HIGHLIGHTS
➔ Drilling continues to target and locate secondary Manganese mineralisation just below surface at
Ira Miri following previous high grade manganese intersections to the west with visual estimates of:
➢
EMDD025 intersected 2.5m of 70% manganese oxides from 1.0m
➢
EMDD026 intersected 3.1m of 60% manganese oxides from 1.4m
➢
EMDD027 intersected 1.6m of 30% manganese oxides from 1.4m
➔ Current drilling targeting secondary high grade manganese mineralisation just below the surface
➔ LiDAR and Drone-Mag surveys underway at Ira Miri to support MobileMTd and pinpoint manganese
drill targets. LiDAR survey completed at Werumata Limestone Project.
➔ Plans finalised at Werumata Limestone Project with community consultations and environmental
applications completed. Drilling to commence pending ANM approvals and construction of all-weather
access.
➔ Step-out drilling continues at Ira Miri while awaiting Werumata environmental approvals, after which
the rig will be reconfigured for limestone drilling to begin.
Figure 1: Secondary and detrital manganese in EMDD026. For visual estimates and
visual estimates disclaimer please refer to Table 1.
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce further
successful drilling at the Ira Miri prospect located in Timor-Leste, with exploration targeting secondary
manganese developed just below surface.
Recent drillholes EMDD024 to EMDD027 intersected primary manganese with secondary enrichment to
the west of the initial discovery zone and the visual estimates are shown in Table 1 below with assays
expected within 4-6 weeks.
Table 1: Visual estimates of EMDD024 to EMDD027
Hole ID
EMDD024
EMDD025
EMDD026
EMDD027
m From
m To
Interval
Description
0
6
Baucau Limestone
6
7.8
Noni Formation Muds
7.8
8.6
8.6
35.4
Noni Formation Chert
0
1
Colluvium / Soil
1
3.5
3.5
10.5
Noni Formation Chert
0
1.4
Colluvium / Soil
1.4
4.5
0.8
2.5
3.1
15% Manganese oxide, 85% clay
70% Manganese oxides
60% Manganese oxides
4.5
35
Noni Formation Chert
0
1.4
Colluvium / Soil
1.4
3
3
8.2
1.6
30% Manganese oxides
Noni Formation Chert
Cautionary Statement: The Company draws attention to uncertainty in reporting visual results. Visual estimates of mineral
abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of
principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations.
Commenting on the new intersections Estrella Managing Director Chris Daws said:
“It is comforting to see more manganese intersected in the current drill program at Ira Miri, expanding on the
already exceptional initial manganese assay results recently returned.
Drilling is continuing steadily with our teams now settled into the rhythm of exploration drilling in Timor-Leste,
it is a testament to their hard work that we have been able to successfully execute the first ever major modern
mineral exploration drilling in Timor-Leste.
I do thank and Estrella is very grateful to all those involved, from our partners Murak Rai Timor E.P.,
Coresearch, AMIT, to the government bodies ANM, IGTL and Ministry’s involved in getting Estrella to where
we are today.
I look forward in more results flowing before the year end - stay tuned, stay engaged and GO ESTRELLA!”
The secondary enrichment follows the trend of primary manganese deposited within the Noni Formation.
Although folded on the small scale, the primary mineralisation broadly follows a northwest trend and drilling
will continue in this direction (Figure 2).
Figure 2: Mineralised Trend follows a northwest direction with drilling to continue in this direction.
The drilling will chase the extents of mineralisation along strike within the supergene horizon just below
surface between the two main areas of outcropping manganese. This line is represented below in yellow
in Figure 3.
Location of Drilling
Figure 3: Location of the mapped detrital and subcropping secondary
manganese along with the geological boundary between the Noni Formation
(manganese potential) and the underlying Triassic sediments. Drilling will be
following this outcropping trend to the northwest.
Ira Miri LiDAR and Drone-Mag Survey
The company has commenced both LiDAR and Drone-Mag surveys at Ira Miri1. The LiDAR survey is in
anticipation of commencing MobileMTd surveys as soon as a suitable drone can be sourced. The LiDAR
is also necessary to enable topographic control along with control over the Drone-Mag results and
processing.
It is anticipated that, in combination with the MobileMTd, the Drone-Mag will enable the identification of
prospective primary and secondary manganese mineralisation which can then be targeted through drilling.
The areas to be flown for the Drone-Mag and the MobileMTd are shown in Figure 4.
N
Figure 4: Areas at Ira Miri to be flown by Drone-Mag and MobileMTd
Preparations for Drilling at Werumata Limestone
The company has had a full schedule preparing for the impending drill program at the Werumata Limestone
Project. The location of access roads and drill locations have been finalised along with community
consultations and the official Environmental Application which involves a sizable amount of research into
all aspects of the project, from environmental to social and cultural effects. The Company is awaiting official
approvals from the ANM to commence groundworks and to drill.
Once received a road construction crew will be deployed to create all-weather access to the area selected
for drilling so as to facilitate work well into the wet season.
1 Refer to ASX Announcement dated 28 August 2025
Figure 5: Location of the Werumata Limestone Project in Exploration and Evaluation License 2025-ZA003
Drilling will initially consist of 27 RC holes with some stratigraphic diamond drilling followed by infill drilling
to produce a JORC2012 Resource. The location of holes is shown in Figure 6.
Figure 6: Location of drilling at the Werumata Limestone Project
Community Consultations have concluded for now with a local Cultural Ceremony smoothing the way for
works to proceed (Figure 7).
Figure 7: Cultural Ceremony at the Uero-Mata Community Centre, Baucau
A LiDAR survey was also flown at Werumata in preparation for drilling and project development. The
survey is crucial for topographic control for resource definition and for project planning. In addition, the
company is planning to conduct a bathymetric survey to ascertain the best position for a potential port
facility from which it can export the calcite mineralisation. Quotes are being received and the Company
will make a decision on this in coming days.
Next Steps
The Company will continue step-out drilling at Ira Miri whilst awaiting environmental approvals for
Werumata in the next few weeks. Once obtained the rod carrier at Ira Miri will be brought back to Dili and
configured for RC to begin the limestone drilling. Drilling will commence once sufficient drill pads at
Werumata have been created. The area is rocky and will require good road construction to facilitate drilling
during the wet season.
The Board has authorised for this announcement to be released to the ASX.
ENDS
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner consents
to the inclusion in the report of the matters based on their information in the form and context in which it appears.
Cautionary Statement of Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The Company draws
attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be considered
a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations.
Table 1: Collar and survey details
Hole_ID
East
North
RL
Depth
Dip
Azi
EMDD024
270109
9068155
127.829
35.4
-60
225
EMDD025
270099
9068143
124.97
10.5
-60
180
EMDD026
270098
9068145
124.97
35
-60
180
EMDD027
270100
9068140
124.97
8.2
-75
330
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological logging of diamond
core and field trenching with metal
concentration confirmed by a Bruker S1
pXRF.
•
Diamond core is drilled PQ3, cut in half
using a hand-grinder for competent core or
split using a chisel for sooty, less
competent core and clay.
•
Core is split perpendicular to bedding
when
primary
mineralisation
is
encountered.
•
At the lab the full sample is crushed and
pulverized to 90% passing 75 um.
•
A subsample undergoes fusion and XRF
analysis.
•
Samples are analysed at PT Geoservices
in Jakarta, Indonesia
•
Diamond drilling has been undertaken
utilising HQ and PQ triple tube.
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
Recoveries are calculated based upon the
depth drilled and compared to core
recovered.
Sample recovery using the man-portable
diamond rig is below an acceptable
standard and a more suitable diamond drill
and chemical water treatment regime is in
place which has significantly lifted
recoveries.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling
stages
to
maximise
•
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
•
•
•
•
Rock-chip and core samples were
geologically logged for mineral content
and photographed prior to sending for
assay or screening by pXRF.
Drill core has also been geologically
logged.
The trenches have been mapped and
sampled.
Sample sizes are appropriate to the grain
size of the mineralisation which in
manganese oxides is very fine.
Sampling on core is performed by splitting
or cutting the core in half, perpendicular to
bedding when observed.
The sample sizes are adequate for the
grain size of the material being sampled.
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
•
•
No prior modern exploration has been
conducted in the area. Mineralisation has
been verified by several external parties.
•
EMDD002 twinned EMDD001 with very
similar results
•
No adjustments to assay data were
undertaken.
•
Geological and recovery data is measured
and entered digitally into logsheets which
are then stored on the Company cloud
storage system.
•
Drillhole collar and survey information is
also recorded.
•
Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
Topographic control is accomplished
using 5m spaced satellite point data.
Drillholes are located using a Garmin GPS
Samples are decided upon geological
characteristics and observed dilution.
Minimum 30cm sample widths can be
taken, ranging up to 1.2m depending on
core characteristics.
No composites have been taken.
•
•
•
Location of
data points
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
Sample
security
•
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
•
•
•
•
•
•
•
•
•
•
•
Samples are being analysed at PT
Geoservices in Jakarta using an XRF
Fusion technique for 15 elements and all
samples are also being tested for Au by
fire assay a 50g sub-sample.
The technique is considered total.
Lab standards and blanks are adequate at
this stage of the exploration program.
Sampling perpendicular to bedding will
occur when bedding can be observed in
the core.
This is not necessarily observable in
secondary enrichment zones.
The drilling is generally at a high angle to
mineralisation.
Exported samples are in the possession of
ESR personnel from the core processing
site and through customs in Atambua in
Criteria
JORC Code explanation
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
Commentary
Indonesia, where they are transferred to
ABC Express for delivery to the lab in
Jakarta.
•
No independent audit or review has been
undertaken on the Lab.
•
Independent reviews on geological
logging and sampling techniques have
been done and all methods used are at
industry standard.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
were converted to Exploration Licenses
and are awarded to Estrella Resources
Limited
Representante
Permanente
(100%)
•
Exploration and Evaluation Concessions
MEL2024-DA-ZB001,
MEL2024-DAZB002 and MEL2024-DA-ZB003 are
awarded for four years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Estrella also operated Reconnaissance
Permits ESR-RP-01, ESR-RP-02 and
ESR-RP-03
•
Estrella
Resources
Limited
Representante Permanente and Estrella
Murak Rai are registered in Timor-Leste
and is a wholly-owned subsidiary of
Estrella Resources Limited (Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Local geologists and companies have
sporadically explored the area however
there has been no documentation
collected nor systematic exploration to
quantify mineral occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Concessions and Permits
host three main forms of manganese
mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
Commentary
processes exist.
•
Secondary mineralisation exists as a
supergene blanket above the cherts
where they have been exposed to
chemical weathering.
•
Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels or scree deposits.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
• No drilling has been undertaken in the
area.
• Sample locations are shown in the body of
the text.
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used
save for length-weighted composite grades
for significant intercepts.
Metal equivalent values have not been
used.
•
Any relationships have been discussed
within the body of the text or depicted in
diagrams.
•
Relevant diagrams have been included
within the main body of text.
•
No new information has been withheld.
Criteria
Other
substantive
exploration
data
Further work
JORC Code explanation
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
All observations are discussed within the
body of the text.
•
Further work by ESR will include
trenching and drilling.
Additional work on specific areas will be
included under the heading Next Steps in
the body of the text when appropriate to
do so.
•
Share your feedback
Discover