Ira Miri Manganese Extraction Update TL
Released
Released
Announcement PDF
6 February 2026
Ira Miri Manganese Market Sample Extraction
Update
Project Highlights
• Manganese horizon intercepted as extraction activities accelerate at the Ira Miri project
in Timor-Leste
• Additional manganese bearing mineralisation identified outside sample extraction area
• Pithead stage 1 stockpile area now receiving manganese ore with permit to produce
up to 30kT of ore for market appraisal
• Production ramp-up underway with grade control sampling commenced to optimise
extraction sequencing
• Discussions continue to advance with several potential international offtake partners for
first manganese sales
• Estrella continues to actively maintain its highly successful community stakeholder
engagement program as the Ira Miri project advances
• Estrella confirms ALL limestone samples have left Timor-Leste for laboratory analysis
Figure 1: typical geological horizons at the Ira Miri manganese pit excavation2
Commenting on extraction activities, Managing Director Chris Daws said:
“With the successful intersection of the manganese horizon and the identification of further
mineralisation within a clay unit, the Ira Miri project continues to march towards the production of an
initial market sample.
The manganese market sample of up to 30,000 tonnes is significant not just in terms of project
development but also for the country of Timor-Leste, representing the first minerals export following
the adoption of the new Mining Code.
Our project development activities have been heavily supported by the Timorese government, our
local contractor workforce and the nearby community groups. With such strong partnerships, we’re
thrilled to be delivering on our aggressive program of works.
Stay tuned and stay engaged as we accelerate our Ira Miri product to market. Go Estrella!
Estrella Resources Limited (ASX: ESR) (“Estrella” or the “Company”) is pleased to provide an update
on extraction activities to produce up to 30,000 tonnes (30kT) of high-grade manganese material from
the Ira Miri project located in Timor-Leste.
The manganese-bearing mineralised horizon, which has been tested by numerous drill-holes completed
in 2025 (assay results reported 4 September 2025 “Assays received and further Manganese intersected
drilling”)1
has been successfully intercepted as part of pit excavation activities, validating the Company’s
exploration model and providing further confidence in project development (Figures 1 & 2).
Figure 2: manganese ore previously intersected by EMDD001 and EMDD002 being extracted during Ira Miri pit excavation1
The manganese horizon has been encountered at a shallow depth as mining of the hillside proceeds to
access the known manganese outcropping further downhill, which is in-line with the Company’s
exploration drilling results and geological model.
1 Refer to ASX announcement on 4 September 2025 – “Assays received and further Manganese
intersected drilling”
Current excavation progress (Figure 3) has penetrated the distinctive red-brown layer that is associated
with the manganese mineralisation (refer to Figure 1), in which there is also some manganese
mineralisation present as thin layers of manganese oxides and manganese enrichment in the clay itself,
as demonstrated by reported drilling results for several drill-holes in which red-brown clay and
manganese oxides are interbedded (e.g., EMDD033, EMDD034 and EMDD038, reported 18 December
2025 “High Grade Ira Miri Mn Assays”).2
Figure 3: Exposure of manganese bearing red clay interpreted to overlie main mineralised zone (see Figure 4) within excavation2
Figure 4: Manganese bearing red clay overlying main mineralised zone in EMDD0392
2 Refer to ASX announcement on 18 December 2025 – “High Grade Ira Miri Mn Assays”
With favourable weather and manganese extraction underway, the Company has commenced its
production ramp-up plan, with further heavy equipment arriving plus lighting towers to facilitate night
shifts.
Equipment under the control of our lead contractor at the pit now consists of 12 dump trucks, five
excavators, two bulldozers, a G12 grader, a compacting drum roller, hydraulic rock breakers, a water
truck, and a backhoe.
Two mine supervisors are overseeing excavation works while Estrella’s geological team has
commenced initial grade control sampling activities. The sampling work consists of in-depth ore
identification and quality categorisation with the aim of producing a product specification sheet and
optimised extraction sequence.
Following confirmation of an optimised extraction sequence, excavation activities are anticipated to
accelerate, with the pithead Stage 1 stockpile area already receiving initial manganese ore (Figure 5).
Figure 5: initial ore, sourced from the zone intersected by EMDD001 and EMDD002, in manganese pithead stockpile area at Ira Miri1
A haulage road network has been installed using limestone and compaction to improve access to the
pithead stockpile (Figure 5). Stockpiled material will soon be transported approximately 17km to the
former Lautem airstrip and decommissioned fish-processing facility, which hosts an existing barge
landing site identified by shore anchor points (Figure 7). Material will be loaded onto a barge and
shipped offshore to be on-loaded into a bulk carrier.
Figure 6: Ira Miri proposed manganese bulk sample extraction location and pit design overlayed with drill assay results
With the market sample extraction progressing at a rapid pace, the Company has elevated its
discussions with several potential international end-users. Negotiations with a range of prospective
buyers continue to advance and the Company will keep shareholders informed on material
developments.
Figure 7: Tenu beach port site location with anchor point
Estrella also reports that the Company has successfully implemented its safety management protocols,
as well as site access and traffic management programs. There have been zero LTIs during Estrella’s
activities at the Ira Miri sample extraction site to date. These safety measures are highly important and
continue to underpin the strong relationship with its local contractors.
Community engagement activities via its local contractors, government partners and local communities
are a key priority. Regular updates continue to be provided to all groups, reinforcing transparency and
long-term commitment to the region.
Next Steps
• Sampling and assaying of “as mined” manganese ore to generate the marketing “Product
Specification Sheet”.
• Ready Tenu Beach Port location for arrival of manganese market sample
• Engagement of prospective buyers for sale and export.
• Complete necessary compliance testing required under International Maritime Solid Bulk
Cargoes (IMSBC) Code,
• Transfer of MEL-CA_ZA001 concession into the Estrella Murak Rai Timor Lda incorporated JV
Company.
The Company will keep shareholders informed of the progress including on the Werumata Limestone
Project which is progressing. The Board has authorised for this announcement to be released to the
ASX.
Engage with this announcement on Investor Hub
ENDS
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Peter Spitalny,
who is the Exploration Manager, Timor Leste of Estrella Resources, and a Fellow of The Australasian Institute of Mining
and Metallurgy. Mr Spitalny has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Spitalny consents
to the inclusion in the report of the matters based on their information in the form and context in which it appears.
Compliance Statement
With reference to previously reported Exploration Results, the Company confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement which continue
to apply and have not materially changed. The company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
Share your feedback
Discover