5A Nickel Ore Extraction Update
Released
Released
Announcement PDF
ABN 39 151 155 207
ABN 39 151 155 207
5 January 2023
ASX Announcement
5A Nickel Ore Extraction Update
Estrella Resources Limited (ASX: ESR) (Company) is pleased to provide an update to the extraction of
bulk high grade nickel sulphide ore which will be sent to Glencore’s Murrin Murrin HPAL process
facility.
The mining and crushing of the high grade nickel sulphide ore has successfully been completed. This
is a real credit to the contractors and staff involved at a difficult time of the year. The Company
currently estimates that it will be able to truck approximately 2,500 tonnes of high grade nickel
sulphide ore to Glencore’s Murrin Murrin HPAL process facility this month.
Laboratory assays are underway to determine the expected delivered ore grade and moisture
contents. A further 1,000 tonnes of low grade nickel sulphide material will be retained by the company
which will be utilized for metallurgical test work on new process flowsheet designs for the nickel
sulphide resources.
A positive process outcome for the nickel sulphide ore via the Murrin Murrin HPAL route will provide
the Company with a strong basis to fully develop the 5A nickel mine resources via simple pit cut back
mining methods and further develop remaining nickel resources at Andrews, 5B and 1A nickel
deposits.
As nickel prices continue to rally pushing through A$40,000 per tonne prior to the year ending, our
decision to retain the Spargoville Nickel Rights assets and push forward with their development looks
at this stage to be the right decision and well timed for shareholders.
The Board of the Company has authorised this announcement to be released to the ASX.
For further information contact:
Christopher Daws
Managing Director
+61 8 9481 0389
info@estrellaresources.com.au
Forward Looking Statements
This announcement contains certain forward looking statements which have not been based solely on historical facts but,
rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to significant
uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and advisers.
__________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
ABN 39 151 155 207
ABN 39 151 155 207
Figure 1: Crushing operations at the 5A nickel mine, Spargoville W.A.
Figure 2: High grade nickel sulphide stockpile (uncrushed pile 24 located on the 5B ROM Pad)
__________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Share your feedback
Discover