Quarterly Activities and Cashflow Report (June 2014)
Released
Released
Announcement PDF
QUARTERLY ACTIVITIES REPORT
Quarter ending 30 June 2014
ASX RELEASE 29 July 2014
HIGHLIGHTS
Completion of $1.25M Capital Raising through Placement and Share Purchase Plan;
Significant progress towards Porphyry target delineation at the Antucoya West
Prospect within the Altair Project;
Shallow RC drilling to identify near surface mineralisation extensions at the Colupo
Prospect within the Altair Project;
Initial shallow drill testing at the Colupo Norte Prospect;
Assay Sampling Underway - Results expected early August; and
Completion of Board Succession Planning Program.
Quarterly Activities Report – 30 June 2014
Estrella Resources Limited (ASX:ESR) (Estrella or Company) is pleased to provide its Exploration
Activities and Cashflow Reports for the quarter ending 30 June 2014.
1. INTRODUCTION
Estrella’s exploration activity for the Quarter was focussed solely on the Altair Project (Figure 1)
(Estrella’s flagship project) with a 38 Reverse Circulation (RC) drill hole program completed at Antucoya
West in conjunction with a further 21 holes drilled at Colupo and 4 holes at Colupo Norte. Drilling activity
at these Prospects remains on-going with results to be released to the market as collated and received.
Figure 1: Estrella’s tenement holdings in Chile- Project Altair (comprising the Antucoya West, Colupo,
Colupo Norte, Dania and Ivannia Prospects) plus the two key Prospects outside Altair, Mercurio and
Saturno. (Map Datum PSAD56 Zn19).
2
Quarterly Activities Report – 30 June 2014
Table 1: Mines and project developments nearby to Project Altair (None owned by Estrella)
Nearby Deposits *
Ore Reserve
( All not owned by
Mineral Resource
Mineralisation
Proximity to
style
Altair
Estrella)
Measured: 26.7Mt @ 1.61%
Michilla
N/A
Indicated: 24.7Mt @ 1.45%
Manto & Breccias
17 km west of
Saturno
Inferred: 15.8Mt @ 1.67%
Proven: 215Mt @ 0.38%
Antucoya
Measured:278 Mt @ 0.34%
Indicated:737 Mt @ 0.30%
Porphyry
Probable: 427Mt @ 0.34%
Surrounded
by
Altair
Inferred:91 Mt @ 0.28%
Proven: 26.3 Mt @ 0.83%,
8.3 Mt @ 0.54%, 2.1Mt @
0.18%
Mantos Blancos
Measured:47.8 Mt @ 0.75%, 14.1Mt
@ 0.47%
Indicated: 68.1 Mt @ 0.56%, 10.5 Mt
Probable: 19.7 Mt @ 0.80%,
@ 0.43%, 8.3 Mt @ 0.20%
Rhyolite dome
40 km south of
Altair
16.3 Mt @ 0.33%, 49.6Mt @
0.23%
Inferred: 30.5 Mt @ 0.55%, 5.2Mt @
0.49%
Disclaimer: This table and information contained therein relates to nearby deposits of Project Altair, none of which are owned by Estrella. The
information is obtained from publicly available information. All deposits have been published in compliance with the 2004 JORC Code. Estrella
makes no comparison between its projects and these named deposits other than to demonstrate their locality. There is no guarantee that
Estrella’s projects will realise similar results.
3
Quarterly Activities Report – 30 June 2014
2. THE ALTAIR PROJECT
Figure 2: Locality map of Estrella’s active exploration prospects within Altair and its proximity to
nearby mining infrastructure (not owned by Estrella) (Map Datum WGS84 Zn19S).
2.1.
Antucoya West Prospect
Estrella followed up its mapping at Antucoya West in the March 2014 Quarter with a shallow depth (20m)
RC drill hole program in the June Quarter. The target area has been focussed on the Buey Muerto Fault
Zone (BMZ) as it extends beyond the Antucoya Project (owned by Antofagasta Minerals PLC) and also
where dipole zones were identified in the electrical resistivity and induced polarisation geophysical
surveys that Estrella conducted in late 2013 (refer ASX announcement 24 January 2014). The intention
of the shallow drill hole program is to provide Estrella with geological information from beneath the
shallow caliche cover to reduce the porphyry exploration target area from the current 7 km2 into smaller
and potentially several projects that can be further drill tested according to their prospectivity priority.
Estrella is presently awaiting the assay results from the RC drill program which are due early August. In
the interim, geological logging from the rock chip cuttings in each drill hole has enabled Estrella’s
exploration team to extrapolate a subsurface geological map (Figure 3) that includes rock identification
of intrusive and semi-intrusive porphyritic rocks, fault related breccias as well as pyrite with hydrothermal
texture and extensive jarosite alteration (commonly associated with mineralised porphyry systems).
Estrella’s geologists have also observed copper oxide mineralisation in the RC hole rock cuttings. The
overlaid geological map on the electrical resistivity image (Figure 4) shows a clear spatial correlation
between the prospective intrusive and semi-intrusive porphyritic units and the resistivity dipole zone (that
trends northwest along the BMZ).
4
Quarterly Activities Report – 30 June 2014
As the shallow RC drill program is a ‘detection’ program designed to reduce the target area, Estrella has
sampled the drill holes using 2 metre composite sample intervals to reduce exploration costs. This is a
common practice and widely used in mineral exploration. The consequence of sampling larger masses of
rock per sample is to reduce the detection threshold for assay results to identify mineralisation
anomalies. Assay values will more likely resemble those typically associated with soil sampling programs.
Figure 3: Antucoya West subsurface geology map constructed from shallow drilling beneath the ‘caliche’
gravel cover (Map Datum WGS84 Zn19S).
5
Quarterly Activities Report – 30 June 2014
Figure 4: Antucoya West geology overlaid on the electrical resistivity image to display the spatial correlation
between breccia and intrusive rock units with the strong electrical dipole, both trending northwest along
faults of the BMZ. Also note the strong jarosite alteration presence within the same area (Map Datum WGS84
Zn19S).
6
Quarterly Activities Report – 30 June 2014
Following receipt of the assay results, the next steps for Estrella’s exploration activity at Antucoya West is
to embark on a diamond drilling program to obtain more definitive geological information regarding the
mineralised porphyry potential. The assay results will determine crucial program activity including the
time of commencement, the positioning of drill holes and the total metres to be drilled in the program.
2.2.
Colupo Prospect
Colupo is 20 km north of Antucoya West (refer Figure 2 the location of Colupo in relation to Antucoya
West) with both prospects connected by easily accessible roads. Shallow ‘caliche’ gravel also covers areas
of mineralisation at Colupo and during the June 2014 Quarter, Estrella employed the same shallow RC
drilling program technique at the Colupo prospect to detect near surface extents of mineralisation drilling
21 shallow holes in the June Quarter.
Estrella has drilled two campaigns at Colupo in the last 12 months, consisting of RC and Diamond core
drilling. The best results are summarised below (refer ASX announcements of 11 November and 3
December 2013:
20m @ 2.4% Cu from 12 m (hole RCC04) including;
o 6m @ 6.6% Cu, 0.5 g/t Au & 27.1 g/t Ag
16m @ 1.5% Cu from 131m (hole RCC04) including;
o 6m @ 1.6% Cu, 0.2 g/t Au & 7.5 g/t Ag
o 6m @ 2.2%Cu, 0.2 g/t Au & 11.8 g/t Ag
20m @ 0.9% Cu from 144m (hole RCC02) including;
o 3m @ 3.4% Cu
8 m @ 1.1% Cu from 126 m (hole RCC06) including:
o 3 m @ 2.5% Cu, 0.15 g/t Au & 20.3 g/t Ag
6 m @ 0.8% Cu from 102m (hole RCC06) including:
o 3 m @ 1.2% Cu
5 m @ 0.7% Cu from 55m (hole RCC07)
All previously reported drilling results from the RC campaign are shown in Table 2 and results from the
diamond drilling campaign in Table 3.
Both Estrella’s historical drilling and drilling by SQM (Figure 5) demonstrated that copper mineralisation
at Colupo is associated with two major zones: (trend i) a west-northwest mineralisation trend which
dips steeply to the north with true widths of up to 21 metres and (trend ii) a northeast trend dipping
steeply to the northwest. Both trends remain open at depth, which has currently been confirmed to 150
metres depth for trend (i) and approximately 100 metres for trend (ii).
7
Quarterly Activities Report – 30 June 2014
Figure 5: Drill plan layout for all historical Estrella’s and SQM’s drill holes at Colupo Prospect. The red
arrows indicate the mineralisation trends and the yellow ellipses highlight the areas drilled in the
shallow RC program (Map Datum PSAD56 Zn19).
8
Quarterly Activities Report – 30 June 2014
Composite samples consisting of 2 m intervals have also been taken from each drilled hole at Colupo and
submitted to the laboratory for assaying. Results will be announced once they have been received and
interpreted.
Table 2: A summary of the assay results from holes RCC01 to RCC09 at Colupo is set out below (using
a cut-off of 0.3% Copper) as previously announced to the ASX on 11 November and 3 December 2013.
Hole_ID
RCC01
Coordinates (PSAD56)
East
North
402081
7514511
RL
EOH
Dip
Azimuth
1910
210
-60
180
Incl
Incl
RCC02
402089
7514579
1910
200
-70
180
RCC03
402096
7514638
1910
200
-60
130
RCC04
402033
7514550
1910
230
-60
180
Incl
Incl
Incl
Incl
Incl
RCC05
402008
7514595
1910
250
-60
180
RCC06
402067
7514616
1910
200
-60
146
Incl
Incl
RCC07
402140
7514653
1910
199
-60
130
RCC09
402050
7514600
1910
257
-60
180
From
(m)
10
12
34
43
47
53
7
118
144
150
41
52
87
12
23
56
102
115
116
131
131
141
91
197
102
104
125
127
50
194
83
101
184
195
To
(m)
16
15
37
56
51
55
10
122
158
153
44
54
94
31
26
62
108
122
119
147
137
147
96
199
108
107
133
130
55
196
89
103
186
199
Interval
(m)
6
3
3
13
4
2
3
4
20
3
3
2
7
20
6
6
6
7
3
16
6
6
5
2
6
3
8
3
5
2
6
2
2
5
Copper
%Cu
0.7
1.1
0.5
0.4
0.6
0.5
0.5
0.4
0.9
3.4
0.3
0.5
1
2.4
6.6
0.4
0.4
0.5
0.7
1.5
1.6
2.2
0.3
0.4
0.8
1.2
1.1
2.5
0.7
0.3
0.4
0.5
0.3
0.5
Gold
g/t Au
Silver
g/t Ag
0.5
27.1
0.2
0.2
7.5
11.8
0.15
20.3
0.2
9
Quarterly Activities Report – 30 June 2014
Table 3: Colupo Diamond hole Assay results reported to the ASX on 18 March 2014.
Estrella is currently finalising the Quality Assessment – Quality Control (QA-QC) measures to produce a
JORC 2012 compliant Mineral Resource for Colupo. Estrella has now engaged a Competent Person who is
scheduled for a site visit in August for this purpose and the compilation of a resource estimation and
statement will follow. Subject to the outcome of the initial resource estimation, Estrella will be able to
consider future production scenarios at Colupo.
2.3.
Colupo Norte Prospect
Colupo Norte lies approximately 3 km NNW of Colupo (refer Figure 1 and 2). Estrella has also drilled
four shallow RC holes at Colupo Norte to test the copper oxide occurrences exposed in historical SQM
trenches that Estrella identified during reconnaissance regional mapping (Figure 6 and Figure 7) (refer
ASX announcement of 28 January 2014). At this early stage Estrella’s exploration team considers
mineralisation at Colupo Norte to be similar to Colupo due to copper oxide mineralisation presence within
a quartz-tourmaline fault breccia. Estrella is awaiting assay results from drilling at Colupo Norte before
planning the next exploration steps.
10
Quarterly Activities Report – 30 June 2014
Figure 6: Trenches at Colupo Norte, dug historically by SQM, exposed copper oxide within breccia
(view NE).
Figure 7: Copper Oxide in brecciated rock sample from Colupo Norte trench.
2.4.
Dania Prospect
During the quarter, Estrella received the assay results from its 2 diamond drill holes at Dania (refer ASX
announcements of 7 April and 29 April 2014). The assays continue to identify mineralised copper
intrusive porphyritic stocks. Estrella is currently assessing the next steps to advance exploration activities
at Dania.
2.5.
Ivannia Prospect
No exploration activity was undertaken at Ivannia during the June 2014 Quarter.
11
Quarterly Activities Report – 30 June 2014
3. TENEMENT HOLDINGS
Pursuant to ASX Listing Rule 5.3.3, the Company provides the following information:
3.1
The Altair Project-100% ESR Owned- subject to Option Agreements with SQM
(providing SQM with either a 49% clawback right or royalty payments per discovery)
The Altair Project located in Region II of northern Chile, 90 km north northeast of Antofagasta covers an
area of 1,232.33 km2 (inclusive of both the “Mercurio and Saturno” Prospects which are located outside
Altair and comprise a total of 108 km2 of 100% Estrella owned tenement) at the end of the June 2014
Quarter.
3.2
Estrella’s Tenement holdings in Chile
Description
Tenement Size
(hectares)
Option Agreements held with SQM
Tenement Size
(km2)
109,890
1,098.90
2,476
24.76
Option Agreement One
Option Agreement Two (Ivannia and Dania)
100% Owned by Estrella Resources Limited
Mercurio (100% owned by Estrella)
7,417
74.17
Saturno (100% owned by Estrella)
3,450
34.5
123,233
1,232.33
Total tenement holdings in Chile
4. CORPORATE
4.1
Board Succession Planning
During the June 2014 quarter, the Board undertook a Board Succession Planning Program as announced
to the ASX on 14 April and in the Quarterly Activities Report of 30 April. The Program was finalised in late
June in accordance with the ASX announcement of 30 June 2014. Both Mr Simon Kidston and Mr Gavin
Solomon resigned as directors to focus on their other business opportunities and interests. Mr Robert
Thomson was appointed as Chairman. Accordingly, the Board now comprises:
Mr Robert Thomson
– Independent Non-Executive Chairman
Dr Jason Berton
– Managing Director
Mr Julian Bavin
– Independent Non-Executive Director
The Board is extremely grateful to both Mr Kidston and Mr Solomon for their efforts during their time as
directors of the Company having worked tirelessly since incorporation to position the Company where it
is today.
4.2
Capital Raising
During the quarter Estrella undertook its second capital raising since listing on the ASX. The capital
raising was comprised of two stages with the first being a placement (Placement) to new and existing
institutional and sophisticated investors and the second stage being a Share Purchase Plan (SPP). Funds
raised from the Placement and SPP were approximately A$1.25M at a price of A$0.11 per share and
resulted in the issue of 11,677,728 new ordinary shares in the Company. Bell Potter acted at sole lead
manager to the Placement.
12
Quarterly Activities Report – 30 June 2014
The SPP was designed to provide existing shareholders at the time with the opportunity to purchase
shares in the Company at the same issue price as the institutional investors that participated in the
Placement. Funds raised via the Placement and SPP are primarily used to accelerate the Company’s
exploration program at Project Altair with particular focus upon exploration drilling programs at each of
the Antucoya West, Colupo and Dania Prospects.
4.3
Change of Address
The Company wishes to advise that effective today, it will have a new address for its principal place of
business and also registered address as follows:
Level 51, MLC Centre 19-29 Martin Place, Sydney NSW 2000.
The company’s Chilean address remains the same: Santa Beatriz 294 Providencia, Santiago, Chile
5. FINANCIAL POSITION
The Company had A$1.128 million in cash at 30 June 2014.
Disclaimer: References are made in this quarterly report to historical drilling results by SQM and to
drilling results from Estrella’s own drilling, all of which have previously been released to the ASX. The
Company is not aware of any new information or data that materially affects either of the drilling results
from SQM or Estrella.
Competent Person’s Statement:
Exploration information in this announcement is based upon and fairly represents, information,
supporting documentation and work undertaken by Dr. Jason Berton, the Managing Director and a fulltime employee of Estrella Resources Limited whom is a Member of the Australasian Institute of
Metallurgy and Mining (AusIMM). Dr Berton has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Dr Berton consents to the
inclusion in this presentation of the statements based on his information and context in which they
appear.
About Estrella Resources
Directors and Management
Estrella Resources Limited is an ASX listed, Chilean focused
copper-gold exploration company. Estrella has a number of
exploration projects in Chile. With a highly experienced board, a
strong operational and management team and a sole focus on
Chilean copper and gold projects, the Company is well positioned
to develop its projects and add value for shareholders.
Independent Non-Executive
Chairman:
-Robert Thomson
Independent Non-Executive
Director:
-Julian Bavin
ESTRELLA RESOURCES LIMITED
ACN 151 155 207
ASX CODE: ESR
ORDINARY FULLY PAID SHARES:
108,278,728
UNLISTED OPTIONS:
12,380,000
Managing Director
-Dr. Jason Berton
Company Secretary
-Justin Clyne
13
APPENDIX 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
Estrella Resources Limited
Quarter Ended (''Current Quarter'')
ABN
39 151 155 207
30 June 2014
Consolidated statement of cash flows
Current
Year to date
quarter
$A’000
(12 months)
$A’000
-
-
(479)
(1,959)
(b) development
-
-
(c) production
-
-
(331)
(1,172)
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
(a) exploration and evaluation
(d) administration
1.3
Dividends received
-
-
1.4
Interest and other items of a similar nature received
-
-
1.5
Interest and other costs of finance paid
6
45
1.6
Income taxes paid
-
-
1.7
Other (provide details if material)
-
-
(804)
(3,086)
-
-
(b) equity investments
-
-
(c) other fixed assets
-
-
(a) prospects
-
-
(b) equity investments
-
-
(c) other fixed assets
-
-
Net operating cash flows
Cash flows related to investing activities
(a) prospects
1.8 Payment for purchases of:
1.9
Proceeds from sale of:
1.1
Loans to other entities
-
-
1.11
Loans repaid by other entities
-
-
1.12
Other- Project Option Fees
(322)
(322)
Net investing cash flows
-
-
(1,126)
(3,408)
1.15
Total operating and investing cash flows (carried forward)
ESTRELLA RESOURCES LIMITED- APPENDIX 5B 30 June 2014
Page 14 of 18
Cash flows related to financing activities
1.16
Proceeds from issues of shares, options, etc.
1,285
2,235
1.17
1.18
Proceeds from sale of forfeited shares
-
-
Proceeds from borrowings
-
-
1.19
Repayment of borrowings
-
-
1.20
Dividends paid
-
-
1.21
Other – Capital raising costs
(81)
(162)
Net financing cash flows
1,204
2,073
Net increase (decrease) in cash held
78
(1,335)
1.22
Cash at beginning of quarter/year to date
1,061
2,487
1.23
Exchange rate adjustments to item 1.2
(11)
(24)
1.24
Cash at end of quarter
1,128
1,128
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
Current quarter $A'000
1.25
Aggregate amount of payments to the parties included in item 1.2
127
1.26
Aggregate amount of loans to the parties included in item 1.10
-
1.27
Explanation necessary for an understanding of the transactions
Directors including Managing Directors fees/salary for the period: $127,203.04
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on consolidated
assets and liabilities but did not involve cash flows
Nil
2.2
Details of outlays made by other entities to establish or increase their share in projects in which
the reporting entity has an interest
Nil
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount
Available
$A,000
Amount
used
$A,000
3.1
Loan facilities
-
-
3.2
Credit standby arrangements
-
-
ESTRELLA RESOURCES LIMITED- APPENDIX 5B 30 June 2014
Page 15 of 18
Estimated cash outflows for next quarter
$A’000
4.1
Exploration and evaluation
250
4.2
Development
-
4.3
Production
-
4.4
Administration
180
Total
430
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of
cash flows) to the related items in the accounts is as follows.
Current
quarter
$A’000
Previous
quarter
$A’000
5.1
Cash on hand and at bank
203
218
5.2
Deposits at call
925
843
5.3
Commercial Bills
5.4
Other: Term Deposit
-
Total: cash at end of quarter (item 1.22)
1,128
1,061
Interest
at beginning
of quarter
Interest
at end of
quarter
Changes in interests in mining tenements
Tenement
reference
6.1
Interests in mining tenements relinquished,
reduced or lapsed
6.2
Interests in mining tenements acquired or
increased
ESTRELLA RESOURCES LIMITED- APPENDIX 5B 30 June 2014
Nature of
interest
Page 16 of 18
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
7.1
Preference +securities(description)
7.2
Changes during quarter
Total Number
Number
quoted
108,278,728
108,278,728
11,132,271
11,132,271
Issue price
per security
(see note 3)
Amount paid
up per
security
(see note 3)
$0.11
$0.11
Exercise
price
Expiry date
(a) Increases through issues
7.3
(b) Decreases through returns of capital,
buy-backs, redemptions
+Ordinary securities
7.4
Changes during quarter
(a) Increases through issues
7.5
7.6
(b) Decreases through returns of capital,
buy-backs
Convertible
debt
securities
(description)
Changes during quarter
(a) Increases through issues
(b)
Decreases
through
matured, converted
7.7
securities
Options
Unlisted
3,600,000
-
25 cents
12-Sep-14
Unlisted
1,000,000
-
25 cents
25-Oct-14
Unlisted
505,000
-
20 cents
19-Dec-16
Unlisted
600,000
-
20 cents
25-Oct-16
Unlisted
1,500,000
-
20 cents
9-May-17
Unlisted
475,000
-
20 cents
3-Oct-18
Unlisted
450,000
-
35 cents
18-Apr-16
Unlisted
3,000,000
-
35 cents
21-Nov-18
Unlisted
500,000
-
35 cents
18-Dec-16
Unlisted
750,000
-
35 cents
7-Mar-17
7.8
Issued during quarter
7.9
Exercised during quarter
7.1
Expired during quarter
7.11
Debentures (totals only)
7.12
Performance Rights (totals only)
7.13
Unsecured notes (totals only)
ESTRELLA RESOURCES LIMITED- APPENDIX 5B 30 June 2014
Page 17 of 18
Compliance statement
1. This statement has been prepared under accounting policies which comply with accounting
standards as defined in the Corporations Act or other standards acceptable to ASX (see note
5).
2. This statement does give a true and fair view of the matters disclosed.
Sign here:
Print name:
Date: 29 July 2014
Justin Clyne - Company Secretary
Notes:
1. The quarterly report provides a basis for informing the market how the entity’s activities have
been financed for the past quarter and the effect on its cash position. An entity wanting to
disclose additional information is encouraged to do so, in a note or notes attached to this
report.
2. The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining
tenements and petroleum tenements acquired, exercised or lapsed during the reporting
period. If the entity is involved in a joint venture agreement and there are conditions
precedent which will change its percentage interest in a mining tenement or petroleum
tenement, it should disclose the change of percentage interest and conditions precedent in
the list required for items 6.1 and 6.2.
3. Issued and quoted securities The issue price and amount paid up is not required in items
7.1 and 7.3 for fully paid securities.
4. The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral
Resources and AASB 107: Statement of Cash Flows apply to this report.
5. Accounting Standards ASX will accept, for example, the use of International Financial
Reporting Standards for foreign entities. If the standards used do not address a topic, the
Australian standard on that topic (if any) must be complied with.
ESTRELLA RESOURCES LIMITED- APPENDIX 5B 30 June 2014
Page 18 of 18
Share your feedback
Discover