findings are significant. Not only does it provide confirmation that
manganese mineralisation extends sub surface, it also provides further confidence in the accuracy of our
developing exploration model which seeks to identify rich manganese deposits.
Timor-Leste is an underexplored region, meaning we have a substantial first-mover advantage, unlocking
new and highly prospective targets to develop into a truly special project.
All of this could not be achieved without the support of so many partners in Timor-Leste. Whether that be the
Timorese Government, the government’s regulatory authority Autoridade Nacional dos Minerais (ANM), or
our joint venture partners and state mining company Murak Rai Timor – who have all been with us from dayone.
It would also be remiss of me not to mention our contractors CoreSearch, who have been vital in delivering
this drilling inside six months from initial discovery, and finally the local communities who have not only
supported our work but have also actively taken part in our discovery program.”
Commenting on the significance Murak Rai Timor Managing Director Jose Goncalves said:
“We are very pleased that the initial drill hole at Ira Miri Prospect has encountered massive manganese
oxides as hoped. We look forward to resuming the drilling to uncover more potential across the targeted
area.”
Figure 2: Location of the Ira Miri Manganese Prospect
EMDD0001 was a vertical hole, drilled into the outcropping Ira Miri manganese mineralisation which was
discovered by the Estrella Murak Rai team in November 2025 (refer to ASX Announcement dated 18
November 2024 entitled “Two Outcropping Supergene Manganese Discoveries in Lautem Exploration
Licenses”).
Rock chip assays reported in February 2025 from the outcrop indicated the mineralisation was very high
grade (refer to ASX Announcement dated 12 February 2025 entitled “High-Grade Assays Received for New
Lautem Discoveries”).
The drillhole ended in mineralisation due to poor recovery of the friable manganese oxides along with a
rostered break required under the Timor-Leste mining law. The Company will use the break to swap out
the man-portable diamond rig for the more powerful diamond drill package owned by CoreSearch with
mobilisation expected in around 2 weeks.
A sumarised drill log and visiual estimates of the drillhole is given in Table 1.
PXRF determinations on the core indicate that the high-grade manganese mineralisation assayed on the
outcrop face continue under cover to the northeast. The PXRF determinations are shown in Table 2 with
accompanying cautionary statement.
Figure 3: Exploration Manager Steve Warriner and Exploration Geologist Bebeto Abilio show the mineralised core from
EMDD001. Core has been removed for presentation at the IMnI Tokyo Annual Conference. For visual estimates
please refer to Table 1 and accompanying cautionary statement.
Table 1: Visual estimates of EMDD0001
m From
0
1.35
1.45
2.8
2.95
6.2
6.9
7.4
m To
1.35
1.45
2.8
2.95
6.2
6.9
7.4
7.8
Description
Colluvial soil
Mn bleed into soil
Massive MnO
Silicious Massive MnO
Massive MnO
Silicious Massive MnO
Massive MnO
Silicious Massive MnO
Visual Estimate
50% MnO, 50% Colluvial soil
100% Low-Si high grade MnO
60% MnO, 40% Manganiferous Chert
100% Low-Si high grade MnO
50% MnO, 50% Manganiferous Chert
100% Low-Si high grade MnO
50% MnO, 50% Manganiferous Chert
Cautionary Statement of Visual Estimates
Table 1 contains references to visual results and visual estimates of mineralisation. The Company draws attention to
uncertainty in reporting visual results. Visual estimates of mineral abundance should never be considered a proxy or
substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual
estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to
valuations.
Table 2: PXRF Mn% Determinations
Depth
0
1.5
1.7
1.9
2.1
2.3
2.5
2.7
2.9
3.1
3.3
3.5
3.7
3.9
4.1
4.3
4.5
Comment
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% High-Silica MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
PXRF
Mn%
Depth
x
12.5
27.6
30.9
65
56.5
39
40.1
27.2
52.3
42
25.4
40.4
36
69.1
58
4.7
4.9
5.1
5.3
5.5
5.7
5.9
6.1
6.3
6.5
6.7
6.9
7.1
7.3
7.5
7.7
Comment
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% MnO
100% High-Silica MnO
100% High-Silica MnO
100% High-Silica MnO
100% MnO
100% MnO
100% MnO
100% High-Silica MnO
PXRF
Mn%
46.1
46.1
56.2
62.6
45.6
56.8
30.9
41
17
20.2
24.1
28.7
42.3
41.8
35.2
20.3
42
Cautionary Statement of PXRF - PXRF results that are announced in this report are from uncrushed, diamond core
samples and are preliminary only. The use of the PXRF is an indication only of the order of magnitude of expected final
assay results. Samples that are the subject of this report will be submitted for assay and are expected to take 8 weeks.
The hole will be redrilled with a more suitable drill rig when mobilised to site in the coming days.
The PXRF results averaged 40.1 %Mn on a weighted average over the 6.45m intersection.
In addition to the drilling, a trench was dug 8m to the southeast of the drillhole collar into an area covered
by colluvial soils. A foot track running over this area has been used by the local community and the Estrella
exploration crew to access the areas to the south. There was no indication that the massive manganese
oxides were continuing from the outcrop underneath this area.
Massive manganese oxides were encountered just 0.7m below the surface and were exposed to a depth
of 3m. The mineralisation was still strong and massive in the base of the trench.
This understanding of the colluvial soils development and subsequent obscuration of the Noni Formation
and associated manganese mineralisation confirms there is a high potential for further mineralisation
covered by a moderately thin layer of soil and scree in locations predicted by Estrella’s exploration
model.
Figure 4: Estrella Exploration Geologist Bebeto Abilio looking over the first few buckets of massive manganese oxides
from trench EMT01 which were uncovered just 0.7m below a well used footpath, with no surface expression
evident
Figure 5 below shows the current exploration partnership team (Estrella and CoreSearch) along with Ira
Miri locals who have been employed on the project to fill various functions from site security to light track
clearers and local guides. It has only been 6 months from initial discovery to drilling, in a country where no
exploration drilling capability existed. Estrella wishes to thank all those involved in its exploration efforts to
date.
Figure 5: Exploration team at site, which includes Ira Miri locals as well as representatives from Estrella and CoreSearch
Next Steps
Estrella’s proposed drilling campaign to be conducted by CoreSearch will consist of 10,000m of RC drilling
and 3,000m of diamond drilling. A secondary round of drilling is also under contract, consisting of a further
10,000m of RC drilling to be conducted after geological review.
Initially, the man-portable diamond drill was selected first due to the ease of access and to accomplish
corporate timelines. The drill rig has proven not suitable to deliver the desired torque necessary to drill the
friable manganese at greater depths than currently achieved. A natural break in the roster cycle enables
Estrella and CoreSearch to swap out this rig for a more powerful diamond drill capable of meeting the
requirements of drilling and recovering the friable manganese at greater depths which is now required.
The new diamond package will be mobilised to site in less than 2 weeks.
This period will provide Estrella time to analyse the geological significance of this discovery as well as give
track crews sufficient time to set up additional drill sites on this first line, plus access to additional lines so
that drilling can continue unhindered.
The Company will update shareholders as exploration drilling continues.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Cautionary Statement of pXRF - pXRF results that are announced in this report are from uncrushed, rock-chip
samples and are preliminary only. The use of the PXRF is an indication only of the order of magnitude of expected final
assay results. The samples that are the subject of this report will be submitted for laboratory assay in Australia and
some variation from the results presented herein should be expected.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner consents
to the inclusion in the report of the matters based on their information in the form and context in which it appears.
Cautionary Statement of Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The Company draws
attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be considered
a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations.
Table 3: Collar and survey details for EMDD001
North
-8.4248
East
126.912
RL
170
Depth
7.8
Dip
-90
Azi
0
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological mapping, visual
mineral estimates and confirmation of
metallic concentration using a Bruker S1
Titan Portable XRF instrument.
•
Initial rock-chip samples were taken and
pXRF determinations on uncrushed
samples made in the field.
•
Samples are then brought back to Dili and
pulverized to 100% passing 1mm before
the powder is again subjected to PXRF
•
A sub-sample of 150g is then dispatched
through customs and quarantine in
Australia to ALS in Malaga for multielement analysis.
•
Exported samples are analysed using a 4acid digest, ME-XRF26s, ME-MS61L at
ALS in Malaga
•
Diamond drilling has been undertaken
utilising HQ triple tube.
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
Recoveries are calculated based upon the
depth drilled and compared to core
recovered.
Sample recovery using the man-portable
diamond rig is below an acceptable
standard and the Company will swap this
diamond drill for one capable of better
recovery.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling
stages
to
maximise
•
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
•
•
•
•
Rock-chip samples were geologically
logged
for
mineral
content
and
photographed prior to sending for assay or
screening by pXRF.
Drill core has also been geologically
logged but will not be samples due to poor
recovery.
The trench has been mapped and
samples.
Sample sizes are appropriate to the grain
size of the mineralisation which in
manganese oxides is very fine.
The exploration program is in its very early
stages and initial sample sizes are kept
small due to freight and customs /
quarantine restrictions. They are not
considered representative of the bulk of
mineralisation.
Sampling on low recovery drillholes will
not take place as there may be a
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
relationship between recovery and grade.
•
•
•
•
•
•
Verification
of sampling
and
assaying
Location of
data points
•
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
•
Three sample types are quoted:
1 – Uncrushed Field PXRF (a fresh mineral
face is chipped from samples prior to the
XRF determination in the field)
2 – Crushed PXRF (samples from above
are taken back to Dili, 1-3kg of material,
and crushed/pulverised to 100% passing
1mm in the company’s dedicated sample
preparation facility, and 15g of powder is
then taken for PXRF analysis. Crushed
PXRF
determinations
have
been
subjected to repeat samples, standards
and confirmation of accuracy by laboratory
analysis.
3 – Assay, where 150g of material is
exported to ALS in Malaga via quarantine
in Darwin. Standards and blanks have not
been included in samples sent to Australia.
The company relies on the internal
standards and blanks used by ALS.
Samples are being analysed at ALS in
Malaga using a 4-acid digest, ME-ICP for
61 elements and all samples are also
being tested for Pt, Pd and Au by fire assay
and ICP-MS finish on a 50g sub-sample.
Currently, uncrushed field samples are
being analysed by PXRF on location,. The
Cautionary statement is included when
assessing pXRF.
No prior modern exploration has been
conducted in the area.
•
No adjustments to assay data were
undertaken save where the ME-XRF26s
method reports MnO%.
•
Mn% is derived by dividing MnO by 1.2912
•
Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
Topographic control is accomplished
using 30m spaced satellite point data.
No systematic sampling has been
conducted at this early stage.
•
•
•
No orientation-based sampling bias has
been identified.
Criteria
Sample
security
JORC Code explanation
introduced a sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure sample
security.
Commentary
•
•
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
•
•
•
Exported samples are in the possession of
ESR personnel from field collection to
customs
submission
in
Darwin.
Possession
then
passes
to
the
Department of Agriculture, Forestry and
fisheries where Northline Couriers pick up
the samples and take them by road to ALS
in Malaga.
Non-exported samples remain with ESR
personnel past Darwin Airport Customs.
No independent audit or review has been
undertaken.
Internal QAQC involves frequent standard
checks on the PXRF instrument to
determine any drift of accuracy.
Additional checks involve analysis of any
assayed samples in comparison to the
crushed and uncrushed in-country PXRF
determinations so as to provide
confidence in in-country analysis.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
were converted to Exploration Licenses
and are awarded to Estrella Resources
Limited
Representante
Permanente
(100%)
•
Exploration and Evaluation Concessions
MEL2024-DA-ZB001,
MEL2024-DAZB002 and MEL2024-DA-ZB003 are
awarded for four years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Estrella also operated Reconnaissance
Permits ESR-RP-01, ESR-RP-02 and
ESR-RP-03
•
Estrella
Resources
Limited
Representante Permanente and Estrella
Murak Rai are registered in Timor-Leste
and is a wholly-owned subsidiary of
Estrella Resources Limited (Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Local geologists and companies have
sporadically explored the area however
there has been no documentation
collected nor systematic exploration to
quantify mineral occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Concessions and Permits
host three main forms of manganese
mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
Commentary
processes exist.
•
Secondary mineralisation exists as a
supergene blanket above the cherts
where they have been exposed to
chemical weathering.
•
Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels or scree deposits.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
• No drilling has been undertaken in the
area.
• Sample locations are shown in the body of
the text.
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used.
Metal equivalent values have not been
used.
•
Any relationships have been discussed
within the body of the text.
•
Relevant diagrams have been included
within the main body of text.
•
No new information has been withheld.
Criteria
Other
substantive
exploration
data
Further work
JORC Code explanation
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
All observations are discussed within the
body of the text.
•
Further work by ESR will include
trenching and mapping
Additional work on specific areas will be
included under the heading Next Steps in
the body of the text when appropriate to
do so.
•
Share your feedback
Discover