Hong Kong & Singapore Investor Presentation
Released
Released
Announcement PDF
A Unicorn Moment in Exploration
ESR Timor-Leste Presentation
Non-Deal Roadshow Hong Kong & Singapore
November 2024
Disclaimer & Declaration
This presentation has been prepared by Estrella Resources Limited (“ESR”) as a summary of the company’s exploration and development activities.
No Offer of Securities
The presentation is not, and should not, be considered as an offer or invitation to subscribe for, or purchase any securities in ESR, or as an inducement to make an offer or invitation with
respect to those securities. No agreement to subscribe for securities in ESR will be entered into on the basis of this presentation.
Forward Looking Statements
This presentation contains certain forward looking statements which have not been based solely on historical facts but, rather, on ESR’s current expectations about future events and on a
number of assumptions which are subject to significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and advisers.
Reliance on Third Party Information
Due care and attention has been taken in the preparation of this presentation. However, the information contained in this presentation (other than as specifically stated) has not been
independently verified nor has it been audited. Accordingly, the company does not warrant or represent that the information contained in this presentation is accurate or complete. To the
fullest extent permitted by law, no liability, however arising, will be accepted by ESR or its directors, officers or advisers, for the fairness, accuracy or completeness of the information
contained in this presentation.
Compliance Statement
With reference to previously reported Exploration results and mineral resources included in this presentation, the company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner, who is the Group Exploration Manager of Estrella Resources, and
a member of The Australasian Institute of Geoscientists, and based on information compiled by Beau Nicholls, who is a Director of Sahara Natural Resources and is the Exploration
Manager for Estrella Timor-Leste, and a fellow of The Australasian Institute of Geoscientists. Mr Warriner and Mr Nicholls have sufficient experience relevant to the style of mineralisation
and type of deposit under consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner and Mr Nicholls consent to the inclusion in the report of the matters based on their information in the form and
context in which it appears.
The Board authorised for this presentation to be released to ASX.
2
100 km
Estrella in Timor-Leste
• Estrella Murak Rai (EMR) incorporated in-country
• Operates a Joint-Venture with state-run Murak Rai Timor (MRT)
• EMR 70% MRT 30% JV on Exploration and Evaluation Licenses
• The EEL’s cover 315.94 km2 (blue areas)
• Licenses granted a 4-year term with up to 6-year extension
• EEL’s allow mapping, sampling, trenching, drilling, geophysics
• EEL end-game is a positive feasibility study which triggers MRT to
contribute 30% or convert to 2% NSR
• Estrella Resources Limited R.P. incorporated in-country
• Owns 100% Reconnaissance Permits
• The RP’s cover 382.2 km2 (white areas)
• 1 year term with 6-month extension
• RP end-game is to convert to E&EL and fold into JV
Three Main Assets in Timor-Leste
• Biggest asset is our proven manganese exploration model on the largest exploration
landholding in Timor-Leste of almost 700 km2
• Manganese is the obvious low-hanging fruit
• Other commodities will be explored for including Cu, Au, Cr, Ni
• Timor-Leste staff (x5)
• Ex-IGTL (Geological Survey), very highly trained with field experience
• They were the leaders in their field but on wrong side of political fence
• Sub-contracted to Estrella through CRA Global (low risk to ESR)
• Great results so far by combining ESR and IGTL experience
• Office and sample-prep facilities in Dili
• In-country pXRF analysis and Portable PPB gold system
• Rapidly speeds up exploration through next-day sample turnaround
12% to 48% Mn
Mn-Fe Oxides
0.3% to 8% Mn
Chert and Mudstone
35% to 58% Mn
Mn Oxides
Targeting Secondary Manganese, good tonnages that
may or may not be preserved under cover, with
supplementary high-grade tertiary manganese feed.
Manganese Model
No Samples were taken for assay – Refer to Appendix A
Cautionary Statement
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations
or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
Simple Successful
Working Model
• Stratigraphic mapping of target primary
horizons (Noni Formation)
• Sampling of surficial and outcrop
mineralisation
• Development of in-house Induced
Polarisation geophysics for deployment
over preserved Noni Formation (under
cover)
• Competitive edge maintained in that
Timor-Leste geology related to manganese
mineralisation is currently misunderstood.
Picture from ASX release dated 16 October 2024 “Samalari Exploration Update”. Visual estimates of the exposure
are not possible for safety reasons. The scree from this exposure exhibited >70% manganese-iron-oxide minerals .
The scree was not submitted for assay. Refer to Appendix A for more information and Cautionary Statement
regarding reliance on visual estimates.
Our Team
Chris Daws – Managing Director
Steve Warriner – Technical Director
Beau Nicholls – Associate Geologist
Agio Xavier – Liaison and Logistics Officer
Edwin Ornai – Project Geologist
Kharol Varela – Exploration Geologist
Bebeto Carlos – Exploration Geologist
Eustaquio Amaral - Geophysicist
Picture of outcrop from ASX release dated 15 August 2024 “Additional
Exploration Licenses Timor - Revised”. Visual estimates of the outcrop were
>90% manganese-iron-oxides. Samples have been submitted for assay and are
due in December. Refer to Appendix A for more information and Cautionary
Statement regarding reliance on visual estimates.
Office and
Sample Prep
Facility in Dili
Office and container storage space
Sample preparation and pXRF for rapid analysis
Portable PPB Au analysis
High-speed internet (Starlink)
Large industrial yard shared with H2O Drilling
Secure facility in Dili (Capital Timor-Leste)
4WD Work Vehicles
Regional Prospects
(so far…)
• ESR has been exploring on the ground
since March 2024
• Adding one new prospect every month
• Additional prospects off the leases have
also been identified
• Strategy in place to acquire additional
ground
• New high grade Mn discovery Ira Miri
pXRF results +55%Mn
• Very close to sealed roads and port
Ira Miri Prospect
Japanese Port
• Old WW2 Stockpile from the local
area
• 2 Grab samples assayed 57.6%
Mn and 58.1% Mn
• Only 45 tonnes but gives a sense
of the high-grade tertiary
manganese feed available in the
area and indicative assays
See ASX Announcement dated 31 May 2024 titled “Timor Exploration Update”
Assay results of grab samples from the stockpile are presented below. – Refer to Appendix A
ME-GRA05
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
LOI%
Al2O3%
BaO%
CaO%
Cr2O3%
Fe2O3%
K2O%
MgO%
MnO%
Na2O%
P2O5%
SO3%
SiO2%
TiO2%
ESRTL-02
12.53
0.95
0.4
<0.01
0.01
1.06
0.13
0.15
74.4
0.02
0.26
0.12
4.77
0.07
ESRTL-04
13.5
0.86
0.25
1.91
0.01
0.66
0.11
0.15
75.08
0.04
0.3
0.05
1.22
0.04
Ililal
NEW PORT LOCATION
Dasidara Prospect
• 2 Grab samples assayed 58.4% Mn and
53.7% Mn
• Was one of the sources for the Japanese
Stockpile
• Tertiary manganese accumulation,
tonnage spread out but very high grade
• Artisanal collection or possibly ore sorting
from riverbeds
• Source secondary manganese yet to be
located in hills above creek
• IP Target
See ASX Announcement dated 31 May 2024 titled “Timor Exploration Update”. Assays from
indicative samples taken are presented below. – Refer to Appendix A
ME-GRA05
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
ME-XRF26s
LOI
Al2O3
BaO
CaO
Cr2O3
Fe2O3
K2O
MgO
MnO
Na2O
P2O5
SO3
SiO2
TiO2
12.36
1.04
2.06
0.78
0.01
0.67
0.15
0.14
75.44
0.06
0.08
0.64
1.34
0.06
11.53
0.59
0.31
0.83
<0.01
0.74
0.09
0.12
69.29
0.03
0.25
0.06
10.42
0.02
Lalena Prospect
• Chert with supergene manganese exposed
at surface
• Links through to the Sica Prospect
• Manganese forming at surface
• This prospect went on the backburner
with the Sica Discovery however it needs
to be revisited with mapping and
geophysics to find preserved supergene
See ASX Announcement dated 3
April 2024 titled “High-Grade
Manganese Reveals Estrella’s
Timor-Leste Potential”
A rock chip sample from the
manganese depicted in the top
image assayed at 60.8% Mn. –
Refer to Appendix A
Sica Prospect
• Extensive tertiary supergene blanket at
surface
• In-situ secondary supergene source recently
discovered in the surrounding hills
• IP survey trials to start mid-November
See ASX Announcement dated 11 October 2024 titled “Sica and Lalena Prospects Deliver Exceptional Assays”. Assay results from
9 rock-chip samples graded between 46% Mn and 58% Mn. – Refer to Appendix A
Sica Prospect Breakthrough
• Supergene source recently located in
surrounding hills
• Major breakthrough in terms of targeting
and application of the model
Refer ASX Announcement dated 18 November 2024 titled “New Supergene Manganese
Discovery”. Visual estimate at 90% iron-manganese oxide. Samples will be submitted for assay
in Perth. Refer to Appendix A for more information and Cautionary Statement regarding
reliance on visual estimates.
• Proves that the widespread preservation
of supergene under cover is occurring
• Distinctive boxwork textures indicate
strong secondary supergene formation
Refer ASX Announcement dated 11 October 2024 titled “Sica and Lalena Prospects Deliver
Exceptional Assays”. Specimen depicted was not submitted for assay, pXRF determinations
were 21% Mn. Refer to Appendix A for more information and Cautionary Statement regarding
reliance on visual estimates.
Soru Prospect
• All indications of large supergene
profile formation can be seen
• Requires mapping and geophysics
See ASX Announcement dated 19 April 2024 titled “New Soru Manganese Prospect Discovery”
Right: Boulder of chert with some manganese enrichment visible. No mineral abundancies available
due to location of chert boulder. – Refer to Appendix A
Top Right: pXRF of boulder 40% manganese oxide graded 27.9% Mn. Not submitted for assay. –
Refer to Appendix A
Samalari
Prospect
•
Large, mostly in-situ, high-grade supergene
manganese outcrop only 7.8km from the
highway
•
IP to start next week over known
mineralisation to develop a regional,
portable exploration tool
•
Environmental surveys and then drilling
planned at Samalari
•
Regional mapping over the greater leases
yet to commence
Pictures from ASX release dated 15 August 2024 “Additional Exploration Licenses in Timor – Revised”
and map from ASX release dated 16 October 2024 “Samalari Exploration Update”. Visual estimates of
the outcrop were >90% manganese-iron-oxides. Samples submitted for assay in Perth are due in
December. Refer to Appendix A for more information and Cautionary Statement regarding reliance on
visual estimates.
Samalari Prospect
Pictures from ASX release dated 15 August
2024 “Additional Exploration Licenses in Timor
– Revised” and map from ASX release dated
16 October 2024 “Samalari Exploration
Update” – Refer to Appendix A
Ira Miri Prospect
• 3-metre-high bed of outcropping
supergene manganese discovered in
reconnaissance mapping
• Portable XRF on crushed field samples
graded 57.5% Mn and 63.4% Mn, some of
the highest grades seen to date.
• Ira Miri lies across the river valley to the
east on a predicted duplication of the Noni
Formation approximately 4.4km SE of the
Sica Prospect
Picture and map from ASX release dated 18 November 2024 “Two Outcropping Supergene Manganese
Discoveries in Lautém Exploration Licenses”. Visual estimates of the outcrop were 80% manganeseiron-oxides with 20% chert. pXRF determinations graded 57.5% Mn and 63.4% Mn. Samples
submitted for assay are due in December. – Refer to Appendix A
Cautionary Statement of pXRF
pXRF results are preliminary only. The use of the PXRF is an indication only of the order of magnitude
of expected final assay results. The samples that are the subject of the above will be submitted for
laboratory assay in Australia and some variation from the results presented herein should be
expected. – Refer to Appendix A
Close up of image presented in ASX Announcement dated
18 November 2024 titled “New Supergene Manganese
Discovery”. Visual estimates of mineralisation included in
previous slide.
Port of Com
75km from Baucau
In Summary
• The manganese-rich Noni Formation underlies the entire northeast of Timor-Leste
• Weathering of the Noni has created a significant secondary high
grade supergene manganese opportunity
• ESR Model starting to bear fruit after 6 months of development
such as Samalari, Sica and the new Ira Miri prospect
• ESR PLAN:
• Continue mapping particularly the upper Noni interface
• Develop portable Induced Potential geophysics to target
Noni cherts under cover to find preserved supergene
manganese
• Trench, auger and drill promising prospects
Above: Estimated 95% Pyrolusite from the Sica Prospect. Sample was not taken for assaying. Refer to
Appendix A for more information and Cautionary Statement regarding reliance on visual estimates.
Appendix A – Visual Estimates and Disclosure
Slide Image Location Description
Sample Type
Visual Estimate *
pXRF Estimate ** Expected timimg of Assays
Primary Chert in-situ
In-field rock chip 100% Chert
0.3% to 8% Mn Not submitted for assay
5
Right
Secondary Manganese in-situ
In-field rock chip 75% Fe-Mn Oxides, 25% caly
12% to 48% Mn Not submitted for assay
Tertiary Manganese in-situ
In-field rock chip 95% Pyrolusite, 5% Iron oxide
35% to 58% Mn Not submitted for assay
6
Right
Scree from Secondary Manganese
In-field rock chip >70% iron-manganese oxide, <25% clay
na
Not submitted for assay
7
Far Right
Secondary Manganese Band
Rock chip
>90% iron-manganese oxide, <10% carbonate
na
Due in December 24
ESRTL-02 Tertiary Manganese cobblestone Grab
>95% Pyrolusite
na
Disclosed 31 May 24
11
Right
ESRTL-04 Tertiary Manganese cobblestone Grab
>95% Pyrolusite
na
Disclosed 31 May 24
Top Right ESRTL-03 Tertiary Manganese cobblestone Grab
>95% Pyrolusite
na
Disclosed 31 May 24
13
Bottom Right ESRTL-05 Tertiary Manganese cobblestone Grab
>95% Pyrolusite
na
Disclosed 31 May 24
14
Top Right LRG-015 Banded manganese-chert outcrop Rock chip
>90% Mn-oxide, <10% Fe-oxide and chert
na
Disclosed 3 April 24
15
Right
CBR114517-CBR114554
Grab
>80% Manganese oxides
na
Disclosed 11 October 24
Top Right Secondary Manganese in-situ
>90% iron-manganese oxide, <10% carbonate
na
Due in January 25
16
Bottom Right CBR114523 Secondary Manganese eroded Crushed rock chip
21% Mn
Disclosed 11 October 24
Top Right Tertiary manganese boulder
Crushed rock chip 60% Chert, 40% Manganese oxide
27.9% Mn
Not submitted for assay
17
Right
Chert with Mn enrichment
na
na
na
Not submitted for assay
18
Far Right
Secondary Manganese Band
Rock chip
>90% iron-manganese oxide, <10% carbonate
na
Due in December 24
Top Left
Secondary Manganese Band
Rock chip
>90% iron-manganese oxide, <10% carbonate
na
Due in December 24
Bottom Left Scree from Secondary Manganese
In-field rock chip >70% iron-manganese oxide, <25% clay
na
Not submitted for assay
19
Top Right Scree from Secondary Manganese
Crushed rock chip >95% Pyrolusite
47.4% Mn
Disclosed 30 September 24
Centre
Map
Crushed rock chip
Disclosed 30 September 24
Top Right CBR114689 Secondary Manganese in-situ Crushed rock chip >95% iron-manganese oxides
57.5% Mn
Due in January 25
20
Top Right CBR114690 Secondary Manganese in-situ Crushed rock chip >95% iron-manganese oxides
63.4% Mn
Due in January 25
21
Slide
Secondary Manganese in-situ
na
>95% iron-manganese oxides
See slide 20 Due in January 25
23
Left
Tertiary Manganese Sica Prospect
na
>95% Pyrolusite
na
Not submitted for assay
* Cautionary Statement on Visual Estimates - visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where
concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations.
** Cautionary Statement of pXRF - pXRF results are preliminary only. The use of the pXRF is an indication only of the order of magnitude of expected final assay results
and does not substitute for laboratory analysis.
Share your feedback
Discover